HomeMy WebLinkAboutNCG020029_COMPLETE FILE - HISTORICAL_20170724STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V U&Ua Uba O'
DOC TYPE
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑
YYYYMMDD
Kir.1-0
Environmental
`Quality
July 24, 2017
JoHN TMERI
DIVISION PRESIDENT
P.O. Box 30013
RALEIGH, NC 27622+0013
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Subject: Multimedia Compliance Inspection
Martin Marietta Materials, Inc.
Alamance County
Dear Permittee:
Department of Environmental Quality staff from the Winston-Salem Regional Office conducted a
multimedia compliance inspection of Martin Marietta Materials, Inc, on July 13, 2017 for permits and
programs administered by the following Divisions:
Division of Air
Division of Energy,
Division of Water
Division of Waste
Quality
Mineral, and Land
Resources
Management
Resources
We appreciate your cooperation during the inspection and hope that you have enjoyed the benefit of our
initiative to provide a single inspector capable of handling multiple areas of environmental compliance at
your facility. The results of each applicable inspection and any associated response actions or necessary
corrective measures are detailed in the inspection letters/reports attached to this transmittal sheet. If a
Division report is not attached, you may assume compliance with that Division's rules and regulations at
the time of inspection.
If you have any questions regarding this multimedia inspection, please contact Ryan Swaim at (336) 776-
9659 or ryan.swaim@ncdenr.gov. Thank you for your cooperation.
enei: Air Quality Inspection Report
DEMLR Inspection Report
Stormwater Inspection Report
cc: DAQ WSRO Files
DEMLR WSRO Files
DWR WSRO Files
DWM WSRO Files
State of North Carolina I Environmental Quality
Winston-Salem Reglonafoffice 1450West Hanes Mill RoadSulte300 { Winston-Salem, North Carolina27105-7407
336 776 9800 T 1 336 776 9757 F
NORTH CAROLINA DIVISION OF
AIR QUALITY
Inspection Report
Date: 07/ 1312011
Facility Data
Winston-Salem Regional Office
Martin Marietta Materials, Inc. - East Alamance
Query
NC Facility ID 0100227
County/FIPS: Alamance/001
Permit Data
Martin Marietta Materials, Inc. - East Alamance Quarry Permit 06132 / R18
2251 Martin Marietta Drive Issued 12/30/2016
Burlington, NC 27215 Expires 11/30/2024
Lat: 36d 7.7150m Long: 79d 21.3030m Classification Small
SIC: 1429 / Crushed And Broken Stone Nec Permit Status Active
NAICS: 212319 / Other Crushed and Broken Stone Mining and Quarrying Current Permit Application(s) None
Contact Data
Program Applicability
Facility Contact
Authorized Contact
Technical Contact
SIP
Josh Turner
John Tiberi
Jay Nivens
NSPS: Subpart 000
Plant Manager
Division President
Sr. Environmental
(336) 578-5420
(919) 7814550
Engineer
704 409-1475
Compliance Data
Comments:
Inspector's Signature: ti
Date of Signature: / - Z L/
I Total Actual esnisslans in TONS/YEAR:
Inspection Date 07/13/2017
Inspector's Name Ryan Swaim
Operating Status Operating
Compliance Code Compliance - inspection
Action Code FCE
RS O"Ite Inspection Result Compliance
TSP
S02
NOX
VOC
CO
PM10
* HAP
2015
0.6400
---
---
---
—
0.2400
---
2010.
0.5800
--
--
---
—
0.2800
--
* Highest HAP Emitted
Five Year Violation History: None
Date Letter Tviae Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE: None
Date Test Results Test Method(s) Source(s) Tested
Permitted Sources
Emission
Source ID
Emission Source
Description
Control
System ID
Control System
Description
Non -Metallic Mineral Processia Plant, utilizin water suppression with no other control devices including:
....... g .......... _. _........................... pp......._...... -....._ . .. �........ ,...
ES -Convey
jConVeying Operations
NIA N/A
ES -Crush
Crushing Operations
N/A- N/A
............... .... ... . .................
ES -Screen
_� M......
Screening Operations
_
r_...____.. — N/A N/A
1
Insignificant/Exempt Activities
Source
Exemption
Source of
Source of Title V
....... .... " -.._
.... _.. ...........
Regulation
...... ..
TAPS?
Pollutants?
....... _. _.
above -ground,
above ound, diesel fuel storage teaks (10,000 �
2Q .0102 �—
Yes Yes
gallon capacity)....
(c)(1)(D)(i)
I-TO2 - above -ground, diesel fuel storage tanks (10,000-
12Q.0102
I Yes
Yes
gallon capacity)
_.. . .. ................_.......-..........._........................................ ...
(c)(1)(D)(i)
.......__. .._. _... _.._......'.1..-......_...................................._
.
I-TO3 - (NESHAP) above -ground gasoline storage tank
Q .0102
Yes
Yes
(3,000-gallon capacity) :
_. ...jF7
(c)(1)(D)(ii}
-
I-T04 - Seven (7) above -ground lubricating oil storage
tanks less than 2,000-gallon '1(c)(1)(D)(i)._..
2Q2Q 00102
Yes
Yes
(each with capacity)
Introduction
On July 13, 2017, Mr. Ryan Swaim, Environmental Specialist, of the DEMLR WSRO contacted Mr. Josh Turner, Plant
Manager, and Jay Nivens of Martin Marietta Materials, Inc. — East Alamance Quarry for an announced targeted multi-
media compliance inspection. The facility was previously inspected on June 8, 2016 by Paul Williams, Environmental
Specialist, of the DAQ WSRO and was found to be operating in compliance at that time. The facility is a crushed stone
quarry and typically operates lam to 5pm on a variable basis based on demand. Mr. Turner also stated that the facility has
not added any new equipment since the last inspection. All IBEAM contacts were confirmed to be accurate.
Safety Equipment
Safety shoes, hard hat, safety vest and ear protection are required in areas of production. Wheel chocks are not required
if parking in paved lot by the office.
Applicable Regulations
According to permit Condition A.1, the facility is subject to the following regulations: Title 15A North Carolina
Administrative Code (NCAC), Subchapter 2D .0202, 2D .0501, 2D .0510, 2D .0521, 2D .0524 (40 CFR 60, Subpart
000), 2D .0535, 2D .0540, 2D .1806 and 2Q .0309. The facility is not subject to the RMP requirements of the 112(r)
program since it does not use or store any of the regulated chemicals in quantities above the threshold in the rule. The
facility is only subject to the General Duty clause of the Section 112(r) program because they do not produce, use or store
any regulated chemicals in quantities above their corresponding threshold limits.
