Loading...
HomeMy WebLinkAbout20070276 Ver 1_Approval Letter_20070307 O~O~ W A T ~9pG ~ _~ ®-1 o `~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources March 7, 2007 Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 2007-0276 County: Wake Mr. Richard C. & Lisa C. Needham 5108 Salinas Court Holly Springs, NC 27540 Subject Property: 5108 Salinas Court Deck Extension, Holly Springs, NC UT to Middle Creek [030403, 27-43-15-(1), C, NSW] AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B .0233) Authorization Certificate Dear Mr. and Mrs. Needham: You have our authorization, in accordance with 15A I~ICAC 02B .0233 and any conditions listed below, to impact approximately 435 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the proposed deck extension that is greater than 8 feet in height at the subject property as described within your application dated February 12, 2007, received by the Division of Water Quality on February 14, 2007, with additional information received by DWQ on March 5, 2007. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application, If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved (Units) Plan Location or Reference Zone 2 Buffers 435 (square ft.) Additional Information dated March 1, 2007 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: 401 Oversight/Express Review Permitting Unit ]650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: httn~//h2o enr.state nc.us/ncwetlands N ne Cazolina tura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper ,. Mr. & Mrs. Needham ~ ~' Page 2 of 3 March 7, 2007 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 6. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 7. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 8. Deed Notifications Mr. & Mrs. Needham Page 3 of 3 March 7, 2007 Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions or would like a copy of the buffer rules, please call Cyndi Karoly or Amy Chapman (919) 733-1786. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USAGE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. Sincerely, ~ ~~ A an W. Klimek, P.E. AWKlcbklasc Enclosures: Certificate of Completion cc: Lauren Cobb, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Filename: 070276Salin asCourtDeck(W ake)NB R