HomeMy WebLinkAboutWQ0010059_Compliance Evaluation Inspection_20191227
December 27, 2019
Elisa Triplett
City of Lenoir
PO Box 958
Lenoir, NC 28645
SUBJECT: Compliance Inspection Report
City of Lenoir Lenoir Blends Processing Facility and Distribution Program
Non-discharge Permit No. WQ0010059
Caldwell County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the City of Lenoir Lenoir
Blends Processing Facility and Distribution Program on 12/18/2019. This inspection was conducted to
verify that the facility is operating in compliance with the conditions and limitations specified in
Non-discharge Permit No. WQ0010059. The findings and comments noted during this inspection are
provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report".
If you should have any questions, please do not hesitate to contact me at 828-296-4686 or via email at
mikal.willmer@ncdenr.gov.
Sincerely,
Mikal Willmer, Environmental Specialist II
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
EC: WQS-ARO Server, LF
G:\WR\WQ\Caldwell\Wastewater\Non-discharge\City of Lenoir\Inspections\Dec. 18, 2019 CEI\20191227_WQ0010059_CEI
Compliance Inspection Report
Permit:WQ0010059 Effective:08/01/15 Expiration:07/31/20 Owner :City of Lenoir
SOC:
Contact Person:
Region:
County:
Directions to Facility:
Caldwell
Asheville
Elisa Triplett
Effective:Expiration:Facility:City of Lenoir Lenoir Blends Processing Facility and Distribution Program
1905 Broadland Rd
Lenoir NC 28645
Title:Phone:828-757-2198Wastewater Treatment Plant Superintendent
From Hwy. 64 East in Lenoir turn right onto Southwest Blvd. Take the first exit off Southwest to Virginia ST. (left on Virginia St.)
Continue to Broadland Rd. on the right. Facility is approximately 1/2 mile on the left.
Secondary ORC(s):
Phone:Certification:Primary ORC:
System Classifications:
On-Site Representative(s):
Related Permits:
Secondary Inspector(s):
Primary Inspector:
Inspection Date:Exit Time:Entry Time:
Phone:
12/18/2019 10:00AM 01:00PM
Mikal Willmer 828-296-4686
Facility Status:
Permit Inspection Type:
Reason for Inspection:Inspection Type:
Not CompliantCompliant
Other
Distribution of Residual Solids (503)
Compliance Evaluation
Question Areas:
Miscellaneous Questions
(See attachment summary)
Page 1 of 3
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0010059
12/18/2019 Compliance Evaluation
City of Lenoir
Other
Inspection Summary:
Mikal Willmer & Tim Heim, with the Asheville Regional Office, conducted a compliance evaluation inspection of the City of
Lenoir's Class A distribution facility on December 18, 2019. This inspection was conducted in conjunction with the facility's
NPDES inspection and to ascertain the timeline for installation of the new thermal belt dryer system. Donnie Hawkins (ORC)
and Lisa Triplett (Wastewater superintendent) were present and assisted in the inspection.
The following items were discussed and/or noted during the inspection.
Thermal Belt Dryer: Currently scheduled to begin installation in January of this coming year and be fully operational by 2021.
Ms. Triplett indicated the City still intends to have an initial start-up period to acclimate to the new system before any
distribution occurs. The City is currently planning to landfill all residuals until 2021. New belt dryer and belt filter press will be
inside. The current covered storage pad will be enclosed on three sides once upgrades are complete. SCADA will be
installed with the new system and the air system will be updated in the current sludge holding tank. The City still plans to
continue bulk distributions. Recommend public outreach/education regarding the new biosolids product once the nutrient
and mineral content is established.
O&M Manual: Ms. Triplett indicated the O&M manual, submitted with the application add info request, would be modified
once facility staff have established standard operating procedures and schedules for the new equipment and process.
Please provide a copy to the Division when this occurs.
Residuals Sources: Any future residuals from other sources, not introduced at the headworks, would require a permit
modification and would need to be added as a residuals source. Please notify our office if there are any planned changes to
the method of accepting Blowing Rock's residuals.
Page 2 of 3
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0010059
12/18/2019 Compliance Evaluation
City of Lenoir
Other
Type Yes No NA NE
Land Application
Distribution and Marketing
Page 3 of 3
Certificate Of Completion
Envelope Id: E8BACD7537F5493692A068871BD4B82A Status: Completed
Subject: Please DocuSign: 20191227_WQ0010059_CEI.ltr.docx, 20191227_WQ0010059_CEI.inspect.pdf
Source Envelope:
Document Pages: 4 Signatures: 1 Envelope Originator:
Certificate Pages: 1 Initials: 1 Mikal Willmer
AutoNav: Disabled
EnvelopeId Stamping: Disabled
Time Zone: (UTC-05:00) Eastern Time (US & Canada)
217 W. Jones Street
Raleigh, NC 27699
Mikal.willmer@ncdenr.gov
IP Address: 149.168.204.10
Record Tracking
Status: Original
Dec 27, 2019 | 08:49
Holder: Mikal Willmer
Mikal.willmer@ncdenr.gov
Location: DocuSign
Signer Events Signature Timestamp
Mikal Willmer
mikal.willmer@ncdenr.gov
Environmental Specialist
North Carolina Department of Environmental Quality
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 149.168.204.10
Sent: Dec 27, 2019 | 08:49
Viewed: Dec 27, 2019 | 08:52
Signed: Dec 27, 2019 | 08:52
Freeform Signing
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted Dec 27, 2019 | 08:49
Certified Delivered Security Checked Dec 27, 2019 | 08:52
Signing Complete Security Checked Dec 27, 2019 | 08:52
Completed Security Checked Dec 27, 2019 | 08:52
Payment Events Status Timestamps