Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG020051_COMPLETE FILE - HISTORICAL_20180424
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V U& OaDasj DOC TYPE STORICAL FILE WONITORINGREPORTS DOC DATE ❑ YYYYMMDD Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 2, 2018 Martin Marietta Materials, Incorporated Attention: Mr. Richard Broughton 8701 Red Oak Boulevard, Suite 540 Charlotte, North Carolina 28217 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG020051 1vlecklenburg County, North Carolina Dear Mr. Broughton: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director RECEIVED APR 2 4 ZOIB CENTRAL FILES DWR SECTION Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at 4551 Beatties Ford Road, Charlotte on March 8, 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at angela. lee@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPS WQ Regional Engineer Land Quality Section Enclosed: Inspection report CcfStbrmwat� e� rxPermitting Branch Compliance „Inspection Report Permit: NCG020051 Effective: 05/09/16 Expiration: 09/30/20 Owner : Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Charlotte County: Mecklenburg 4551 Seatties Ford Rd Region: Mooresville Charlotte NC 28216 Contact Person: Richard Broughton Title: Phone: 803-978-6275 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/08/2018 Primary Inspector: Angela Y Lee Secondary Inspector(s): Certification: Phone: Entry Time: 03:OOPM Exit Time: 04:30PM Phone: 704-235-2139 Reason for Inspection: Routine inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwate€ Discharge COC Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® Storm Water (See attachment summary) f r Page: 1 Permit: NGG020057 Owner -Facility; Martin Marietta Materials Inc Inspection Date: 03/0812018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: This inspection was conducted as a routine annual inspection. Richard Broughton from Martin Marietta was on site. The site was in compliance. Page: 2 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 0310812018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA Nls Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? 11 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® ❑ ❑ ❑ # Does the facility provide and document Employee Training? in ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? Is ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? IN ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? IN ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA N@ # Is a copy of the Permit and the Certificate of Coverage available at the site? .❑ ❑ ❑ . # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment: Page: 3 i Compiiance Inspection Repo Permit: NCG020051 Effective: 05109l16 Expiration: 09/30/20 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Charlotte County: Mecklenburg 4551 Beanies Ford Rd Region: Mooresville Charlotte NC 28216 Contact Person: Richard Broughton Title: Phone: 803-978-6275 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/10/2016 EntryTime: 10:15AM Primary Inspector: Water Quality Program Meckenburg County Secondary Inspector(s): Certification: Phone: Exit Time: 12:50PM Phone: 704-336-5449 Zahid S Khan Phone : Reason for inspection: Routine Inspectlon Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 PAV permit. NCG020051 Owner - Facillty: Martin Marietta Materials Inc Inspection Date: 1111012016 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Martin Marietta Charlotte Quarry is located at 4551 Beatties Ford Road on approximately 600 acres. The facility extracts minerals and produces aggregate for use in asphalt, concrete, road base, and other purposes. At the time of inspection, the facility was observed to be in compliance with the City of Charlotte Storm Water Pollution Control Ordinance. The facility should evaluate and document all stormwater outfalls on the property to ensure that compliance is maintained with the facility's NPDES permit. Please see the inspection report for comments and recommendations. Page: 2 Permit NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date:- 11110/2016 Inspection Type: Compliance Evaluation Reason for Visit- Routine Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Semi-annual stormwater monitorina has not been conducted due to "no discharge" bein Yes No NA NE ® ❑ ❑ ❑ MINI Imi documented. Quarterly monitoring of the mine dewatering discharge is conducted; the most recent documented events were conducted on 10/22/15, 7/20/15, 517115, and 2/6/15. No instances of exceeding permit limits were observed. Analytical data from this calendar year was not available for review. Discharge from the facility's vehicle maintenance area flows to the mine -pit, where it is then commingled with process water and discharges through the process water outfall. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ i ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ E ❑ Comment: The dewatering outfall and several sedimenUerosion'control basins were observed. Stormwater outfalls were not clearly documented in the SPPP and facility personnel reported that discharge from sediment control BMPs is sheetflow prior to reaching surface waters. CMSWS recommends the facHlity_accurately document all stormwater discharge outfalls in the SPPP and on facility maps. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: The facilitv has documented "no discharae" durina the previous vear and reports that no Yes No NA NE ❑❑■❑ discharge has occurred since approximately 2007. At the time of inspection, evidence of discharge from at least two of the sediment control basins was observed. Facilily personnel stated that any discharge from the basins is sheet flow by the time it reaches surface waters. CMSWS recommends the facility conduct and document a full evaluation of potential outfalls and clearly identify all true outfalls. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ Page: 3 Permit NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 1111012016 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ® ❑ ❑ ❑ ® ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ®❑❑❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ Comment: No significant spills have occurred within the previous three years._ A_ notation of no significant_ spills has been documented during the annual review. The most recent non-stormwater discharge evaluation was conducted on 3/18/16 . Employee training was conducted on 1117/16. The plan was most recently reviewed/updated on 3/18/16. The facility conducts weekiv inspections of sediment and erosion control measures, as per permit requirements. The current inspection documentation includes no evaluation criteria for the inspected items" CMSWS recommends including additional notes that document presence/absence of discharge and other qualitative elements that are on the inspection form. Page: 4 1 F�LE NCDENR_----- �4 North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E Dee Freeman Governor Director Secretary DIVISION OF WATER QUALITY August 7, 2012 Martin Marietta Materials Mr. Richard Broughton 2000 Center Point Drive, Suite 2325 Columbia, SC 29210 Subject: Charlotte .Quarry Permit No. NCG020051 Mecklenburg County Dear Mr. Broughton: Attached is a copy of the subject stormwater permit inspection conducted on July 26, 2012 By Mr.Samar Bou-Ghazale of this Office. The report should be self-explanatory: however, should you have any questions concerning the report, please do not hesitate to contact Mr. Bou-Ghazale at (704) 235-2199. Sincerely, Robert B. Krebs Surface Water Protection Regional Supervisor Attachment Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 1 Fax: (704) 663-6040 1 Customer Service: 1-877-623-6748 Internet: www.ncwaterouality.org An EgUW Opportunity 1 Affirmative Action Employer— 50% Recycledli O% Post Consume( paper Qac NrnthCaroIin4 Compliance Inspection Report Permit: NCG020051 Effective: 01/01/10 Expiration: 12/31/14 Owner: Martin Marietta Materials Inc __SOC: Effective: Expiration: f'W Facility: Martin Marietta -Charlotte County: Mecklenburg 4551 Beatties Ford Rd Region: Mooresville Charlotte NC 28216 _ Contact Person: Dean Borud Title: Phone: 704-409-1475 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 07/26/2012 Entry Time: 01:30 PM Primary Inspector: Samar E Bou Ghazale Secondary Inspector(s): Certification: Exit Time: 02:30 PM Phone: Phone: 704-663-1699 Ext.2199 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 07126/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site is in compliance with the permit.Thank You! Page: 2 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 07/26/2012 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan-T_ -__ --- ------ Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non Stormwater) discharges? Comment: Reason for Visit: Routine Yes No NA —NE— ---- ■nnn ■nnn ■nnn ■nnn ■nnn ■ n n n ■nnn ■nnn ■ n n n ®nnn ■nnn ■ n n n ■ n n n ■nnn ■nnn Yes No NA NE ■nnn Yes No NA NE ■ n n n ■nnn ■nnn ■nnn ■nnn ■nnn Page: 3 OtoF W A rEgQ G 0 Y Ms. Julia Andoe, Environmental Engineer Martin Marietta Materials 8701 Red Oak Blvd., Suite 540 Charlotte, North Carolina 28217 Subject: Dear Ms. Andoe: Michael F. Easlev, G veWor William G. Ross Jr., retary ) North Carolina Department of Environment and Natural t1sources Coleen H. Sullins, Director Division of Water Quality June 16, 2008 Compliance Evaluation Inspection Martin Marietta Materials — Charlotte Quarry Stormwater Pennit Number COC NCG020051 Mecklenburg County, NC Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted at the subject facility on March 25, 2008, by Mr. Ron Eubanks of Charlotte -Mecklenburg Storm Water Services. This inspection was conducted as part of a cooperative working agreement between Mecklenburg County and the Division of Water Quality. In addition, the inspection was conducted on behalf of the City of Charlotte in compliance with the City's NPDES Permit, NCS000240, Part II Section H. Thank you for your assistance and cooperation during the inspection, Overall, the inspection found that the Charlotte Quarry operated by Martin Marietta Materials has developed and implemented a Stormwater program and this Office commends the permittee's efforts to ensure compliance with your NPDES permit. The enclosed report should be self-explanatory; however should you have any questions concerning this report or have any questions regarding your permit, please do not hesitate to contact Ms. Marcia Allocco of this Office at (704) 663-1699. Sincerely, for Robert B. Krebs Regional Supervisor Surface Water Protection Section Mooresville Regional Office ® � Npr hCarolina WDENR watura!!ty Mooresville Regional Office Division of Water Quality Phone 704-663-1699 Customer Service Internet: www.ncwatergualitv.ore 610 East Center Ave, Suite 301 Mooresville, NC 28115 Fax 704-663-6040 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper NO Ms. Julia Andoe, Martin Marietta Materials Charlotte Quarry CEI, Page 2 June 16, 2008 Enclosure cc: NPS-ACO Unit Rusty Rozzelle, Mecklenburg County Craig Miller, City of Charlotte Mr. Mike Hamrick, Plant Manager Martin Marietta Materials — Charlotte Quarry 4551 $eatties Ford Road Charlotte, NC 28216 Compliance Inspection Report Permit: NCG020051 Effective: 01/19/05 Expiration: 12/31/09 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Charlotte County: Mecklenburg 4551 Beatties Ford Rd Region: Mooresville Charlotte NC 28216 Contact Person: Brian K North Title: Phone: 704-409-1475 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 03/24/2008 Entry Time: 09:30 AM Exit Time: 11.30 AM Primary Inspector: Water Quality Program Mecklenburg County Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ® Compliant ❑ Not Compliant Question Areas: ■ Storm Water (See attachment. summary) Page: 1 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc ft Inspection Date: 03/2412008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Facility Description: Martin Marietta Aggregates, a Division of Martin Marietta Materials, operates the Charlotte Quarry for the purpose of producing crushed aggregate for use in the construction industry. The quarry is located at 4551 Beatties Ford Road in Charlotte, North Carolina. Compliance History: Charlotte -Mecklenburg Storm Water Services responded to a discharge from the Martin Marietta Charlotte Quarry on May 21, 1999, due to elevated turbidity levels in Stewart Creek. A Notice of Violation was not issued for the discharge. The permitteelfacility was inspected by DWQ in Sept. 2007 for compliance with the stormwater permit. Industrial Operations/City of Charlotte Stormwater Ordinance Review Quarry/Pit Sump — AII discharges at the site are either stormwater discharges or a combination of groundwater seepage and stormwater runoff. Groundwater seepage collects in the pit sump prior to be discharged. The sump also collects the majority of the stormwater runoff. All other discharges at the site are the result of stormwater runoff. Pit dewatering is a typical quarrying activity and is authorized under the NPDES permit. The implementation of diversion ditches, rock check dams, and sediment basins are used to manage stormwater runoff at the site. Pit expansion is to be conducted in a manner so as to divert all stormwater runoff from disturbed areas to the pit, which allows sediment to settle out prior to discharging. Analytical monitoring of any mine dewatering wastewater discharges shall be performed as specified in Part III, Section C of the the general permit. Detention Pond — The detention pond at the site is used to collect runoff from the aggregate wash area. The water in the detention pond is recycled at the facility. Therefore, there is no discharge from the detention pond. Storage Tank