Loading...
HomeMy WebLinkAboutWQ0041329_Application (FTSE)_20191122I4 State of North Carolina Department of Cnvirontnentai Qunlity Division of Writer Resources 1SA NCAC 02T .0300 -- FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: !�0 U L ( �717 G (Ia be coinoelcd by nWR) All items must be coat leted or the Rrmllcatlon will be returned 1. APPLICANT INFORMATION: I. Applicant's name: TQ%vn ofFugttav-Varina (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ IndividuaI ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ Stale/County ® Municipal ❑ Other 3. Signature authority's name: Jay T. Meyers. PE per 15A NCAC_02T.0I06(b) Title: Public Utilities Director 4. Applicant's mailing address: 401 Old Honeycutt Road Z City: FucUav-Varina Stale: ihLC Zip: 27526-_ a 5. Applicant's contact information: o Phone number: 919 567-3911 Email Address: imeyersQfuquay-varina.ore Do 11. PROJECT INFORMATION: go r.) 0 I. Project name: Arlington Meadows Q CD 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/project p co If a modification, provide the existing permit number: WQ00� and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 � 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees). Latitude: 35_ .s60908 Longitude: - 8.77 85985° 5. Parcel ID (if applicable): PIN 0665399098 AND 066529926J (or Parcel ID to closest downstream sever) I1I. CONSULTANT INFORMATION: 1. Professional Engineer: Thomas Spaulding License Number: 019375 FirnuSaulding.&Norrls..PA Mailing address: 972 Trinity Rd City: Raleigh State: NC Zip: 2Z607- Phone number: 919 85 -7990 Email Address: IOM(aspauldingnorris.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION; 1. Facility Name: Harnett Cgunly WTTP Permit Number: W 6b Owner Name: Hamett County 1 V. RECEIVING DOWNSTREAM SEWER INFORMATION ordifferent titan WNVTF): 4. Permit Number(s): WQ0040793 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection Sys(em_Perin it Numbers) (if antplicable): WQCS00193 Owner Name(s): Town of Funuay_Varina FORM: FTA 04-16 Page I ors Vl. GENERAL REQUIREMENTS I. If the Applicnni is a Privately -Owned Public Utility, has a Certificate of Public Convenience mrd Necessity been nitached? ❑ Yes ❑No ®NIA 2. If the Applicant is a Developer of lots to be sold, has a Deveio cr's Operational Agreement FOR • DED been attached? ❑ Yes ❑No ®NIA 3. If the Applicant is a Home/Property Owners' Association has an O eralional Agreement FORM: HOA been attached? ❑ Yes ❑No ®NIA 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparationtservice ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Fflter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater : 1 D0 % Domestic/Comtnercial _ _% Commercial % Industrial (See 15A NCAC 02T .0103(20)) 4Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under I5A NCAC 02T .0114(f)7 Yes l,� No D irves, provide n cony or now reduction annroval letter 7. Summarize wastewater generated by project: Establishment Type (see 211.01140 Daily Design Flow No, of Units Flow Single Family Units 300 gol/day 90 27,000 GPD gav GPD gav GPD gov GPD gall GPD gall GPD Total 27,000 GPD c/ a See I SA NCAC 021' .0114(b). (d), (e)(I) and (e)(2) for caveats to wastewater design now rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals ns defined In G,S.d2A-4). -- -- b Per I5A NCAC 02T .01 14(c), design now rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 27,QQ0 GPD (per 15A NCAC 02T.01 14) D Do not include future flows or previously permitted allocations ifpermitied flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehab! Iitation or replacement of existing sewer with no new flow expected ❑ Other (Explain). FORM: PTA 04-16 Page 2 or5 VII. Vlll. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & iNDC fQrnvity Sewers): I. Summarize gravity sewer to be permitted: Size (incites) Length (feet) Material 8 6,162 PVC ti 1,151 DIP D Section lI &III of the MDC for Permitting of Gravity Sewers contains information related to design criteria D Section III contains information related to minimum slopes for gravity setver(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) —02'r .0305 & MDC (Puffin Stnlions/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: �° Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of titre pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (incites) Length (feet) Material 6. Power reliability in accordance with , 5A NCAC 02T .0305 h