Discussion
This facility is a crushed stone quarrying and sales operation, with a vast majority of its product being sold to the
construction and paving industries. Granite of various sizes are produced on -site. The facility was actively crushing (ES -
Crush), screening (ES -Screen) and conveying (ES -Convey) during this inspection. The plant flow diagram and equipment
list were reviewed and found to be dated April 14, 20I4 (fixed equipment list) and October 10, 2016 (Mobile'Equipment
List) which matches what is on file at WSRO. Any changes to the non -primary crushing equipment are required to be
submitted to DAQ, with an updated flow diagram, at least 15 days prior.
The process begins as granite rock face is blasted and transported to the primary crusher. After the material is crushed it
is sorted into various sizes through the screening and conveyor systems. Mr. Turner stated that the primary crusher is
setup to operate at a 4.75-inch discharge opening setting. Smaller material bypasses the crusher as it drops out through a
bypass screen. The materials are then transported, via conveyor, to the main screening operation where the material is
processed through multiple screens, secondary crushers and a wash tower, before being conveyed to their appropriate
surge pile. The facility was observed using the appropriate wet suppression on the conveying, crushing and screening
operations. No visible emissions were observed at time of inspection.
This facility lists several exempt.sources which include; two above -ground 10,000-gallon diesel fuel storage tanks (I -TO 1,
I-T02), one 3,000 gallon above -ground gasoline storage tank (1-T03), and 7 above -ground lubricating oil storage tanks (I-
T04). Each of these exempt sources were observed and found to be consistent as listed on the permit.
Permit Conditions/ Applicable Regulations
Condition A.2 contains 15A NCAC 213.0202 permit renewal and emissions inventory requirements. The permit expires
November 30, 2024 and the facility is required to submit a renewal request and air pollution emission inventory report for
the 2023 calendar year 90 days prior to the expiration of the permit. This condition was discussed with Mr. Turner and
compliance with this condition is anticipated.
Condition A.3 contains the 2D .0501(c) equipment reporting requirements. The permittee shall maintain an on -site
equipment list and flow diagram of all equipment used covered under this permit. The equipment list and flow diagram
are also required to include the revision date. The equipment list and plant flow diagram are kept in the main office and
were observed to be completed and up to date. Compliance with this condition is indicated.
Condition A.4 contains the requirements for 2D .0510 particulate control requirements for particles from sand, gravel or .
crushed stone operations. This condition requires the facility to take steps to reduce, to a minimum, any particulate matter
from becoming airborne to prevent exceeding the ambient air quality standards beyond the property line. This facility
makes use of wet suppression in order to control process particulate matter. The wet suppression systems were observed
and appeared to be functioning correctly at time of inspection. Compliance with this condition is anticipated.
Condition A.5 contains the primary crusher specifications. This condition requires the facility to submit a permit
application if any changes are made to the primary crusher other than like -for -like replacement. The primary crusher is
listed as a 4248 Allis Chalmers and is rated at 615 tons per hour, at a 10-inch maximum jaw setting. Mr. Turner
confirmed that the crusher was set at 4.75 inches and was producing approximately 375 tons/hr. Compliance with this
condition is indicated.
Condition A.6 contains the requirements for operating additionai.primary crushers. On April 16, 2014, the facility
modified their permit in order to add portable, self-propelled, crushing, screening, feeder and conveyor units. This
condition prohibits the facility from operating the primary crushers simultaneously and states that the throughput of any
additional primary crusher shall not exceed the rated capacity of the 4248 Allis Chalmers Jaw Crusher (61 5 tons/hr. at a
maximum discharge opening setting of 10-inches). At time of inspection the quarry only had one crusher on site
according to Mr. Turner. Compliance with this condition is indicated.
Condition A.7 contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is limited to 200/u
opacity visible emissions, for sources manufactured after July 1, 1971, when averaged over a six -minute period. No
visible emissions were observed during this inspection. Compliance with this condition is indicated.
Condition AS contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is limited to 40%
opacity visible emissions, for sources manufactured as of July 1, 1971, when averaged over a six -minute period. The
facility does not operate any listed equipment manufactured as of July 1, 1971. Compliance with this condition is
indicated.
Condition A.10 contains the 15A NCAC 2D .0535 rule which requires the permittee to notify the director of any excess
emissions lasting longer than four hours resulting from a malfunction, breakdown of process or control equipment or any
other abnormal conditions. Mr. Turner stated that no process malfunctions have occurred since the last inspection and
there are no issues registered to this facility in IBEAM. Compliance with this condition is indicated.
Condition A.11 contains the 15A NCAC 2D .0540 fugitive dust control requirement. No fugitive dust was observed
traveling beyond the property boundaries during this inspection. This facility operates a water tanker truck which was
observed wetting the unpaved driving surfaces during the course of this inspection, indicating compliance with this
condition.
Condition A.12 contains the requirements for 2D .1806 control and prohibition of odorous emissions requirements. No
objectionable odors were detected during the approach to the facility or at the property boundaries. The facility does not
have any previous odor complaints in ]BEAM. Compliance with this condition is indicated.
NSPS/NESHAP
Condition A.9 contains the requirements for 2D .0524 New Source Performance Standards (NSPS), for the nonmetallic
mineral processing equipment, as promulgated in 40 CFR 60, Subpart 000, including Subpart A "General Provisions".
This condition applies to the crushing operations (ES -Crush), Conveying operations (ES -Convey) and Screening
operations (ES -Screen).. Under this condition the following conditions are set:
• Notify the Regional Supervisor, in writing, of the startup of an affected facility.
• A 15% opacity limit is set for any crusher and I0% opacity for conveyor belts, screening
operations and other affected facilities constructed, modified or re -constructed after August 31,
1983, but before April 22, 2008.
• A 12% opacity limit is set for any crusher and 7% opacity.for conveyor belts, screening
operations and other affected facilities constructed, modified or re -constructed on or after April
22, 2008.
• Monthly inspections of the wet suppression systems are required for any affected equipment that
commenced construction, modification or reconstruction on or after April 22, 2008 and must
record these inspections within a logbook.
No visible emissions were observed. The facility utilizes wet suppression for its conveying, screening and
crushing operations. Compliance with this condition is indicated at this time.
Condition A.13 contains the Federal Rules Applicable to Sources Exempted from Air Permitting Requirements, as
promulgated in 49 CFR 63, Subpart CCCCCC (NESHAP). This requirement applies to each gasoline cargo tank during
the delivery of product to a gasoline dispensing facility, including storage tank I-T03. A GDF with a monthly throughput
of <I0,000 gallons of gasoline must comply with the requirements.
