Loading...
HomeMy WebLinkAboutWQ0041359_Application (FTSE)_20191219D.., I � W�� Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W —I 1 3 5 /(to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Movement Foundation (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Casey Crawford per 15A NCAC 02T .0106(b) Title: Treasurer 4. Applicant's mailing address: 11405 Community House Road City: Charlotte State: NC Zip: 28277- 5. Applicant's contact information: Phone number: (104) 526-9080 Email Address: Garrett@MoyementFoundation.com II. PROJECT INFORMATION: 1. Project name: Movement School East RECEIVED/NCI)EN ?ID`dUR [:SEC 1 3 '919 WQROS t�40ORCSVILLE REGIONAL OFFICE_ ❑ Privately -Owned Public Utility ❑ Other 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.209717' Longitude:-80.755278' 5. Parcel ID (if applicable): 10304127 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Greer Firm: Oak Engineering, PLLC Mailing address: 4929 Monroe Road City: Charlotte State: NC Phone number: (104) 989-4046 License Number: 33996 Zip: 28205- Email Address: Greg@Oak.Engineering IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek WWTP Permit Number: NCO024970 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ® Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) 4 Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0l 14(f) ❑ Yes ® No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01.14& T Daily Design Flow e°b No. of Units Flow School with Cafeteria 12 gal/Student 800 9,600 GPD CATs Transit Center (Employee Bathrooms Only) - General Business Facilities 25 gal/employee/shift 4 100 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 9,700 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 9,700 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 198 Clay (Existing) ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: ° Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) 1•H ❑ Portable pumping unit with plugged emergency pump connection and telemetry- 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(h1 & (a) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum seoarations that shall be nrovided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any buildin foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ "Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.01.05(c)(6) (additional permits/certifications)? ® Yes [:]No Per 15A NCAC 02T.0105(c)(6}, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 1, Greg Welsh (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: �••. Note Regarding Certifications: ; oFEss Doti ;? The sewer line being permitted was designed and constructed :4 SEAL r in the 1980's. The sewer line has been surveyed and inspected. 33996 s To the best of my knowledge, it meets the state's gravity sewer :• �� design criteria and minimum setback and separation requirements.F`c •`!.•' lyy ....................... 4 r,.......................,J>>................. $##glass 3. Applicant's Certification per 15A NCAC 02T .0106(b): I Casey Crawford attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — in accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature• Date: 12, - S - 1'1 FORM: FTA 04-16 Page 5 of 5 4 z - inch . M 3 m ti 3 a m Regal Estate c f w - o- Tiara Ln _ o - - - - C > a'o8v to Cb ch u, o` U _... ., m CO 2>_�� �mY382, ooE�o�� Ap Cl C7 c Gr oue 1►€" f g 1 C* �� 8 if r zs C7 CO c c v Yy V CD�s$ iilGii y col N •�rj Ln It LU Co 11JPPu� c co p m r� m �� p� U2 -- ae o ! wo c ! r U u co IC —ia0tlj3U' Ul 9 U �J�, J1��7�• ' � a aAt f t- ,a — v 0 . € L � FL `� g w _LLJ ;- �� �LU G O w N y ca 4 = w NN VCR ZZLu ::� w tw- N 4s 15 Q `jo ` .? '' O ILL Q l!J ' u d i3 - y"k mIMF 94� t„# State of North Carolina Department of Environmental Quality Division of Water Resources INNi"Nitmi, of Water r-�ar�ar� Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: OAK Engineering Project Name for which flow is being requested: Movement School East More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NCo024970, NC0024945, NCO024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 13.06 e. WWTP facility's actual avg. flow 74.98 f. Total flow for this specific request 0.0096 g. Total actual and obligated flows to the facility 88.053 h. Percent of permitted flow used 88.9% I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p