Area There are several aboveground storage tanks (ASTs) located at the facility; there are no records of any underground storage tanks (USTs) at the site. The ASTs contain petroleum products used to service mobile and plant equipment. The tanks included a 6,000-gallon diesel AST, a 530-gallon gasoline AST, a 1,000-gallon bulk oil AST, a 2,000-gallon bulk oil AST, and a 500-gallon waste oil tank. In addition to the ASTs, there are also several 55-gallon bulk oil drums located in the storage tank area. Secondary containment was provided for all of the ASTs and drums. During the inspection, several new tanks were observed at the site. Mr. Mike Hamrick (Plant Manager) indicated that the old ASTs were going to be replaced with the new double -walled ASTs within the next few months. Page: 2 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 03/2412008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ n n # Does the Plan include a General Location (USGS) map? ® n n n # Does the Plan include a "Narrative Description of Practices"? ® n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ® n n n # Does the Plan include a list of significant spills occurring during the past 3 years? © n n n # Has the facility evaluated feasible alternatives to current practices? ® n n n # Does the facility provide all necessary secondary containment? ® n n n # Does the Plan include a BMP summary? ® n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® n n n # Does the facility provide and document Employee Training? ® n n n # Does the Plan include a list of Responsible Party(s)? ® n n n # Is the Plan reviewed and updated annually? ® n n n # Does the Plan include a Stormwater Facility Inspection Program? ® n n n Has the Stormwater Pollution Prevention Plan been implemented? M n n n Comment: The SPPP should be updated after the the new ASTs have been installed. Qualitative Monitorin Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n n n Comment: The permittee has initiated qualitative monitoring since the Sept. 2007 inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n01 Comment: Analytical monitoring of any mine dewatering wastewater discharges shall be performed as specified in Part III, Section C of the the general permit. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage availab€e at the site? W n n n # Were all outfalls observed during the inspection? M n n n # if the facility has representative outfall status, is it properly documented by the Division? ❑ n ® n # Has the facility evaluated all illicit (non stormwater) discharges? ja n n n Page: 3 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 03/24/2008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Page- 4 _ it _•-,;.,+. Martin Marietta Charlotte District NOV 3 Q 2007 P.O. Box 7446 Charlotte, NC 28241-7446 Telephone 704-525-7740 NC DENR SRC Fax 704-527-9283 November 29, 2007 M-Sufte Wator Rrtc, n"'Or��� f,'ERTIFIED MAIL RETURN RECEIPT REOUESTED 7005 1820 0000 0465 3575 Ms. Marcia Alloceb Surface Water Protection Section 610 East Center Ave., Suite 301 Mooresville, NC 28115 Re: Letter of Deficiency, Martin Marietta's Charlotte Quarry NPDES Permit No. NCG020051 Dear Ms. Allocco: In response to the stormwater inspection conducted by Ms. Lespinasse on September 10, 2007 at Martin Marietta's Charlotte Quarry, I am providing information to address the concerns outlined in the Compliance Evaluation Inspection. In accordance with the most recent SPCC regulations, it is our understanding that secondary containment is not required for designated fuel dispensing areas (i.e. tanker transfer to bulk storage or dispensing fuel for quarry vehicles). Our current SPCC Plan requires that the fuel supplier have a spill containment kit available during the transfer of product. In addition, Martin Marietta has on site absorbent pads, granular material, and booms to address incidental spills. We feel that all feasible alternatives have been provided associated with fueling activities to protect the waters of the State. However, it is our intention to maintain the standards established by our company and implement good housekeeping practices, as well as, continue to educate all employees to meet the desired standards set forth by our company. The runoff from the vehicle wash area discharges as overland flow before reaching any area that may cause concern. However, we will evaluate the implementation of passive and/or active practices to address this issue. 