• Minimize gasoline spills.
• Clean up any spills as expeditiously as possible.
• Cover all open gasoline containers and all storage tank fill pipes with a gasket seal when not in
use.
• Minimize gasoline sent to open waste collection systems.
• Maintain records of monthly gasoline throughput.
During this inspection, the gasoline storage tank, and surrounding area, was observed to be properly maintained and
sealed. There was no evidence of any recent spills. Mr. Turner and Nivens indicated that the threshold for this
requirement had not been exceeded and showed receipts of the gasoline purchased of just over 2,500 gallons used since
February of 2016 to current. Compliance with this condition is indicated.
This facility does not appear to be subject to any other NSPS/NESHAP rules at this time.
Emissions Data
The emissions data for 2010 and 2015 are located in the reportheader.
4
Permit Issues
Thera do not appear to be any permit issues at this time.
Stack/Source Testing
Visible emissions testing was conducted, on January 29, 1998, on several conveyor belts, a double deck screen and VSI
crusher. The testing produced maximum observed visible emissions of 5% opacity and satisfied the testing requirement
within condition A (5) (c) of Permit 06132R09.
5 Year Compliance History
There have been no NOD's, NOV's or NOVIRE's issued to this facility in the past 5 years.
Conclusion
Based on visual observation and review of records, Martin Marietta Materials, Inc. — East Alamance Quarry appears to be
operating in compliance with all applicable Air Quality standards and regulations at the time of this inspection.
North Carolina Department of Environment and Natural Resources,
Division of Energy, Mineral, and Land Resources, Land Quality Section
MINE INSPECTION REPORT
® PERNUTTED MINE SITE ❑ UNPERMITTED MINE SITE
1. MINE NAME: East Alamance Quarry2. MINE LOCATION: 2251 Martin Marietta Dr._
3. COUNTY: Alamance 4. RIVER BASIN: Cape Fear 5. CASE:
6. OPERATOR: Martin Marietta Materials Inc.
7. ADDRESS: 8701 Red Oak Blvd. Charlotte, NC 28217
8. NEPUNG PERMIT #: 01-08 ❑ N/A 9. PERMIT EXPIRATION DATE: 8-22-2018 El NIA
10. PERSON(S) CONTACTED AT SITE: Josh Turner and Jay Nievens
11. PICTURES? ❑ Yes ® No TAKEN BY: NA
12. TYPE OF INSPECTION:
❑ A. Initial Inspection (Unpermitted Mine Sites)
1. Size of affected land: ac: (attach sketch map)
2. How was this area measured? NA Measured by: NA
® B. Routine Inspection (Permitted Mine Sites)
Q C. Fallow -up Inspection
13. Date of last inspection: 7-25-16
14. Any mining since that date? ® Yea El No If yes, cite evidence of such mining activity: Smaller
aggregate was being produced at time of inspection.
15. Was mine operating at time of inspection? ® Yes No If yes, explain: The mine appeared to be
operating at time of inspection with truck hauling and conveying activities observed at time of inspection._
16. Is the mine in compliance with the Operating Conditions of the Permit? 0 Yes. Ej -No ❑ NIA
If no, explain:
17. Is the .mine incompliance with the Reclamation Conditions of the Permit? El Yes ❑ No ® NIA
If no, explain:
18. Is there any off -site damage? A. ❑ Yes B. N No C. ❑ None observed
If A, describe the type and severity of the damage:
If B or C, is there potential for offsite damage? ❑ Yes ® No Explain:
19. Corrective measures needed and/or taken: N
20. Other recommendations and comments: Please provide this office with the most current version of the
approved mine map. Provide stabilization for the settling pond #1 cleanout activities where equipment
damage has occurred. Take steps to ensure all settling ponds are functioning as designed. Remove excess
vegetation from inside all settling pond riser pipes. Provide adequate stabilization on all stockpiled dirt as
discussed in field.
21. Is the Annual Reclamation Report +/- map accurate? U Yes LI No (Explain) U Not Reviewed M NIA
22. Follow-up inspection needed? LJ Yes Q9 No Proposed date NA
23. No. of additional pages of Inspection Report NA 24. Copy of Report sent to operator 7/24/2017
INSPECTED BY: Ryan Swaim DATE 7-13-17
Telephone No: 336-776-9659
Copy to file Copy to operator Copy to Mining Specialist
Compliance IngRqgtion Report
Permit NCG020029 Effective: 10/01/15 Expiration: 09/30/20 Owner: Marlln Marietta Materials Inc
SOC: Effective: Expiration, Facility: East Alamance Quarry
County: Alamance 1666 Hwy 49 N
Region: Winston-Salem
Haw River NC 27258
Contact Person: Jay Nivens Title: Phone: 704-409-1475
Directions to Facility:
System Clasalflcatlons:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Represontative(s):
Related Pemafts:
Inspection Date: 07/1312017 Entry Time: 09:30AM Exit Time: 12:30PM
Primary Inspector: Ryan Swaim Phone: 336-776-9659
Secondary Inspoctor(a):
Ree4on for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspoction Type: Mining Activities Stormwater Discharge COC
Facility Status: Compliant [] Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit NCGO20029 owner - Facility: Martin Marlelta Materials Imo
Inspection Date: 07113M017 Inspectioom Type : Compllance Evaluation Reason for Via t Routine
Inspection Summary:
Page: 2
pemdC NCGD20029 owner- Foolllty: Martin Marlette Materials Inc
Inspection Deb: 07/1312017 Inspvatlon Typo: Compllenoe Evaluation Reesan for Vlslt:- Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
Yee No NA NE
S ❑ ❑ ❑
# Does the Plan Include a General Location (USGS) map?
S ❑ ❑ ❑
# Does the Plan include a 'Narrative Description of Practices"?
E ❑ ❑ ❑
# Does the Plan include a detailed site map Including outfall locations and drainage areas?
®❑ ❑ ❑
# Does the Plan include a list of signlflcant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan Include a Spill Prevention and Response Plan (SPRP)?
S ❑ ❑ ❑
# Does the Plan Include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan Include a list of Responsible Party(s)?
S ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
E ❑ ❑ ❑
# Does the Plan include a Stormwater Facillty Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
E ❑ ❑ ❑
Comment: A Copy of the SWPPP was reviewed and was found to be up to date for the 2017 year.
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment, Qualitative monitoring was being completed as theNCG permit requires.
