Loading...
HomeMy WebLinkAboutNCG160150_ROS Denial and Inspection Report_20191220ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Rogers Group Inc. Attention: Van Medlock 421 Great Circle Road Nashville, Tennessee 37830 NORTH CAROLINA Environmental Quality December 20, 2019 Subject: Compliance Evaluation Inspection Permit: NCG160000 Certificate of Coverage: NCG160150 Henderson County, North Carolina Dear Mr. Medlock: The Asheville Regional Office staff have reviewed your request dated December 17, 2019, for a determination that stormwater discharge outfall (SDO) 001 be granted representative outfall status for stormwater outfall 003. Based on the information and maps provided and site visit, we are Denying this request. Please see the enclosed inspection report for a full explanation for this denial. Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that representative outfall status has been denied. If changes in drainage areas, structures, processes, storage practices, or other activities occur that address the concerns leading to this denial, reapply to this office for representative outfall status based on updated information. If you have any questions or comments concerning this letter, please contact me at 828-296-4500. Sincerely, Stanley E. Ai GA Regional Engineer Land Quality Section Enclosure: Inspection Report cc: Bethany.Georgoulias@ncdenr.gov North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 �� / 828.296.4500 Compliance Inspection Report Permit: NCG160150 Effective: 08/01/19 Expiration: 05/31/24 Owner: Rogers Groupinc SOC: Effective: Expiration: Facility: Rogers Group, Inc. County: Henderson 2700 Asheville Hwy Region: Asheville Hendersonville NC 28791 Contact Person: Van D Medlock Title: Phone: Directions to Facility: System Classifications: Primary ORC; Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/17/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 10:30AM Exit Time: 12:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant E Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG160150 Owner- Facility: Rogers Group Inc Inspection Date: 12/17/201e Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 17, 2019 this facility was inspected for compliance and to determine if representative ouffall status could be approved as requested. I met with Alisa Hatmaker on site. During the inspection, the following compliance issues were noted: 1) Secondary containment was not provided for all bulk storage of liquid materials on site. The permittee is directed to immediately begin efforts to provide secondary containment for all bulk storage areas discussed on site as outlined in the NCG160000 General Permit. During the inspection, the following items were noted concerning the request for Representative Outfall Status 1) The storage of fine asphalt "dust' is exclusively located in the drainage area of Outfall 3. Representative Outfall Status cannot be granted for the facility because there is an industrial process likely to contribute to TSS in the drainage area of Outfall 3, and therefore the Industrial process is not the same or similar to the representative outfall requested. 2) There is no history of Analytical monitoring data for Outfall 3. Representative Outfall Status cannot be granted for the facility because there is no monitoring history for the outfall which is proposed to be excluded from analytical monitoring. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG160150 Owner- Facility: Rogers Group Inc Inspection Date: 12/17/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ M ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all oulfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non slormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3