I : ❑ Standby power source or pump with automatic activation and telemetry -15A NCAC 02T .0305(h)(l)(B)_ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day; ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with pluggedentergency pump connection and telemetry - 15A NCAC 02T.0305(h)(I)(C): D it shall be demonstrated to the Division that tine portable source is owned or contracted by the applicant (draft agreement) and Is compatible with tite station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided In tite case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS— (02B .0200 & 15A NCAC 02T .0305(t)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305ff) & (g) ® Yes ❑ No I5A NCAC 02T.0305 contains minimum separations that shall be provided for server s stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer Including In benclied trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private orpublic watersupply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, Impoundment, or ground water lowering and surface drainage ditches 10 feet Any,building foundation 5 feet My basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches > 15A NCAC 02T.0305fe1 contains alternatives where separations in 02T.0305 cannot be achieved. D **Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee D If noncompliance with 02T.0305(f) or (gh see Section X ofthis application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® NIA D See the Division's draft separation requirements for situations where separation cannot be meet D No variance is required If the alternative design criteria specified is utilized in design and constriction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ®N/A D This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coveragelauthorizntioti under a 404 Nationwide or Individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch ® Yes [--]No 5. Does project comply with 15A NCAC 02T.0105 c 6 (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105 c 6 directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this perni t is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siplion, or sewer positioned parallel to streambnnks that is subject to erosion that undermines or deteriorates the sewer, ❑ Yes ®No ❑ NIA D If yes, include an attachment with details for each line, Including type (aerial line, size, material, and location). High priority litres shall be inspected by the permlttee or Its representative nt least once every six -months and Inspections documented per ISA NCAC 02T,0403(a)(5) or the perntitee's individual System -Wide Colleefion perntil. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply will, 15A CAC 02L the Minimum Design Criteria for the Permitting of emu§ ntians and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria flatesl version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10- I4) and supporting documents for review. Approval of (lie reguest. is re uir•ed prior to submittal of the Fast Tracts An plientioa and support Indocuments. 2, Professional Engineer's Certification: M s name from Application Item III,I.) that this application for has been reviewed by me and Is accurate, complete and consistent with the h,forniatlon supplied in the plans, specitications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (Incest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals niny have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3, Applicant's Certification per I5A NCAC 02T .0106((b):: r 10{ C 0 1 t l� t 1, a -r r "i LF %� i� t V fl 1 !� r attest that this application for (Signs tre Auth rity's nanik & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if ail required pails of this application are not completed and that if all required supporting documentation and attachments are not Included, this pplication package is subject to being returned as inoomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result In an immediate enforcement action that may include civil penalties, Injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand thal if all required parts of this application package are not completed and that if all required supporting information and attachments are not Included, this application package will be returned to me as Incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613. any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signature: 