Analytical Monitodna Yes No NA NE
Has the facility conducted Its Analytical monitoring? 1111 ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical monitorfna was also being completed as rectuired.
Permit and Outfalle
# Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑
# Were all outfalls observed during the Inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all Illicit (non atormwater) discharges? ■ ❑ ❑ ❑
Comment: Ail components ofpie NCG etmit appealed to be in good order and the site insoection reflected
Its reguirementp.
Page: 3
, _77
Environmental
Quality
June 22, 2016
JOHN TIBERI — PRESIDENT MID -ATLANTIC DCvisiON
MARTIN MARII.TTA MATERIALS, INC.
2710 WYCLIFF ROAD
RALEIGH, NORTH CAROLINA 27607
Dear Permittee:
PAT McCRORY
Governor
DONALD R. VAN DER VAART
secrurury
Subject: Multimedia Compliance Inspection
Martin Marietta Materials, Inc. — East
Alamance Quarry
Alamance
Department of Environment and Natural Resources staff from the Raleigh Regional Office conducted a
multimedia compliance inspection of Martin Marietta Materials, Inc. — East Alamance Quarry on June 8,
2016 for permits and programs administered by the following Divisions:
Division of Air
Division of Energy,
Division of Water
Division of Waste
Quality
Mineral, and Land
Resources
Management
Resou roes -
We appreciate your cooperation during the inspection and hope that you have enjoyed the benefit of our
initiative to provide a single inspector capable of handling multiple areas of environmental compliance at
your facility. The results of each applicable inspection and any associated response actions or necessary
corrective measures are detailed in the inspection letters/reports attached to this transmittal sheet. If a
Division report is not attached, you may assume compliance with that particular Division's rules and
regulations at the time of inspection.
If you have any questions regarding this multimedia inspection, please contact Jack Kitchen at (919) 218-
8409 or Jack.Kitchen@ncdenr.gov. Thank you for your cooperation.
encl: Air Quality Inspection Report
Mining Inspection Report
Stormwater Inspection Report
cc: DAQ WSRO Files
DEMLR WSRO Files
DWR WSRO Files
DWM WSRO Files
State of North Carokna I EnvironmrntalQuality
Wlnston-Salem Regional Office 1 450 West Hanes Mill Road Suite 300 1 Winston-Salem, North Cardin 27105-7407
336 776 9600 T 1 336 T76 9797 F
e'- y
NORTH CAROLINA DIVISION OF
AIR QUALITY
Inspection Report
Date: 06/ 16/2016
Facility Data
Martin Marietta Materials, Inc. - East Alamance Quarry
1666 North NC Highway 49
Haw River, NC 27258
Lot: 36d 7.7150m Long: 79d 21.3030m
SIC: 1429 / Crushed And Broken Stone Nec
NAICS: 212319 / Other Crushed and Broken Stone Mining and Quarrying
Contact Data
Facility Contact
Authorized Contact
Technical Contact
Josh Turner
John Tiberi
Jay Nivens
'Plant Manager
Division President
Sr. Environmental
(336)584-8875
(919)781-4550
Engineer
(704)409-1475
Comments:
Inspector's Signature:
Date'ofSignature:
Total Actual emissions in TONSIYFAR
Winston-Salem Regional Office
Martin Marietta Materials, Inc. - East Alamance
Quarry
NC Facility ID 0100227
County/FIPS: Alamance/001
Permit Data
Permit 06132 / R17
Issued 4/16/2014
Expires 1/31/2017
Classification Small
Permit Status Active
Current Permit Application(s) None
Program Applicability
SIP
NSPS: Subpart 000
Compliance Data
Inspection Date- 06/08/2016
Inspector's Name Paul E Williams
Operating Status Operating
Compliance Code Compliance - inspection
Action Code FCE
On -Site Inspection Result Compliance
1
TSP
S02
NOX
VOC
CO
PMIO
* HAP
2010
0.5800
---
---
---
---
0.2800
---
2006
2.03
---
---
---
---
0.9700
---
* Hi hest HAP Emitted (inpounds)
Five Year Violation History: None
Date Letter Tyge Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE: None
.Date Test Results Test Methods) Sources Tested
Permitted Emission Sources
Emission.
Source CD
Emission Source
..... Description
Control
System ID
FControl System
Description. III
Non.Metallic Mineral ProcessingPlant utilizingwater suppression with no other control devices including.-:
pp
ES -Convey : EConvey�ng Operations rW_ N/A NIA
................... I
_
ES -Crush Crushing Operations
_
NIA I NIA
'. NIA ES -Screen :Screening Operations NIA
.....
InAfinificantfF.xemnt Activities
Exemption
Source of
Source of Title V
Source
Regulation
TAPS?
Pollutants?
I -TO 1 - above -ground, diesel fuel storage tanks { 10,000-
Q .0102
F(C)
yes Yes
gallon capacity}
(1)(D)(i)
i-T02 - above round diesel fuel storage tanks (10 000-
2Q .0102
yes Yes
gallon capacity)
__..._::_.-__--
(c)(1)(D)G}
—
— �.------- ---
I-T03 - (NESHAP) above -ground gasoline storage tank
'(3,000_gallon
—._ ----
2Q .0102
((c)(I)(D)(ii)
----
Yes
--
Yes
capacity)
I-T04 Seven (7) above -ground lubricating oil storage
2Q 0102 Yes
Yes
tanks (each with less than 2,000-gallon capacity)
Introduction
On June 8, 2016, Mr. Paul Williams, Environmental Specialist, of the DAQ WSRO contacted Mr. Josh
Turner, Plant Manager, of Martin Marietta Materials, Inc. — East Alamance Quarry for an announced
targeted multi -media compliance inspection. The facility was previously inspected on March 25, 2015 by
Steve Helms, former Environmental Specialist, of WSRO and was found to be operating in compliance at
that time. The facility is a crushed stone quarry and typically operates lam to 5pm on a variable basis
based on demand. Mr. Turner stated that business has been slow and that the facility has only operated the
crushers twice so far in 2016. Most of the stone being sold is being trucked in from their Burlington
quarry. Mr. Turner also stated that the facility has not added any new equipment since the last inspection.
All IBEAM contacts were confirmed to be accurate.
Safety Equipment
Safety shoes, hard hat, safety vest and ear protection are required in areas of production. Wheel chocks
are not required if parking in paved lot by the office.
Latitude[Longitude Verifications
The latitude and longitude coordinates were verified to be accurate as documented in IBEAM.
