Loading...
HomeMy WebLinkAboutWQ0010059_Compliance Evaluation Inspection_20191227 December 27, 2019 Elisa Triplett City of Lenoir PO Box 958 Lenoir, NC 28645 SUBJECT: Compliance Inspection Report City of Lenoir Lenoir Blends Processing Facility and Distribution Program Non-discharge Permit No. WQ0010059 Caldwell County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the City of Lenoir Lenoir Blends Processing Facility and Distribution Program on 12/18/2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Non-discharge Permit No. WQ0010059. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". If you should have any questions, please do not hesitate to contact me at 828-296-4686 or via email at mikal.willmer@ncdenr.gov. Sincerely, Mikal Willmer, Environmental Specialist II Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS: Inspection Report EC: WQS-ARO Server, LF G:\WR\WQ\Caldwell\Wastewater\Non-discharge\City of Lenoir\Inspections\Dec. 18, 2019 CEI\20191227_WQ0010059_CEI Compliance Inspection Report Permit:WQ0010059 Effective:08/01/15 Expiration:07/31/20 Owner :City of Lenoir SOC: Contact Person: Region: County: Directions to Facility: Caldwell Asheville Elisa Triplett Effective:Expiration:Facility:City of Lenoir Lenoir Blends Processing Facility and Distribution Program 1905 Broadland Rd Lenoir NC 28645 Title:Phone:828-757-2198Wastewater Treatment Plant Superintendent From Hwy. 64 East in Lenoir turn right onto Southwest Blvd. Take the first exit off Southwest to Virginia ST. (left on Virginia St.) Continue to Broadland Rd. on the right. Facility is approximately 1/2 mile on the left. Secondary ORC(s): Phone:Certification:Primary ORC: System Classifications: On-Site Representative(s): Related Permits: Secondary Inspector(s): Primary Inspector: Inspection Date:Exit Time:Entry Time: Phone: 12/18/2019 10:00AM 01:00PM Mikal Willmer 828-296-4686 Facility Status: Permit Inspection Type: Reason for Inspection:Inspection Type: Not CompliantCompliant Other Distribution of Residual Solids (503) Compliance Evaluation Question Areas: Miscellaneous Questions (See attachment summary) Page 1 of 3 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0010059 12/18/2019 Compliance Evaluation City of Lenoir Other Inspection Summary: Mikal Willmer & Tim Heim, with the Asheville Regional Office, conducted a compliance evaluation inspection of the City of Lenoir's Class A distribution facility on December 18, 2019. This inspection was conducted in conjunction with the facility's NPDES inspection and to ascertain the timeline for installation of the new thermal belt dryer system. Donnie Hawkins (ORC) and Lisa Triplett (Wastewater superintendent) were present and assisted in the inspection. The following items were discussed and/or noted during the inspection. Thermal Belt Dryer: Currently scheduled to begin installation in January of this coming year and be fully operational by 2021. Ms. Triplett indicated the City still intends to have an initial start-up period to acclimate to the new system before any distribution occurs. The City is currently planning to landfill all residuals until 2021. New belt dryer and belt filter press will be inside. The current covered storage pad will be enclosed on three sides once upgrades are complete. SCADA will be installed with the new system and the air system will be updated in the current sludge holding tank. The City still plans to continue bulk distributions. Recommend public outreach/education regarding the new biosolids product once the nutrient and mineral content is established. O&M Manual: Ms. Triplett indicated the O&M manual, submitted with the application add info request, would be modified once facility staff have established standard operating procedures and schedules for the new equipment and process. Please provide a copy to the Division when this occurs. Residuals Sources: Any future residuals from other sources, not introduced at the headworks, would require a permit modification and would need to be added as a residuals source. Please notify our office if there are any planned changes to the method of accepting Blowing Rock's residuals. Page 2 of 3 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0010059 12/18/2019 Compliance Evaluation City of Lenoir Other Type Yes No NA NE Land Application Distribution and Marketing Page 3 of 3 Certificate Of Completion Envelope Id: E8BACD7537F5493692A068871BD4B82A Status: Completed Subject: Please DocuSign: 20191227_WQ0010059_CEI.ltr.docx, 20191227_WQ0010059_CEI.inspect.pdf Source Envelope: Document Pages: 4 Signatures: 1 Envelope Originator: Certificate Pages: 1 Initials: 1 Mikal Willmer AutoNav: Disabled EnvelopeId Stamping: Disabled Time Zone: (UTC-05:00) Eastern Time (US & Canada) 217 W. Jones Street Raleigh, NC 27699 Mikal.willmer@ncdenr.gov IP Address: 149.168.204.10 Record Tracking Status: Original Dec 27, 2019 | 08:49 Holder: Mikal Willmer Mikal.willmer@ncdenr.gov Location: DocuSign Signer Events Signature Timestamp Mikal Willmer mikal.willmer@ncdenr.gov Environmental Specialist North Carolina Department of Environmental Quality Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 149.168.204.10 Sent: Dec 27, 2019 | 08:49 Viewed: Dec 27, 2019 | 08:52 Signed: Dec 27, 2019 | 08:52 Freeform Signing Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted Dec 27, 2019 | 08:49 Certified Delivered Security Checked Dec 27, 2019 | 08:52 Signing Complete Security Checked Dec 27, 2019 | 08:52 Completed Security Checked Dec 27, 2019 | 08:52 Payment Events Status Timestamps