fl, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Albemarle Road at Eastland Mall Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: I Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Chief Engineer Title of Signing Official Date Page 2 of 6 FTSE l0-1S SOSID: 1492962 Date Filed: 1/21/2016 12:09:00 PM Elaine F. Marshall North Carolina Secretary of State i C2015 237 00405 State of North Carolina -- Department of the Secretary of State APPLICATION FOR CERTIFICATE OF AUTHORITY FOR NONPROFIT CORPORATION Pursuant to 155A-15-03 of the Honoree Statutes of North Carolina, the undersigned corporation hereby applies for a Certificate of Authority to conduct affairs in the State of North Carolina, and for that purpose submits the following: 1. The name of the corporation is The Nownent Foundation, his. and if that name is unavailable for use in the State of North Carolina, the name the corporation wishes to use is: 2. The state or country under whose laws the corporation was orpmizsd is: shoe of Georgia, USA 3. The date of incorporation was Will 112012 -its period of duration'is:_ perpetual 4. The street address of the principal office of the corporation is: Number and Street 11403 N. Comrtu * House Road I1200 City, State, Zip Code Charlotte NC 28277 S. The mailing address jfd(Q'erant fim the sftd addrorr of the principal office oftha corporation is: 6. The street address and county of the registered office in the State of North Carolina is: Number and Street 11 W N, Communrrlty House Road #Wl City, State, Zip Code Charlotte. NO 28277 County- Me"riburg 7. The mailing address if dWe►ent )m the serer addnw of the regiatorod office in the State of North Carolina is: 8. The name of the registered agent in the State ofNorth Carolina is: cs* Crawford 9. The names and usual business addressee of the current officers afthe corporation are: Name Me Basinesa Add"$$ Toby Hants 11 President 11043 N. Community House Road e200. Charlotte NC 28277 Casey cmwfad Tress" 11040 N. Commw* Horne Road #2200, Chadolts NC 28277 Glenn Chembom Seerstsry 11048 N. Community House Road 0200, Charlotte NC 28277 Revised January 2000 Form N-09 CORPORATIONS DIVISION P. 0 BOX 29622 RALEIGH, NC 27626-0622 APPLICATION FOR CERTIFICATE OF AUTHORITY FOR NONPROFIT CORPORATION Page 2 10. (Check one of the following,) a. The corporation has members. b. ✓ The corporation does not have members. 11. Attached is a certificate of existence (or document of similar import), duly authenticated by the Secretary of State or other official having custody of corporate records in the state or country of incorporation. 12. If the corporation is required to use a fictitious name in order to carduct affbirs in this State, a copy of the resolution of its board of directors, certified by its secretary, adopting the fictitious name is attached. 13. This application will be effective upon filing, unless a date andlor time is specified: This the 14 day of 'August 20 15 The Movement Foundation, hc. Namo of Casey Crawford, Treasurer Type or Print Name and Title Notes: 1. Filing fee is $125. This document and one exact or conformed copy of this application must be filed with the Secretary of State. Revised January 2000 Form N-09 CORPORATIONS DIVISION R 0. BOX 29622 RALEIG}H, NC 27626-0622 Control Number: 12003097 STATE OF GEORGIA Secretary of State Corporations Division 313 West Tower 2 Martin Luther King, Jr. Dr. Atlanta, Georgia 30334-1530 CERTIFICATE OF EXISTENCE I, Brian P. Kemp, the Secretary of State of the State of Georgia; do hereby certify under the seal of my office that THE MOVEMENT FOUNDATION, INC. a'Domestic Nonprofit Corporation was formed in the jurisdiction stated below or was authorized to transact 'business in Georgia on the below date. Said entity is incompliance with the applicable filing and annual registration provisions of Title 14 of the Official Code of Georgia Annotated and has not filed articles of dissolution, certificate of cancellation or any other similar document with the office of the Secretary of State. This certificate relates only to the legal existence of the above -named entity as of the date issued. It does not certify whether or not a notice of,intent to dissolve, an application for withdrawal, a statement of commencement of winding up or any