HomeMy WebLinkAboutWQ0041323_Application (FTSE)_20191220Permit Number WQ0041323
Program Category
Non -discharge
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
dean.hunkele
Coastal SWRule
Permitted Flow
Facility
Facility Name
The Point at Barclay Commercial Public Sewer
Location Address
Owner
Central Files APS _ SWP
11126/2019
Permit Tracking Slip
Status
Project Type
In review
New Project
Version
Permit Classification
A
Individual
Permit Contact Affiliation
Major/Minor Region
Minor Wilmington
County
New Hanover
Facility Contact Affiliation
Owner Name
Owner Type
Cape Fear Public Utility Authority Government - Municipal
Owner Affiliation
James R. Flechtner
PE
235 Government Center Dr
Dates/Events Wilmington NC 28403
Scheduled
Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
11/25/2019
—_-Reaulated Activities
9972
HANOVER DESIGN SERVICES,
Hanover Design Services, P.A.
Land Surveyors, Engineers, Land Planners
November 25, 2019
Mr. Dean Hunkele
Department of Environment and Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: The Pointe at Barclay Street and Utility Extensions
New submittal
New Hanover County
Dean:
EI
This is a new request for a 1,088 If sewer extension and 34,370 GPD of additional
commercial flow. Enclosed please find the submittal package which includes:
• A check for $480
• Fast Track Sewer Application and one additional copy
• Flow Tracking/Acceptance for Sewer Extension Application and one
additional copy
• 1- Sewer system Location Map
• 1- Sanitary Sewer Collection System Design Specifications
If you have any questions or comments, please feel free to contact me. Thanks.
Sidny,
Adam Grady, PE
Hanover Design Services P.A.
agrady@hdsilm.com
(910) 343-8002 Office
(910) 343-9941 Fax
1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9941
Business Firm License No. C-0597
State of North Carolina
P Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources M FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: C(N4 (J r3 (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: CFPUA (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal ® Other Authority
3. Signature authority's name: Jeff Theberge, P.E. per 15A NCAC 02T .0106(b)
Title: Engineering Manager
4. Applicant's mailing address: 235 Government Center Drive
City: Wilmington
State: NC Zip: 28403-_
5. Applicant's contact information:
Phone number: 910 332-6569 Email Address:+tet"ir :ttybett(a)cfpua.org
6673 jf:fb.THEBcittfE
II. PROJECT INFORMATION:
1. Project name: The Pointe at Barclay: Street and Utilities Extension
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000_ and issued date:
If new construction but part of a master plan, provide the existing permit number: W000_
3. County where project is located: New Hanover
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.17830 Longitude:-77.9199°
5. Parcel ID (if applicable): R06500-003-031-000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Adam H. Grady License Number: 43166
Firm: Hanover Design Services, PA
Mailing address: 1123 Floral Parkway
City: Wilmington
Phone number: 910 343-8002
State: NC Zip: 28403
Email Address: agradvAhdsilm.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Southside (Maffit) Permit Number: NCO0239373
Owner Name: Cane Fear Public Utility Authority
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): W00037196 Downstream (Receiving) Sewer Size: 8 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS0038604
Owner Name(s): Cave Fear Public Utility Authority
FORM: FTA 04-16 Pagel of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ®No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ®No ❑N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ®No ❑N/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ® Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater : % Domestic/Commercial 100 % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No
➢ If yes, provide a cony of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 021.01140
Daily Design Flow a•s
No. of Units
Flow
Commercial Future: Lots 1-3 and 5-7
880 gal/acre
17.58
15,470 GPD
Lot 4 Future Building 2
25 gal/Employee and 250/practitioner
8,900 GPD
Lot 4 Future Building 5
25 gal/Employee
200
5,000 GPD
Lot 4 Future Building 6
25 gal/Employee
200
5,000 GPD
gal/
GPD
gal/
GPD
Total
34,370 GPD
a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 34,370 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8 1088 DR 18 (C900)
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: _
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -
3. Design flow of the pump station: _ millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at _ feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B),.
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) &(e) [-]Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be orovided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee
➢ If noncompliance with 02T.0305(f) or (e). see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No N N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No N N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes N No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permittine Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? N Yes [-]No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402. "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes N No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Pennitting of Pump Stations
and Force Mains (latest version), and the Gmvit) Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
IfNo, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Aporoval of the reauest is required orior to submittal of the Fast Track Apmlication and su000rtine documents
2. Professional Engineer's Certification:
name
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T.0106(b):
P.E.
name & title from Application Item 1.3.)
CA RO /��i
`�?�Q,:�FESS/p�/•f �i�
aX SEAL 9r 9 =
4346
i
that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition
of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE In accordance with General Statutes 1.43-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: _
Date:
FORM: FTA 04-16 Page 5 of 5
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Cameron Properties Land Co. LLC.,
Project Name for which flow is being requested: Pointe at Barclay St & Utility Extension
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewaterJlow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: M'Kean Maffitt (Southside) WWTP
b. WWTP Facility Permit #: NPDES NC 0023973
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
AlI lows are in MGD
12.000
2.408
8.044
0.034370
10.487
ME
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
Pump
Pump
Station
Station
Firm
(Name or
Permit
Capacity,
Number)
No.
MGD
36
N/A
1.365
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Average
Approx.
Not Yet
Total Current
Daily Flow**
Current
Tributary
Flow Plus
(Firm / pf),
Avg. Daily
Daily Flow,
Obligated
Available
MGD
Flow, MGD
MGD
Flow
Capacity***
0.546
0.353
0.193
0.546
0.00
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a pealing factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cape Fear Public Utility Authority
Downstream Permit Number: WQ0037196
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Jeff Theberge, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Title of Signing
Page 2 of 6
FTSF 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
35% % and 0.193 MGD of the Available Capacity (E) in Pump Station
36 ; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
Pump Station 36 Expansion is in design or under construction with
planned completion in 2020 ; and/or
d. The following applies:
Pump station upgrades have been designed to provide future capacity for the full basin build
out. Construction began in 2019 and is expected to be complete in 2020.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
/i
Official
Page 3 of 6
FTSE 10-18