1� X/V/1 Date, 11.0 0J f 7 FORM: FTA 04-16 Page 5 of 5 _ State of North Carolina Department of Environmental Quality Division of Water Resources M, Ision of %Vater Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Fuquay-Varina Project Name for which flow is being requested: Arlington Meadows S/D Phase 1-6 r More than one FTSE may be required far a single project if the owner of the WI-VTP is not responsible for all pump stations along the route of the proposed irastimaterjlow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NCO021636 A11 flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 1.146 MGD FV Obligated Flow NYT 0.570 MGD Lillington Obligated Flow NYT 0.113 MGD HC Obligated Flow NYT 0.324 MGD Angier Obligated Flow NYT 0.139 MGD e. WWTP facility's actual avg. flow 5.000 MGD FV Actual Flow 1.402 MGD Lillington Actual Flow 0.800 MGD HC Actual Flow 2.151 MGD Angier Actual Flow 0.647 MGD f TotaI flow for this specific request _ 0.027 ,MGD g. Total actual and obligated flows to the facility 6.173 MGD FV Actual Avg. + Obligated Flow 1.999 MGD LiIlington Actual Avg. + Obligated Flow 0.913 MGD HC Actual Avg. + Obligated Flow 2.475 MGD Angier Actual + Obligated Flow 0.786 MGD h. Percent of permitted flow used 82.31 % Page 1 of FTSE 06-13 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow* * Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm i pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS 120 14.4 5.76 2.755 0.995 3.7503 2.010 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 III. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this waste)ater flow. Signing Official Signature 14 - .2.3-1 f Date Page 2 of 4 FTS Ew 06-13 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director November 7, 2001 Mr. Michael A. Allway, Assistant Town Manager Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, North Carolina 27526 Dear Mr. Allway: NCDENR NORTH CAROLINA DEPARTMENT of ENVIRONMENT AIM NATURAL RESOURCES lw:ECEEIIAM NIJV 0 8 2001 Subject: Town of Fuquay-Varina FIow Reduction Approval Wake County d -Va" On September 10, 2001, the Division of Water Quality Non Discharge Permitting Unit received your flow reduction request for future and present, but not yet tributary, single-family dwellings in the Town of Fuquay-Varina. The letter requests approval of a residential flow value of 220 GPD/residence for these dwellings. The information provided water use information for 2000 and actual daily waste water flow recordings for their peak month of May. Other supporting data was provided. The evaluation covered 90 homes that are representative of the subdivisions in Fuquay-Varina in accordance with 15A NCAC 2H .0219(1)(3). Based on the information submitted. the Division hereby approves the use of 75 GPD per bedroom per dwelling for residential units (225 GPD per three bedroom home) in all applicable non -discharge permit applications for future sewer line extensions and present, but not yet tributary projects for the Town of Fuquay- Varina. The Division did note that the average flow per residence in February 2000 was 271 GPD. Reeardless of the adiusted desiLen daily wastewater flow rate at no time shall the wastewater flows exceed the effluent limits defined in the Town's NPDES vermi t for the'treatment facilitit or exceed the cai3acitv of the sewers downstream of any new sewer extension. Please submit a separate letter to the Raleigh Regional Office that requests flow reductions for specific previously permitted projects (indicate permit number, project name, permitted flow, new flow under reduction and the difference between, them). If you have any questions or comments regarding this matter, please contact Marie Doklovic at (919)733-5083 ext. 371. Since , C' Gregory I, Thorpe, Ph.D. cc: Raleigh Regional Office Flow Reduction File 1617 Mail Service Center. Raleigh, North Carolina 27699-16 t 7 Telephone 919-733-5093 Fax 919-7I5-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper S ' I 'uDD I Ind ;11-`_ SCALE 1:24 000 FUQUAY-VARINA, NC 1 0.5 0 KILOMETERS 1 2 2016 1000 500 0 METERS 1000 2000 1 0.5 0 1 MILES 1000 0 1000 2000 3m 4000 5" 6000 7000 4000 10000 aq MLINGTON ME"' rn rmnru run: TRUE HOMES am ) * 649 BREKONRIDGE CENTRE DR. c FUQUAY-VARINA, WAKE COUNTY NORTH CAROLINA SUITE 104 cm c SEWER PERMIT MDNROE NC 2e„o DATE : 1i/21/20i9 USGS QUAD 'FUQUAY-VARINA' S&N FIRM CERT. #: C-1875 PROJECT ENGINEER: C+ THOMAS J. SPAULDING PROJECT CADD DESIGNER: THE SPAULDING GROUP, PA BD n 9 L planning civil engintering 161IJnefF nRadSuittlolRaleigbNC27� PROJECT SURVEYOR: Pb ne(919)954 7990 Fax 919 854 7925 ROBINSON & PLANTE, PLC FUTURE SEWER (PHASE 7-10) F, PHASE 10 ; , PHASE B RO'10 PJIASE 8 �- EXISTING SE+ (BY OTHERS) aLINGTON A AWWS FUOUAY-VARINA, WAKE COUNTY, NORTH CAROLINA SEWER PERMIT STREET LEVEL MAP THE SPAULDING GROUP, PA pknniad civil cadiueriea 1611 j*AffP=Jm AmdS"101 Rdd A NC176W AMBER FOREST DRIVE 7 ' n� % PHASE 4 P Sfl 3 PHASE •`_.