HomeMy WebLinkAboutSW6190506_Final Permit_20191216ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Steven Neuschafer, City Manager
City of Dunn
PO Box 1065
Dunn, NC 28334
NORTH CAROLINA
Environmental Quality
December 16, 2019
Subject: Stormwater Permit No. SW6190506
Clarence Lee Tart Memorial Park Improvements
Harnett County
Dear Mr. Neuschafer:
The Division of Energy, Mineral and Land Resources (DEMLR), received a complete Stormwater
Management Permit Application for the subject project on December 16, 2019. Staff review of the plans
and specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 02H .1000. We are forwarding Permit No. SW6190506, dated
December 16, 2019, for the construction, operation and maintenance of the subject project and the
stormwater system. This permit shall be effective from the date of issuance shall be subject to the
conditions and limitations as specified therein, and does not supersede any other agency permit that may
be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per
NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this
permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required)
and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via
telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made
this permit shall be final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need
additional information concerning this matter, please contact Corey Anen at (919) 707-3649; or
Corey.Anen@ncdenr.gov.
Sincerely, l
for S. Daniel Smith,
Director, Division of Energy, Mineral and Land Resources
cc: SW6190506 File, Fayetteville Regional Office
cc: Del Crawford — Crawford Design Company
D EQ �� North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA
DepadmamofEnmmnmemlQuslfty /� 919.707.9200
State Stormwater Permit
Permit No. SW6190506
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT QUALITY
STATE STORMWATER MANAGEMENT PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
City of Dunn
for
Clarence Lee Tart Memorial Park Improvements
1269 South Elm Avenue, Dunn, NC
Harnett County
FOR THE
construction, operation and maintenance of a low density development, in compliance
with the provisions of 15A NCAC 02H .1000 (hereafter referred to as the "stormwater
rules") and the approved stormwater management plans and specifications, and other
supporting data as attached and on file with and approved by the State and considered
a part of this permit.
The Permit shall be effective from the date of issuance until rescinded and shall be
subject to the following specific conditions and limitations:
I. DESIGN STANDARDS
The overall tract built -upon area percentage for the project must be maintained
below 24%, as required by 15A NCAC 2H .1017 of the stormwater rules.
3. Approved plans and specifications for projects covered by this permit are
incorporated by reference and are enforceable parts of the permit.
4. The only runoff conveyance systems allowed will be vegetated conveyances
such as swales with minimum side slopes of 3:1 (H:V) as defined in the
stormwater rules and approved by the Division.
5. No piping is allowed except that minimum amount necessary to direct runoff
beneath an impervious surface such as a road or to provide access.
6. All roof drains must terminate at least 30 foot from the mean high water mark.
7. The built -upon areas associated with this project shall be located at least 30 feet
landward of all perennial and intermittent streams.
8. All swales that discharge into a wetland shall do so at a non -erosive velocity for
the 10-year storm.
9. Each builder and/or property owner must have plans for individual lots approved,
knowing and understanding the BUA limit and the prohibition against excessive
piping, how to size the driveway pipe, knowing where the buffer is on that lot,
Page 1 of 4
State Stormwater Permit
Permit No. SW6190506
knowing where the drainage easements are and the expectation to keep existing
swales open, and ensuring roof gutters and impervious surfaces are
disconnected to the maximum extent technically feasible.
10. Curb cuts must be provided where ribbon curbs and/or curb and gutter is
provided.
II. SCHEDULE OF COMPLIANCE
The permittee is responsible for verifying that the proposed built -upon area does
not exceed the allowable built -upon area.
2. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
3. This project may not be sold or subdivided in whole or in part without first
receiving a permit modification.
4. The following deed restrictions must be recorded with the Office of the Register
of Deeds:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW6190506.
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons
and parties claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the State.
f. This project may not be sold or subdivided, in whole or in part, without first
receiving a permit modification from the Division.
h. Construction of additional impervious areas such that low -density
requirements are no longer met will require a permit modification prior to
construction. An engineered system will be required to collect and treat
the runoff from all built -upon area associated with the project, including
that area permitted under the low density option.
i. Filling in or piping of any vegetative conveyances (ditches, swales, etc.)
associated with this development, except for average driveway crossings,
is strictly prohibited by any persons.
j. The built -upon areas shall be located a minimum of 30 feet landward of all
perennial and intermittent surface waters.
5. A copy of the recorded restrictions must be received in this Office within 30 days
of the date of sale.
6. Filling in or piping of any vegetative conveyances (ditches, swales, etc.)
associated with the permitted development, except for average driveway
crossings, is strictly prohibited by any persons.
7. The permittee shall submit to the Director and shall have received approval for
Page 2 of 4
State Stormwater Permit
Permit No. SW6190506
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area in whole or in
part. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering or piping any vegetative conveyance shown on the
approved plan.
8. During construction, erosion shall be kept to a minimum and any eroded areas of
the swales or other vegetated conveyances will be repaired immediately.
9. The permittee shall at all times provide the operation and maintenance
necessary to operate the permitted stormwater management systems at
optimum efficiency to include:
a. Inspections
b. Sediment removal.
c. Mowing, and re -vegetating of the side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
10. Within 30 days of completion of the project, the permittee shall certify in writing
that the project has been constructed in accordance with the approved plans.
11. The permittee shall submit all information requested by the Director or his
representative within the time frame specified in the written information request.
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. The Director may require modification or revocation and
re -issuance of the permit to change the name and incorporate such other
requirements as may be necessary. In the event of a name or ownership
change, a completed Name/Ownership Change form, signed by both parties,
must be submitted to the State accompanied by the supporting documentation
as listed on page 2 of the form. The approval of this request will be considered
on its merits, and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until the
Director approves a transfer of ownership. Neither the sale of the project nor the
transfer of common areas to a third party, such as a homeowner's association,
constitutes an approved transfer of the stormwater permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to an enforcement action in accordance with North
Carolina General Statutes 143-215.6A to 143-215.6C.
4. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules, and regulations contained in Session Law 2006-
246, Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000;
Page 3 of 4
State Stormwater Permit
Permit No. SW6190506
and North Carolina General Statute 143-215.1 et. al.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by the State, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants permission to DEQ Staff to enter the property during
normal business hours, for the purpose of inspecting all components of the
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance, or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the swales
must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state and federal), which have jurisdiction.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
Permit issued this the 16th day of December, 2019.
for S. Daniel Smith
Director Division of Energy, Mineral, and Land Resources
Page 4 of 4
City of Dunn
Clarence Lee Tart Memorial Park Improvements
Harnett County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project Name)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Submit to: NCDEQ-DEMLR Fayetteville Regional Office
225 Green Street, Suite 714
Fayetteville, NC 28301-5095
Page 1 of 1