Loading...
HomeMy WebLinkAbout510033_Compliance Evaluation Inspection_20191024O V-J v t nJ (VIA `IAA V Division of Water Resources Facility Number �' -� 0 Division of Soil and Water Conservation Other Agency 11 Type of Visit: t5rCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 1�0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: 'S a County: ah Region: R Farm Name: Owner Name: Mailing Address: Owner Email: Phone: Physical Address: 5f/ cmwaD x / 0aic Facility Contact: bno', Ali t°i91t?fa Title: 2 & - Phone: Onsite Representative: kPil _iftWeA48 h%Att*&d Integrator: Certified Operator: NPIr Certification Number: I9W3 Back-up Operator: Location of Farm: Latitude: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Qther Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. L ayer Discharues and Stream Impacts Pullets Other Poults Design Current Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non-Daity Beef Stocker Beef Feeder Beef Brood Cow I. Is any discharge observed from any part of the operation? ❑ Yes ]':A No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? []Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) [—]Yes []No ❑ NA ❑ NE 1. Is there evidence of a past discharge from any part of the operation? ❑ Yes 0 No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ® No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - 3 Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [] No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) YM 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes P No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any ofthe structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and;'or wet stacks) 9. Does any part of the waste management system other than the waste structures require []Yes allo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 5g No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes [gNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure. Sludge into Bare Soil ❑ Outside of Acceptable Crap Wind �`1V5) ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes J�j No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ® No [] NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? Ifyes, check the appropriate box below. ❑ Yes [,o No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [:]Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [A No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No J!�NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: ST - 3j Date of Ins ection: 51-3 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes CR No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA [] NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [� No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes �j No ❑ NA ❑ NE permit? (i.e., discharge, Freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). a6—Pr hi1I nfol � his cUjVnujeJby +hf aoal, a3-, s vfvf� 4 be, -W5 Y-ew, I IE"Yion Vevloaj q— Co l i b1 ) due-NI9far, �vo1k -Aacyjej " timi 10 4 311Q woo as SF woo6131 W&Wo- 3? (Jvs) 113I �q Woo 3q qo hlDp 4�� -%I 171D -sc o11,1W -I P)(0 l 1s , LI o n4440 y r/419 21�z4 CaM,O4'. P ± G 300 k 10169115 a �A cal u�. r a 03) . Good rec �,� .Soureacrea IeAjP _ �ed1e Reviewer/Inspector Name: SGh a Phone: gjq?91-ga3 Reviewer/Inspector Signature: Date: Page 3 of 3 21412015