other similar document has been filed or is pending with the Secretary of State. This certificate is issued pursuant to Title 14 of the Official Code of Georgia Annotated and is prima -facie evidence that said entity is in existence or is authorized to transact business in this state. Docket Number :12451308 Datelnc/Auth/Filed :01/11/2012 Jurisdiction : Georgia Print Date : 1/15/2016 Form Number : 211 k00100 i Brian P. Kemp Secretary of State OAK] Greg Welsh <greg@oak.engineering> RE: [External] Re: Charlotte Private Sewer Research 1 message Fertenbaugh, Christyn L <christyn.fertenbaugh@ncdenr.gov> To: Greg Welsh <greg@oak.engineering>, Garrett <garrett@movementfoundation.org> You would have to ask Charlotte Water about their requirements for your project, as per your original email, they have asked that you determine whether or not it was permitted by NCDEQ. If you are developing the parcel adjacent that is served by this line, I would assume you will be adding building(s) and/or flow to the line (i.e. replacing what was on the parcel), and that is likely why they inquired? I'm happy to provide as much information as I can regarding anything we might have on file, but based on what has been provided previously, I have not been able to locate anything that appears to be for this sewer line. The provision regarding more than one building has been in place as long as the 02T Rules have existed, which were originally ri riginally promulgated around 2006. Prior to 02T, sewer extensions were governed by 02H and I am not overly familiar with what was included in those Rules. I assume a similar provision was listed in 02H, as our MDC have been in place since 1999 and carry over a lot of Rule -related items. Charlotte Water may have permitted the line in 2006 when they added the building, but then it would be a public sewer and not a private one — they are not delegated at this time to issue permits for private gravity sewers or private pump station/force mains extensions. I'm not sure if that helps clarify anything, but please let me know if I can provide further assistance. ChrIstVn L. Fertenbaugh, P.E. Environmental Engineer PERCS Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" Please note that my phone number has changed to 919-707-3625. 919-707-3625 — Office -OAK_ Greg Welsh <greg@oak.engineering> RE: [External] Private Sewer permit 1 message .......... Fertenbaugh, Christyn L <christyn.fertenbaugh@ncdenr.gov> Nov 21, 2019 at 1:04 PM To: Greg Welsh <greg@oak.engineering> Cc: "Jarrett, Jason" <jja rrett@ci. charlotte. nc. us>, "Buchanan, Emily" <Emily. Buchanan@ci.charlotte. nc.us>, Garrett <garrett@movementfoundation.org> Hello, I would recommend adding a qualifying statement to the certification page, next to the seal area, that states what you mentioned in your email — that to the best of your knowledge it meets the criteria even though it is an existing line and not a new one. That should be fine, and if the reviewer has any questions, they'll contact me and I can confirm. Thanks, Christyn L. Fertenbaugh, P.E. Environmental Engineer PERCS Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" Please note that my phone number has changed to 919-707-3625. 919-707-3625 — Office 919-807-6489 — Fax christyn,fertenbaugh@ncdenr.gov Mailing- 1617 Mail Service Center Raleigh, NC 27699-1617 Physical; 512 N. Salisbury Street, Rm. 925S Raleigh, NC 27604-1170 Greg Welsh <greg@oak.engineering> RE: [External] Private Sewer permit 1 message Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov> Thu, Nov 21, 2019 at 1:07 PM To: "Jarrett, Jason" <jjarrett@ci.charlotte. nc.us>, "Buchanan, Emily" <Emily.Buchanan@ci.charlotte.nc.us>, Greg Welsh <greg@oak.engineering> Cc: Garrett<garrett@movementfoundation.org> Hello, For this particular project, I would recommend estimating the current, actual flow for the CATS facility and including that in this permit. Should the flow have been already permitted somewhere else, although we cannot locate the permit, the additional "paper flow" will not adversely affect Charlotte Water's flow tracking, as "paper flow" converts to actual flow once the building is in place, and then any remaining "paper flow" is removed once the actual flow is known — so the flow tracking will remain the same with respect to the existing facility. Hopefully that makes sense, but if you have any further questions, please let me know. Thanks! Christyn L. Fertenbaugh, P.E. Environmental Engineer PERCS Unit Division of Water Resources Department of Environmental Quality "*Subscribe to Collection System & Sewer Permitting Updates** Please note that my phone number has changed to 919-707-3625. 