Applicable Regulations
According to permit Condition A.1, the facility is subject to the following regulations: Title 15A North
Carolina Administrative Code (NCAC), Subchapter 2D .0202, 2D .0501, 2D .0510, 2D .0521, 2D .0524
. (40 CFR 60, Subpart 000), 2D .0535, 2D .0540, 2D .1806 and 2Q .0309. The facility is not subject to
the RMP requirements of the 112(r) program since it does not use or store any of the regulated chemicals
in quantities above the threshold in the rule. The facility is only subject to the General Duty clause of the
Section 112(r) program because they do not produce, use or store any regulated chemicals in quantities
above their corresponding threshold limits.
Discussion
This facility is a crushed stone quarrying and sales operation, with a vast majority of its product being
-sold to the construction and paving industries. Granite of various sizes are produced on -site. The facility
was not actively crushing (ES -Crush), screening (ES -Screen) or conveying (ES -Convey) during this
inspection. The plant flow diagram and equipment list were reviewed and found to be dated April 14,
2014 which matches what is on file at WSRO. Any changes to the non -primary crushing equipment are
required to be submitted to DAQ, with an updated flow diagram, at least 15 days prior.
The process begins as granite rock face is blasted and transported to the primary crusher. After the
material is crushed it is sorted into various sizes through the screening and conveyor systems. On the day
2
of this inspection, crushes and sorted stone was observed being loaded into haul trucks, though the quarry
was not actively in production. Mr. Turner stated that the primary crusher is. setup to operate at a 4.5-inch
discharge opening setting. Smaller material bypasses the crusher as it drops out through a bypass screen.
This step is effective in minimizing wear to the crusher jaws. The materials are then transported, via
conveyor, to the main screening operation where the material is processed through multiple screens,
secondary crushers and a wash tower, before being conveyed to their appropriate surge pile. When
operating the facility utilizes wet suppression on the conveying, crushing and screening operations.
This facility lists several exempt sources which include; two above -ground 10,000-gallon diesel fuel
storage tanks (I-TOI, I-T02), one 3,000 gallon above -ground gasoline storage tank (i-T03), and 7 above-
ground lubricating oil storage tanks (1-T04). Each of these exempt sources were observed and found to be
consistent as listed on the permit.
Permit Conditions/ Applicable Regulations
Condition A42 contains 15A NCAC 2D .0202 permit renewal and emissions inventory requirements. The
permit expires January 31, 2017 and the facility is required to submit a renewal request and air pollution
emission inventory report for the 2015 calendar year 90 days prior to the expiration of the permit. This
condition was discussed with Mr. Turner and compliance with this condition is anticipated.
Condition A.3 contains the 2D .0501(c) equipment reporting requirements. The permittee shall maintain
an on -site equipment list and flow diagram of all equipment used covered under this permit. The
equipment list and flow diagram are also required to include the revision,date. The equipment list and
plant flow diagram are kept in the main office and were observed to be completed and up to date.
Compliance with this condition is indicated.
Condition A.4 contains the requirements for 2D .0510 particulate control requirements for particles from
sand, gravel or crushed stone operations. This condition requires the facility to take steps to reduce, to a
minimum, any particulate matter from becoming airborne to prevent exceeding the ambient air quality
standards beyond the property line. This facility makes use of wet suppression in order to'control process
particulate matter. The wet suppression systems were not observed operating during this inspection since
the facility was not in production. Compliance with this condition is anticipated.
Condition A.5 contains the primary crusher specifications. This condition requires the facility to submit
a permit application if any changes are made to the primary crusher other than like -for -like replacement.
The primary crusher is listed as a 4248 Allis Chalmers and is rated at 615 tons per hour, at a 10 inch
maximum jaw setting. Mr. Turner confirmed that the crusher was set at 4.5 inches and has a maximum
operating capacity of less than 655 tons per hour. Compliance with this condition is indicated.
Condition A.6 contains the requirements for operating additional primary crushers. On April 16, 2014,
the facility modified their permit in order to add portable, self-propelled, crushing, screening, feeder and
conveyor units. This condition prohibits the facility from operating the primary crushers simultaneously
and states that the throughput of any additional primary crusher shall not exceed the rated capacity of the
4248 Allis Chalmers Jaw Crusher (615 tons/hr. at a maximum discharge opening setting of I0-inches).
Mr. Turner stated that the portable crusher had been removed from the site and the facility has no
immediate plans to return it to this facility at this time. Compliance with this condition is indicated.
Condition A.7 contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is
limited to 20% opacity visible emissions, for sources manufactured after July 1, 1971, when averaged
over a six -minute period. No visible emissions were observed during this inspection, since the facility
was not operating. Compliance with this condition is anticipated.
Condition A.8 contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is
limited to 40% opacity visible emissions, for sources manufactured as of July 1, 1971, when -averaged
over a six -minute period. No visible emissions were observed during this inspection and the facility does
not operate any listed equipment manufactured as of July 1, 1971. Compliance with this condition is
indicated.
Condition A.10 contains the 15A NCAC 2D .0535 rule which requires the permittee to notify the director
of any excess emissions lasting longer than four hours resulting from a malfunction, breakdown of
process or control equipment or any other abnormal conditions. Mr. Turner stated that no process
malfunctions have occurred since the last inspection and there are no issues registered to this facility in
IBEAM. Compliance with this condition is indicated.
Condition A.11 contains the 15A NCAC 2D .0540 fugitive dust control requirement. No fugitive dust
was observed traveling beyond the property boundaries during this inspection. This facility operates a
water tanker truck which was observed wetting the unpaved driving surfaces during the course of this
inspection, indicating compliance with this condition.
Condition A.12 contains the requirements for 2D .1806 control and prohibition of odorous emissions
requirements. No objectionable odors were detected during the approach to the facility or at the property
boundaries: The facility does not have any previous odor complaints in IBEAM. Compliance with this
condition is indicated.
NSPS/NESHAP
Condition A.9 contains the requirements for 2D .0524 New Source Performance Standards (NSPS), for
'the nonmetallic mineral processing equipment, as promulgated in 40 CFR 60, Subpart 000, including
Subpart A "General Provisions". This condition applies to the crushing operations (ES -Crush),
Conveying operations (ES -Convey) and Screening operations (ES -Screen). Under this condition the
following conditions are set:
• Notify the Regional Supervisor, in writing, of the startup of an affected facility.
• A 15% opacity limit is set for any crusher and 10% opacity for conveyor belts, screening
operations and other affected facilities constructed, modified or re -constructed after August 31,
1983, but before April 22, 2008.
• A 12% opacity limit is set for any crusher and 7% opacity for conveyor belts, screening
operations and other affected facilities constructed, modified or re -constructed on or after April
22, 2008.