� PHASE 5 % • 1 i' I PHASE6T ,.1 RUE HOMES !649 BREKONRIDGE CENTRE [ ;UITE 104 IONROE, NC 28110 DATE : 11/21/2019 S&N FIRM CERT. #: C-1875 PROJECT ENGINEER: THOMAS J. SPAULDING PROJECT CADD DESIGNER: BD PROJECT SURVEYOR: ROBINSON & PLANTE, PLC PROPOSED SEWER (PHASE 1-6) PROPOSEDI SITE THE SPAULDING GROUT; PA planning - civil engineering Arlington Meadows Project Narrative: The proposed Arlington Meadows Development is located at 1401 Angier Road, Fuquay -Varina, NC 27526. The site is approximately 3,200 LF south of the intersection of S Judd Parkway SE and Angier Road. The ultimate project includes infrastructure construction for 172 Single Family Residential Units. The enclosed permits are for infrastructure construction associated with phases 1-6 (90 units). The homes in Phases 1- 6 will be served by 6,162 LF of 8" PVC and 1,151 LF of DIP sewer mains with a proposed flow of 27,000 GPD. A sanitary sewer outfall will be constructed within acquired easements through the Niels Crossing Subdivision and connect to a proposed sewer outfall currently under construction by the adjacent Geneva Subdivision. Please see enclosed Utility Plans. Project Schedule: Construction of Arlington Meadows is anticipated to begin in November of 2019. Infrastructure construction for phases 1-6 is estimated to be complete by May of 2020. Complete build -out of phases 1-6 and issuance of certificates of occupancy is expected to be complete by May 2021. NCDept of Environn+ental Quality' Gov 7 7 Mg Ra'16911 Itcgioi}al O r1 icc Q 0 THE SPAULDING GROUP, PA planning - civil engineering TRANSMITTAL To: NCDENR- Water Quality Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276o9 Sending: ® Attached ❑ Shop Drawings ❑ Copy of Letter ❑ Total Quantity NC Dept of Environmental Quality NOV 2 7 2019 Raleigh Regional Office Date: 11/21/2019 Attention. Jason Robinson Job Number: 891 Re: Arlington Meadows Phase 1-6 Fuquay-Varina, Wake County Fast -Track Application PKG ❑ Under Separate Cover via: ❑ Prints ❑ Plans ❑ Other: ❑ Change Order ❑ Samples ❑ Reproducible ❑ Specification Copies Date Description 1 11-21-2019 $480.00 Review Fee 2 11-21-2019 Project Narrative, Cover Letter 2 10-16-2019 Fast Track Application for Gravity Sewers 2 10-16-2019 FTSE (Fuquay-Varina and Harnett County) 2 10-05-2019 USGS Map (Color) P2 10-05-2019 Vicinity Map 2 11-21-2019 1 Watershed Classification Form Transmitted far: ® Your use ❑ As Requested ❑ Review and Comment Comments: Mr. Robinson, ❑ Approved as Submitted ❑ Approved as Noted ❑ Returned for Corrections ❑ Copies for Approval ❑ Distribution Copies ❑ Corrected Prints Please see enclosed Fast Track Application (FTA 04-16) and accompanying documents for review And approval. Please contactme with any questions. Thank you. Copy to: Tom Spaulding, PE Phone: (919)854-7990. Fa& (919)854 7925 ■ 1611 Jones Franklin Road Suite 101 + Raleigh, NC 27607 Cashion, Ted From: Allen, Trent Sent: Friday, December 20, 2019 2:09 PM To: Cashion, Ted; Brantley, Mark Cc: Robinson, Jason Subject: RE: Fuquay subdivision to discharge 27,000 gpd to N. Harnett WWTP Ted, We do not have a problem with the added flow. Trent Allen Fayetteville Regional Supervisor Division of Water Resources 910 433 3336 office Trent.Allen (a)ncdenr.eov 225 Green Street —Suite 714 Fayetteville, NC 28301 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Cashion, Ted Sent: Thursday, December 19, 2019 4:29 PM To: Allen, Trent <trent.allen@ncdenr.gov>; Brantley, Mark <mark.brantley@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: Fuquay subdivision to discharge 27,000 gpd to N. Harnett WWTP Hi Trent and Mark, Fuquay has a fast track sewer extension application in with us to build 90 homes with 27,000 gpd going to N. Harnett WWTP. Just checking with yall to ensure you're ok with this?? We'll cc you on the permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office