2. Annual training of SPCC regulations has taken place at each location. This training is conducted during our annual refresher training as required by MSHA. As part of this training, we have modified the content to include SPCC regulations. In addition, annual training is conducted to the plant managers concerning all environmental issues (i.e. changes in regulations, changes in corporate standards, current topics of concern, etc.). This training also includes quarterly discharge sampling, annual stormwater sampling, as well as, other environmental issues related to our sites. Training logs are available and copies will be sent to each quarry to be maintained on site for future inspections. .v 3. We will initiate efforts to emphasis the importance of making corrections to any deficiencies noted during our weekly site inspections. 4. Qualitative Monitoring will be initiated in accordance with the conditions of the NPDES permit. Quarry personnel will be informed of the schedule and procedures required to conduct this monitoring, and appropriate records will be maintained. 5. Representative outfall status was requested from DWQ on August 8, 2000. No response was ever received for the request. A copy of this documentation will be sent to the quarry for their records, and has been provided for your information. 6. An amendment and/or revision section will be added to the BPM Plan/SWPPP to document updates that have been implemented. This information should complete the requirements of the Notice of Deficiency. Should you have any questions, please contact Richard Broughton at (803) 779-6500. Sincerely, TIN MARIETTA MATERIALS, INC. Brian K. orth, PE Manager, Engineering Services 6180WQ Letter of deficiency Response Martin Marietta Aggregates Charlotte District P.O. Box 240635 Charlotte, North Carolina 28224-0635 Telephone: (704) 525-7740 Fax; (704) 527-9283 August 8, 2000 Mr. Tony Evans NPDES Group North Carolina DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Request for Representative Outfali Status - Martin Marietta Materials, Inc. Arrowood, Asheboro, Bakers, Bessemer City, Bonds, Caldwell, Charlotte, Denver, Hickory, Jamestown, Kannapolis, Kings Mtn., Maiden, Mallard Creek, Matthews, Pomona, Rocky River, Salem, Statesville, Thomasville and Woodleaf Quarries Dear Mr. Evans: Based on our past conversations and subsequent meetings with your Department, I am officially submitting two copies of each stormwater maps for the above referenced quarries. This request is for Representative Outfall Status for stormwater discharges from Land Disturbance, Process Areas and Vehicle Maintenance Areas at our quarry locations, as indicated in the General Permits. I have identified the outfall location for each sample type on the stormwater map for your review. The land disturbance sample location for each site was based on current exposed areas (berm construction or overburden removal) and the maximum acreage exposed. Process and Vehicle Maintenance areas were located on the map, based on drainage features and actual topography of each site. I plan to begin the stormwater sampling in September. I trust the information provided is adequate for your review and approval. If any additional information is required, please feel free to contact me at (704) 525-7740. Sincerely, MARTIN MARIETTA MATERIALS, INC. Brian K. North, PE Sr. Environmental Engineer Attachments generallrep outfall satuts >� OF W A rF9 Q �O�a G ❑ `C Mr. Brian North Martin Marietta Materials, Inc. P.O. Box 7446 Charlotte, NC 28241-7446 Dear Mr. North: Michael F. Easley, Governbif" William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality October 29, 2007 Subject: NOTICE OF DEFICIENCY Compliance Evaluation Inspection NPDES Permit No. NCG020051 Charlotte Facility Mecklenburg County, North Carolina Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on September 10, 2007, by Ms. Polly Lespinasse of this Office. It is requested that a written response be submitted to this Office by November 29, 2007, addressing the deficiencies noted in the Inspection Summary, Qualitative Monitoring, and Permits and. Outfalls Sections of the report. In responding, please address your comments to the attention of Ms. Marcia Allocco. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact Ms. Lespinasse or me at (704) 663-1699. Sincerely, v3 Robert B. Krebs Regional Supervisor Surface Water Protection Section Enclosure cc: Shelton Sullivan, DWQ, NPS-ACO Unit North Carolina Division of Water Quality 610 East Center Avenue, Suite 301 Internet: h2o.encstate.nc.us Mooresville, NC 28115 Phone (704) 663-1699 Fax (704)663-6040 No hCaroiina ,,/ urally An Equal opportunitylAfSrmative Action Employer — 50% Recycledll0% Post Consumer Paper Compliance Inspection Report Permit: NCG020051 Effective: 01/19/05 Expiration: 12131I09 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Charlotte County: Mecklenburg 4551 Beatties Ford Rd Region: Mooresville Charlotte NC 28216 Contact Berson: Brian K North Title: Phone: 704-409-1475 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Rep rosentative(s): Related Permits: Certification: Phone: Inspection Date: 0911012007 Entry Time: 10:00 AM Exit Time: 11:30 AM Primary Inspector: Polly Lespinasse Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Q Compliant ■ Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 A Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 09110/2007 Inspection Type: Compliance Evaluation Reason far Visit: Routine Inspection Summary: The facility developed a SWPPP plan even though the general permit does not require one. In addition, they have an SPCC plan which incorporates many elements of the storm water permit in it. Issues observed at the facility include the following: 1. No evaluation of feasible alternatives to current practices (i.e., containment for fueling area, designated vehicle wash area with containment). 2. Training log not available on site and training program does not specifically include storm water. 3. Inspection reports indicated that deficiencies were noted, but they were not explained nor was there indication that they had been resolved. 4. Qualitative monitoring is not being conducted. 5. Request for representative outfall status not available on site 6. Need to provide an annual update page in the SWPPP. DWQ staff needs to determine whether the discharge of mine dewatering water directly to surface waters is in compliance with the permit. The facility indicated that they are closed loop (yet analytical monitoring is still conducted). However, when there is no need for the water collected from the pit, it is discharged directly to a "pond" which outfalls to a stream. There is no weir or other device to hold the water in the pond prior to discharge to the stream. The analytical sample- site is located in this stream, downstream of the pond. Page: 2 Permit: NCG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 09/10/2007 - H Inspection Type: Compliance Evaluation Reason for Visit: Routine .. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®n n n # Does the Plan include a General Location (USGS) map? ® ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n Q Q # Does the Plan include a list of significant spills occurring during the past 3 years? ® 0 Q Q # Has the facility evaluated feasible alternatives to current practices? ❑ M ❑ ❑ # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ n n ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? ■ n n o # Does the Plan include a list of Responsible Party(s)? ■ n In n # Is the Plan reviewed and updated annually? ■ n n n # Does the Plan include a Stormwater Facility Inspection Program? ■ n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: The plan does not include an evaluation of feasible alternatives. Based on the site inspection, feasible alternatives to current practices exist on the site and were discussed with the facility representative. The annual training log was available on site, but according to facility representatives, it is conducted annually and the log is kept at a main location. In addition, the training materials do not include a specific section on Stormwater. Staff discussed the necessity of including a specific section on stormwater in the training. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Q ■ ❑ Comment: The facility has failed to conduct and document qualitative monitoring. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ D n 0 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ Q Comment: Results from analytical monitoring indicate that all parameters were below the cut off concentrations/benchmarks. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ 0 Page: 3 Permit: NOG020051 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 0911012007 Inspection Type: Compliance Evaluation # Were all outfalls observed during the inspection? # if the facility has representative outfall status, is it properly documented by the Division? Reason for Visit: Routine # Has the facility evaluated all illicit (non stormwater) discharges? Comment: The facility has stated that they have requested representative outfall status for the facility. Documentation to substantiate the request was not available on site. Will require the facility to provide documentation. 0000 n®nn ®nr�n Page: 4