+ Monthly inspections of the wet suppression systems are required for any affected equipment that
commenced construction, modification or reconstruction on or after April 22, 2008 and must
record these inspections within a logbook.
No visible emissions were observed, since the plant was not actively operating during this inspection.
The facility utilizes wet suppression for its conveying, screening and crushing operations. Mr. Turner
stated that the facility does not maintain a logbook of the I/M activities, for the wet suppression system,
since none of the affected equipment was constructed, modified or reconstructed on or after April 22,
2008. Mr. Turner also stated that if any of the equipment falls under this requirement, in the future, they
will keep and maintain a logbook of these actions. Compliance with this condition is indicated at this
time.
Condition A.13 contains the Federal Rules Applicable to Sources Exempted from Air Permitting
Requirements, as promulgated in 49 CFR 63, Subpart CCCCCC (NESHAP). This requirement applies to
i
each gasoline cargo tank during the delivery of product to a gasoline dispensing facility, including storage
tank I-T03. A GDF with a monthly throughput of <10,060 gallons of gasoline must comply with the
requirements:
• Minimize gasoline spills.
• Clean up any spills as expeditiously as possible.
• Cover all open gasoline containers and all storage tank fill pipes with a gasket seal when not in
use.
• Minimize gasoline sent to open waste collection systems.
• Maintain records of monthly gasoline throughput.
During this inspection the gasoline storage tank, and surrounding area, was observed to be properly
maintained and sealed. There was no evidence of any recent spills. Monthly. throughput records were
reviewed and found to be complete. Records were reviewed and indicated that 4 gasoline deliveries were
made in 2015, totaling 2.059.1 gallons. There have been 3 deliveries thus far in 2016, which total 1,502.0
gallons. 'Compliance with this condition is indicated.
This facility does not appear to be subject to any other NSPS/NESHAP rules at this time.
Facility Wide Emissions
.Actual and potential emissions from permit review RI 7 for Martin Marietta Materials, Inc. — East Alamance
Quarry (Sharon Wyatt, April 16, 2014).
Pollutant
CY2010 Actual Emissions,
tons/year
Potential Emissions, tons/year
'with wet suppression
without wet suppression'
PM
2.03
51.04
536.67
PM 10
0.28
18.52
191.47
PM2.5
Not gjven
2.52
186.88
Permit Issues
There do not appear to be any permit issues at this time.
Stack/Source Testing
Visible emissions testing was conducted, on January 29, 1998, on several conveyor belts, a double deck screen
and VSI crusher. The testing produced maximum observed visible emissions of 5% opacity and satisfied the
testing requirement within condition A (5) (c) of Permit 06132R09.
5 Year Compliance History
There have been no NOD's, NOV's or NOWRE's issued to this facility in the past 5 years.
Conclusion
Based on visual observation and review of records, Martin Marietta Materials, Inc. — East Alamance
Quarry appears to be operating in compliance with all applicable Air Quality standards and regulations at
the time of this inspection.
5
Compliance Inspection Report
Permit: NCG020029 Effective: 10101/15 Expiration: 09/30/20 Owner : Martin Marietta Materials Inc
SOC: Effective: Expiration: Facility: East Alamance Quarry
County: Alamance 1666 Hwy 49 N
Region: Winston-Salem
Haw River NC 27258
Coritact Person: Jay Nivens Title: Phone: 704-409-1475
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
inspection Date: 06108/2016 Entry Time: 09:30AM Exit Time: 12:301`M
Primary Inspector: Sue L Homewood Phone: 336-776-9694
Secondary inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: ® Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG020029 Owner - Facility: Martin Marietta Materials Inc
Inspection Date: 0610812016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG020029 Owner - Facility: Martin Marietta Materials Inc
Inspection Rate: 06108/2016 Inspection Type : Compliance Evaluation Reason For Visit: Routine
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑
Comment: Monitoring conducted 1/29/15, 4128115, 9/23/15, all within limits. No discharge activity from
Vehicle Maintenance area.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwaler) discharges? 0 ❑ ❑ ❑
Comment: New basin at shop, installed about 2 Years, acting as primary containment.
Pit discharge pumped to water trucks and adjacent pond, samples taken from pipe.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Monitoring conducted June 2015, December 2015 and April 2016
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
E ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
E ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
E ❑ i❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 [] ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
■ ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
E ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ [] []
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ❑ ❑
Page: 3
Permit: NCG020029 Owner - Facility: Martin Marietta Materials Inc
Inspection Date: 06108/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Comment: Most recent plan was updated in April 2016
Page: 4
North Carolina Department of Environment and Natural Resources,
Division of Energy, Mineral, and Land Resources, Land Quality Section
MINE INSPECTION REPORT
X PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE
1. MINE NAME: East Alamance Quarry_ 2. MINE LOCATION: Haw River
3. COUNTY: Alamance 4. RIVER BASIN: Cape Fear _ 5. CASE:
6. OPERATOR: Martin Marietta Materials, Inc. Attn: Mr. Brian North,
7. ADDRESS: 413 S. Chimney Rock Road Greensboro, NC 27409 - +
8. MINING PERMIT #: 01-08 ❑ N/A 9. PERMIT EXPIRATION DATE: 08-22-2018 ❑ N/A
10. PERSON(S) CONTACTED AT SITE: Jay Nivens / Josh Turner
11. PICTURES? ❑ Yes X No TAKEN BY:
12. TYPE OF INSPECTION:
❑ A. Initial Inspection (Unpermitted Mine Sites)
1. Si7e of affected land: ac. (attach sketch map)
2. How was this area measured? Measured by:
® B. Routine Inspection (Permitted Mine Sites)
n C. Follow-up Inspection
13. Date of last inspection:
14. Any mining since that date? ® Yes ❑ No If yes, cite evidence of such mining activity:
Mine in operation at time of inspection
15. Was mine operating at time of inspection? ® Yes ❑ No If yes, explain: _Stone being._ transferred
offsite.
16. Is the mine in compliance with the Operating Conditions of the Permit? ® Yes ❑ No ❑ N/A
If no, explain:
17. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑ Yes ❑ No ® N/A
If no, explain:
18. Is there any off -site damage? A. ❑ Yes B. ® No C. ❑ None observed
If A, describe the type and severity of the damage:
If B or C, is there potential for offsite damage? ❑ Yes ® No Explain:
19. Corrective measures needed and/or taken: N/A
20. Other recommendations and comments: 1. Ensure buffer area is maintained around creek and an
disturbed areas are stabilized per the approved mining permit.