919-707-3625 — Office 919-807-6489 — Fax christyn.fertenbaugh@ncdenr.gov Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N. Salisbury Street, Rm. 925S Raleigh, NC 27604-1170 North Carolina Secretary of State Search Results Page 1 of' 1 - Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings Non -Profit Corporation Legal Name The Movement Foundation, Inc. Information Sosld: 1492962 Status: Current -Active Citizenship: Foreign Date Formed: 1/21/2016 State of Incorporation: GA Registered Agent: Crawford, Casey Addresses Mailing 11045 N. Community House Road #200 Charlotte, NC 28277 Reg Office 11045 N. Community House Road #200 Charlotte, NC 28277 Principal Office 11045 N. Community House Road #200 Charlotte, NC 28277 Reg Mailing 11045 N. Community House Road #200 Charlotte, NC 28277 https://www.sosnc.gov/online services/search/Business Registration Results 12/16/2019 OAK E N G I N E E R I N G TRANSMITTAL December 11, 2019 Mr. Barry Love REGEIVEDINCDENR/DWR NCDEQ — Water Quality Section HC 13 2619 Mooresville Regional Office 610 E. Center Avenue l'UGRUS Mooresville, NC 28115 MOOM? SVILLE REGIONAL OFFICE 704-235-2143 RE: Movement School East 5249 Central Avenue, Charlotte NC NCDEQ Private Sanitary Sewer Extension Permitting (Retroactive Permit for Existing System) Mr. Love, Enclosed are the following items for your use: • Cover Letter o Site Map o Flow Tracking / Acceptance Form • Fast Track Sewer System Application (Signed Original) • NC Secretary of State Filing • Check for $480.00 to NCDEQ Please let me know if you need any additional information for your review of this project. Sincerely, Greg Welsh, PE OAK E N G I N E E R I N G oak.engineering 1 j PAGE OAK E N G I N E E R I N G _ = ="M December 5, 2019 C,EC 13 c'01,9 V,K)ROS r'"RESV!LLE= REGAONAL OFFICE COVER LETTER RE: Private Sanitary Sewer Application: Movement School East 5249 Central Avenue, Charlotte NC The Movement Foundation is renovating an existing facility and building a new two-story building to support their proposed Movement School East, a charter school located at 5249 Central Avenue in Charlotte, North Carolina (Parcel ID's 10304127 and 10304134). The proposed improvements will include renovating the existing 35,000 SF building (the former Harris Teeter building), constructing a new adjoining 2-story 63,000 GSF, adding approximately 125 vehicular parking spaces. The existing and proposed building will be served by an existing 8-inch private gravity sanitary sewer that crosses the adjoining property (formerly the Eastland Mall site). The private sewer connects to a City -maintained 10-inch trunk line. In 2006 the Charlotte Area Transit System (CATS) built a regional transit center on the Eastland Mall property. The sewer lateral serving the transit center was connected to the 8- inch private sewer. There's no evidence that this was properly permitted. The enclosed application is intended to permit the portion of the private sewer service that serves both facilities. Thank you for your review of this project. If you have any questions regarding this submittal, please contact me at qLeg_ cyak.enrgineeri� or by calling (704) 989-4046. Sincerely, Greg Welsh, PE OAKE N G I N E E R I N G oak.engineering Central Files: APS _ SWP _ 12/19/2019 Permit Number WQ0041359 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRuIe Permitted Flow 9,700 Facility Facility Name Movement School East Location Address Owner Owner Name The Movement Foundation Inc Dates/Events Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Type Non -Government Owner Affiliation Casey Crawford 11405 Community House Rd Charlotte NC 28277 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 12/19/2019 12/13/2019 12/19/2019 12/19/2019 Regulated Activities Requested /Received Events Food preparation, other Additional information requested School Additional information received Wastewater collection Outfall Waterbody Name Streamindex Number Current Class Subbasin