21. Is the Annual Reclamation Report +/- map accurate? ® Yes ❑ No (Explain) ❑ Not Reviewed ❑ N/A
22. Follow-up inspection needed? LI Yes L!j No Proposed date
23. No. of additional pages of Inspection Report 0 24. Copy of Report sent to operator
INSPECTED BY: Chuck Kirchner (Team-2 Multimedia DATE 6-8-16
Telephone No: 336-776-9800
Copy to file Copy to operator Copy to Mining Specialist
Permit: NCG020029
SOC:
County: Alamance
Region: Winston-Salem
Contact Person: Jay Nivens
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance inspection Report
Effective: 10/01/15 Expiration: 09/30/20 Owner; Martin Marietta Materiais Inc
Effective: Expiration: Facility: East Alamance Quarry
1666 Hwy 49 N
Haw River NC 27258
Title: Phone: 704-409-1475
Inspection Date: 07/13/2017
Primary Inspector: Ryan Swaim
Secondary Inspector(s):
Certification: Phone:
Entry Time: 09:30AM Exit Time: 12:30PM
Phone: 336-776-9659
Reason for inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
permit: NCG020029 Owner - Facility: Martin Marietta Materials Inc
Inspection Data: 07113/2017 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG020029 Owner - Facility: Martin Marietta Materials Inc
Inspection Date: 07/13/2017 Inspection Type; Compliance Evaluation Reason for Via it: Routine
Stormwater Pollution Prevention Plan .
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: A copy of the SWPPP was reviewed and was found to be up to date for the 2017 year.
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment: Qualitative monitorincLwas being completed as the NCG permit requires.
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment: Analytical monitoring was also being completed as required.
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
Yes No NA NE
❑ ❑ ❑
Yes No NA NE
■❑❑❑
Cl ❑ E ❑
Permit and Outfalls Yea No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: All components of the NCG permit appeared to be in good order and the site inspection_ reflected
its requirements.
Page: 3
MINING PERMITAPPLICATION REVIEW FORM
for
DIVISION OF WATER QUALITY
Project: CArz- �c Rrac-E (�UZCounty:
**Due Date for Comments Back to Land Quality Section.-__R1 16 **
Water Quality Section Review: Assigned to- Je iVl q bYaz_gai�
Date Review Completed W`k 1 �ZCM8
Will the operation, as proposed, violate standards of water quality? No
CQmments:lte._ ihI60-4. as P(-pDOw_J. W k 11 Jlsi_� b O_qq acmes
r r r� r r r r• r � r� ♦ � r
NPDES permit required
NPDES permit existing
Nondischarge permit required
Nondischarge permit existing
Wetianda-disturbed ✓—
401 Wetland Cer1_ required
YES
rho I CCb
'(Permit )
NIA
(Permit n ) NtA
Approved by: ADate: H (� g
9199
NO
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
December 1, 2006
- �matd=M=Mae=6wrr8; -
Martin Marietta Materials
2710 Wycliff Road
Raleigh, NC 27607
Subject: NPDES Mining General Permit Inspection
Martin Marietta Materials — East Alamance Quarry (NCG020029)
Alamance County
Dear Mr. Moe:
On November 28, 2006, Jenny Freeman of this office performed a General Permit Inspection at
Martin Marietta Materials — East Alamance Quarry located at 1666 Highway 49 North in
Alamance County, North Carolina. This facility holds General Permit No. NCG020029 under the
National Pollutant Discharge Elimination System (NPDES) to discharge Stormwater and
Wastewater from Mining Activities. Nuwan Wijesuriya (Environmental Engineer) and Tony
Jenkins (Plant Manager) were present for the inspection. This type of inspection consists of two
basic parts: an in -office review of facility files and self -monitoring data and an on -site inspection
of the facility's discharge outfalls. This particular inspection evaluated five (5) areas, and
observations from each area are addressed below:
1. Permit
The permit became effective January 19, 2005 and expires December 31, 2009.
2, Records/Reports
As required by the permit, the facility has implemented a Stormwater Best Management
Practices (BMPs) Plan for the site. All mandatory paperwork was available during the
inspection, including monitoring records, secondary containment information, and a complete
map of the quarry with the outfalls marked and labeled. The facility also has a Spill Prevention,
Control, and Countermeasure Plan dated April 10, 2003. Plant staff observes accumulated
stormwater in the secondary containment areas prior to release; records of these inspections
are maintained with permit records and reports.
3. Facility Site Review
Materials stored outside include kerosene (--250 gallon tank) and bulk oil storage, all in
secondary containment. The facility does conduct on site vehicle maintenance, utilizing more
than 55 gallons per month of new motor oil. Mine dewatering wastewater is pumped from the
borrow pit to discharge outfall.
4. Effluent/Receiving Waters
Stormwater and wastewater from the property discharges to Boyds Creek (Class C; NSW) in
the Cape Fear River Basin. There are two stormwater discharge outfalls: shop maintenance
area drainage (SD02), and overburden maintenance area drainage (SD03). Both outfalls have
settling ponds prior to discharge. The ponds are routinely cleaned out.. The pond in the
overburden maintenance area had been cleaned out the day before the inspection. There is
one wastewater discharge; the effluent appeared clear with no traceable solids.
North Carolina Division of Water Quality 585 Waughtown Street Winston Salem NC 27107
Internet: h2o.enr.state.nc.us
o ` NCarolina
NWturally
Phone (336) 771-5000 Customer Service
FAX (336) 771-4630 1-877-623-6748
An Equal OpportunitylAffirmative Action Employer — 50% Recycled110% Post Consumer Paper
Martin Marietta Materials — East Alamance Quarry 1
Page 2
December 1, 2006'
5. Self -Monitoring Program
The facility uses TriTest Laboratories for sample analysis. The facility is required to perform:
(1) Annual analytical monitoring for stormwater discharges from land disturbing activities and
process areas,
(2) Annual analytical monitoring for stormwater discharges from on -site vehicle maintenance
(3) Semi-annual qualititative monitoring for stormwater discharges from land disturbance areas,
process areas, and vehicle maintenance areas,
(4) Quarterly analytical monitoring for mine dewatering wastewater, and
(5) Weekly inspections of all stormwater BMPs
An on -site review of the monitoring data during the inspection showed that ail parameters were
evaluated per the specifications of the permit.
You are found to be in compliance with General Permit No. NCG020029, Please refer to the
attached report for further details from the inspection. if you have any questions concerning this
report, please contact Ms. Freeman or me at (336) 771-5000.
Sincerely,
Steve W. Tedder
Regional Supervisor.
Surface Water Protection Section
cc: NPS Assistance & Compliance Oversight Unit
SWP — Central Files
.•SWP W.SRO�
United States Environmental Protection Agency
Form Approved. '
EPA Washington, D.C. 2046C
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
- 1 N 1 - 5 IVCGUTOLrZ9 - — lTrIZB -0 i-VI—WoS
Remarks
J I 1 1 16
Inspection Work Days Facility Self -Monitoring Evaluation Rating 81 CA --------------------------- Reserved ----------------------
L 80
671 169 701 31 711 1 721 NI 73 W 74 711 1 1 1 _ 1 _ I
Section B: Facility.Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, afso include
Entry Timetbate
Permit Effective Date
POTW name and NPDES permit Number)
11:00 AM 06/11/28
05/01/19
East Alamance Quarry
Exit Time/Date
Permit Expiration Date
1666 Hwy 49 N
Haw River NC 2725E
12:00 PM 06/11/28
09/12/31
Name(s) of Onsite Representative (s)/Titles(s)/Ph one and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Steve Whitt,PO Box 30013 Raleigh NC 27622//919-781-4550/9195104739
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit ® Records/Reports ® Self -Monitoring Program ® Facility Site Review
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Jennifer M. Freeman WSRO wQ//336-771-5000/
/
l
Signature of Manageme t O A Reviewer Agency/Office/Phone and Fax Numbers Date
iG ��o
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page # 1
NPDES yr/mo/day inspection Type
3I NCG020029 111 12I 06/11/28 I 17 18IWI
(cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
nnv Freeman of this office performed a General Permit Insr)ection at Martin
IVIaIIMUCI IVICILCIIdIJ — L:dJL J'UOIIIdI1GC UUdlIy Wi dil;U dL IUUU rllyIIVVdy'id INIUILI1 Ill MldlIIdIIGC UUUIIty, NUI U I —
Carolina. This facility holds General Permit No. NCG020029 under the National Pollutant Discharge
Elimination System (NPDES) to discharge Stormwater and Wastewater from Mining Activities. Nuwan
Wijesuriya (Environmental Engineer) and Tony Jenkins (Plant Manager) were present for the inspection.
This type of inspection consists of two basic parts: an in -office review of facility files and self -monitoring data
and an on -site inspection of the facility's discharge outfalls. This particular inspection evaluated five (5)
areas, and observations from each area are addressed below:
1. Permit
The permit. became effective January 19, 2005 and expires December 31, 2009.
2. Records/Reports
As required by the permit, the facility has implemented a Stormwater Best Management Practices (BMPs)
Plan for the site. All mandatory paperwork was available during the inspection, including monitoring
records, secondary containment information, and a complete map of the quarry with the outfalls marked and
labeled.. The facility also has a Spill Prevention, Control, and Countermeasure Plan dated April 10, 2003.
Plant staff observes accumulated stormwater in the secondary containment areas prior to release; records
of these inspections are maintained with permit records and reports.
3. Facility Site Review
Materials stored outside include kerosene (--250 gallon tank) and bulk oil storage, all in secondary
containment. The facility does conduct on site vehicle maintenance, utilizing more than 55 gallons per
month of new motor oil. Mine dewatering wastewater is pumped from the borrow pit to discharge outfall.
4. Effluent/Receiving Waters
Stormwater and wastewater from the property discharges to Boyds Creek (Class C; NSW) in the Cape Fear
River Basin. There are two stormwater discharge outfalls: shop maintenance area drainage (SDO2), and
overburden maintenance area drainage (SDO3). Both outfalls have settling ponds prior to discharge. The
ponds are routinely cleaned out. The pond in the overburden maintenance'area had been cleaned out the
day before the inspection. There is one wastewater discharge; the effluent appeared clear with no traceable
solids.
5. Self -Monitoring Program
The facility uses ThTest Laboratories for sample analysis. The facility is required to perform:
(1) Annual analytical monitoring for stormwater discharges from land disturbing activities and process
areas,
(2) Annual analytical monitoring for stormwater discharges from on -site vehicle maintenance areas,
(3) Semi-annual quantitative monitoring for stormwater discharges from land disturbance areas, process
areas, and vehicle maintenance areas,
(4) Quarterly analytical monitoring for mine dewatering wastewater, and
(5) Weekly inspections of all stormwater BMPs
An on -site review of the monitoring data during the inspection showed that all parameters were evaluated
per the specifications of the permit.
You are found to be in compliance with General Permit No. NCG020029.
Page # 2
Permit: NCG020029
Inspection Date: 11128/2006
Owner - Facility: East Alamance Quarry
Inspection Type: Stormwater
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new application?
n
n
n
Is the facility as described in the permit?
■
n
n
n
# Are there any special conditions for the permit?
❑
■
n
n
Is access to the plant site restricted to the general public?
n
n
n
Is the inspector granted access to all areas for inspection?
❑
L
n
Comment:
Page # 3
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
February 7, 2005
Donald M Moe
Martin Marietta Materials Inc
PO Box 30013
Raleigh, NC 276220013
Subject: NPDES Stormwater Permit Coverage Renewal
East Alamance Quarry
COC Number NCG020029
Alamance County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water
Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize
yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of
wastewater. You must meet the provisions of the permit for the types of discharges present at your facility. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
• A new Certificate of Coverage
A copy of General Stormwater Permit NCG020000
• A copy of a Technical Bulletin for the general permit
• Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater
Five copies of Qualitative Monitoring Report Form
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification
or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other
permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable
federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater Permitting
Unit at (919) 733-5083, ext.578.
Sincerely,
for Alan W. Klimek, P.E.
cc: Central Files
Stormwater & General Permits Unit Files
Winston-Salem Regional Office
one
NoahCarolina
Xaturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: h2o.enr.state.nc.ustsulstormwater.html 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 1-877-623-6749
An Equal OpportunitylAffirmabve Action Employer- 50% Recycled110% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020029
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Martin Marietta Materials Inc
is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated
with mine dewatering wastewater and process wastewater from a facility located at
East Alamance Quarry
1666 Hwy 49 N
Haw River
Alamance County
to receiving waters designated as Boyds Creek, a class C;NSW stream in the Cape Fear River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, IV, V, and VI of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective February 7, 2005.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 7, 2005
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Pormit: Owner - Facility: f
Inspoction Date: Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Preventlon Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ❑ ❑ '❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls Yes No NA NE
# is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ ❑
# Were all outfalis observed during the inspection? ❑ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ 1100
# Has the facility evaluated all illicit (non stormwater) discharges? 0 000
Comment: