Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3191105_Millbridge Phase 7E Construction Documents_12/18/2019
W O. zaw z o-°°o w ,z Qo¢ wwo oo o �a0 =�o �w ozw F -p w�oz Uo z oz ow wY� =UQ ~p= OY� w�Q w o o m ¢ z< z OZ¢ oo < ozz Ow0 w w¢� ¢�z D w� wwoo 0 Fz w�Q ¢�Im_ mm� p Fr a22E zmz -3:2 oz8) U-O zzo ow_ YUF U On lo YmQ �=z o Ft oFt 0 =zw oo= aE2E o O ool 014 III PROJECT SITE VICINITY MAP N.T.S. DEVELOPMENT DATA FOR MILLBRIDGE PHASE 7E TAX PARCEL ID: 05168019 05168018 05168018B CONDITIONAL USE ZONING NO. CU-001545-2013 TOTAL ACREAGE: +/- 45.14 ACRES TOTAL AREA IN R/W: TOTAL AREA IN LOTS: TOTAL AREA IN COS: PERIMETER BUFFER: EXISTING POND: REMAINING: TOTAL AREA IN FUTURE 7F ZONING: PROPOSED USE: PROP. DENSITY: BUILDING TYPE: WATERSHED: FIRST WATERCOURSE: +/- 4.37 A.C. +/- 12.39 AC. +/- 7.47 A.C. +/- 0.85 A.C. (+/- 11.4%) +/- 1.01 A.C. (+/- 13.5%) +/- 5.61 A.C. (+/- 75.1 %) +/- 20.91 A.C. CU R4-PRD & CU R-3 (TOWN OF WAXHAW) SINGLE FAMILY RESIDENTIAL 3.10 UNITS/AC. DETACHED SINGLE FAMILY HOMES LOWER CATAWBA 12-MILE CREEK LOT SIZE: MIN LOT SIZE REQUIRED: 6,000 S.F. (0.138 AC.) MIN LOT SIZE PROVIDED: 6,032 S.F. (0.138 AC. - LOT #621-625) AVG. LOT SIZE PROVIDED: 7,135 S.F. (0.164 AC.) MAX LOT SIZE PROVIDED: 10,471 S.F. (0.24 AC. - LOT #678) LOT COUNT: TOTAL NUMBER OF DWELLINGS: 75 LOTS 52' SINGLE FAMILY (DETACHED) 75 LOTS (100%) (52' X 130' TYP.) BUILDING SETBACKS (MIN.) FRONT YARD SETBACK: 20' SIDE YARD SETBACK: 5' (10' CORNER LOTS) REAR LOT SETBACK: 20' *MAXIMUM STRUCTURE HEIGHT TO BE 45'* *MILLBRIDGE PHASE 7E SHALL COMPLY WITH PLAN REVIEW GUIDELINES FOR MILLBRIDGE SUBDIVISION* INTERNAL STREET NETWORK: TOTAL LINEAR FOOT DEEP RIVER WAY: 1,773 LF TOTAL LINEAR FOOT GABARDINE LANE: 481 LF TOTAL LINEAR FOOT BATISTE AVENUE: 548 LF TOTAL LINEAR FOOT WHIPCORD DRIVE: 795 LF TOTAL LINEAR FOOT HANCOCK ROAD: 210 LF INTERNAL STORMWATER RESTRICTIONS: BMP #1 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT BMP #2 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT BMP #3 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT GENERAL NOTES: BOUNDARY INFORMATION BOUNDARY INFORMATION OBTAINED FROM SURVEY PREPARED BY McKIM & CREED SIGNED JUNE 24TH, 2008 AND A SUPPLEMENTAL SURVEY COMPLETED BY SUMMIT OF THE CAROLINAS, P.C. ON NOVEMBER 18TH, 2016 TOPOGRAPHIC INFORMATION TOPOGRAPHY FOR THIS SECTION OF MILLBRIDGE IS A COMPILATION OF AERIAL SURVEY OBTAINED FROM LAND DESIGN, INC. ON OCTOBER 30, 2013. ROADWAY CONNECTIONS WERE OBTAINED FROM PHASE 7ABC CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL VERIFY ELEVATIONS PRIOR TO CONSTRUCTION. WETLAND & FEMA FLOOD INFORMATION WETLAND INFORMATION OBTAINED FROM SURVEY COMPLETED BY SUMMIT OF THE CAROLINAS, P.C. ON NOVEMBER 18TH, 2016. NO WETLANDS EXIST WITHIN MILLBRIDGE PHASE 7E BUT DO EXIST IN MILLBRIDGE PHASE 7F. THIS SITE IS LOCATED WITHIN FEMA FLOOD HAZARD ZONE 'X' PER PANEL 3710446300J. HORIZONTAL REFERENCE: NAD83 VERTICAL REFERENCE: NAVD88 SUBMITTED BY: LANDEAVOR, LLC 9101 SOUTHERN PINE BLVD STE 210 CHARLOTTE, NC 28273 PHONE NUMBER: (704) 525-5998 EMAIL:COOK@LANDEAVOR.COM DEVELOPER: LANDEAVOR, LLC 9101 SOUTHERN PINE BLVD STE 210 CHARLOTTE, NC 28273 PHONE NUMBER: (704) 525-5998 EMAIL:COOK@LANDEAVOR.COM DESIGN ENGINEER: W.K. DICKSON - WESTON BOLES, PE 1213 W. MOREHEAD STREET, SUITE 300 CHARLOTTE, NC 28208 PHONE NUMBER: (704)-334-5348 Z�n �I m 13 MILLBRIDGE PHASE 7E TOWN OF WAXHAW, UNION COUNTY, NORTH CAROLINA FOR LANDEAVOR LLC. 9101 SOUTHERN PINE BLVD, CHARLOTTE, NC 28273 DEC. 2019 I t PHASE7D t / NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN:05165001 / I -SS-----SS- ZONING CU R4-PRD / L � \ STREAMBUFFER (TYP.) R /... BMP I r STORMWATER POND (TYP) V. 629 630\ D / \ 631 \ P �Py /��1'1 I 694 z < \ 632 oEE �� 692 693 I cBMP / IQ �� 633 STORMWATER Q I �p 678 _\- Z:. POND (TYP)�� 679 ()/.. 634 _ 75 UNIT MAIL�OX STOP SIGN (TYP.)- 677 KIOsl4 /::::C05::::.:: 691 D z 635 _ - 680- O - - I 661 I STREET IG TYP. 676 690636 I I 681 662 STORMWATER -i .COs :. I 689 675 O ::{. EASEMENT (TYP) I -+ D l / 637 - - ! 682 674 - 663 D , I m 688 I I 638 �j 660 0 ;! 683 HANCOCK ROAD 639 i 640 12' BMP PON - - ACCESS ROAD (TYP.) 641 PROPERTY BOUNDARY (TYP.) `. BMP STORMWATER POND (TYP) BMP POND WITH VINYL COATED CHAINLINK SECURITY FENCE AROUND PERIMETER (TYP.) WBOLES@WKDICKSON.COM DESIGNER: Know what's below. CONNOR HORN, El 334.5348 Call before you dig (704) CHORN@WKDICKSON.COM 664 r" �t 659 - - ,, m - 665 II658 1 I I 666 II 657 656 667 J 673 684 - 1 671 1 672 668 669 670 I 1 I WHIPCORD DRIVE-� 20' NATURAL PERIMETER AjUWAY TREE SAVE (TYP.) CSXR J 687 686 / �� 685 PLAN VIEW SCALE: 1" = 100' 20' UTILITY EASEMENT (TYP.) FUTURE PHASE 7E NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN:05168018B ZONING: CU R-3 FUTURE PHASE 7F NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN 05168018 ZONING: CU R-3 PHASE 7C Sheet List Table SHEET NUMBER SHEET TITLE DRAWING REVISION NUMBER REVISION DATE C1.0 COVER SHEET B 12/18/2019 C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN B 12/18/2019 C3.0 OVERALL SITE PLAN B 12/18/2019 C3.1 SITE PLAN - SHEET 1 B 12/18/2019 C3.2 SITE PLAN - SHEET 2 B 12/18/2019 C4.0 OVERALL GRADING PLAN B 12/18/2019 C4.1 GRADING PLAN - SHEET 1 B 12/18/2019 C4.2 GRADING PLAN - SHEET 2 B 12/18/2019 C4.3 GRADING PLAN - INSET B 12/18/2019 C5.0 PLAN & PROFILE B 12/18/2019 C5.1 PLAN & PROFILE B 12/18/2019 C5.2 PLAN & PROFILE B 12/18/2019 C5.3 PLAN & PROFILE B 12/18/2019 C5.4 PLAN & PROFILE B 12/18/2019 C5.5 PLAN & PROFILE B 12/18/2019 C6.0 OVERALL EROSION CONTROL - PHASE I B 12/18/2019 C6.1 EROSION CONTROL - PHASE I B 12/18/2019 C6.2 EROSION CONTROL - PHASE I B 12/18/2019 C6.3 OVERALL EROSION CONTROL - PHASE II B 12/18/2019 C6.4 EROSION CONTROL - PHASE II B 12/18/2019 C6.5 EROSION CONTROL - PHASE II B 12/18/2019 C7.0 LANDSCAPE PLAN - SHEET 1 B 12/18/2019 C7.1 LANDSCAPE PLAN - SHEET 2 B 12/18/2019 C8.0 GENERAL NOTES B 12/18/2019 C8.1 GENERAL NOTES B 12/18/2019 C8.2 GENERAL NOTES B 12/18/2019 C9.0 DETAILS - SHEET 1 B 12/18/2019 C9.1 DETAILS - SHEET 2 B 12/18/2019 C9.2 DETAILS - SHEET 3 B 12/18/2019 C9.3 DETAILS - SHEET 4 B 12/18/2019 C9.4 DETAILS - SHEET 5 B 12/18/2019 C9.5 DETAILS - SHEET 6 B 12/18/2019 C9.6 DETAILS - SHEET 7 B 12/18/2019 C9.7 DETAILS - BMP #1 B 12/18/2019 C9.8 DETAILS - BMP #2 B 12/18/2019 C9.9 DETAILS - BMP #3 B 12/18/2019 APP-A ALTA SURVEY LANDEA 100 0 100 200 SCALE: 1" = 100' Wl< DICI<SON community infrastructure consultants 1.0 T N 0o \ N z O I- U U) z O U O LL LU U) O z O Q Cz_ G_ J LU Ir n WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 0 S8` 2 � PROFESSIONAL SEAL U U m Z Ir O O Ir z z C15 U LU w LLJ O :E : U) O O W Ir O O O O Ir Ir LU LU 0- 0- z z O O Ir Ir rn rn 0 0 w H 0000 N Q r r ImIQI ° I` CV CID CV z L H H Oo tr LU = I` U J LU Q N LU _ Ir LU = ��0--- cn � OQ� Ir t] LU Ir m z J O � � m U J LU Z_ IZ z Ir LU H O 0 rn W Lj.j Z W Z Ir Ir tL � PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C1.0 WKD PROJ. NO.: 20170279.00. C L Om .ww 0OUO 0J 0Zw <o¢ woo 2E,� U=w om .ao =-0 ~ -w ozw _0 Wo. UZ Zz-O Z 0 wY< =U< ~0= 0.1 w§w .00 °wa °z¢ °a 0ZZ Ow 7 a¢� w-� ¢ 5z 0 � 0 WD¢ WF0 z w§< ¢�� =al 0 Fr- w QO2E ?mw �2P 0Z8 U-O Zw0 °�_ 6I~ p00 Y.4 §=z I(9 o0Fr 0 =Zw (90M a� 0 °oLL / / - - ---\\ \ \ \ \ \ - 1 1 I \�/ l 111/!%/''�� \ / �� / \ / // \\�\ /) =, 1 'r' ;, ' ` / / /�_/ \_ I / \/ - - - l ^I ll�l1 l _ I III II l l�///ii \ / ) / \ \ \ /�/ / // //< \ , - - / \\ %loll �- �\ \\ \\\� \ \ 1 Il I - l��\� �l I lj /lI - l I �� I 1�11%�l ll�/, \ / / \ \ / / �\ / / _ I /�/ _ ( / / \�. /- \ \ \ � / i---� = !- J ' i— � _ _ J l 11 l L //// \ / \ \\ ///� / / \ / / / 1 \ \ \ \ �,) - \\ I /� //// � / \ \ / \. / / \_s-- - / //' ( / // - ��� -. / \ ///�/�\\\\�\\\ \ ��ll�j' 1 1 1 I TIlljlll( / )'\/ I_-!�✓/ Il ll/�ii/�`\\� ��/ o \� \� /7 I / // 1\ ,� ��\\ // II /1 \�l( // / �Il�l ////� WIC DICKSON �' , -, \\ \�\\ \\\ III m I ( �� � \ / \\ / \ \ \ / \-- // �/ \\.� /,��/ III I (IIII _ _ _Imo_ _ ll�l11I11 1 1 r / I 1 ( l lrl % ' �� , �.\ ;1-1 / I / /, -� \\, \\\ �_ II `_ 1 v �J I//'IIII- o ) I lllrlrlr ✓� �\ ,/ \� / //' �� \\ // \\\\ \ `/I I�' \� / ,/ \ /// �\ , I I — I J' I I / /�, /\\\ \\\ / I \ //i \\ II I I � I I l t o (h'' I�iilrl�i ��� /�\ ` � /,� - \\ \ \ I - - - \ , 0,, l \��\ �< /III I communit infrastructure consultants 1213 W. MOREHEAD STREET J\\ \�\`,I Ili �`_ I I (l �-� \\\ \ IN I 1 \ I ��// I \ 1 III 1 I \ / 1 �1/IIIII I /PII II \ ' ' ( -,\ \ 1 v / / //� I l \\\ ` - \ 1 / / / \ 11 III J1 I I/\ _ _ - -� I(I11/ l l I 1 -� \w\\\\ \/i \\\ J - _ _ �I I ' FUTUREIMILLBIR DGE �\ �l / �I �\ %i' '/ \ 1 / I r �, 1 l - 111111I 1 III '' \� \ \\\\\\ s \\ \ % -_�� / / I II i \ \ 1 I - / / � / / IIII I / ll ' 1 � \( - / � = _ /III I Il / — \ ,, ` `- \ \ \ \ �/ \ \ r r / // /4 1 1 J i� I �� / I 11 \ - I \\\\\\ \ \ / \\\ \ / PHASE 7C DEVELOPMENT \ / Il _ _ - _ /i I I / \ \ l I - - / / I I _ _ II w �) I - -� \\ _ - „\�\ \ / \ \\� 1�1 I�\ \\� �__ _ _ i =` 1 111 /l \\\\\\ \\�\\ I (\ I ZONING: CU-R4-PRD 11 CHARLOTTE, NC28208 (t) (704) 334-0078 (f) (704) 334-5348 / /% //�///1/ II/ / / �\ 1111 I 1 \ \\ / j��� ////� _ _� / / // /�111 - -� \ \ �`'/ ///_ J i'/ �r 11 (I\ / Y l / 1 I .L Jr�\ �_ '� \ // \ _ \\ \\ — -� / /: _ ��/J) I _ _� ll1 /1/I �--_ � -// " \\ \\ \\�\ \ 1 \ �' \\ \� II I 1 \ /%/�/// � / ' // �\ / / / / T / / /� / // /// / - -\\\ ,, - // I , 1 I I 1 _ / l RESIDENTIAL \ � \\\ /� �' \ �� � _ - - 1 \ � \� / �/%� - \ l Imo/ , - / / // /"I , / / 1, \ _\ ,,' / - / (( - � m I //^ \\� / 1 I ,� 1 \ /�// .� "� -.\ 1 Ill ((� / / / / / - _ \ \\ // /�/ / l 1\ \ `` / . FUTURE MILLBRIDGE ~ - a\\\ / _ // - I I 1 \s \ \\ / >' I % '\ \ / 1 ////// / / 'i /� �' I / / / WWW.WKDICKSON.COM - / =\ / /'�/'// _ \ \ \\\\ ✓/ // J \\ / / / \\\ s \ 1� \ Q - // / /// / / ,�� / / 9/�/�. _� J / / / 1 L l \ �� / /III % /J,-\ -1 I / PHASE 7D DEVELOPMENT // Q \\ /� \C \ / / / / / / / / / //� \ \ // In ���, I IIr- I \ /\\\\\ �' \ �\ / / �- /'� / �/ / // �/ /'� ////i NC LICENSE NO.F 0374 = \ \\� / '- - / �,�" �\ 1 I �5 / �-�� FUTURE /// ( l /� \\ \ -� // ,/ l / \ \ \ 1 \ /I/ �5 ( ZONING: CU-R4-PRD /� f \\ \\ \ , , \ //////i \� \ //// /////`` _ - // / / / // / / /-�\ \ \ / / �� �// �� 11I - AMENITY /I \ \ v V\ / \ s ///// \a //� / / / �� = // // //// / //�//// \\ \ / / _ / l �\ /I 1 - III \\ \ s \ / \ / / _�✓ _ / /� / / / i ��\\ \\ -- / �/i \l�, \\c \�� \�\\�� I I 1 ��-� 11III. I aQ� II II \ s '�� \ �(l(' I ' i \� l // _\ /- /- //�////// ��\\\\\\\ \-�/ ///'/-111�11 \ / \)1 �J/III/ \� l / , ``\ II \. CENTER 1\\ \��Illl \ \ \ \ \ \ \\\/ i / \ �/i .-_/�/,//, /// /; -/ - �\ _-�_ ///�-/// /// �1111Ig1 \ \ �IIIIiI -, \ \ \ \ i ///// \\IIIII �\ \ \\ \�\ �\1`�1 1 IIII c� - /// / \ / \ �< // / / -\\ \\ \�\ \\�\ /// / // / IIII I llll�\\ \\ \ \ / %�' \ \ \ - kki Illl - '° �. IIIII1111 / \\\� �\ /� //r\ J I \ \ / -- / \ ,� \\\\ \ J /� / / / - _ L - - _ . //;� J l/� 1 \ \ \ �/// / �\\111\I I \\ \- L \� � 1- \ 1 III / - \\�\�// (� s \ \ / / \ \\ ✓ / / / ,�i, / / // �� -, / // / 11 \ \ \ // / // IIIII) II ► I \\\ / e' / \ > ., \ Jul lI l I I 1 / // ��� s \ �( \ / / \ / 1) / r �<<���� / / / /- - -// / ll I , \ \ �1 / / / III Il I \ \ \- o I _ \ \\\, / m ,I, Ill \�\ o // \ \\\ \ \ �- ( / `� ///J //��/l/ ;� \� /,,�/,, , ,�_ - -i/ / I 1 \ \ // / IIIIIIII\/ l \�\ \ \- 5� I I �\ I I 1\ \ \\., \� / _//- / /// /ll; //'/'IIIIIII \\\ `\\� \// \ \ \ /��� \\\\-\ o % F / ,- ; �. o o a :07 S \111 IIIII \�\\ I --- IIIIIII � \�^ 11 11 'tr �/ = IIIII\\\ \ \\\,' `�j/ \ �i - ;\\ �\\/ Km %'%�//////��/iT�// _�/�// I Illl \\ \ \ I_-� /�///' / '� IIIIIII IIIIII \\\\\� \ /` \ ��_�, �- \�' 1 / ql lllr-� �� II Il\\\ \ s9s�, \� / �� �\ \� // �� / / ('(�,1� I \ I _ / III II \ \ / \> \ \ \ \ 1 ll I► \�\ r \ k\ s6 \ I / / _ / / �\ \\\�\\\\\\\\��///////// / /� // /�/ �-� /// ` / \ �// /// / / ///j / / � \` //� I �\\ \ \ �- I 1 1 I Il \ ( � �o \\ \ l \\\ \ -� \\\\\ \\\\ / / //// /_ -^ \�\\�1='//// // //�IIIIIIIII jllllll \\\\ \/ \\ �� \ l\'==-//11111 I 1 i� III 1\ I I �' .�/ / / \\D -� \\\\\\\. //// ��// 'J�///=_�\�c�-- ///Ill IIII - I /l IIII► \�\� JI/� //�� I \ \ \ \ �\ \\ \ „�\ \\\ \\\ /r r ///<<�_ c//_ w� II III II &�\\\ / I (( W8_ 4s-)�, C�IIII�\I1\\\ ��` •.yc :11 � •. �►vtiE.'�:IIIIIIII �// /�/ III -J \'�;.\ ��� RESIDENTIAL /// III IIII IIII ll \\ / \ \�� I \\\\ \_ ___-//� / o \ r //i p0 \ i /� \ \ /f \\�\\\ ///l I ( �ii — �\� =_ \�� / �/� IIIIII l "�� \ / % \ _- I 1 \\\ _ _ _ - I / \ \\ ��( 1 (( _�_///_-__ _- EDENMOOR LAND ACQUISITION II, LLC. : 1 \\ \\\ �\\ \\\ \i, \ -,� 1 1 l \ \\ \�= _ = -r L (/ //� / / / � ` << / // \\ //// 11\\\\\\ 1 \ \I I I I �./ _� /i_ _ ��\\� NOW OR FORMERLY // \\ \\\\\\\\\ \\\\ \ ) \ \ \ - s ((( / ///i^\" \I / \ \ \\ l \ \ I J I %/� �_ - - Ii©N G. V, l 1 I 1 /IIIII\\ -\\\�. _/_ �\ \�\\ \ / > > � ,�< ---- e 1 - /(( \ \1 I II I it / /,//,' ��__ \�\ 1800 AVENUE OF THE STARS, 3RD FLOOR - _ �// / \\��\\\�\\S \�\\) /�� �� /� - -51. s� ` \ y� ��> T / \ // - \ \ \\ //i / i- - - l I I l / /� �, ��_ _� \\\ `_ \\\\\\\�' 80= �1\\ /i= / / \ * 1 \ \\ -- — / /� �\ \\ / I \ I I 1 // /// // // — \\\ //// // / —/ij �\\\\\\\\� LOS ANGELES, CA 90067 — / / / / �\\ \\�575= = /J ) . S�0/i \ \ l l , \ �� r s < - --\ �� t i / 1 \ \ \ ` - � 5 i /- \ \ �// ^ // j = - �/- // / / o\ � ��5i0__ /// // \ \�S �\\ _ - - r rf / / \ 59 // ^ 1-1 1�(/ I I III IIII IIIIII /// //,///-� ////� - \\\\\ = D6:639 PG: 17o = %/ / / / \\�\�56 =_/��i ;\�.: 6S \�\ �\ %/ / / - _ ���, I� \�c\\ \ - - / ��� !� / l� �i �\ II / / / 1 III I II/1I111 I /�// jam/ /-/ �- \\\ / // I I I 1 // / // //-� .. // \ \ /-/w// �\ \\� \ \\ 5 — . — \\ �� _ / /i \\ C / %/ \\ 111 / % \ I I J II / l/l/ //�/i// //� �\\\�.�� i / / \ PROFESSIONAL SEAL ,/ _ /�� PARCEL ID # 0015-00-013.00 i �6 - \ass \\\ _ ((� \\ \ \ \ - 90'-�� \ �\\ < \ Ill \ I /l 11 I ll l l l l / / �� ///\\\ �\ _; ,/ ) ZONING: NLN / (/( _ �= \ \ _ \\\�\� / // / r GfB \ \ �j \ O \ \\ \ / 1 / / / // / / / //% \\ - // _ = �,-_-�<�\ \\ / 1 I ;�1 1 I \ J / I \ / \ \\ \� 111 _,\ l \ \\ l //l�lll%��i/i�'���%/�%'/-, , �i'�/1(/ 'ill\\ \ �/ \ I / / \ ® \'� I // / ✓// ��%/ r 0 0 �__\ ((1 // �/ \I v q j /�� �-: - ) /� � - / \\� l /, I ( - �) I i1 I� I EXISTING SEWER TYP. -' - - �Sg 1 I ( / / \� \ s < l� \ / // IIl/,r I II / ///I'1(I / ((111 I //ll/l / /�i',, / \\- _ _ \\\ \\\ I �IIIr ��� \\ - (/ /'��\\\\ ( -, /l /ice\ \ 111 I Ill I I/ �////� //// _ I /i//(_ \\ II I �\ �ti \\ I I 1 \ ;, � J/� \�11 III - \ I / - ��--_ rl I I1 / /r r ll �\ / \� �\ = �" l,i IIIII /�� � �_ 1\ �/� / _- _ - /I I �/ III I III 1 / \ �__�\�/ o'��I�v '/7/(/// /�� __ _� _--- I �I111� I ) - ,/ 's8o-\ I l/ / /\�\ ��\\v �// \ \\\\ i ,, 1/ /\ \ \1 I11 III II ll /I/'/ //Ill//,I l \ / / I / \� /� I I� \ I /\ \ IIIII IIII / \/ /%_=_� =_ // _-_ 1�=_� \ II IIIIIII\\ / / I ��-- �I��Ig ( / l��__ 1 1 ( / ° %' \ \ \ - 1 / 1 /� /�///////// vs` I /-I'---c6cn I l I I I / -- - - - _ lI _ _ _ \1 \ \ \ \ 1) i I � / �/f - ((\ \ \\\\ CONTRACTOR SHALL /I/// I II 1 I \\ `. 11 I l �//, / \ I \ � / I = �� \ 1 I ) / //�/�% ____� =- —�-\\ \\ � )EXISTING WATERMAIN � I / I ( 1 \111 III \\ \ \ / \ \ \ 1 �� - l \\\ REMOVE EXISTING VALLEY / I I(� I IIIIIII /I (I ( IIII /�//////�/ JIII� l //�/ /l�� `\\\\� ���,, �� \ \ ///1 11\I 1\I \ \\\\ \ _ / .ij IIII I I ( �- I ggl � �) / 1 l II / J I1 I 1 I (/ �----_ \\\\\ S �'� \ \\ 1 I I / (TYP.) >- /i ' CURB &SIDEWALK. // I 111 \\ \\\ IIIIIIII /// / ///r \ � III I/ I I I 11� �-�� - \\ \ S, .. \ \ ��- -' 11 -/ / IIII IIII // (Q) 1 v� \ \\�\\\\ /t \� �\ \sue l l�/'/'/ / `\\ \ \\ / / ��� I r//j I lI 1 \\\\\\\\� \\\� I I////////� �----- I f .. , I I EXISTING V 1 I11\ \� 55 /// \\�\� \ \ \ \ 1 / /,� \ \ \ \ �Je CONTRACTOR SHALL MAINTAIN INTEGRITY OF EXISTING IIII(( /// - J 1 --_-.. __--\ ' :�l II \\ \ \1 \�\�s60;�\- ////' \\\\\-_� // r' \ \\ \ \ \1 ll I II l � - - - -- / \ POND I\ l % \ \ � \\�= �_ (// �� ) \ 1 \/ / / EXISTING STORM I �\ . \ ( Ill / I \Z % J��/ I I WATERMAIN THROUGHOUT CONSTRUCTION UNTIL Z I (r I i \sgs \` \�/// II� - '' /// / { \ \\ / \ I //� J I III11� \II��\�\ \ _ -� \ \ \\ /// �� / - - _� l 1 6 \ \ \\\ PROPERTY BOUNDARY (TYP.) \ - :•'• I I III • \\� (� _� _ S65 �� �� `_/�/�/`55oJJ�/, �// � - / --/ / i , ��� \ 1 I (III DRAINAGE (TYP.) \ \\ \ RELOCATION IS MADE POSSIBLE. ANY INTERRUPTION IN \ J \\ \ \\ - J/ - �:�t'� I III * .--=5sp,\�\ - �/ //�_ / / // ( 0��1 1\ ( / y �� I 1 \\\ / SERVICE TO LOTS 1695 & 1696 SHALL BE CLEARED THROUGH /\\\�\ \\\ r - - //��� ///� _ _ _- \ / \�� _�/J/� -- \ \\/ / �� ^ \ .:.� /II ill � \\— ��\\� /�565 = /1°/ 1./�'i— — — .6 \\\ �\I / ) s \// \\ ��\ _ _ \ �\ ( �- - /j /i/ - (TYP.) / / �((( UNION COUNTY PUBLIC WORKS 48 HOURS PRIOR . \ / / // / �)� 111 I // \ ��\` j �`�o \ ��� 565— ,WETLANDS \ / '\ /_ \\ /% \//�//, I IIII /-- 11 I . �\ \`\_ 'S _ /--/ // /,� /// / \ \ r / / % \�\\ // SHIRLEYLONGGAMBLE \ \1/ / /, I III -------- - � � s �_ \ \ //'/ a�lll I • . \�� � _— 6� / � % / / / / _ � \\\�� 5 // //O' / / \ 1 / / // / \ � //V/ 4303 TORY PATH RD \' \ \ / / / IIIII III _ �\ \ \ ^ / — \ \ /'- — -' I \ _�'/ / ` //�/// ////-3 / , — — _ —\ I I 1 / / / 15 , \\ / \ \ GI I / WAXHAW, NC 28173 ' \ \'�/ / / - - \ \ -\ � / ' //// / '/ - _// \ Il l l / /� / / /, 6 \ \\ -- / . , /,.� ► I / (^ 05168014 � Ir o - ,- _ STREAM (TYP.) ' / // / — =-0 \� IIII I /Q ` \\ \ / 1\\\` \ \\ \\ \\ ` -- STEVE & KAREN E HELMS - — \\ / _ �' / — — \ — _ _ �r /r\\\\\fj\X - �� � i / \ /// —��- — \ / \-) �I \\�I ( /'/ %//Cb/ I ��Gi � -1) \ \ ZONING: RA20 \ \ \—� 4423TORYPATHRD ------ I 1 // / �; / _TEMPORARY CONSTRUCTION / /' / \ \ \ \\ O � LU cn cn C) - �550/ / Q` = -' - / \\ I I �(� / = -�= _�/ /d _ � , I ( ///// 3 `\` \`/. / / o — — \\ � I / / / 1 I I I (l l I I ' / o / , ' ` \ \ \ ` \\ \ \ \ \\\ \ W 051680 3A 8173 \\ \ �, / / Z - � - ) / -� \ I I m ( - /� �\� STREAM BUFFER � / / � � ENTRANCE SEE DETAIL 514.1 ' 1 I - \\\�!/ / _ >= -_moo - - O I I I - / 1 i" ..� -; // �// - I I 1 / / \ \ \ \ \ I `\ / //� _ / --G2/ / / / ON SHEET C9.1 : ( _ \ _ ZONING: RA-20 \ 1 \ O F- - \\� J i/ /� �i� ZONE (TYP.) / / / /i J I I I I I / I l _ '� ( 1 \ \ / � - - I /���-1 / I 1 l - I 1�,c,��\\\\- ` Ir LU w w w Z p O 0 0 � _ �- / -� // //_-/ _ \--/ - /� -- I / \\\/\ / // /p / u--� �/ I \ \�4h///� z -- J 1 / // /^\\\ \///, Q __ //;; /; - , I 1IL l / / \ l (l�//--/�/--�'///////,/i///��o / / ���� \�O--//-�- - 'II IIII I/ ll /I I / 1 `� - I \�\�` _\ ��-\_�// /r /��✓I! �� /\\\\ / - ---_` 1 / \11�/i� ('-=_ /�_-i//j//// /// /i /o`' /i \ 1 / I 1- - U) 0 0 . O _ / /�\ /-- -- -��ti /� \ 1 \ i \\ /�/�/ U �! \\ - / IIII 1 11 / �� 1 --/ /i/// / h // / .� / /�- // I/ / // U II I�/ / ( I/ \ - \ - \ /\\\\-- / / r(/ /�\\ IIII, ///JIB// _�/ - %//,///// / \\ l \ I I 1 / r l \ / - \\��\ I �j // \�\IIIII / / I / / I �, > LU Q Q \\ \� )\ I \. _ I _ \ -, \ //� 2 / // - \ I \ ll/I / / / III / I /i// �/ /- _ //// /�/// �� o / i I I / _ / \- �- \\ /p/ ,L -zQ_ 560//////%\��� I \ ( \\\\\ / l 1 /// -- II II , �/ /��-/i��ii//� i/// /j 60//- \\ / \\11 I I I // / ? \ \ \ _��__ \�`�__` �`� ` _ ----//'i/i �/\\\L \ `` \ \/ i \ / r I l(, // �- / —/ — _�///j//% / —/ // —�\\ \ I I / / \\\1,-- —\�\ \��o/ �'i- O z _ -_� /,_� \ \\\\ \ // II .\\\✓ I I //T c2 \\I�� II;// %-,/ // /// / / \ \1 l lI I IIII / � \ \ \ --_- \ - /� \�\ �(/ �1 �' \ \ 1 \ ��I oc = _ LL LL �// _ - - _ _ ///\\ \ ^_ O z -j _ - \\\ \\, \ 11\ /IIII \ \.-� / l \\IIII(//� �"/ ��_-/�//�/�//'� -// \\ r O _�\� 565= \,I / // - / p�j /\\\\ \ \ I I \ \ / I - _ -� /�/\\\\ `' Il 1 / / \ /,n // I / // // / // //� \ \ \ \ I LIMITS OF DISTURBANCE - ,- \ �/\ \\,//// // - , I _ - \ \ Cr - -�- -570- // // \ \ \\\ \\ �/ / l n \ - - - / /� I I / \ \\ \I II I(//// // PHASE LINE (TYP.) / / / /'/ - ��\\\\ 1 \\ I I (24.94 ACRES) - \\ \ \ \ ( I / r - `��'' -_ - _ _ ' - --,\ / //' ���= Q =-__-_ i/ I \--\\ \ \ \ \` /// \ -- / l // /� \\Ill ///, / - /-- \ Z \, \\ III I \ I -____-\ l ((/( \ �`' \ \ 1 J z z _--, / __ I ~ \ `° 1 =-: 573E �/ -\ \�\\ \\ ///�� /// o/// \\1\ �I� // / /// /� //� // // \\\\ Ill\1 \ i \ \ �\ J� \ \ I - \ \ /� / / / /,. Z Q U - \ \ 1\ 1,/j / \ .� /� - / / / / 610- \ \ \\ \\ I 1 1 I 1 \ \ 1 \ s \ - \\ I / _ _ - __-- \/ IIIIII 1 / /. \ -- ///jh/// / \\IIII/ /III / /i / / // / / _ \\\\ \\\ 1 \1 1 I _/__ \ \ \ \ 1 I / / ��_-_ _ _ _ _�\\ /I/ /, �- \\(II // \✓/ /� /// /// ///I \\ IIII)//) I11II \� \ \ \ / % ///// /�\/--, w w \ �� ;___�\\ \\�/ /i// �IIII�/(Il\\�I1�111/ / / //-/ - -\� \\\ \\ \ `--� / _ /;_ \= �\=_ ' U / // / 5 \\ ll1\\\\\\\�I,�//.//- - / //h \\\\�\\\�\ \ 111 �/ / // /// / � /�/ \\ I I (I \ \ \ \� _ 62 \ \ \ \ \ / /'-, / /I���i;--= �; `� / \\\ =�_/ __ �\ ,,\ _\ �.- / / /- \ \\\\\ \\\\` \ 11\\` III I /'i /i / l l/ / l l l� / / /'- \ \ \ \ \�\��\�\ IIIII I \ \ \ / Z '/ / / TOPOGRAPHY OBTAINED �/ / \ \\ \ \\ I I ( / / / / / / - \ \ \ \ I I \ \ \ \ \ \ - \ / \ \ / - / i// / ,-_, \ \\ \\ FROM LAND DESIGN, INC. / ll I 1 / / /// / / / / / \\ 1 1 \ _ ., / - �\\� �57oJ 'l' W �- i / - \^/// // /\\�\111 II / \ � \ 1 I \ n _ / / / _ �'/ 1 > >� - / O / / / / \ \ \ / �(/ / 1 \ \` \ I / / / / o / // - - - \\ \\I IIIIIIIIIIIII (,/ /' \ \k\\\\\\\ ;`�I\ll \ \�\ O O - - �n �n\\\ \ \\_ , \ / / o \\\ \ / 1-1 / - 1 / /' 615. \ \\\ �\ 1 1 I- � \'\__/ z / / �\ \ 1 I \\\�\�'///"/' i ^ \ -/ / / / /^�\��� IIIIII IIII IIIIIII /(�/ ll/ / lI I I I / I ( \ \ \ \ \�\\\�\\ 0 1 \ 6' \ \ I� 6/s -� 1 \ l \ \ ., �, / / `°/// / /i -__- -- ��/�� / Q ' / //'/ \ JI I I I I I I I r I / \ \ o\ \ ,� \ � l \ \ / / / / / / / �- - / ____ % / ��\� s7s \_/ / // >>\�\�. j /////�/'��_�// \\ 11III II\ l\1 ((1 1 III I I I \ \ 1\ I \ \ / / / /// / 1 1 Ej oc oc \ z O / �\ \ \\\�II\\ \\ \ \ ` \ �% ,o, / --__, �\ I- / / \ \ I ` / / / -!// / //,5 5 \ \\,\\ IIIII I \\ \\ \\v I I I I I \\\\ \ \ - l / /// '// /I/ / o �- - / / , / / 1 \ \ \\ \ - - / % CONTRACTOR TO VERIFY PROPERTY LINE PRIOR J / �/ \ \\\\\\� \ \ \ \\\\ \\\� \ \ I I \ I \ \ '�/ / / b \ ) J / / ' \ \ \ \ /' /// �/ / / / / /' / p5[- / / / - �\ 6g -� O� / TO DEMO. NO PAVEMENT REMOVAL OR DEMO TO /// / -�_ =� l l l //'' / 'Yo - \\\\ ��-= \\\ \\ �� \ \ 1\ I I 1 I t�E�fAIL \ / / \ \ I I \\�\ / / ' J// / \ \ \ / - / // / / / / / //6 _ _ 1 0\0 N Q o N r \ \ \�� _ —\ 0—� o Il�lr�// _-�J// //\�; __ ___,\�\\�I II HEIG�it: f T \\`1 1 \ ,/ / /// �`, \\\\\6 \ /�///'// / / / /'//// // \ _ OCCUR IN LANCASTER COUNTY, SOUTH CAROLINA. ( I I �- \�•/ // / /\�_ _ _- \� \\ 1 \ III I I� / \\ `( / / / _ - - \ \ 20 \ / / / <10 1 \ \ \ I \\ \ l %l IIIIII/�// /- -�// '/ / �595 _ -=��\- \\�,\ \ \ \ \ \ \ \\ �`c., L -\_— \ / / / / ) I I i — 1 l, 1 \ �. �- ^ ` / / / / — — \� ��\I \\ \ \ \ \ \\ \ \ \\ \ / \ \ \ ^ — WANDA D OUTLAW c� \ \ \ \ // Jl/�J / / T — \ \\ \\\\ / // — — \ \�\\\\\\ \ \ \\ \\ \ \ _ _ \ \ 1311 REFLECTIONS DR. \ \ \ �) / �- - \� .\\� _/�/// / -/ SOIL DELINEATION-_ \\\\ \ \ \\ \ / 1 - __- \ \ w2m o — / / \\ \\ \\\ \ \ \ \ \ \ MONROE, NC 28112 Y �- N w I_ Q ____ \\ \ / \\\ \ // / I \ \ \ m p N \ \\\\\\�� \\ , \\ \ �. _ -___ \ \ Q- / g0 _ _ -\ \ REMOVE EXISTING GRAVEL/ASPHALT / / / � / LINE (TYP.) - _ � \ \ \\ �\ \ - - \ \ 05168011 m o U o Q 5 I _ \ \\ \\\\ \ REMOVE EXISTING OVERHEAD ELECTRICAL \ z `- - - J - = 1 \ \ DRIVE. REMOVE ALL UTILITIES / / / / / - / � , - - \ \ \\ \\\\� \ \\ \ \ \\ _ \ \ ZONING: RA-20 w w I. \ �s \ 0 \ 1100 / / - - \ 1 / / / / - - \ \ , \ \ \ \\ \\ \ \ \ LINES, GUYWIRES & POWER POLES. \ \ o 0 - \ \ \ \ INCIDENTAL TO CONTRACT. \ I I / / \ \ \ \ \ \ \ - \ \ \ '� w o Q F I - / /' \ \ / / o / --\ \ \\ \\ \ \ \ \ \ \ - \ \ s " �''roz \ \ \ \ REMOVE ANY ADDITIONAL STRUCTURES \ r � / _ \. - - \ - ��� \ \ \ � , 11 �\ \ \\ \ I I ( / W / / / \ \ \\\ \\ \ \ \ \\ \ \ \ -- ;� I I - - - / - / \ \ \\ \ ) \ \\\� \\ \\ \ 1 1 1 / / // \ \ \\ \� _l \ 1 \ \ \ 1 \ ASSOCIATED WITH POWER LINES. - _ \ \ \ \ .� / -1 M - N — _— /`�--- f jr \ \ I \\ \ / \\\\\� \ \ / / \\ 60D I I // — _ - i cd /\ \ \ / � / \ \\ \ \ \\\\\ \ I / O°' �` ��_\\\ _ I / I I I I f f f Ij//1/ / /' 1 r\ -_ -_ \ \ -\_ J ,/ I \ I I 1 /� \\\` - \ / / /l I I .--- 575 -- -i� \ ) )/ I I /�� \\\—� � \\\\\\1\I i I \ k ( --, �� _\ I 1 % / \�fB2\ -\\ / � ---- - /'\\\ \) I�/ 1 /, / / -/\\\\ \\�\� ",��_=_=_=_ I \ \\\\ \ I \ 1 1 \ \\ s\= ---. '' / 4/ �/o/j%/�/'i / l III\ \ �_\ - - 1 / / � J / / / _---- - \ II 1 / / / /� i\ \-_ - \\ 1 II 1 \ ` \ \ - 05_ / ,/,/ // / //// / / / // \- - / W U / / /-� __ \\> //l / I o11 / / / l / / �\J� --\-� - \ \ \ __ i/ / / / / \ l \/ J / / _ / - - \ \ I r/ I I ^ l �I I I q> / \� \\_ - \ - \ _ - ) \\ \ \ \ \ \ � I I / -61 / / / / / I / RESIDENTIAL - - / \ I _ ��/ / I - _ / h / / / / / \ \ \ \ \ / �n \ / o -- - _ - �\ \ \ \ \ \ \ \ \ / FUTURE MILLBRIDGE � � - - - _� - ) / /� 1 1 l III l / / / J��' / \� y �\ \ \ / \ /\ 1 \ Q z LLI � g i///�- \\l \ \ \� \ \ 1 (/ - _ , \\\_/ _ - _ -- v /// / -565 - _ 40 / / (,^� I \ (/ I / / / / / / \ �� \(-, - _ \ \� / I ` \ \ , \ \ \ \ 1 I I / ' - - - / r / /PHASE 7F DEVELOPMENT / \ � 6 5 \ _ = /// -- __ g 1 / \ \ I I III / // / / / -,- \ \\\ \ \\\ \ \ \\ ) 11, t9� _ �r/ � � --- ' ' - ir° ( I \ \ \ \ 1 1 1 ( / \ ' ' l%// ZONING: CU R-3 ^ � ^ \ \ \ \ - _ _ O O � - Z �/%� ��-)) / /r ( \ \ \ \ /I 1 \ I I I I \ ( ( (� ,/ t'!!92, r -\ \ \ , \\\� � / ///�//// // i---�'�IJ/ / l \���L =-\\\\ )`I III'(// \\ -\ \\ \--� \�_\\_ \ ` - / / - ,_, / / // 1 ( I \ / \ I \ \� \ \\ \/ i ) / ( / / Y 1 I \ I ) I 1 111 I a-\ I \ __ -— \ I 1 \ \ \ \ I 1 / / / I — — \ /� /, / / / I I \ ///// J 0 Q O = / J ,/ �\ \ , / / / / // - I \ \ \ \ / — _ _ FRED E BAKER �555 , \ (/ \ \\ I I \ I / / jam l / // // / / / j \ \ ( 1 \ \ \ \ I \ / \ \ \ / // / / / ) 1� I I I I Ill I IIIII \ \ --- J \ — _ \ \ 4404 TORY PATH DR i% /// / l / / // / < (`\\\ `�\ \\ \ > l \ / -� \� \ \\ / / / / I //� � // / / / > I I I I I I I \ ,, \ r -� - -600� \ _ // \ WAXHAW, NC 28173 / l , , 1 \ \. �/, Il ' ' ' / I IIII IIII /,\ / - _\ �'iii�ll / /� / I I I I U W J I- o O I// I I , - \ \ ( /' \ /l ,' / � — / 05168010A '/ Ill//z/'//'//' (� (�/ \ \ \ / l\\ REMOVE STORM DRAINAGE �� _ / I\ _ _ \ / / %� //� \ (\\ \ \ -� \ \ i ` >> / l / - / / / SOIL CLASSIFICATION (TYP) ,j / //,/ / %/'/ // / / / / ' /' / h /' // i / 1 I I \ I I I I II I1 I \- \��� S / \ - _ I--, ZONING: RA-20 — / /DLO / ����- \ \ I 1 // / '/, / '//'/// // I / / / / / I) IIII III \ Ild \\\� W U CV W J Q J 0 o �/ -- / / // /2/STOF�Y 0� / I �'\/ '-� J ��\ \�/� _=\ -� b 1 // / /�/////i /�// / // - � \ \--/--_- / 'i / / / / I I I I /-- �� \ \_ / ) L � — — _ / / / / / / / /(( WOOD,f-IOMe / / I I I ti \ \ ' I 1// / //// �/ �/ / / \ //, // / l \ \ / / / / / I I I Ill /— /\ \ � \-/ — z _ - ILL a o � � z LLI Q __-- _ / / i -/ � — — — J �/ / / / // / I / / p0 — �- �i / // / / ( I 1 \ / HEIGHTi: 31' OQf /, , / / / / I I I 1 �-' -� \ \ \ \ — -\ _ __ _--_ �1 / ,/ � /, /// I, (, I ( 6 \ ,, / /l ` _/ -- I ,- / / ( I / / ,-^ / / / / ( \ \ \ O \ \ / 1324/S f� / // / o / / / / IIII \I //�— ^ \ \� -- —_ — _— % /L.� / // / � \---�-----1 1 STORY G�R�cGE// / / / 1 \ \ / �\ --_ o � 0 ILL Q , N 0 W J Z 0 1--_—=__ \ \ /-� `I � ( _� — " l— / 6'\ / / \ / �_ --/�/j /� /�' �/ I \ I / / // \ ~/--\ —/ \ ��� l=�` %/'� \— _ ��1GIIT /i7'�T Q6F/ /�/ / / / 1 II \\, 4 j - \\\\\\ -- / 1 U E m O co Z W H I --^S9S\ \ \\\- \ <_ =- I \ / UoD/`/ ! / / /,- __/ _-�� -�I /�>� / --- -- �97��r'T- /// _� / / % / ) 111` \\l ///� / / \ \ \ � - = -i z o -:,, - - \ 1 / \\— —���� 1 \ ��—LOD��L\ ( \ ( i /( \ —` ------ ��ii—// i//� // �/' / ) 1) /� 1 I I \\ --\ -- / \> //' �_ - - --- ` \ / - =-J_fJ ) \ — /// -'/ �/- / / /// o//// )� / I I O w 0 I / =\ _ � � Cp �� _ \�tiL,Q d __ _ - / � - _,ter -- \ \ - \\ �\ \°� - -' - ' j'- - / / , �Op( \ ( ` 1 1 ))) )/ l mil\ �( / -( - - / - _ CONTRACTOR TO VERIFY PROPERTY - / /� �' j/j ( Z Z_ __ (/ / /��: 1 1 ( r / — / I — _ �_ \ \\ ,,-\ -- ---'/ , / / / / / ( —\� /// L -- _/ / —//�7 %� \—\L \ 1 i // - // ,///// / � s���� \\1 J � I = LINE AND BUFFER PRIOR TO DEMO. NO \ s = -��\ _ i - / / / _ - - - / I \ 1 - - // U,� - - _ -- / / //� � �'� r--= / / H Cn _ »// r \ \(\ (� ( / / / -r- PAVEMENT REMOVAL OR DEMO TO �- � / / / �� , / — — _ — — —� — —/ii — / _ / / // - - -- - i- -// z� \ _ = - // - - \\\ ( ( OCCUR INSIDE 20 UNDISTURBED _ \ \ _ �� - _ - - -_ _ _ - / - �// - - - /_ _ -_ / ��-- -/ - /// /,f //�/ \ l $=___-_--- =_ -�\ - // ///--/- - _ _ �y;��i- /��//-`/r]]� U W o _� / — �\ _ ---/-� - _/-- - I - $� � -ter _ -�__-- _ _- - //// �/ / / i�r� _- _ 5 NATURAL BUFFER. _ - - _� — \ - - -I =- _-= = _ _ -- ______ -/ _� / - -/ /� - /_ -/'- - — ! - - % 5 - / //��//� I/ /� ■� l _= �__ AILR — '� O \/%__-- �_ _ _-- )//�¢ / j \ _-- — ��^M /-"'� - / / - = / '_--�'--\�=\=�-�'=�\\��_- — -===_ RIGHT-p `�-_ —590- - / / / _ -_ _-_�� �- _- - __ =_� F-WAY --- -� -- `-- i/�== -` — �_ -'� 1 // -�- w w m s�so 2 o �� Ngt1, NgIV q<< / — �_\ \._\\\ \,,\\-- — -, —_—_ _ _ — —___— /i �// -- /i=— �`\\\ \\�\\� \�\ ` �\ ) 'f alz%s� \ ZoNNsaoos28/> / Q -- i \"`� \�- \ _\\\\ `\ _1_ �__\/%�� \ ��' % — % ' — o ��Pti° \ / arm /� ��\ r--� —�__ —�—\_ \—i_/'� =__ � J i /� \\� �� \ N O oc oc 0 __— O O°Q R2p a�N o'j \\�\ __ _---\�___�J//\�=--- =--- l //f?�� lil 1-1 OF �� / -T . A�CHAVI% I-�VI/y = _ _ _ ,> ^ \ \ � ` —\ -W �— / — \ �/ TRAILS END CORP \ roc — _ _ o O — � w / (HWY 75 r — — _ � P.O. BOX 24224 ��� 10 O�V'Z•�O w - Zoo Z Q Q v o `� 2 \ \ - -- \ ^ = _ _ _= -� ` � _ _ _— _ \ — — /� \ \ �/ �� JACKSONVILLE, FL 32223 \ 100 0 100 200 1 / ��� de -_--� l O PROJ. MGR.: WGB DESIGN BY: CJH o / ar�o� off^ / ^�-- \ -_- � -. - --/ p , \ a Q N k � r � - \ - - - 05168008 I / \o���o��°^ o� �� ? o / m U 41 N W /, _1-1 `\ I l \ \ \ _ / // - _ _ — ZONING: R-20 \ SCALE: 1" - 100' �O�Op� R° Qo O r2a � J — i — OC / �� 1 / / / � \�-----L� DRAWN BY: CJH PROJ. DATE: DEC. 2019 Q-0,J"co4i°� N �O i� �, o• �, ,,, o• / � � -T / o � � / I I c,�,0 OZ\� Q� rop `�U W NwN , ,, ti0 / ��`� Y o N / Y v Z o I I I z\^� ir CO) TRAILS END CORP Wl< Z DRAWING NUMBER: ^R. (j J o O 1 cod P���^ Z ic a i� Z P.O. BOX 24224 I R AARON HUTSON `Q -Z\ G p p J o 0 JACKSONVILLE, FL 32223 C2.0 9932 CHEROKEE TRL �V , 19)` a _ N 05168008 DICI<SON I WAXHAW, NC 28173 / Q'- Q) �P,N -"z . 4 - a ZONING: R-20 WKD PROJ. NO.: 05168022 Q \ ZONING:R-20 \ / `°,� ,�) I community infrastructure consultants W 20170279.00.CL \ \ / o. zww °o w 'z pow ao¢ w ww0 2E om_> g¢oow m Sao - = w ~ w Ozw F-o o. woz " o z oom o ' =Q p= oY� w ¢oo zwa o.w Do< ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 wFz w�= ¢�Im_ =a� p 0zw A' awe z°w -3:2 o z 8 o-o z,- ow oo~ po0 YUQ =z oFt ooa 0 =Zw F,o, a�2E 0 oow LEGEND (STAKING) SYMBOL DETAIL SYMBOL ,CC, DETAIL _ \ / / R/W 51' R/W R/W PROPOSED SIDEWALK - ADJOINING PROPERTY LINE p s/ - � J, � TYPICAL LOCATION OF ��= - LIGHT POLE (2' OFF BOC) communit4DICKSON lrao isultants Q 0 i \ I / s I _ A% I .. •. .. .. .. 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 PROPOSED HANDICAP RAMP - PROPERTY/BOUNDARY LINE _ _J _ s - Y \ — — 17' UTILITY I I EASEMENT 51 5' 7' UTILITY I SIDEWALK 2.0 24' BOC TO BOC 2.0 SIDEWALK EASEMENTI (t)(704) 334-0078 (1J(704) 334-5348 Z RESIDENTIAL MILLBRIDGE I i 1.o (TYP.) 7 5, (TYP.) 1.5' 215 WWW.WKDICKSON.COM PROPOSED STOP SIGN - — — PARCEL LINE \\ m PHASE 7D DEVELOPMENT s - ZONING: CU-R4-PRD Q / \ `� ' � FUTURE �\\ / I I CANTING PLANT NG 1.0' STRIP f I 1/4"/FT 1/4"/ T 3 21 5% 3 21 5% t//FT 1/4"/FT • �"' NC LICENSE NO. F 0374 AMENITY , I \ aQ CENTER s� / �� C 3.25' --► 3.25. TYPICAL LOCATION OF C I fCgl STORM DRAIN - NATURAL BUFFER \ ' \ - O ij �� ♦ I ♦ �✓ I SEWER MAIN I I \ 11 \\\\ \a{ , ... S R e'i ,9 o EASEMENT � � ss / \�O� FS / \ \ ` / Z \ � � I I TYPICAL LOCATION OF WATER MAIN � � � 2 � 8` SANITARY SEWER EASEMENT - — — — — — — BUILDING SETBACK - PAVEMENT SCHEDULE 10.0' FROM BACK OF CURB s TYPICAL LOCATION OF MAIL BOX (2' OFF BOC) TYPICAL LOCATION OF �\\ to ,'Y' �i�ci') .�''INEE,. ��\�-1 \ \ �2 2'-0" VALLEY GUTTER SEWER LATERAL %©tilG.f��,p0\�\�, / �`� PROPOSED 2'-0" - COMMON OPEN LINN COVE - / / / 51, R/W ♦ i \\oe C 5' CONCRETE SIDEWALK *SEE DETAIL 200.3 FOR PAVEMENT SECTION INFORMATION PROFESSIONAL SEAL VALLEY GUTTER SPACE _ 1 FUTURE \ ��� TYPICAL STREET CROSS-SECTION N.T.S. PROPOSED - ) I ♦ �:::: PHASE 7F MAXIMUM BUA PER LOT 0 0 m MAILBOX KIOSK \v��—�— I / / I j I♦ \ \��/// ♦ I SANITARY \\ /� SEWER s� i ` I I ♦ I EASEMENT (TYP.) LOT WIDTH MAX BUA Cos 52 FT. 3,500 SQFT. A •'•:� •:: \ ���, ��� WETLANDS ♦ ASS �� 5 Cam' �..... .... T` (TYP.) _ ` ;.•t ♦ j �...... BMP POND WITH VINYL COATED .............. �...�... ♦ ` �.�./::::: CHAINLINK ..... AROUND PERIMETER \ ) �_ ��� J.... SECURITY FENCE (TYP.) \ \\ ,` RESIDENTIAL MILLBRIDGE PHASE7C DEVELOPMENT 1::::.... NOW OR FORMERLY.. _ — STORMWATER WSLD MILLBRIDGE VI, LLC :::: � � � �..�--....:... POND (TYP.) PIN: 05168019 —� ............... PONfl l-............... Q \ \ ss SHIRLEY LONG GAMBLE ZONING: CU-R4-PRD 4303 TORY PATH RD WAXHAW, NC 28173 05168014 .................................. Z.. ZONING: CU-R4-PRD ............................................................. 0 ....� ... ......I.....�.... .:..............:::::::..:................................... .. 0... / \ O .........................._. .. ..—..�.. .......... ............ f .............. / _ . ........................ `..T::::.:::::..::::::............::::............ / ZONING: RA-20 ` STEVE & KAREN E HELMS 4423 TORY PATH RD WAXHAW NC 28173 O Q 0 cn cn - W o z z U Q..........1............................r: U�...... ...... ..... _ ...... ..... ...... /....... �......... .C.QS .........................�......................... \.... ......................................................................�............................. / .............. .. STREAM ZONE ................. 051 6801 3A ZONING: RA-20 w w LU Z w O � � o=...../ ............................... BUFFER (TYP.) ............................. O O Q Z Z J ........ \.._.... /........_.... .� _ _ -'.'.. ..� W Ir 0 620 - XX XX 1 U j STORMWATER = O ... POND (TYP.) i 1 628 I 627 i 626 i 625 624 623 622 1621 63� 630 629 I I / 1 O O ►- U ::: p Z .... \ 632 I 633 I I ` 0 0 RESIDENTIAL 1 W �r..I 634 V.— \ 1 I EDENMOOR LAND ACQUISITION II, LLC. j ........ = 635 51' RAN ` I W W NOW OR FORMERLY 1800 AVENUE OF THE STARS, 3RD FLOOR 1 O ..: ....:: U \ .... \.�........ 636 \ STREET LIGHT (TYP.) NOW OR FORMERLY I WSLD MILLBRIDGE VI, LLC ` O_ O_ LOS ANGELES, CA 90067 W ... (5) 16 UNIT\-::::::. I PIN: 05168018B DB:639 PG:170 1 - PARCEL ID # 0015-00-013.00 v~j �- MAILBOX � Q O J KIOSK (TYP.) U Z .... (:..... fl........ 12' BMP POND — — 679 I I 678 692 693 / ACCESS ROAD (TYP.) —694 I ZONING: CU R-3 I ` ZONING: NLN 1 Q :::. 637 J 0 .... I....... I.:... I — STOP SIGN (TYP.) 661 1 0 o w � N aT 638 ............... _680 — — I 677 �I J 1 ♦ r r HA 662 I... — 681 W I I ♦ �00�Q� zz 1 OCK-� 660 — `— 676 691 56R °e —_ w --I 663 W 682 > _ 659 — — ` 675 w 690 STORM DRAINAGE I I EASEMENT 1 FUTURE P HAS E 7 F ♦ ♦ ♦ o N 1 -- _ (TYP.) 664 —_ -- I ♦ I 0\0 1 639 — 658 �1 683 I ►- — 674 m 689 I PHASE LINE (TYP.) 1 FRED E BAKER ♦ ♦ 4312 TORY PATH RD T _ _ 640 665 _ — I� 684 ` WANDA D OUTLAW WAXHAW, NC 28173 ♦ 1311 REFLECTIONS DR. 05168010B T 1 1 — — 657 _ — �� — — 673 688 I I — — — I I 666 1 I ♦ MONROE, NC 28112 ZONING: RA-20 11 / ZONING: RA-20 ZONING: Lu Z 641 656 Cps........— — — 668 ` T 687 ♦ ♦ —L - Q L ..— ~ ... _ -.Q... _ _ 667 669 670 — 671 672 ♦ — � H O 1 HIPC RO p I 1` — 686 � LNOW I ♦♦ 0 Q 1 ° 51 RNV IVE OR FORMERLY 1 ♦ WSLD MILLBRIDGE VI, LLC 685 PIN: 05168018 ♦ ♦ FRED E BAKER 4404 TORY PATH DR - U LU Z 1 STORMWATER POND (TYP.) I 642 ' �. ZONING: CU R-3 1 ♦ WAXHAW, NC 28173 05168010A LU U LU J 643 644 I ♦ ZONING: RA-20 Q LU — — ...... ................ I 645 II 646 647 648 649 I 650 651 z O — W Ir O u r 0 LL < co 0 W> N Q ..... 652 653 ....................- I 65LU ` I 655 ♦ — .................. —. — I ~ U 0 m m Z Z > O 1 20' PERIMETER BUFFER (TYP.) _ ♦ — ...................... —� ♦ r z 1 - , , cn W _ — — PROPERTY BOUNDARY (TYP.) ♦ z ~ CSX RIGHT- LROAO ♦c ` 1 OF -WAY U u� TYPICAL 52' HW _ — �� _ `�1 — — _ — — — — — _ � o T LOT LAYOUT.' WAXH AWHIG °' SEE SHEET 3.1Uj 20' REAR_ — HOUSE PAD SETBACK Y �„��^�, I VO � do g� V V o Q = o°' P Q C�� 70; s`s/C , qLU �qk 1v 4), z U Z 0 50'(W) x 70'(D) Q o Q� s\'oo JJ 1 h'q /y by r �, q11, q� < YED QI I w �I LOT ## I w w 52' WIDE o I �0S\'Th20 olv o� p O= ^oo s\ ^' �� ���� �} �P �� v 00 �, oo Q Q"QQ \Q'�`Ow C9' ps N 76' C y< Q�^ /(//Nq. 3, 28/ j� p Z R.2 3 2 Q v co ��v SZ �� TRAILS END CORP O Z 00 0_ Q > o w I ^ V� oh \s �� 0 r r QP����O �0� / O� ��O rQa Z Q Q v a N Z a O Q a Q N k •. � r P.O. BOX 24224 JACKSONVILLE, FL 32223 100 0 100 200 Q PROJ. MGR.: WGB DESIGN BY: CJH 10 O zo' FRONT Io / QO�J ^ 4' Cj'w o S <o C� N o W Q Q h Q N w O r � \ SCALE: 1" - 100'Cj ZONING R 20 - DRAWN BY: CJH SETB CK 16, I� 5' SIDEWALK 4PI10 & �� �' 0 r y a � � 5Q�\�'��^�w° Q' / �� N ,,?�� D o Y PROJ. DATE: DEC. 2019 DRAWING NUMBER: R/W �jJOO�PO^\�OWNWN U Z o ' TRAILS END CORP Wl< 7� z T 2'0" CURB T EDGE OF PAVEMENT R AARON HUTSON Q -� C7 P.O. BOX 24224 PATRICIAS ROGERS Z a u�o o JACKSOO 1168008E 32223 10707 WAXHAW HWY = C3.0 ROAD CENTERLINE 9932 CHEROKEE TRL WAXHAW, NC 28173 / 05168022 N WAXHAW, NC 8173 ^ a I ZONING: R-20 DICI<SON J 1 WKD PROJ. NO.: TYPICAL 52' WIDE LOT N ZONING R-20 ZONING: R-20 community infrastructure consultants 20170279.00. C L (NTS) Om zww 00 0 w 'z pow ao¢ wwo gym; U=w oo' �a0 = _ww oZw F-p oz o zz Z oom T =UQ ~p= OY� y w °w= OZ¢ oo < ozz Ow0 w w¢� ¢3:z o�0 wD¢ wi0 z w�= =w� p �Zw ¢o< QO2E z°w �2P o z 8 U-o Zwp 02E= YUF U po0 Y ." §=Z FO o Ft 0 Zw ooF a2P 0 olLL AV RESIDENTIAL / . / ,• \ 7. .,vw EDENMOOR LAND ACQUISITION II, LLC. j NOW OR FORMERLY RESIDENTIAL MILLBRIDGE / ( ti / DDICKSON . r _ _ I. WSLD MILLBRIDGE VI LLC PHASE 7D DEVELOPMENT - - ..�... , �. NOW OR FORMERLY / � I 1800 AVENUE OF THE STARS 3RD FLO • ZONING: CU-R4-PRD ��O l ... PIN. 05168019 �. --.... . 4 / LOS ANGELES, CA 90067 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \ r.� -.- - • , communit infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 ..........f... ZONING: CU-R4-PRD .......EXISTING ................................ \ i �i. . .N81°.44'.02.64"W...�.. .. �. �.. DB:639 PG:170 . . . . . . . . . .. /� . . . . . .I4. . . . . . . . . . . . . . / A PARCEL ID # 0015-00-013.00 1. PQ�Ip. \ / . . ! . �f }3� 2,88 . . . . . . . . . . . . . / T\> - / • . , ZONING: NLN ..........1.. .. ... x ` 9 .. STORMWATER / 6' �..... �. `9 \\ � N61° 15' 39.73"E BMP �. \� .� .� . . . . . _. . . . ... . . . . . . . . . . . I N36° 44.51"E „ CHARLOTTE, NC 28208 (t)(704)3340078 (704) 334-5348 _._._....... 18 a qf_ . . / . 1 S 31. N00� 39' 39. 2' W . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \ . . . . . . . ....................................... 1 .. . . . . .18.29 ........ FUTURE PHASE / 25 �7. - - . . . . .......... ..'I.................................�.,..... �........................... - _ 7F MILLBRIDGE ..�............... y......................... RETAINING \.......... I...............COS......................................................... WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ..�.. .................... �...... �.. / ........... \ WALL TYP. ... . o............. .. ,00.........�. ( ) S39° 1„E . r <0. . . . . . . . \. . . . . . . . . . . . . . /. . . . . . 5° -.� 1 . . �... " s .. . / . . . . . . . . . . . . . .53 . \................................................. STREAM ZONE .................................. so9°. N48° T6"�2:97" . . i J. . . . . . . . . . . . . . . . °-69.49"E . rn� ... / °........ �..... ... ........... ..................... BUFFER (TYP.)........................................ 69.48. . . .... sr 9.90 �. .21.98 5. , . . . . . . . . . . /. �,. 52.00 . . . . . . . . . . . . . ... ' 0 8sr` _ / _ 52.00' 52 52.00 82.23 �, . \ a 35�2g. s�.03, �.�..�._. \ 5 `� - o . . . . . . . . . 2:00'. .52:0 -I SANITARY SEWERES�'O 52.00` . . 8° �. 'y - 2 0(l. _. .52.00' _ . _ _ '1V 47' 19.52"E I I / O . . . . . 6352. sg4° 4„�- 68.60 II - t6°47-M.57 EASEMENT (TYP.) �x �61.77 2 5.87 I I 121.84 \\\ CA i R 0 i ! �i / _= S . 8' j 2 1 S 3 2' 40.48"E J N00.005' 06.16' -1 1 116.00 I II I ��g �. .51 Wl� N.I I I N84° 35I I I I I I' 1 621 I I � ��' ..... 6g? 6„�-- I I 620 391 S76° 53' 39.16" I I I 623 1 622 ILLI 5 627 626 1 624 � I �032 SQ. FT. S12° 34' 01.22"E 2 N76 \ 1 I I I I �I 7629 SQ. FT. �. 0°. i� 60.19 I 628 625 I 6032 SQ. FT. �I 6032 SQ. FT. III FFE: 582.00 FFE: 582.00 6032 SQ. FT. FFE: 583.00 I= / � /, • 30.16 STORMWATER �6�0- � � ppp 630 629 6760 SQ. FT. � I 6760 SQ. FT. � I 6760 SQ. FT. � I 6032 SQ. FT. I �I FFE- ~ \ 631 I 6760 SQ. FT. I FFE: 583.00 I I I � FFE: 584.00 I I'I BMP \' 6760 SQ. FT. FFE: 581.50 FFE: 582.25 FFE: 584.00 Cj I 632 I FFE: 5 0 00 FFE: 580.00 BPE: 572 00 BPE: 573.00 I I 11 I I I I I -I co OQ ` I I I I I L� II PROFESSIONAL SEAL 7535 SQ. FT. BPE: 571.00 BPE: 571.00 J I j I FFE: 581.00 I I III 1 3-WAY STOP INTERSECTION I I �/ 633\ BPE:572.00 I I I J `� III ,.-.'• 11I 1 s� o .� Z �' 7683SQ. FT. FOR TRAFFIC CALMING 4931' ` I I �1' 52.00' FFE: 573.00 I I I -DEE V R WAY- - P 52.00' I U UO Z /5� BPE:573.00 J L� 52.00' J 51' R/W 52.00' 52.00' 52.00' Q Q -T U - J 52.00' I. = %.. / 6�� �� 634 \� 52.00' S2.00' .I rL 7535S8 FT. 3. ' 52.00' I �� P 45 88 0 $+00 . b \ FFE: 584.00 �} 6+00 0 I. .uJ A�1� lG�� \ BPE:575.00 \ C. .\ 49.41 -+ �+ _O +7 D� -- j F- r . -+ g+00 L3 � �'��� I N ���' 635 g°_ � -+ 0 00 900, �\ f � o � +0 46 53.26, 61.29' 8 Z \\ 7534 SQ. FT. \ .2' / �2+ 00 _ FFE: 585.50 - `90°.J 1 S25 56 00 85 E O . . . > �� _ _ _ o \ 02 3T !/ N 5° 56' 00 U II � \ R� A 107.21 �j 3 17.21 15.84 I I ko � �:. gMSTUE M 6.21 -U _ 1............. • p .� ..... �0' �FZ ° ° � R-23 (TYP) `_u _ I 636 /�ko �-� ti __� I I //�� 2 .42 PC= +27.4 f' �\ . + ... U SETBACK (TYP.) z �' I 7534 SO. FT. . �� . -7 _ 0 679 T 0+ w I. . . . . . . . . �0' \ FFE: 586.50 o I 8322 SQ. FT. I `�� 57.98 III U co g• 38°.10'.56.25"W.. COS..II G / 7�j�\ (5) 16 UNIT' %` 7:90. . . . . . . . . . . . . . .� N FFE:580.50 I 678 I 69200 ol.. ...... MAILBOX / ........ m ;I °' ' I I 693 694 0 I Im 10471 SQ. FT. 8240 SQ. FT. _ O �N 8793 SQ. FT. ° . KIOSK (TYP.) / :' P1 II FFE: 588.50 f' _ FFE: 584.50 7691 SQ. FT. I PROPOSED BMP ACCESS I.I .... 637 \ - \ 00 .. o I 1- L I I I FFE: 583.50 7 FFE: 582.25 i' EASEMENT TYP. �. I �`� \ 7534 SQ. FT. b x I 661 I . . . . \� FFE: 586.50�" I ,. -O+ N w 5.0 �2 J o I III 6760 SQ. FT. o I I Z O LY 0 OW H H U �h + I / O \ G . . . . . FFE: 583.00 I o ' e- u� I 680 N� III I I N83° 31.44"W 7 \ �. �I 6760 SQ. FT. o o III r 20.190 1 \ / S38° 10' 56.25"E . .� ' ^I I / Z Z (n W W W O 0 ^ FFE: 582.50 N 677 S 1 C �� 13.4g u� 1- -� _ N 1- I ° 8 5Q46" L_ J . . . . . . . . . . .o �. o. oI 6463 SQ. FT. _ obi N84° 31' 58.48"W Y N06° 42' 28.56"E638 COS N Q? �- z FFE: 590.50 I C\i 57.27' LL _ / 20.0042.59 9349 SQ. FT. o .662 QO 1 52.00, �/ - (n O O U U LU IrFFE: 586.50 �' Uj - 6760 SQ. FT. o N 5• �- 11 8 150. 5' NOW OR FORMERLY FFE:585.00 I N I 681 _ -w ,L� WSLD MILLBRIDGE VI, LLC °` oo �I 2+ q-.6 +0\9 M`� ^hx ^� 6760 SQ. FT. I Z I 691 �� "' PIN: 05168018B 00 660 I I 1- I I ' (_ FFE: 584.50 I I 676 ! � O 8129 SQ. FT. d N I ZONING: CU R-3 6533 SQ. FT. �z I 6641 SQ, FT. Q =�i L FFE: 591.50 �� crT I O O Z z O O _FFE:586.50 II 663 J O! 1- �L _FFE:592.50 t e- CV' = 1 7 I 1 W - O o \ 1 (n ��� 10:1 PAVEMENT 1+0p 6760 SQ. FT. Z �o N; IN ` 5.�0� �- �F- I:'' 00 o" FFE. 587.00 Q _ I G82 _ 1 _�Q -U - TAPER (TYP.) 6760 SQ. FT. m I 690 � � z z o 0 a �m FFE:586.50 I I 675 L 659 S79° 57' 03.94"E HANCO 41 � 1- Q w _ _ 7796 SQ. FT. OAO, ��O 7542 SQ. FT. 20. o O _ 6819 SQ. FT. FFE: 593.50 I I / 56' _ FFE: IoQ6 o FFE: N / R \ �- I PHASE LINE (TYP.) COS. \ o - �1. I 664 - o - >) >) W W E � - 113Z�i _� -IIJI WARNING PLAQUE / �� � 6760 SQ. FT. o N �� 5. 0' �- _ (W1-1 R & W13-1 P) �� FFE: 589.00 I N , I 683 Cl?�n ca 6760 SQ. FT. Z o W 10 MPH SUGGESTED CV - � N I 689 I ' I o o I 00 N 0 658 oo 1- = FFE: 588.00 _ I 674 7462 SQ. FT. PROP. PAVEMENTSQ. N FT._ N + FUTURE PHASE L N T T T _� FFE:595.50 co o I AND SIDEWALK FFE: O �- 00' FFE: 1- I I �' ss2b52'22.1"E 665 M %oQ0 S 5� _ �36 �- r 7F MILLBRIDGE LIMITS THIS PHASE = 15�g 20. 0 _��11 I I I I I ImIQI ° z _ �- 6760 SQ. FT. o •. J � I I T D _ 640 684 oI � � � _ ,' IM � � I � FFE: 590.50 I � •• � L 673 I 688 I 6896 SQ. FT. = 5` Ems^ _ 6760 SQ, FT, o cV =L FFE: 584.50 PT= 1 +7 657 r I FFE: 590.00 I I 7175 SQ. FT. _ 4 . • CO M o � N � � 1-" `��j' �, 7129 SQ. FT. 0 8134 SQ. FT. N FFE: 599.00 N L FFE. 598.00 52� I o� O N rye W FFE: 585.00 coo - II o - o o I'. - 21.00, 31.00'- PC= 3+89.243 I I r _ 666 5 ats- 1 + =� z `� I I 7' UTILITY I 5.00' _ cOi 6760 SQ. FT. o - co WARNING PLAQUE FFE:592.50 N�; EASEMENT (TYP.) c, I (W1-8) ONE SIDED _ �, , T 687 NOW OR FORMERLY I I CO I N T " FFE: 584.00 J I 1 10.38' v o' 6801 SQ. FT. WSLD MILLBRIDGE VI, LLC 656 1� _ o N40° 15' 32.7 "\\//��II IV M' �\ o - o I I I I I FFE: 600.00 / PIN: 05168018 5 � FFE: 585.50 �� IM o -p� 668 - 1 PT- 4 0 9 �' ML N80° 53' 17.19"W t_38.49 560 SQ. FT. ' 6 o N o STOP SIGN (TYP.)' I I I _� 20.0o ZONING: CUR 3 S84°.54'.37.03"W` I I I b- M o - i- 6991 SQ. FT. I 669 - I I •� �� �/ FFE:597.50 O+ c' I 670 I I I W Q U Z W z o 3 - 126.67' 7276 SQ. FT. °'�I 6500 SQ. FT. I=III=III= - I=II 0o c] - FFE: 598.50 671 44"y�/ Lp _ FFE: 594.00 15 X 15 SIGHT 6655 SQ. FT. I I o ,...., 58 .. TRIANGLE TYP. FFE: 600.00 6760 SQ. FT. 672 N I 686 N + I 1+ �05.00 ( ) I I FFE:601.00 3 of - Icn 00 7323 SQ. FT. 6595 SQ. FT. PROP. BARRICADE & I III Q J 0 Ir rn . FFE:603.00 I FFE:602.00 / TEMPORARY TURN AROUND g�� ; I 3110.60 I I I 14.30 I ,ems 150 2+00 1 L � I L WH III - (SEE DETAIL 280.5 AND 706.1) ATE Q _ U UI o °, N �I I 1 PCORD DRIVE �� ��x x� 50 0 50 100 oI �... o, ��' 33 o � 38.24' I + � .- � � 52.00' S1 R/VV � J/L ' � � � S� �� M 3'00 LU � o U H ,' WARNING PLAQUE... 52. -. , : ; 0 685 92 o M. p 00' 00' '�^ _ (W1-8) TWO SIDED �, 52. I \� SCALE: 1 - 50 WARNING PLA UE 52 j o� LU N W J W W Q I .I.. WARNING PLAQUE ....^ �j (W1-1R & W13O-1P) s2.00. .. , .._ I 4 i00 L10 _5zoo 3� -�' 7575sQ. FT. 00 FFE:605.50 NOTE: z _ a_ D Q7 07 O o U 6 0 LL S 6° 14' 21.58"E ( ) �. I 10 MPH SUGGESTED W1-8 ONE SIDED I �52.00' S 1 5+00 TABLES. ' ' ' ' 1 SEE SHEET C3 2 FOR LINE &CURVE TAB S56°�35' 8.14"W STORMWATER o �, o1 1� E SHEET C3 0 FOR TYPICAL STREET 2 27 11 BMP o SE I I I � 20 RF ONT 52.00' 1 - 6+00 g� 10 . + I00 0 - ~ 0 Z Q 0 co p W CV m w r 642 N p CROSS-SECTION & LOT LAYOUT. I 6745 SQ. FT. 643 I I I I TBacK (T1'IP.� - 5 ' 7+ '��X\ 3. POSTED SPEED LIMIT IS 25 MPH I I 52 00' 00 U U m Z F 9 o FFE: 587,00 I ADA HANDICAP RAMP N 6760 SQ. FT. I 644 I I I 52.00 a N FFE:589.00 (TYP.) SEE DETAIL 127.1 6760 FT. I 645 I I 1 52 I s+ 00 LEGEND (STAKING) / �.°...... I I � Z o ... � oo FFE: 591.50 �' 591 5g.. 9CO+ •- 6760 SQ. FT. 646 , I \ I I I I I I /+ _ 29.21 ,'�Ir \ N 02' 18.76"E FFE: 593.50 1 22.79' 9+00' SYMBOL DETAIL SYMBOL DETAIL E.\ Sss° 6760 SQ. FT. 647 I %� I I I I I I V ) LU _ o�6�ri . 3. 1 3-W AY STOP INTERSECTION 52.00' 03, FFE: 595.50 I' ' 5 p4 NgZ44, I 6760 SQ. FT. 648 I_ � PROPOSED SIDEWALK - ADJOINING PROPERTY LINE o S18° 52' 20.95"E 4�5„� I I I I I I FOR TRAFFIC CALMING 59.gg 2p8'F J' �' `� I FFE: 596.00 6760 SQ. FT. I - \ 147.36 1 649 26 . `.00' I I FFE: 597.00 - I 1 � I 1 I I 6760 SQ. FT. I 650 I I I I STREET LIGHT (TYP.) L ~ O 4q' �I L .. . ' . ' . ' . ' . ' . ' . ' . ' . ' . ' . . E ° 12 I I FFE: 598.50 6760 SQ. FT. 651 PROPOSED HANDICAP RAMP - PROPERTY/BOUNDARY LINE - - L� 5 ................... 59.21 _-�z� I I I I I I I - �5 14 I FFE: 599.50 - 6760 SQ. FT. I 652 I I I U O T 2 F ° w' AO'�1 I FFE: 601.50 -�.27"FF � I 6760 SQ. FT. I 653 I I , ' _ _ . . . . . . . . . . . . . . . . . 0 = ��J ° 31 �8 III FFE: 603.50 6760 SQ. FT. 654 / t PROPOSED STOP SIGN PARCEL LINE c� �52.00� I I I FFE: I `'a l 52 I I 64-� I 6760 SQ. FT. I 655 I I I o W W g 00,....................... ........... �- FFE:609.00 S J I I I 7246 SQ. FT.�31 rI I FFE: 611.50 STORM DRAIN - NATURAL BUFFER - T �_�`�j� � �° ��.2 I I EASEMENT i 04.3$� W r/� �,/ i Q Z � 10 � I ��52.0aJ PROPERTY BOUNDARY (TYP.) . ..... ..................... .. ���8 L . . . . . . . . . . . . . . . . . . . .- ��.V�� _ /I L IU Z in " r 9°nn ^ SANITARY SEWER - - - - BUILDING SETBACK _� EASEMENT 20 NATURAL PERIMETER 52.00-,"7 E _ 5 -` L24. 53" w COS I O O Q Ir 0 U 242 136.2��L� r. - BUFFER (TYP.) - . �{ - - - 2.o co O PROPOSED 2'-0" COMMON OPEN .. 24, VALLEY GUTTER SPACE ` p " . . . . . . . . . . . . . . . . . . . . . . . . . . . .° .'.' Z53" - _ - CSX 136.63' -� m - RAILROAD STORM DRAINAGE 5. . . o O PROJ. MGR.: WGB DESIGN BY: CJH a PROPOSED RIGHT-OF_WAY EASEMENT (TYP.) ............ Z MAILBOX KIOSK DRAWN BY: CJH - PROJ. DATE: DEC. 2019 o 10 _ _ HWY 75 WAXHAW HIGHWAY \ Q z DRAWING NUMBER: - _ C3.1 DICI<SON WKD PROJ. NO.: 2 2 a a -_ _ community infrastructure consultants W 20170279.00.CL w _ 1..� I o. zww ° °o w 'z Qo¢ woo ww� U=w o¢m .ao =�o w ozw F-o o. WUz Zoo oz ow w. =UQ ems= oY� w ¢oo zwa F F., oo Q ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 wFz wQ ¢�� =a� 0 c7zw Qom z°w -�2E o z 8 U-o zzo °w_ YU~ U 0o0 Y.4 �=Z oog 0 =Zw ooF a�2 Ow¢UD 41W \ v / EXISTING MILLBRIDGE POND \\ PHASE 7D STREAM \ \ BUFFER (TYP.) 3 TS / COS T. ' �-00' N81°4 �i \ l0/ 630 / / ° 25' 06.16"W \ - _ 18.37 . 6760 SQ. FT. / 's / FFE: 580.00 / 20.Oa\ 0f7,. _ 4.N �� . \ \ / ✓ gSj/ BPE : 571 .0 0 / > \ 629 N61 ° 15' 39.73 / 6760 FT. 581 / / S? o . S ! / C FFE: 581.00 0 � BPE: 572.00 o S59 24' 16.77" E / J 6760 SQ. FT. � \ � 18:29' FFE:581.50 ^ BPE: 573.00/ 627 / / 6760 SQ. FT. FFE: 582.25 69.486760 SQ �O XOp S�0 / FFE: 583 00 'x°o / 625 STORMWATER S ° 47' 19.52"E BMP ?00 / 6032 SQ. FT. / 68.60 g FFE: 584.00/ 624 O \70 0, 6032 l / / 6032 SQ. FT. / / 00 , % ,• ° \ FFE:584.00 \ S? o \ x 0 \ 623 /i2' 40.48"E / 6032 SQ. FT. 116.00 / N36° 41' 44.51" FFE:584.00185.61 622 679 06 0 1 s? ` / 6032 SQ. FT. / . 8�; . \\ 8322 SQ. FT. 5�0 ° n�� ': `9Y-0 °0 \ / / FFE: 583.00 / po N86° 7 19 b1 "E ??v'' / FFE: 580.50 ��b V / . / ) 621 121.84 / \ 7 \ / 00 2 42' 7 \023�' \ / S?0 , \ / \ / \ 0 C / p 0 6032 SQ. FT. / SF oR�- R=23' (TYP) • O 8xo < ., \ FFE: 582.00 o % 680 ^ \\ �o°/ eqc� Rs�\ 0 0620 \ \\ 6760 SQ. FT. 6%yp F /� ?00' co• \ , FFE- 582.50 % M \ \ 12' BMP ACCESS'Al \ROAD (TYP.) / 5.0 678 00.5200, \ ^ � 10471 SQ. FT. / _ \ 681 \\ \�i ��L ^^Oo � \ FFE: 588.50 PC� 0+ 7. \ V • ; � .: , \ �00, 6760 SQ. FT.FFE: 584 50 \/ � / \ \\6?8, ` \ XO� 6463 \SQ. FT. �' O 15' X 15 sIGHT 692 TRIANGLE (TYP.) 67 �0 8240 SQ. FT. / FFE: 584.50 // 5° 56' 00.85"W TT V 6641 SQ. FT. \\ \ 693 / / 17.21 , FFE: 592.50 / .` \ / 7691 SQ. FT. / / S25° 56'E FFE: 583.50/ R> / / 15.84 off. C SF \ /\\�2� s � 694 O 5. \\ 675 %\ \ / Off' ' ^ / �, / 8793 SQ. FT. \\ 6819 SQ. FT. �C�\ v \ 00 �. \'° S° // FFE: 582.25 O / \ 7 FFE.594.50 Cb 674 \� / 691 \ \ 6997 SQ. FT. \ \ \ \\ \ FFE: 597.00 \Q 8129 S91 FT. �k', 'FFE:591.50 \0\�84° 31'58.48"W �7�5�520.00 673.� 7175 SQ. FT. �L cL• J� /\ \ 690 \ �` 6 FFE: 599.00 \ \ Vh \ p0 �, \ �\ \ / �� \\ 7796 SQ. FT. / \/ \ FFE' 593.50 \�+89.24 �s h� \ �� \ \ \ 689\ ' \\ 7462 SQ. FT. 1.0 h� / Na� \FFE: 595.50D���0 �.8'�Go �^\ 688 °o`er STORM DRAINAGE PT- 4+ 9 Y. \ 7129 SQ. FT. �\ / EASEMENT TYP. 672 , 0 % ' OIL FFE: 598.00 / (TYP.) 23 SQ. FT. �0' \3 PHASE LINE (TYP.) =E: 603.00 (00, : 0 o - \ 687 \ \/ 6801 SQ. FT. \ p0 FFE:600.00 / Cb N$� '1 .19"W \\Z • \� l 261.00 / 686 6595 SQ. FT. \\ \ FFE: 602.00 S2 ° 14' 21.35 .58"F.� \ Q�j ' 7575 SQ. FT. Q� \\ FFE:605.50 X0� S O / \ PROP. BARRICADE & \ ` TEMPORARY TURN AROUND -- Y S • 655 7246 SQ. FT. FFE: 611.50 Oy 00 o% G� Q 9.1.00 �7 10 i00' 9� 2 15.33 AC. �N P� OE�P 51��1 / /- LZ / 3kj 7' UTILITY EASEMENT (TYP.) "'�T'_ANDS (TYP.) EMAIN UNDISTURBED 2.93 AC. SANITARY SEWER EASEMENT (TYP.) FUTURE PHASE 7F MILLBRIDGE 35' X 35' SIGHT I TRIANGLE (TYP) THIS INTERSECTION ONLY I I STREET LIGHT (TYP.) FUTURE PHASE 7F MILLBRIDGE U a STOP SIGN (TYP.) CURVE TABLE CURVE # RADIUS LENGTH CHORD CHORD BEARING DELTA C1 200.00' 74.29' 73.86' S51 ° 10' 36"W 21 ° 16'56" C2 200.00' 161.45' 157.11' S630 39' 44"W 46015'11" C3 350.00' 504.01' 461.58' S450 32' 05"W 82030'29" C4 200.00' 43.67' 43.58' S3° 02' 37"W 12030'35" C5 200.00' 30.52' 30.49' S1 ° 09' 38"W 8044'36" C6 200.00' 13.15' 13.14' S7° 24' 55"W 3045'58" C7 200.00' 210.46' 200.88' N69° 09' 08"E 60°17'33" C8 430.00' 65.07' 65.01' N73° 33' 54"W 8'40'12" i i I MILLBRIDGE - PHASE 7C I DEEP RIVER WAY 51' R/W R=15' (TYP) ALL CORNERS THIS INTERSECTION FUTURE PHASE 7F MILLBRIDGE LINE TABLE LINE # LENGTH BEARING L1 122.69' S61 °49'04"W L2 174.54' S40032'08"W L3 639.85' S86047'20"W L4 95.66' S04012'00"W L5 19.11, S03012'40"E L6 417.84' S09017'54"W L7 27.46' S03012'40"E L8 331.26' S05°31'56"W L9 145.13' S09°17'54"W L10 847.46' S80°42'06"E L11 37.05' N39000'21 "E L12 37.22' N69°13'48"W L13 407.17' N77°54'00"W 1 \ 50 0 50 100 SCALE: 1 " = 50' LEGEND (STAKING) SYMBOL DETAIL SYMBOL DETAIL PROPOSED SIDEWALK - ADJOINING PROPERTY LINE - PROPOSED HANDICAP RAMP - PROPERTY/BOUNDARY LINE - _ t PROPOSED STOP SIGN - PARCEL LINE - STORM DRAIN - EASEMENT NATURAL BUFFER - SANITARY SEWER - EASEMENT - - - BUILDING SETBACK - PROPOSED 2'-0" - VALLEY GUTTER '' COMMON OPEN - '.. SPACE PROPOSED - MAILBOX KIOSK IWl< r community infrastructure consultants 1.0 T N M\ W \ N z O_ U C) z O U Ir O LL rLU V I- O z O i Q z 2 J LU Ir n WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ik AR0 //i �. O 3 / 0,S 8 . 2 � IN %, /11111�0 \,�� PROFESSIONAL SEAL U U m p z IZ O O Ir Z Z � U LU w LLJ o �: O O LU Ir O O O O Ir Ir 0- 0- O O U) U) 0= 0= rn rn 0 0 w N N � ImIQI0 z Lu I- I- 0 U LU O C\I r LU J N LUQ J LU LU _ _ w00cunN cn o �w>� g J OC 0 m 11 m zLU LU J J Z Ir LU I- O 0 lil 6 i Z U Z LU Ir Ir � 0 PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C3.2 WKD PROJ. NO.: 20170279.00. C L o. �ww OJU 0Zw QO¢ wwo 2E,o � U=w om �a0 =gip ~ w Ozw F_p o� WUZ ZOO °Zom �� wY< =UQ ~p= OY1 w ¢op zwa OZ¢ o ozz O w 0 a � W ¢ J ¢�Z o0 wD¢ 0 wFz w�Q =a� p C7Zw Fr A' Q2E ?dw o z 8 U- ZwO p °w_ YU~ U p00 YUQ =Z �(9 oo¢ 0 =Z, w FrFr - awl O OUDLL LEGEND GRADING AND DRAINAGE) I/A� /� _/ _— 1l_ 1 l/�� lvIrv// Il �` _I1 /_ V�\� / J//// /_ / / )\/ I ,/ v//� _ 7 A/\�V\\\ � v/ i//I/�/ 5\ -\VAAV\\\\A��v`� � ,\/i WK DDICKSON SYMBOL DETAIL SYMBOL PROPOSED MINOR CONTOUR PROPOSED SIDEWALK —/;/ /� / I /�///II/ ll�l�l��—l/ �/v/���l I\' l/�/IvAi \��/\\/ \\V� A ll//iIIl/ �ll`rl /v�� � % / /II /\. II/I—_\ � �/� 1 �v\\� �/ /�/� %// �_/ °v�\v ' \_/ � � � L�I �__=�I J \n \V /II/�l /I/lI�� �\ /\\ s nit infrastructure consultant 1213 W. MOREHEAD STREET \/j/j/�//�\ �� 1 >✓ I111/I�/ I / IlI _ J//� IlI l /��l//OI QO (I/lI��I \i V� �V �/A/ \V /� RESIDENTIAL \s I _ MILLBRIDGE ��/�♦ I _ AV\ \\A\\\\\� \\\\\ AA% �\ SUITE 300 CHARLOTTE, NC 28208FUTURE (t)(704) 334 0078PHASE 56520� MAJOR CONTOUR PROPOSED GRAVEL AND RIPRAP APRON vll �ii���� // A� // 1I v_"` A%V�\\/'A i —_ I / I�lIl iI ` \ l II= = v\\ \ I/� � I RESIDENTIAL /\�//V/ IV A�/I '/C�/A \�V\ �/1V/�/11°�1� \ \A7C DEVELOPMENT II I A�` \\ ONING: \/ V ZONING: -PRD\\PROPOSED \A\\� V A\ \ C�UA�- (fl (704) 334-5348 DI W'.1W/ .- WcW��t'' / / l FUTURE MILLBRIGE —� ��_/ (�� _V NC LICENSE NO.F-0374 DRAINAGE SWALE STORM DRAINAGE EASEMENT PHASE 7D DEVELOPMENT FUTURE =JPROPOSED I ZONING: CU-R4-PRD AMENITY ENTER -- //\ // —1 \\Z / / � //Il—�/v/ / /C 1 CAJ 1�•E PROPOSED CHAIN LINK FENCE PROPOSED CATCH BASIN -_#I #1 #, �' �JcD \ \/�� _/ LI__I� v1 �//1_ � �/I ��7% �O ... Ve/o i ' ^J^Cc/AIO, E1N• # II�- DI\I�/� (� '� m _ " \ �\�—\,\V\A /— �A— V/�_A I—_ �1�/IE \� \//—A1l— :N ICy �.O—/M ' �K�S�+i P1` PROPOSED STORM DRAINAGE PROPOSED DROP INLET 0000 G. PROPOSED JUNCTION BOX BMP RISER STRUCTURE \� LINN COVEMH-## v \V/ // � //L \—✓��� �/ �im/I\ PROFESSIONAL SEAL STEEPER THAN 3:1 � II /— / �oo00yrnoNr �monRETAINING PROPOSED DOUBLE CONTRACTOR SHALL INSTALL SLOPE j STABILIZATION MATTING ON ALLCATCH BASIN � /-_AI /, /R �SLOPES - SLOPES GREATER THAN 3:1 // / �_ /_—I/ // or r SB-## SANITARY SEWER PROPOSED SLAB TYPE CATCH BASIN I\ / COS\ VA \ V /1/� // I I�1\ i/ 1/ /v ��D_�, / /I�ce /�/I_ 1 ,� / �� I /\_/1_ t� _ I - �/ /vS—/ I \ 1 wl 1_ X/� �\\ : I �—V � v�vvv III� _— :�/�\� I�\ '—//_/— I—/ VI1v��� =/A HELMS vi\yRA�A4 ,_ �R � II R 4423&ORPATH RD NG GAMBLE WAXHAW, NC 28173RESIDENTIAL LAND ACQUISITION II, LLCM— EXISTINGSEE V� v/ —� SHEETC4.3 4303 TORY PATH RD 05168013A wAXHAw, NC 28173 ZONING: RA20 05168014NOW z OR FORMERLY POND v — AVENUE OF THE STARS, 3RD FLOOkLOS �" ZONING: RA-201800 II — - O�EDENMOOR ANGELES, CA 90067 / I LU DB:639 PG:170 / v WALj� DESIGN BY OTHER -�v z w ww PARCEL ID # 0015-00-013.00 ZONING: NLN �� //\\ 0 ,/ A _ LU � / /� \ �—/—�// /— //� /\ �/ %— — �/�,— �/A�6 / \//_V� LL zz LL —� / / —��—IVV'/ w w Cc / —v/ \A� �/ //�// // --���A\)\_ v„J1v F Cl) E Cl)z z E �� —/ � � / /II_A�r\ /� COS / / �V_ \v / ///l�I /V/l l/ /V /////I /v/ i,, vv; / C�v- v/— vj—_ / oo w < N \�= \A� v /07 �A\ v_��_��� /_//\\/ /�OI� vVI — 000 v/ ��I v/' ���—/� \ �J // v \ � �/ \�/—\/� �G_A� �j FREDEBAKER 4312 TORY PATH RD �WANDA (V �A/_ A v� � m � V D OUTLAW 1WAXHAW, NC 28173 1311REFLECTIONS 0516801 ZONING: RMONROE, NC112 W �//�/— l\I —�— /� 05168011 ZONING: RA-20 7 \ Uz � / /�_vAA_//— _ Ld Opp ��/l PA RA\CORD Qz / //� � z /v /i/ /=�v—�/ /� / A 4404 TORY PATH DR WAXHAW, NC 28173 w /—/A,\\ %_/V A� V Al—' /V_VI / _ ZONING: RA-20 w U c� J J w a_05168010A v/\v-/—/ ,�/ -- ,_ ,�v - _Orro1�SK•E o�oornor- —)� ° o N Q / /_/ / �w oUD 0J/+ _/v_—/\/�/� �/ En Q �c� -- — / / Ir LU _� �—'_/ ,— =—A_ L =/� =�_�\ _ USX z i-O ( /z _ j O�/ —v =I Cl) —/—_/ ��—� _\/� -- - v_ _'I/ _ WAY 40_7 /// AX tIAWN —v�Il�/v w _— � 71 - ;V =/ SHEET C4.1 , wSEE ;/�= LU / may100 0 100 200 OQJ-r PROJ. MGR.: WGB DESIGN BY: CJH SCALE: 1=100' DRAWN BY: CJH � PROJ.DATE: DEC. 2019 Wl< DRAWING NUMBER: C4. 0 WKD PROJ. NO.: D I C 1<S0 J / / community infrastructure consultants LL] 20170279.00.CL o. �ww °°o OJU pZw Qo¢ woo ww� gym; U=w g¢m �a0 = w - ~ oZw F _O oz ZOOo Z °om wY� =UQ oY� wow ¢oo zwa °Z¢ o< OZZ O w 0 a � w¢< ¢�Z o�0 w�¢ 0 w�Z WQ =a� O C7Zw °2E z°w �2P oZ8 U-0 ZW O °w_ YU~ U 000 §MZ oFr oo¢ = 0 Zw ooF a�� 0 °oLL v r / I ( _ _!� I Ill\ 11 MILLBRIDGE \,�� - �\ - ` /PROPOSED RIP -RAP APRON I / \\\ \ \ \ �� \- 15(L)X9(W)X0.56(H)/�,� \ `VY1� / \ I \ .ii 1 \ -- _-�_- I � \ III 111 PHASE 7 STORM DRAINAGE OUTLET (TYP.)_ � _�- - � / /� / / _ \ - PROPERTY \ 545 1 I II\ 11 // �� y / / h I / '\ / \ \ \ \ \ \ \ l / ,� / / / h/ / � - / ' �' ° I\� \ \\ \\ \ � \ \ / / � I I II \ � SEE CHART ON SHEET C8.2 FOR � L i�� � _ � / j DICKSON / / 5, BOUNDARY (TYP.) \ / / \ - J I II PHASE LINE (TYP.) . INVERT ELEVATION_ � / / / / - / G /h / / BMP #1 / _ - \�-F{���REI �IHI� I 1 \I \ 1 CB-111 • communit infrastructure consultants 1213 W. MOREHEAD STREET �\ 1 \PROPOSED RIP -RAP APRON % /� / n / / / /' h \ �F,MIL �iI I I �) ) ! - TW: 561.00 EXISTING � PROPOSED RIP RAP APRON / / °o \ / �\�/ BW: 561.00 / / - / h CB-110 . - STREAM BUFFER 20 (L) X 23 (VV) X 0.56 (H) - \ \ J I I 15' L X 9' X 0.56' H POND � / / / / / / / / _ --")��I1`SUITE PROPOSED RIP APRON O(� OZONE � / / / / / / \ / 300 -RAP - (TYP.) -� -� I / h\ _ \ \ PROPOSED RETAINING __20'(L) X 23'(W) X 0.56'(H) i - -' / i\ \ ' / / h S8 \ g0I TW: 558.50 i I-553 XAW CHARLOTTE, NC 28208 (t) (704) 334-5348 WALL TYP.) - - _ - - 510 / / / / S \ I ' 0 (BW: 558.50 / / - - _ � � \I I 334-5348 _DESIGN BY_OTH_ERS \ PROPOSED BMP WET - -J;,(704) -- -- 55� / II `\ � �� \ \ ( / ice_ ---• 560- \ / \ - p 20 NATURAL PERIMETER- / / t / - TW: 560.25 TW: 565.00 ( - -_ �_ �_ \ / J J, i 5 562 / / / `� POND 7E-1. SEE DETAIL - - I :•:'`/ I WWW.WKDICKSON.COM _ _ f / / �q� _ / BUFFER (TYP.)- \ - / (\ / _ / / /' _ BW: 556.00 \ \ \ BW: 559.00 I / _ -�_- ~ \ \ - f PROPOSED 12' ACCESS ROAD I / / SHEET C9.7 FOR DETAIL I/ I �\ \\\ \ C06 -�' \ I / / / CB-109 \\ NC LICENSE NO.F-0374 / TW: 562.50 \\ TW: 565.50 I II / - ��\� \\\� �/ �� WITH MAXIMUM 15% / hp°� \s9o\ \ _ _ / \ I I 'EMERGENCY/SECONDARY - /' / / BW: 556.50 BW: 559.25 I II SHADED SLOPES \\\LONGITUDE/5% CROSS SLOPE / -PROPOSED 8" SANITARY / / f � / / _ \\\\ 560 _ - 5o�r - FES-100 � / - ...,'• CB-1.08 1 I FES - BMP #2 \ INDICATE STEEPER SEWER (TYP.) STONE SPILLWAY WITH TW: 557.25 / _ / CLASS I RIP -RAP (TYP.) ��- / / / BW: 557.256 \ \\ / I J THAN 3:1 SLOPES (TYP.) 565 - - - / / MH-101 / PROPOSED 20' ACCESS ROAD WITH O I I I 570 - / - / / 575 / A MAXIMUM 20 /o LONGITUDINTAL/ r`My = \ �111111/// _ - - 560 - / SLOPE PER UNION ' \ \ \ ��\\���• •CARO'i� O • ��i -CROSS j 565 575 / 580 / - / COUNTY PUBLIC WORKS DETAIL #32 % SB-116 1 I / / \ •� / •5�- �FES,y'� . _ S 2 �as oLL- //`/ �\\\\ � Q - \ /// 565 57D1-233 / ., � j'// / � I / _ - �'/ �'�'/ /--\ �j?, / '. E%i� O /' FES BMP#2 / } F- \ _ - I \ 1 I I / I 62 \\�\2 �� �624/ 6632 F /F /T/ A2- Q f �2 92 T 6 60 S / / r _ ` / 6032,8(1. r 2. FE if82 Obi . -63U /676p Sq. FT. 67 �Q. T. 6(J3 /C4. F � $.PTO. F E jE5&�o // / �/ / / / / 6�31 6760 S FT./ �,�, / \ i ^ - - \\ \ ` / 1 1 / 7 8 S . FT. 676�Sf$FT. FFE. 1.00 FRE: 581 .59 FE: 5822 E\--�Rj 118.00 /�0 / I / / // / JnB" CB-107 / / \ 1 q FFE: 580.00 PROFESSIONAL SEAL O - \ - - - \ \ \ Q3�1 F O. FO / / / • \ / AE: 71.00 I \ j _ �,Ip81.00 / / DRIVEWAY TYP. \ \ h1\\\572.00 - ( )\\I 5 / 3.2 / _ ` / j - v� U 6 \ bd \ U ' DEEP RI /2 / /..: U m Od / 82. / / -� / \ ,. / � / - U Z c�h �% :%�. / �: $'/'•p�� i / ' •5 50 5 A•5 / 5� • \ 51 R/W -� -;..: • ,50 CB-103 CB-104 / \ \\\ \ \ \ \ / / 5 PROPOSED BMP WET / ) I \ .50� _ / 634 POND 7E-2. SEE DETAIL � I � I / - , - - ,,. 7535 SQ. FT\ • \ { ".' '.r: $8 _ / \ \ {ES\o p \ /PROPOSED 12 ACCESS ROAD ° / WITH MAXIMUM 15% \ CB - 203 LONGITUDE/5% CROSS SLOPE 565 / \\ .534 SQ RT. \ ..: ; "` - - - / CB - / \ � \ CB - 208 / MH-113 \ \\ \ \\ \\\ � / // rr�85.50\ . I ...: •;: •' \ \ CB-202 /5s \ \ \ \ \\ \ 00 \ 6 \ \ \ \ \ \ \\ \ I rJ80 ' 7534 SQ. FT. \ \ CB - 215 / ` CB - 207 / / f� 9 \ �/ / 5, o FFE�586. �0� \ \• / / / / / CB - 206 �. \ / FT. / \ I ` I ��f 1 I / / I I I I ( (p1° \' \ \ \ \\ \ \\O\ 2: / \ \\\\ O I I \ \ / /FF 580 9 I I I I /93 590� / / -I 615 2:1 SLOPES WITH \ \ \ \ \ \ \ \\\\ \ \ DI - 216 / - - sd'O / / // \� �%� III I I~I / / I 16 4 / - / 1041\S .�T. I \ 240SQ�FTI I I \ \ \ \ \ 1SQ. T I 47 F I BENCHING. (SEE \ \ I ~\ % i / \ \ ` / / / / / / '! "I / \ F \ \� 637 \ I I I i LA. �5Q8�. \ I\ t] z0 �':: 5FE\584.50 a \ IF FE: / / �\\/66(1//�/_\\\I1 I\FF DETAIL 520.1) �\ \ \I i I \ \ � p 0- \583.50$ o \ \ 7534 Q. FT. ` \ \ / / I / / \ / / / _ \ \ \ \ \ 3. / \ FFE:1586.50 ` \ \ \ I 67 / - s - / • 'C \ 5�8�10 \ I \ _ / \ \ \ I \ \ \ U (n (n W U Ir // L `b \\ \ \ \ \ \ \ SB-114 I I \ I \ LLILI LLILI W l �760 SR.�T/ �J \\ \ \\ CB - 225 \ \ \ \ \ \ I I � \ \ I \ \ � \-•FFE: s � \ \ CB - 212 h \ Z � � p 0 � � .50 SEE NOTE 1" I= \ \ \ \ \ I / / \ \\ - - O I /\ \ I I I \ \ \ I \ 0 0 _ f / DI-325 \ \ 638 /': / / _ �: 5�0�0_� �,h I - / \ 1 I > LU _ \9349 SQ. FT. I\FE: 586.50\ / \� 1 I I I 1 /6 0Q.T. / I I \ / / = - \\\ \ I CDp� O�� \ \ \ �6�� S \ \ \ \ DI - 229 \ / 583.00 I I / - - / / \ - : - \ \ \ \ l \ \ \ \ \ �$a$�� 6U I I I I IFF`584.5� / Ii �i%6 - \ \ \ \ 1 � � O O I 585 / / - - Q \\\ \ I \ \ / 81 I I • \ \ \ 1\ \ 6CB 53 i �Q. F7� l \ \ _ / / / / 1 SQ. T. \ \ \ OFF 9 1 \ \ \ \ \ \ \ \ \ \ ,•. '' / \FFE: 586.50 1 \ \ / 18 - / FFE: 592.50 \ ' \ \ \ \ \ \ \ y ----- \\ \\\ \ \ \ SLAB TOP INLET (SEE / \ \\ \ \ ��\ \� / \ \\ \\ \\ \\ \ O O \ ,663 J' \) \ - \ r..' -'-g , \ 11 / / \ \ \ DETAIL SHEET C9.6 I / / / DI - 222 - - \ \ \ \\ \ CB-322 - Cy760 SG2. FT/ \ \ \ ) I ( LU LU / f '•• _ \ DI - 217 \ FFE�587.(�0 / / cS / �6�2 / / / - \9S \\ \ \ DI - 230 \ \ \ \ \ \ \ \ \ \ ) ) / Z Z :,. _ gNCOCK ROgp \ $8S \ 659 \ \ \ Y I J FEE: 586.50/ / / / 6%!j / r•' \\ \\ 7� g\� \ \ \ \ \ \ \ \ I \ \ Q \ / \ i '` ;•: CB-321 \ ' / / ,@8 9 SQ FT. / L1Z1 \ \\ .. �513 FT \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ / / / I / 56' R/VV \ \ 7S 2 SQ. FT. \ \ \ I \ FFE: 59 .5� I I w / \ \ FFC�8\ /� \\ \\ E E -_- \\\ _ \\\I� \\\ 1 \ ' z� / FFE: 4.50f'rQ (� \\ \\\\\\\ \\\\ \ \ \ \ \ \ \ \ \ \ / / 00 UI _ 1 �\ 85'L - \ \ 60•s� FT. \ \ 1 I 0-' `- ( ( / I- e- \ O \ \ \ / I Q. T.\ \ 1 \ \ - \ \ \\ \ ss�o \ 1 "' 1 I 83 - . -Y "' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / / / / \ rn rn o o � o / �s7�o \ I �Q \ - \ \ \ CB 320 \ \ \ \\ I \ \ \ \ Q \ \ Q ( o \ \ 9 \ J \ \ \ r T o / \ \ 658\ \ \ 1 O O ` \ / / I, ! �; \ \ 7462�Q. \ / FT • / 8060 SQ. >� \ / :Y /6997 SQ. FT/ / \ \ �FF�59550 - � J� \ I / \ \ \ I / FFE: 597.D6 / \ I 1 / / / / �/ \ m Q O I I I I I I I I \ - / \ _ - - J) / ) \ 1 / / \ \ / / ' / / _ \• \ I \ \�5 \ \\ \ \ - \ / \ \ � • I \ \ \ - 5g�'I T z \ \ \� \ y � '640 \ \ \ \ 1 / / - - I ;�: \ \\ I \ \ \\\6'84 \ \ \ - 6os \ ( I o^° I 1 I I I ) I I I / �' \ O / 6896 SQ FT \ I I I / DI-328 _ \ \ \ \ _ \ \ 5760\SQ.T.\ 61f3 / _ \ FFE: : 584.5 I 6a / \ FFE: �90. 0 I t I / \ \ 7175 TQ. FA \ \ ' - - \ \ \ \ \ FFE: g99.00 1 \ 7129 scT�T' BUILDING PAD TYP. f J / / / / 813 SQ. F ,� / / \\\ \ • 590 \ 1 \ FFE: 598.00 ( )_ / J / / / / / C� FF / / ^'O q4�1 / ) CB-31 j�`V CB-318 / / / DI-327 ` \\\ - \ -687 III ( O - _ / �/ III II i FFE:5YS 0 / O \ \-- \ \ \ \ \ -� -�\ \---�/� / // / / I I I 6801 SQ. F. Lj I - ,PROPOSED 12 ACCESS ROAD I ( \ 1 s o sQ.�T. / / \ � \ - - \ „ \ � � FFE: 600I00 ( � cn � - \-_ / / WITH MAXIMUM 15% / / / \ `�, \ \ �6 / // ' \\\ U " I \ -fifi� _ \ \ \ \ \ I cO co / / I/ �- % I / Q z -LONGITUDE/5% CROSS SLOPE - �\\ 6991�Q F_T- �669� I \ \ \ / - _ - _ - - - - -' / / \ - �/ / / . / \ \ I" FFE: 597.50 OO S T 7 \ \ �IIII II I I I I � � �� � � �- :. :......... / \ \ � � i p 1 \ LLI Z !r\ o � I 7276 SQL. \ _ - � � \ 10 CHAIN LINK \ i:. CB-317 !'. ..... ., Y FFE: 594.0(%\ \ \ FFE\598.5(� 665 SQ. FT.\ 6�71 \ / - _-FENCE I,. dp r I ) / - / / \ I \ \ FFE 60 0 / / GATE (TYP.) \� 60 SQ. FTC \67�R o \ 6 6 , / _ _ - - / / - - \ / ( CB-326 :: `ro CB-331 CB-330 \ \ FFE�iO4.0o 60..: �• I f :. \ \7323�L2. FT. `• 9595 SQ. 0 =I \ / 60NO /FFE 602. 0 / / / / / / % _ _ ' / /' /J/� = 0 - LL s N / sus ��h \ CB-303 CB-329 / / / / / // / / / / / _ \ _ \ \ s�o I I \ \ - c6-3 6� / U calLU c� _ J Lu a / PHASE / 757 SQ. (T. / O/Ri / a cn - ~ , o / _� / �s - 01 \ \ I I 6• \ ::' .;:: ,. ' ::: \ •. ; CB-308 / FP'E: 60'6.50/ / / j I I \ ) / / 7'FILLBRIDGE \ J ('7 z o cn o \ o I I FES-300 I \ \ \ \ \ \ \ I $'S //'/ 595 CB-304 \ oo / / // / / / 50 0 50 100 0 � 0 Q � \ BMP #3 i / \ �42 \ \ s \ J (moo / / / I 3.25 •5 . , / I WHIPCpRD '.:•:. / / l / / / SCALE: 1" = 50' ~ z m Z_ a 5.2 / / I O \ / / I pRIVE ( CB-307 0 74\5 sQ FTI ) 64 / / / / ( I / 5 51, R/Vtr �„ CB-305 / / / / $ / I U m LLJ �_ Z FF) 58.00 F�760 �Q. / / / / \ / / / $ �, ^ / / / FFF/5s o� ` / ' ":.:.,....; / / LEGEND (GRADING AND DRAINAGE) �� O / / �� / 6 60 $Q. FT 6 % • _ ',// SYMBOL DETAIL SYMBOL DETAIL !-� < (� o o ON ON FE.591.51� / to / / 67 o SQ. FT..cD CB-306 / / FES - BMP #3 $� o / / / /E: 593.50 \ \ _ / / l _ $ Lr) / / _ 6760 SQIFT. 647 I - " • / I I ` 627 PROPOSED MINOR CONTOUR - PROPOSED SIDEWALK / ,-:.o: ~ �/� V ! w $�o $�$` r FFE:5.50 6760 SQ. FT / / l ( 1 \ 17 MH �310 / FFE: 596�� 6760 SQ.y I 649 \ \ \ / • sso PROPOSED MAJOR CONTOUR - PROPOSED GRAVEL 65U / 0 ' ` (n / / - I 6760 SQ. FT. .- CQ� / I S AND RIPRAP APRON `PROPOSED I FFE: 598.50 676bSC1 61 / / / / V T 0 2 30 RIP -RAP APRON - </ PROP. BARRICADE, TO BE _-- / / DI-312 FFE:599.50 /P60SQ. / \ \ --� - 8'(L) X 6'(W) X 0.56'(H) / O ( I I I FFE: 601 50 / / \ REMOVED IN FUTURE -� PROPOSED DRAINAGE SWALE - STORM DRAINAGE EASEMENT ( / 6760 SQ. FT. 63 \ 0 o - - - / \ / i / / - / \ \ PHASES l `c\ram i J / I c4�s I I -595 _ FFE:603.J/ 6760S FT. 654 \ / ) c I 'FKE: ` LL W W DI - 313 _ - / 606. o &MO SQ. T. --/,6 5 CB"rra - PROPOSED CHAIN LINK FENCE - PROPOSED CATCH BASIN --'PROPOSED RIP -RAP APRON / I 595 / FF�60' 00 / I I �' 1 1 1 � J �' Q.,RT. / �� / \ - - - - 12'(L) X 14'(W) X 0.56'(H) \ / // / / // I J / - / l / % E:�11.50 co Z H - _ / / \ _ / ( \ \ , < < / ( / / 600 _ DI - 314 �`� I DI-#�a - - - - - / / _ z� \ ` I I \ 600 / I / / J \ PROPOSED STORM DRAINAGE - PROPOSED DROP INLET - PROPOSED BMP WET H 0 W z_ STORM DRAINAGE PIPE (TYP.) SEE- `_� POND 7E-3. SEE DETAIL \ \ CHART ON SHEET C8.2 FOR SIZE, ' 00, MHO# PROPOSED JUNCTION BOX _ BMP RISER STRUCTURE SHEET C9.9 FOR DETAIL = _ ?_==�� ��\\\ ` / - LENGTH SLOPE �� DI - 315 0 o¢C - \ s 610 \ _ - 5' VINYL COATED CHAINLINK - ��= -_ _- -__-_ -STORM DRAINAGE INLET TYP. \ \ s� \ \ �- SLOPES STEEPER THAN 3:1 -- (TYP.) \ F�] SECURITY FENCE TYP. r- ����-� I \ \ \ \ \ PROPOSED DOUBLE CONTRACTOR SHALL INSTALL SLOPE - - (TYP.) CSX CHART ON SHEET C8.2 FOR \ 0 a / R _ - - _ __SEE \ 6 \ - _ CATCH BASIN STABILIZATION MATTING ON ALL AILROgp - - -� _ _ \ \ \ \ \ 1O SLOPES GREATER THAN 3:1 RIGHT -OF- \ \ =INVERT &RIM ELEVATIONS _ ��_�� _ _ - _ \ \ \ \ / /�� \ � = �_ _- _ = � �\ WAY \. \� 1 - � � � ���_� -__= =� - \ � \\ �r sB-## \ \ \ � PROJ. MGR.: WGB DESIGN BY: CJH _�/ -\ \ CONTRACTOR SHALL ENSURE'_���=_ - CATCHSBASIN TYPE - -_ /\ I \ \ \ -== - = - =-- _-\=\ - SANITARY SEWER - if,I DRAWN BY: CJH PROD. DATE: DEC. 2019 - -' - _ _ _ _ = - \ - _ \ \ POSITIVE DRAINAGE TO INLET __ _ �� __ _-�� ,� 1\ \ I\ I\ ( ( WgXH W HIWY GH q , J - -L/ i �� - _ _ _\ \ (TYP.) NOTES: G -� -- -= \\\ W Y / / - - = - / / \\_- _ _ = __ 1. CONTRACTOR SHALL SURVEY EXISTING CONNECTION Wl<z \ ( Q DRAWING NUMBER: \ I _ _ - \ - \ \ \ \ \ POINT PRIOR TO CONSTRUCTION. NOTIFY ENGINEER - C4.1 1._\ _. \ -_ _ _-\ \ \ 1 / / / J J -\ / \ \ = ___ _ _ - _ =- _ _ _ \ \ OF ANY DISCREPANCIES BETWEEN THE DESIGN PLANS �- _ _ j �\ / i _ __ _� J_ f -� \ \�\ \ `l I \ (/ / - �/ r I - - \ S\ _ _ _ __ _ _ _ = \ \ AND EXISTING CONDITIONS. DICI<SON J WKD PROJ. NO.: a _ / /% / // -_ _ _ _ _ - _ -_ -� / \ \ ) ( ( \\ -- _ _ _ _=-_ =_ __ =_ _ _ 2. RETAINING WALLS TO BE DESIGNED BY OTHERS TO _ _ _ - - = - - __ - _ _� =� MEET ALL NC BUILDING CODE REQUIREMENTS & / '-=-- w 20170279.00.CL - - _ - / / , �- - - _\_ \ \ / / \�; ` - ___ = _-__= =- _ _ __= community infrastructure consultants i J / / \ \ SUBMITTED TO TOWN OF WAXHAW FOR REVIEW. w / _zz-zz o. �ww 00MO wz , QO¢ wwp g¢00w m �a0 =gip ~ w ozw F_0 o. wUZ zed z 0Om wY� =UQ ~p= 0 w zwa OZ¢ O< OZZ Ow0 a w¢� ¢3z 0-0 w6- 0 wFz w�Q =a� p FZw QO2P Z°w 0 z 8 U-O ZW 0�= YU~ U p00 Y ." §=Z �0 o0Fr 0 =Zw 00F a�2P �o0 LL EXISTING .-_- _ _ __ _ _- _ _� I / POND/ 1 / f - - I l / / I I \ \ \WK / / / I I / I \ ( 4DICKSON I \ I / 1 I \ STREAM BUFFER . PHASE LINE (TYP`) \ ���\\ �\ \\\ \ \ \� \\ / / // MILLBRIDGE I�// �� \ \ \ \ / I{� \ \\\\ /j% \�\ /\\ \\ �\ _ _ _ _ / \ \ \ \\\\ \ \ \ \\\\ // j\\ \ \\\\\\� �\ / //1 I /n \ \ \ / I \ _ _ - - - - - _ - - - _ 1 I \ ZONE (TYP.) / - - \�\\�\\\\�\ \ \\\ \\ //// j \\ \ \ \\ \ 'Cry \ \ \ PHASE 7D , I j'/ \ 1 1 \ \ ` \ - / / / N PROPOSED / / - \ \\ \ M\\\ l j EX. SANITARY SEWER TYP. \ I communit infrastructure consultants 1213 W. MOREHEAD STREET \ _ - _-- - i \ \\ \\ \\\ \ \\ \ \ �\ / RETAINING \ \ \\ \\\\ \\\�\\ / \) \`�\\ llC�\\�\\\ '/' �' 1/ll � I \ \ \\ // I I II fl _ _' -- _==��� \ \\\\�%� \ ^ \ \\\/ // / / \ \ \ \ \\\\\ \ / / / I \ _ \\ \\ \� \\� \ l (� 1 /ll I //� I \ \ \ I I I \ \\ \\\\\\ \\\ I ( /\ \ \l'\\\) \) SUITE300 CHARLOTTE, NC28208 \ - _ / I I �/ / \ \ �_/i i� / /\ \ \ I1 \ `� \�\\ �\\ G / / 1 I \ , \\\\\\ ��j/!/� \\\\\ I I I \ \ -" / WALL (TYP.) / / \ \ \ \ \\:\\\\\\ \ \ - �/ 1 ,ham I ,1\ \ - �^ I I x DESIGN BY / / / /� - - - \ / ` �\\\ \�\\ \ \ \ - _ - - - °' III I I / / / \ -\ \ \ \ -� J \ \ (\\�� I/ \ \ \_ �\ I (t) (704) 334 0078 / \ \ ,- I OTHERS / / / / / \ STORM DRAINAGE OUTLET (TYP.)- - _ _ \ // SEE CHART ON SHEET C8.2 FOR / (704) 334-5348 WWW.WKDICKSON.COM `� \ \\ / _ \ \\ ✓ / / ��\\\\ _ �� - - - - - - - - INVERT ELEVATION- \ \ / �� \ \\ _ _- - \ \ \ _ - Ln °, \ \ \ \ \ \ \ _ _ \ - - - 560'.� y / �\ \_ / \ \��\ PROPOSED RIP -RAP APRON_ \ \ /i i/i / J \ j'�/��` -- -\ \ \ 20'L X23' X0.56'H ----- / \\ /�� \ \ \\`- -_ \ III I NC LICENSE NO.F-0374 I --o / \\ \\ a\;\\��y� \_ ,�'' \ \\\ \ \\ PROPOSED BMP WET, DI-233. -565- T. \ \ \ \ \ \ POND 7E-1. SEE DETAIL', \ \ III I I I I \ \ \\ Cq 0 O _ SHEET C9.7 FOR DETAIL; , / \ \ \ I I \ \ \ \ �\ \ , - EX. STORM DRAINAGE (TYP.) ° I \ _ \ I -I- _ ' �_ _ ` �� / I EMERGENCY/SECONDARY / \EFE6 0. / / / S \ �\ _ v1 /�\ ` / //� ' \ 1 ` \ I I\ \ ) STONE SPILLWAY WITH I / / / // / IIII i -= / ��� • F E Sys . �� BP CLASS / / /-_\�_ ^,, / /-��\\ // / / CLASSIRIP-RAP (TYP.) _ \ / ' S / / // / / I I 1 \ 1 / /f / / - 70 �\ - - ^�\ / / / / I y// / / \ 676029 sb' - - � FES - BMP #1 \ / / J I 1 N \ - \ / \ s - _ / / , / / / /"\ I \ III 1 \ / I F�s1.o / / / - =_Ssp, - _ \ _ 65/ i / / // \ / I I / / / / l l (2.q� A / // / / / / / I I / ; \ I I MILLBRIDGE BPE:572,P1 _ $� \ \ 5 / \ \ 7- � I ; o / -gF/ o5�° / _s>3\ `1 / / / I I PHASE 7C PROPOSED RIP APRON - / / • %�' ,�'GI Ems•' /l1111\\ -RAP / 57 _ - 568 / \\ 1 I I / / / / / �� / \ \ s76o sC�. FT. SAS s 15 (L) X 9 (W) X 0.56 (H) - / / \ \ :. �1 ( / / / Bra: 57� I A• .. I VINYL COATED CHAINLINK ) I I 1 l _ \ /\\\\\\,/` / I '` / 62� / / �,�0 15 / / / / / - _ _ ____ - _ I ) / `S / �- - 10 CHAIN LINK VOK 573 - -- _/' s�o \\ \\\I ►� SECURITY FENCE (TYP.) / I / 67�Q 5Q. FT, / / PROFESSIONAL SEAL _ ,,II `;\ r l- -- --_�///��/ ��_ s �• FENCE GATE TYP. BM #1 � \ I / / / / - FFE:5 25 I I I (TYP.) 57p� -- ss \ \\ �1 / I I / I / / / U U m 1 CONTRACTOR SHALL MAINTAIN INTEGRITY I ,//FF�$400 \ - / / /FUTURE PHASE I I OF EXISTING WATERLINES ON DEEP RIVER CB - 208 / ��/ _ / / // / / 1 I / / I I / - \ �� /� WAY & TORY PATH ROAD THROUGHOUT \ - CB-2o7 - -6a �.T. \ -- - 5�° / `�/ / /� / 7F MILLBRIDGE 1 I I 1 / / _= - / // // / / / CONSTRUCTION. ANY INTERRUPTION IN -FFE: 584.� \ - \ / vJ / 1 \ , / 1 �5 \ a 7 I i _ _ y PROPOSED 20 ACCESS ROAD WITH I / / - SERVICE TO BE APPROVED BY UNION A MAXIMUM 20% LONGITUDINTAL/ I I / �\ I I r - COUNTY PUBLIC WORKS. I I /FFE: sa4. \ \ S80 S \\ \ \ \ ' 20% CROSS SLOPE PER UNION 595J I I I / I I I / l I I 1 I I I I I CONTRACTOR SHALL SURVEY EXISTING CONNECTION I - - \ R �.q / COUNTY PUBLIC WORKS DETAIL #32 - - I rn I /- - / I � POINT PRIOR TO CONSTRUCTION. NOTIFY ENGINEER 679 >o \ O Y ✓ / 60!3 s - 'PROPOSED 12' ACCESS ROAD / S5 \ \\ \ \ f I I \ \ \ \ / `\ / I I I I I / / I o I �, II / 8 SQ-FT. 58( // - 2 FPE:5a3.00 _ _ 5 \ \ I I I / OF ANY DISCREPANCIES BETWEEN THE DESIGN _ DI - 221 / - WITH MAXIMUM 15 /o / `PROPOSED 8" SANITARY / / I I / 1 1 I I I / I I I I I I I PLANS AND EXISTING CONDITIONS. I \ - - - - u - 59 \SEWER TYP. - \ (� ) lll// / I // - - - \� \\ \� 676�0`SQ� �' h�4j \ (1 I Ii /// �� \\ \\\o \\\\\\ ,// / ! ( 1 i / J////�/ \ I //// / I O _ I 2;i \ \ \ sc9 \ \ \ \ \ \ \ \ / I \ I \\ O -585 \ I / / /// -> F ss2_oo � - _ \ \\\ \ \ \ \ \ \ CB-110 CB-111 �cr /,\�/% CB-102 \ / / / Acc,�75/'6�p w co co °C Ir . / / II CB - 211 _ - h 6 \ \\ \ \ \ \ \ \ \ / \ \\�/ qII .. \ 8� J h 1 1 qp �8.50 / / / / i :. f:.:. , i \ �\ \\ \ \ \ \ \ \ / I / _ - / / \ \ // I/ LU LU w Z p I \ \ / •6760a�C1. FT/ h � I / / / / / CB - 224 -:..,:. \ / - - - _ \ \ _ \ � / 4 // FFE: 584.50LU � O O U U Ir = _ S FT/ O O Z z /FI 584.`�0 tS���: / / / // I �\• // / / / / \ � -- --\_. / CB-22 r..: \ / / // / // ) I lLU /% / 0 0 LU LU SB-116 / \ \ \ \ \ I I 76 1 5e3 5 / / / / , CB-1 CB-107 ' S� J J / / / / / / / \ \ "� = --- \ / / / / F E: 5�g3.50/ / / / / / / 1 \ -� i/- - \ / / /s8 LU CO CO / / / -�':.. / / / / O O 7 / / / /\ -/ `r \\ \\\\��---J/�/�j�\ /879 SQ.FI ///�/ W W // // // /i FZ 58 .,2 �70 / / \ / SLAB TOP INLET (SEE SHEET C9.6)� / / \ °C °C /D-TAIL / \ \ \ / _ \ ) / / \\ \ l o o Lu o N a / \\\\I \\ 11 T T o \\ \ \ \\\ \ / /coo / 6997 SQ. FTC / • \ \ \\I 8112� f F / 1 / / / / / 1 { I O / / / / / / / \ \ I I / DI - 229 / \ \ \ O 0 \ / - _ I � 1 1 1 1 1 m 1 Q 1 z 67>3 /;> DRIVEWAY (TYP.) . \ / / 590 ' 0 \ \ . / 7175/SQ. Fl� FFq: 599.d0 i \ \ \77 DI - 230 \ ���� \ / / \ \ . / ' J I 1 � T 595J<v 1 \\ \ \ 6 g\ o`' I I \ \ \ p I THAN 3:1 SLOPES (TYP.) \ I I I � III I // // // / 1 EX. WATERMAIN (TYP.) \\ I 1 F1' \746'�SQ. FT� CONTRACTOR SHALL ENSURE \ I I I I 605 / / / I I 1 ( / \ / , t r ( / !(�� PFE: 95. 0 0� O I I \ POSITIVE DRAINAGE TO INLET 2:1 SLOPES WITH I I I I I I I / // / / / ( I 1 I I \ / 11 \ \ I /// / / W �� 60 \ \� o�' I 1 1 (TYP.) % BENCHING. (SEE I / I I \< / 1 I I / DETAIL 520.1) I / / I 1 I,n I I I /O/ , I I 1 I \ 1 ) \ I \ \ , :(� �688 \ / ) I STORM DRAINAGE INLET (TYP.) 1 ( I , ` I \ \ I / ) I // / I I I Q Q U z L SEE CHART ON SHEET C8.2 FOR o / // / I \ � �67 \FE:S FT. \ \ I I I) INVERT & RIM ELEVATIONS \// I / I I I I I I 1 \ I \ \ I 1 5ss`oo I I \ \ p \ \ \ \ \ \ \ \ 1 / / / / , I // / / \ _ - \ \ I / 235Q. FT. BUILDING PAD (TYP.) \ \ \ \ rn ✓ =E: 6Q3.0 \\ / I r/ 0 \ \ \ \ \\ Q Cc)�.:a \ STORM DRAINAGE PIPE (TYP.) SEE _ \ 6ao168s�7FT. 1 I I I I 1 \ \ \ U c\I 1.t:>v' 600 FFE. 6V0.00 DI - 231 ,CHART ON SHEET C8.2 FOR SIZE, \ \ / I I I \ I I \ \ \ \ \ ;: � / \ --LENGTH AND SLOPE I \ \ I I 1 / _ 1 / I / I I I I \ - - - J I I I I I I \ \ \ \ \ \ \ \ 1 1 50 0 50 100 \ I -, LU � o W 1 / \ \ \ \ / / l I \ 1 \ I I 1 / I J \ \ \ \\\ . LU J c\I W /. CB-309 / �O \ \ \ \ / / I ) I I / ) I / / I / 1 1 \ \ \ \ \ \ \ \ \ \ \ I 1 \ \ SCALE: 1" = 50' \ /68 o�' \\ \\ \ \ \ \ / �o / 1 1 l I l / l( i I I 1' I I / � 1 1 � \ \ � \ �\ \ \ \ \ I I I I 1-\\ Q J Cl) _ / \ \ _ 659 �Q. FT / o \ \ \ \ \ \ \ \ / / / / I I I l I / I I I \ \ / 1 \ \ \ \ \ \ \ \ \ I I I I NOTE:z / - \ / / \ \ \ \ \ I ' 1. RETAINING WALLS TO BE DESIGNED BY \ � LL o Un � W p � g o CB-308 E:6030>� / \ \ I I I \ \ / J ) \ \ \ I / \ \ \ \ \ r ✓ / l l I I I I I OTHERS TO MEET ALL NC BUILDING CODE 0 0 0 W w c\I a_ REQUIREMENTS & SUBMITTED TO TOWN OF WAXHAW FOR REVIEW. p m 0 z z ° 7�/5 SQ�T/ - \ \ \ \ \ �� / 1 / \\ \\ \ \ \I 1 I I I 1 I I 1 \ \ \ / / / / J / / .. /FFE:-605.50/ / m W J z Q _ - // \ \ \ \ \ / / / / _ _ / \ 1 / __ / / r \ ) CB-307 / / _ - \ \ \ \ \ \ \ _ / / / / / / / \ / / / / .- r \ \ \ / / / I I I LEGEND (GRADING AND DRAINAGE) / / / / �/ / / I / / / DETAIL Z 0 o 0 11 _ / i / / / / / i / / I SYMBOL DETAIL SYMBOL 1-1/ sj \ \ ` \ \ \ Ir ,\O / _ \ \ \ \ 627 PROPOSED MINOR CONTOUR - PROPOSED SIDEWALK - / , / / // \ \ / J J 1 // I I V LU / _ \ / O O _ 550 PROPOSED MAJOR CONTOUR - PROPOSED GRAVEL - _ - - - \ _ _ / / - \ / \ / / _ \ AND RIPRAP APRON / 1,5 -30 \ \ \ \ - - / \ �' - \ / / / / / / / / \ \ \ \ \ ` \ \ ! \ \ I �' \ 1 / / ( -�$PROPOSED DRAINAGE SWALE - STORM DRAINAGE EASEMENT / • SJ ' / / / - - - 618 / / \\ -� \- �/ // /' I \ \ \ \ �- / //� / / / I ` \ \ \ \ \ W \ \ _ PROPOSED CHAIN LINK FENCE PROPOSED CATCH BASIN 1 1 1 J \ I / // / / / / \ \ \ \ \ \ I DI## / / I \ \ \ \ PROPOSED STORM DRAINAGE PROPOSED DROP INLET co z /j1. \ PROP. BARRICADE-72T6 SQ. FT., TO BE / / / J / \ \ \ \ \ \ W _F 611.50 \ \ \ REMOVED IN FUTURE PHASES / / / I / / / \ ` \ \ \ \ \ \ \ \ \ \ \ \ N \ \ PROPOSED JUNCTION BOX - BMP RISER STRUCTURE O FUTURE PHASE 1 \ \ �J, //� i l\ \ \\ \ \ \\ \\ \\\ \ 1 \ \ \ I I z p // /l , // �/ //I \ 1 / \ \ ` ` / / / / / I I \ \ \ \ \ \ I I \ \ \ I DCB-## SLOPES STEEPER THAN 3:1 / 7 F MILLBRIDGE \ \ \ I I / / \ \ \ \ \ \ I PROPOSED DOUBLE _ CONTRACTOR SHALL INSTALL SLOPE - / \ / / \ \ \ \ / .--, CATCH BASIN STABILIZATION MATTING ON ALL \ \ O PROJ. MGR.: WGB a 9 / ✓ SLOPES GREATER THAN 3:1 \ \ \ \ \ \ I \ \ \ \ \ \ \ \ \ \ 1 I \ \ \ \ \ \ \ \ \ \ \ \ 1 - SB-## PROPOSED SLAB TYPE - DI - 316 \ \ \ \ ` - - - _ / / / \ ) \ r \ \ \ \ \ I \ - - SANITARY SEWER - CATCH BASIN ' DESIGN BY: CJH DRAWN BY: CJH is \ J / ) / / / \ \ \ \ \ PROJ. DATE: DEC. 2019 DRAWING NUMBER: 01 \ \ I \ \ \ \ \ / \ \ \ \\\ \\ \ \\\-----------// ��'/ 6\� // // / /' / / / / // // / / / / \ \� \\ \\ \ \\ \\ \Wl< Q C4.2 DICI<SON WKD PROJ. NO.: a 1-1 \ \ �\ \\ - / _- / / / i \ \ \ I /1 \ / o / community � Infrastructure consultants 20170279.00.CL o. zaw z o-F°o w 'z pow ao¢ wwo oo o Sao - = w F w ozw Fom WUz Zoo oz ow wY� =UQ Fp= oY� w�¢ m w moo ¢ z< z om¢ z oo < pzz ow C7 ¢G� w w¢� ¢3:z D w� ¢ 0 wFz w�= ¢�Im_ mm� p CrFr ow °2P z°w �2P oz83 U-O zzo o2_ YUF U po YUQ =z FF oo¢ 0 =Zw ooF a�2E 0 °ow WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 1 #fir MILLBRIDGE _- -_ // /STORM DRAINAGE PIPE (TYP.) SEE - `' / / PHASE 7D -_ - � CHART ON SHEET C8.2 FOR SIZE,/ � �� �` ��•••"•• RO �x ;�o.oFess;o.��', -%/� /�c\ LENGTH AND SLOPE / / / / _- S 2 I- - - - - EXISTING%i POND PHASE LINE (TYP.) - - \ - _- �- �`- - STORM DRAINAGE OUTLET (TYP.) / SEE CHART ON SHEET C8.2 FOR 1 / / / / ��G • ' '�cPj •. JNEE•'���\ �i�©NIG.I��'o��`` l�J� -_ \�\ INVERT ELEVATION- (' - - - - ' _---� �\.,\� � �' 1 I FES-BMP#1 3 -560 PROFESSIONAL SEAL TW: 561.00 BW: 561.00 I TW: 565.00 STORM DRAINAGE INLET (TYP.) / / / SEE CHART ON SHEET C8.2 FOR \\\ _ /- - - , / \ I i I r PROPOSED RETAINING I WALL (TYP.) I BW: 559.00 - INVERT &RIM ELEVATIONS \ \\ - - / / ' 0 'D \ \ TW: 560.25 I DESIGN BY OTHERS I I JI TW:558.50- r SHADED SLOPES--,- / / \ BW: 556.00 TW: 565.50 J I BW: 558.50 I / I INDICATE STEEPER COS, / \ / / - - - 564 - THAN 3:1 SLOPES (TYP.) \ \ 560 TW: 562 50 I / BW: 559.25 - - \ \ \ / \ \ /\SG BW: 556.50 I \ \ I I I I i / / / 565 o MH-101 ' 0 TW:557.25\\/�� I / / / // //- / / BW:557.25 I � /• _ 5Vg.5_ / /� 570 - - ---_ / / / I III / / � /�/� - ) -( / J -- -_/ / z O / FES-too DI-232 \ \� // \ / I \ II I I / / �- / / / // / J II O / // \_-/ I 1 I I / / / / / �- / /' l III 1 I 1 \� 1/ / ;,// -- w �� 0 w w w 555 BUILDING PAD (TYP.) \ 1 / \ / \ / / J / / 1 \ \ \ 1 I I / / / _ / - - I / \ / / / / / i / /I - �� / z � : o O O \ l \ \ \ I \ / \ / / _ / �s \ 626 \ I / / / 62 I ,O \ \ \ \ I 1' �3`4 / � / _ �32 SQ. FT/ 6032 SQ!FT. FF.C-383.00 / I / > MH - 201 / \ 1 \ I / _ - - - / I \ 630 / / I i /676062Q./FT. Q/ / 62 \ 6 60�Q. FT. 6 1 I I "/ \ �[ CYFT. / F E/584.� 676062Q. FT. / I 6�60 S� FT. { -E 58 P5 \I \ � 58� 0� I / /603� SQ, :T. FFE�884.00/ FE:5 1.50 W Q Q \ JO31-9769-64-FT- - / SQ. FT. FFE: 580.00 FFE: 54.00 BPE: 5 2.00 I / \ / PE: 5 3.00- \ \ / / / / / \ \ 1 \ FVE: 5 00 BPE: 571.00 32 / / / E:571.00 / / /� / \ \ \ I I / / / / / / / / / / / / / '- \ \ \ / / I / O O 753�SQ.FT./ \ - 572.00 / \ \ / / / \ \ 1 \JI I I / / / / // // // // / - / 1 / / / �I \ 1 \-' / •� H H �63 \\ \ ,7683-SQ. T. \ \ \ 5 \ \ / \ ---- / / I / / DRIVEWAY (TYP.) �� I / I / �\ // 3/ 5 /' = / \ 1 I ' 1 I I • / 15,8 3. 2 / 1 83f 5/ / / / , w w Cl) Cl) / / \ \ \ \F'RE: E\57.00 1 I \ / / / / / \ 1 • I / / /• PROPOSED 8" SAN TARY �Q I / / / I J I I / / / / / / / / /_ / I // I / / / O O 9'50 sEWER(TYP.) I I 1 - y, •/ / -�' ,.1 ' ° Ej oc oc -� - - \ \ ✓ ( CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE TO INLET I:: / CB-102 ./ 634 \ I I (TYP) ' \ \ I I / 1CB �L/- \ 7535 SQ. FT. 5785.�0 \ \ -. / / :. % ...j / 0 .. \ \ \ 's..:� S8' / / / - 220 RIVER WAY � o o LU o c� BPE: / i . _ DEEP 51' R/W rro Cb •' \ _ 7534 SZZ. Fes. \ FFE: 585.50 \ \ / _ - - _ / / CB - 209 \ .. .` : ,s.:....-.f .. / O DCB 205 \ 0 \ ;. -� _ / / / / / \ \ \ \ \ \// I J I i III i CB-211 I I CB-224 I 636Ro \ \ 7534 SQ. FT. f I - I / '• $o DI - 221 \ \ \ \ J I I ✓ / / / / / / // . FFE:586.50 \\ \ \ / :...: .. I CB - 207 / / 679 ..........\ \ I I I I 15 8322 S FF 80.50 / O I / / / ' \ \ �J / W L z \ DI / -_ :O /� / - - CO O / \ �5 1 I I 1 L0 � \ \ \ `67�8 \ I I I I I I I w ' 69211 / / I I II I \ 1 / / / \ \ 17� SC� F I I I I I 1 8240 SQ. T. ( / 93 OJ \ W / 584.�0 I �SQ. O \� I I 76 \ \ \\ \ I I I \ \ I FE: 583. Ir Q �- LLI \ \ \ V U \ / \ II I \ � ✓ / / /6611 / / Is: Ir- o� / / / -� \ \\\ I \ I\\ 1 \ \ \ m� \ \ O W \ 6 \ \ \ I I / 6 T / / / - \ Q / / / I I \ I:'• \ \ Q 4. \ \ \ W J N z LLI / FE: 83 00 / / / Y m / - Q t _ m / / / / cA \ \ \ -68Q� / , I \ \ \ •- \ \ µf.. \ \\ \ \\ _ _ Cl) J W z ,/ ,� o / / / / N m s' ,, / \ \ 6760 SQ. FT/ / G)� \ \ \ \ \ \ \ \ \ / i \ \ \ \\ \ \ CB 225 \ \ \ \ \ \ \ \ b 7 Z - it C'7 Q tY O (n r J CAS I 1 I I �- - _ / FFE: 2.5 - / �\\\� \\\\\-- c6-212 \ \ \ ^-� 0 �oQo� o_ LU J N 0 I S� FT. \ _ - Ir m z_ _ FFE:` 90.�0 \ \� m z W 0 J �z Q Ir J I �760 SJQ. FT./ / / - _ - - \ \ \ \ � �/ z c� w / FFE/585.0 Ui I I ll / / _ �- \ \ \ I ` ..� Cl) _ O o a` 2 0 T 0 O ILL 6i Ili C) W J Q ~ U co� c/ / o U Z LU d \ A O Ir IQ..L p I..L p U 7O p1. 2 30 0 30 60 O PROJ. MGR.: WGB DESIGN BY: CJH a SCALE: 1" = 30' DRAWN BY: CJH PROJ. DATE: DEC. 2019 o lo NOTE: Wl< Q DRAWING NUMBER: o 1. SEE SHEET C4.0 FOR LEGEND.Z 2. RETAINING WALLS TO BE DESIGNED BY OTHERS TO MEET ALL INC BUILDING CODE DICI<SON C4.3 WKD PROJ. NO.: _j RM REQUIREMENTS & SUBMITTED TO TOWN OF Lij 20170279.00.CL a a WAXHAW FOR REVIEW. community infrastructure consultants o. zaw z °°o w ,z pow wwo U= g¢m .ao =�o ~ w ozw F _o o. WUz Z,o oow z o w. Fn =UQ oY� w�Q jLLfw/1 ¢oo z< z FZ¢ o< ozz ow C7 w w¢� ¢3:z D w� Qo 0 wFz w�Q __ =a� 0 Fr Crow Qom zmz 2P oz83 U-O zzo o2E_ YU~ U po YUQ =z FU Oo¢ 0 =Zw moo, a�2E 0 olLL WK 615 PVI 3TA = 1+12.50 615 600 1600 DDICKSON PVI LEV = 605.71 EXISTING FINAL SLOPE GRADE FROM PHASE A D. _ -1.79% K = 20.00 / \ nity infrastructure consultants 7ABC PLANS BY WK DICKSON. CONTRACTOR 5.80' V 1213 W. MOREHEAD STREET SHALL ENSURE SMOOTH TRANSITION FROM ° -2.12 /° �\ C/L ALIGNMENT - DEEP RIVER AY: STA 8+11.69 = SUITE 300 CHARLOTTE, EXISTING TO PROPOSED GRADE. PVI STA = 5+29. 2 C/L ALIGNME T - BATISTE AVENUE: 0+00.00 ()( ) 334 078208 610 CD M 610 595 - VI ELEV - EXISTING GRADE \ ELEV: 582.92' 595 (f)(704) 334-5348 \ , O '00� U U + ( w A.D. = 8.80% K = 35.00 PVI TA = 8+26.3 PVI LEV = 583.37 WWW.WKDICKSON.COM Jw pip m Uj iLl C) j w T N * 308.00' VC POINT STA = 6413.07 A.D. _ -3.94% K = 20.00 NC LICENSE NO.F 0374 LOW 8 WM cn °O LO LOW POINT ELEV = 79.79 78.74 VC T + 00 \ HIGH P INT ELEV = 582.98 605 PROPOSED GRADE 605 590 w HIGH P INT STA = 8+ 7.15 \ LO co O?Ln �co U w ; NO O EXISTING GRADE \ _co N (0 co =�. 0. _ S 2 + I °o \ \ \ U cI— Ln . . U ; &j w \ > w ///P" - GIN 0, . , Ca J G w w > m cow �©�o\\V\\ 600 600 585 585 / PROPOSED GRADE CB-111 6��0 — — — — — PROFESSIONAL SEAL 90 0/0 78,E CB-110 RcA o / RCA @s T m U U 595 595 580 CB-107 sso jrL- A 580 \ w w \ 4"RC ' WM17 LO � 8ji /L ALIGNMENT - DEEP RIVER WAY: TA 0+00.00 = � = CB-210 � w _ /L ALIGNMENT - ORY PATH ROAD U 590 LEV: 610.97' w 590 575 w 575 24"RCP @1.3 � % U) CB-108 w CB-105 5" RCP @ 1. 5% z ?,\ J 2 CB-1 04 36" RCP@1.53% \ � J 2 � 10 YEAR STORM HYDRAULIC A @so4o CB-103 585 GRADE LINE (TYP) 585 570 570 CB-1 �2 p z O o 10 YEAR STORM HYDRAULIC Ir w w W GRADE LINE (TYP) ZO � : o O O 580 580 565 M O 565 � O w Q Q __ O r— O 0) co M M M (O C° I� I� r- M 00 M O O M N O O N (� N (O M M co °0 O M M N co M O M M � _ O O °O O O (O O O O M O O M O O O 0) N O °0 O co °0 � O 0O L'iO O M O M O 00 M O O LO M O O O O O LO LO O co � co N CO M N M M co O O C0 �° O O � � �° t0 � O �° CO � LO � LO -0+50 3+50 LL LL O O 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 DESIGN SPEED O O 30MPH DEEP RIVER WAY PROFILE VIEW (STA: 0+00.00 — STA: 3+50.00) DEEP RIVER WAY PROFILE VIEW (STA. 3+50.00 — STA: 9+00.00) w w 4 0 4 8 SCALE: HOR 1 "=40'; VERT 1 "=4' SCALE: HOR 1 "=40'; VERT 1 "=4' POSTED SPEED 0- 0- � � 25 MPH SCALE: 1" = 4' O O 40 0 40 80 FUTURE MILLBRIDGE SCALE: 1"=40' STORM DRAINAGE EASEMENT TYP. ( ) SB-114 691 Q N r \ PHASE 7F 7' UTILITY EASEMENT (TYP.) / // / ��\ / ,« .• ' / m ¢ Oz \ / / �' o r �C/ 0 Y. SB-116 > \ QQ N / `'''' \ / 20 FRONT J� j''>" / \ / SETBACK (TYP.) 693 j i/ Q T •� / ,`�� o 3 STOP SIGN TYP. _ i •l. � � ' � :.>. • ' 3k0 L2 ,.:.:'•1 : 4:. 'ice ,'• . , // •: � / �� � �. • + ~ • •• �• •� �` �" y / •„ MH-113 \ / � / / CB-1 04� SETBACK101 O(TYPR // CB -••225 �'/ ` \ \� w ~ U CB-212 / a — — — — ---------- _—:':CB-108 / ::••'.:•::'�'— \ :y e \:." '-. x0 \ \\ 15'X15'SITE 692 ' / / \ LLI a \ .' : �" . — ' , : •— :. .� \ \ TRIANGLE (TYP.) 0 00 �l I L1 1+00 C1 2x0 '' % w�GF` ► CB-103 �.,.� �/ // � \ _ 1.i 1 \ \\ �, I � CB-110'•i� � Q� Pv / ^ \ � �-- ..• \�x0 �'' ':: ry � � / '� ... / / ` � � a CB-111 l51' \ \ / \ \ \ r •4 0 \ _ CB - 224 / / LD U N LU LU ------------------ CB-1 02 \\\ / ILL oI // / CB-211 z 0_ oC O oOC / LD CV co 35 X 35 SITE ADA ACCESSIBLE / 8x 620 / 00 LLJ p m Z Z 9 = TRIANGLE (TYP.) / \ RAMP TYP. / / / \\ (TYP.) / / \ \ o ' \ \ / \ \ // U m J �LU J _ o Q THIS INTERSECTION ONLY \ / oo \\ \ / / \ �' x CB_ gin \ \ / DEEP RIVER WAY (8+11.69) _ :\� / Z " _ CONNECTION TO EXISTING Q TORY PATH ROAD / \ \ / // BATISTE AVENUE (0+00.00) 3 �' / 621 ` N: 431511.5471 M1'> M ' ~ W _ a a ELEV: 610.97 o FUTURE / / // , / %E: 1466191.0540 \ \ "' <\\\ / / / 622 / �\ \��\..� sxoo :... z OCn ~ MILLBRIDGE / / y // / / .. / / / O a PHASE 7F �/ 20' REAR YARD \ �'• �,. SETBACK (TYP.) / / \ \ // / 5' SIDE YARD T z W U / \ / / ^ \ \ \ / / / 623 // SETBACK (TYP.) \ O w lii U /Y� �/ I 0 0 FES-100 MH-101 < \ \ / /624 // // / 0 1. lo o Q J = 0 > \ PHASE LINE \ \�/// / / / / / / (TYP.) \ / 625 / O IU O Z Q p \ z PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH • , PROJ. DATE: DEC. 2019 U lo o Wl<z Q DRAWING NUMBER: o C5.0 2 NOTE: SEE SHEET C3.2 FOR LINE 40 0 40 80 D I C I<S 0 N_j C c WKD PROJ. NO.: 2 = a AND CURVE TABLE _ SCALE: 1 - 40 community infrastructure consultants W 20170279.00.CL O. zaw z °-°°o w ,z Qo¢ wwo 2E oo o �a0 = -ww ozw z -p oz o zz z° oow o w. =UQ ~p= OY� w�Q DLL ¢Op °wa OZ¢ o °a ozz Ow C7 w w¢� ¢3:z D w� Qo 0 wFz w�Q ¢�Im_ mm� p C7Fr zw °2P z°w �2P o z 8 o-o zzo o2E_ oo po Y Q =z ~U ,0o O =Zw oo= a�2E °o0LL 595 � � � � � 595 WK DICKSON � PVI STA PVI ELEV = 14+58.96 = 586.06 community infrastructure consultants A.D. _ -4.60% 1213 W. MOREHEAD STREET C/L ALIGNM NT - DEEP RIVER AY: STA 11+16.3 = 91.94' = 20.00 VC SUITE 3 00 CHARLOTTE, NC28208 C/L ALIGNMENT - GABARDINELANE: 0+00.00 HIGH POINT ELEV = 585.64 (t)(704) 334-0078 590 ELEV: 577.92 HIGH POINT STA = 14+79.92 °0 590 (fl(704) 334 5348 00 `n O N WWW.WKDICKSON.COM + °o LO " W PROPOSED GRADE NC LICENSE NO.F-0374 U > W ji PVI STA = 11+76.8 m PVI ELEV = 576.61- A.D. - H I IC q 585 585 \\\\�� � �i`J \ ........ 90, `o,�� K=35.00 -1.25% °o LOWPOINT 4 M LO 184.57' VC STA = 11+ POINT ELEV = 577.74 ai o r- 3 ° ° 5 _ �' 2� 2.01 co co + N "' 3 GRADE E?'�,"j R` -1. ° 93% �w U U/NEED\: U> / [XISTING \ �J�i©NIG.I,�o������%) Iq 580 > > > W 580 - Lsi \ PROFESSIONAL SEAL j W 18' RCP @ 1.90% W\\/ -t a U U 575 U 575 W z / 30" RCP @ 0.50%' \ 8" WM . 15" RCP @ 0.47% . / I / C/L ALIGNMENT - DEEP RIVER WAY: STA 1 +77.69 = CB-320 15" RCP 0.60% U / C/L ALIGNMENT- HANCOCK ROAD: 0+00.00 CB-319 CB-318 - -B-- 209 CB - 208 N - ELEV: 584.57' 570 570 - i 36" RCP @ 0.48% 36" RCP @ 0.51 10 YEAR STORM HYDRAULIC C/L ALIGNMENT - DEEP RIVER C/L ALIGNMENT - WAY: STA 1 HIPCORD DRIVE +72.50 = 0+00.00 GRADE LINE (TYP) L-iCB ELEV: 582.14' - 204 CB - 203 565 \ / CB - 202 565 0 z O 0- U z z ch w w z � : p O O U) U U W 560 � 560 O M rn O M O N O N N c0 O o0 M N O r— O � O r— M 00 O M M O O O 0 . N N O O O rn N . r— O . CO O N I� M r` O r` M O r` M O c0 M r` r— r— M O [ Oj L O M L0 N 00 M L0 � M 00 M L0 LO 0 M Lo 00 M � M L M M L0 M M N M Q Q In In In In In In In In In In In LL LL 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 9+00 z z DESIGN SPEED O O 30MPH DEEP RIVER WAY PROFILE VIEW (STA: 9+00.00 - STA-17+75.50) 4 0 4 8 w w POSTED SPEED 25 MPH m 0- cn cn z z O O SCALE: HOR 1 "=40'; VERT 1 "=4' SCALE: 1 " = 4' 666 \ / / ` \ \ ::-. OD '•• «`�\ — �R' '+ // // \\\\ // / �/\\ \y'�:.• �MH-FES-300 40 0 40 80 rn rn . \ 677 \ / / / \ \ \ 682 / c :• ' C \ \ / C1 \ �.• CB-3o2 •; SCALE: 1 40 °o N CB-317 \ 665 656 \\ Z \ / / \ • 1 \ \ \\ \ 678 // / \ 681 \ / t. Xoo j / / \ \ \ / DI-328 / 1 �"0 0 04 -218 \% 664 / / s� \¢O / / / \ \ \\ 680+f: r: •. / / \ / / \ \ \ \ 657 \ CB-318 N ° y\..� \\\rye/ // \\ \\ // \\ \\\ \\ // /\\ \\\ \\ // o CB-319// \\ w U w i J / 9X \ \ „°'' \ \ \ 663 \ \ \ \ / j: ,�� \ ~ U a / LL.I a \ CB-209 \\�\ i / ^XO 3 /// Q �� \ \ \ / DI-217 \\ \\\ / ' �'• \ \� \ / ~ I — O o 15' X 15' SITE / ? 4,0 \ ;• .:. TRIANGLE (TYP.) / / �: I / h^ \ \\ 662 \ / \ \\ \ \ j`:' / \ \ \ \ j 659 ,` / \ J Q i \ \ 00 ''*• i•. \�` / .:` J \ \ \ / / DEEP RIVER WAY (15+77.69) / / \ �F `• \ / \ \ / HA4 COO ROAD (0+00.00) .� / \ \ / • • o LU C) W LU /-:. Fp � :•.,• .•, c6 - 2os / \ � c6 •- Zo6 \ \ / \ \ o° / �` \ \ ADA ACCESSIBLE \ X CB-320 \ \ \ / // / \ / / \\ E: 1465522.2823 / 640 \ /y/ +~•:,, / \ a J � �S Y,, / �F i / RAMP (TYP.) 661 \ / \ 660 \ ✓ / •' }� .: / / \ \ / </CR n: 20' REAR YARD \\ / "po/ `.' SIGN (TYR) \ � Z O a_ IY Q r C3 LL Q > co oOC ` \ �> / /STOP R•; / ^ \ / �) y 7x00 1 SETBACK ��/ �• i -; I \\ p J 06 z \ X. \ (TYP.) STORM DRAINAGE \ \ \ i:.• ' \\\ \\ EASEMENT m m z g \� / \ \ (TYP.) / \\ // \ / / / / \ \ �• ' :,i.: DCB - 205 / CB-321 \ \\ 639 (� LU z / / / / / MAILBOX KIOSKS\�,:' \\ \ / / / // DEEP RIVER WAY (11+16.35) _ ' '�� , ` _ DI - 216 (�,P) . k00 CB-322 r.\ \\ y / / 627 / / GABARDINE LANE (0+00.00)::r.; ..•... - - - _ _ •� 1 '''LU "� \ U) z z \ _ - - ,: / / 431494.4805 \ t. /2x `-' ; N: / /GCB - 204 O0 •i _ _ .;•..: / - ` �- c �.. �s E: 1465886.8672 \ .. ;., . , ,-,-: ;.• -.., sr 6' O / Z T- H a 628 / �\ \�'�. _ CB-215 �/ o 629 / �/ / ^ \ \ \ �*`.: -•• . - : `� 10' CORNER \ \ ='. CB-324 20' FRONT / / / \ \�'.r• •::�-,' .».. •'�'`j �~:/' i SETBACK (TYP.) • t••::-: O � LLI ° - SETBACK (TYP.) / - _ \ 638 \\ \ CB-323 \\ \ w Q 1.�� \ \ 5' SIDE YARD / / 7' UTILITY EASEMENT (TYP.) _ _ _ _ _ _ -� r \ \ \ \ \\ / \~ '•' \ \ \ \ DI - 233 \ \ SETBACK (TYP.) /' _ - \ \ \ \\ \\ \ :...:; U z a \ 631 \ \ / / O - - - 637 `PHASE LINE (TYP.) \ \ \ / / / / 1 \ \ \ \ \ DI- 325 \ :. Z I \ \� 632 636 \ \ ✓ / \� \ 633 I 634 635 \ i i / O PROJ. MGR.: WGB DESIGN BY: CJH \ \ / / >- DRAWN BY: CJH \ / \ / \ IL PROJ. DATE: DEC. 2019 0 10 Wl<C Q z DRAWING NUMBER: 1. 2 RETAINING WALL (TYP.) NOTE: 40 0 40 80 SEE SHEET C3.2 FOR LINE DICI<SON_j c C5.1 WKD PROJ. NO.: 2 = a AND CURVE TABLE „ _ SCALE: 1 - 40 community infrastructure consultants LU20170279.00.CL O. zaw z pOo OJU pow ao¢ wwo oo DO¢ro �a0 _ = w ~ w ozw -o zo. WUz ZOO Oz ow wY� =UQ ~o= OY� w�¢ m w moo oz zwa Om¢ z ozz ow C7 w w¢� ¢3:z D w� Qo O wFz w Q ¢FF mm� 0 CrFr ow °2P z°w �2P oz83 U-O zzo o2_ YUF U po Y Q =z ~U OOO¢ O =Zw oo, a�2E 0 Oow WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM C/L ALIGNMENT - HANCOCK ROAD: STA 0+00.00 = C/L ALIGNMENT BUNKER HILL ROAD: 0+00.00 NC LICENSE NO.F-0374 590 ELEV:58 .57' 590 o lfi so\�\�1 \��\����������� • CARD /// C > ui .. Cc( CD ~ _ S �. PROPOSED GRADE N cw M n 585 0 72 585R` _ I PROFESSIONAL SEAL EXISTING GRADE 580 580 U U m 15" RCP @ 0.50% ICB-323 CB-322 I L8" WM 10 YEAR STORM HYDRALJLIC 575 GRAADI= 1 INIE 575 570 0 o N N 0 0 0 0 0 0 0 0 0 0 0 0 570 pp pp pp N N N N LO LO LO LO LO LO 04 N 00 N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 0 O O_ W Cl) U HANCOCK ROAD PROFILE VIEW (STA: 0+00.00 - STA: 5+50.00) °� w w w Z � � 0 O O O SCALE: HOR 1"=40'; VERT 1"=4' U) U U W Ir O O DESIGN SPEED O O 30 MPH 4 0 4 8 Ir Ir POSTED SPEED w w 0- 0- co co 25 MPH SCALE: 1" = 4' O O 40 0 40 80 rn rn SCALE: 1" = 40' 0 0 w � N Q o N r m I l 0 N 0)Q T N a 20' REAR YARD 15' X 15' SITE — — — _� ' SETBACK (TYP.) ' I 658 I / ' TRIANGLE (TYP.) / CB-320 STOP SIGN (TYP.) PROPERTY LINE (TYP.) o HANCOCK ROAD (0+00.00) _ / ,. o �: ! m 10' CORNER DEEP RIVER WAY (15+77.69) 639 w 31:N _ SETBACK (TYP.) o : 431264.5074co \� E: 1465522.2823 j"AN "'..,, COCK PROPOSED ROADWAY Q U z L z 0y • 7' UTILITY EASEMENT (TYP.) TAPER �56, PUB�/�Rq jam'••••:. om) (10:1)RQ Q O659 ,: ; ' . / '"' �• — CONNECTION TO EXISTING - / Ir 8 1. _ — _ _ CB-322 1+00 CB-324 ,.. HANCOCK ROAD _ •,fit LU c 7 / /••Y .._ •• • •• +00 W T J W J o •• `w :: 1. CB-323 / / •,� \ 660 / '�• Q J _ ILL ADAACCESSIBLE��:,• J ~� 3+p ��0 L6 O O(nN WOO LU 0 0 N a_ ciS _ RAMP (TYP.) 0 > c� W / r /I DI-325 I Ir co z J Z o / \ / 1 / ~ - �y /\ / — I Z / / \ y_ 5� 5+09 ~ Z / M \ �\ Z —� ' / ��� / STORM DRAINAGE I O PROPOSED ROADWAY 46 W /• `� Q�J� EASEMENT (TYP.) I O Q Q Z z CO 5' SIDE YARD Z I / SETBACK (TYP.)LU O 0)10 U O U) z o 20' FRONT w z SETBACK (TYP.) Z ~ 0 a Z Q O � o 0 U ' Z o Q Q PROJ. MGR.: WGB DESIGN BY: CJH a DRAWN BY: CJH PROJ. DATE: DEC. 2019 o lo o Wl< z DRAWING NUMBER: C5.2 o 2 NOTE: 40 SEE SHEET C3.2 FOR LINE 0 40 80 DICI<SON c C J WKD PROJ. NO.: 2 = a AND CURVE TABLE „ _ SCALE: 1 — 40 community infrastructure consultants W 20170279.00.CL O. zaw z FOO OJU pow <o¢ wwo U= o'. �a0 - = w ~ w ozw _o zo. WUz Z,�o oz ow wY� =U< ~F_ OY� w�< m w ¢oo z< z Om¢ z oo < ozz Ow C7 w w¢� ¢3:z D w� Qo 0 wFz w�< __ =a� 0 CrFr ow QO2P zmz 2P oz83 U-O zzo o2_ YUF U po0 Y 4 =z ~U OOO¢ O =Zw oo= aLj2E O OUDLL VIM 600 600 DDICKSON community infrastructure consultants STA 4+70.61 1213 W. MOREHEAD STREET ELEV. 594.14 SUITE 300 / CHARLOTTE, NC 28208 / (t) (704) 334-0078 595 3.12% 595 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 /L ALIGNMENT - GABARDINE LANE: 3TA 0+00.00 = /L ALIGNMENT - DEEP RIVER WAY: TA 11+16.35 PROPOSED GRADE LEV: 577.92' 590 590 H I I C g / \\\\�� g i �/0*- � EXISTING GRADE / INEE� / / Zo��`�/2/J q 585 585©N!G. / / CB-330 / PROFESSIONAL SEAL 580 C/ ALIGNMENT - GA 3ARDINE LANE: S A 4+80.61 = 580 � � m C/L ALIGNMENT - WHIPCORD DRIVE: 3+28.36 / E EV: 594.45' -3.12% / N 575 575 151' RCP @ 0.64% N N CB-218 570 570 10 YEAR STORM HYDRAULIC O GRADE LINE (TYP) Ow � � U UJ CB - 206 z � : o O O U) U U 565 565 0 0 r-� 0-)r— co CDcorn 0 rr X¢ X¢ Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln -0+50 0 0 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 DESIGN SPEED 30 MPH GABARDINE LANE PROFILE VIEW (STA. 0+00.00 -STA: 4+80.61 4 0 4 8Ir w w SCALE: HOR 1 "=40'; VERT 1 "=4' POSTED SPEED cn cn 25 MPH SCALE: 1" = 4' O O 1 ----J I ---J L----J ----J L----J L __j I I I + O 40 0 40 80 \' 1 I SCALE: 1" = 40' O O w —- 650 co N Q :B-220 — — - — — CB - 09 — D I- 222 DI-221 L ---- 670 11. I C — < _ I _ — — ---� I r r T O w\ -- --- -- -- ---- — 1 — — ---- cn — ------ ImIQI z \ :� •'. \� !. I I I I I I I III I II _ I I I I ':i I c y r I I ,: I 10' CORNER STORM DRAINAGE I I r (V a \ :•, SETBACK (TYP.) I I I I I I EASEMENT (TYP.) I I o `` \ 1 7' UTILITY EASEMENT (TYP.) I I I I i ' I I I I I 669 I n 649 �. 679 I I I I I I I I I I L----------J Z \ ? I \ I I 680 I I 681 I I 682 I I 683 I I 684 I— -- — — — — — — -- — —.' I m--- T o CD•� CD ---- r — LLI ADA ACCESSIBLE III III III III I I o Z z Q \ �� m \ �. :. RAMP (TYP.) I I I I GABARDINE LANE I I CB+. 208 - STOP SIGN (TYP.) _ — J L _ — — — J L — — L — — — — J — (51 PUBLICR/W) N I C- I 668 I 1� I / CB-329 I Y.-304 I 648Ld Q z ---- -----r------ ------- _ — —�---_---- _ p 0 ` .•."i .y. '•.'1':...;'••:::' :S: is .t, t{C: B30'••i: — _ 7 219 GABARDINE LANE (4+8.61) UB lo + 2+00 L8 3+00 4+00 + 4 8 .61 ??? LU ?J \ Y• +00 I '.�: I i 647 W U N Q W CB - 218 CB-331 CB - 206 I J IL i \ _------------------ GABARDINE LANE 0+00.00 = ( ) \• �� CD----- I r I W O 0 N Q cc)06 0 LU J N a_ 1 y' DEEP RIVER WAY (11+16.35) — — —— — \ I — --- � zm m g o \ A• N:431494.4805--------�LU CB - 204 E: 1465886.8672 I I I I I I I 1 DCB - 205 I I I I I I I I' I I I 646 Z 11 I I I I I ll '' I I I I I I I I `: \ I I I I I I I I I I TRIANGLE 15' X 15' S ITE I I I I` ;; L--- OZC Ro I 20' FRONT I I SETBACK (TYP.) I I I I I I I I I (TYP.) I I: --- — — — -- —= z w = a 2 o I I I I I I I I I 664 661 662 \ \ 663 ••' •;�. I I I I I I I I I 665 I I 666 I I I 667 II •' '' .s I O U o cf) \ \ III III I '•• I o Z 631 � ••. \ I I III III III III +\ I I I I I20' REAR YARD 203 5 SIDE YARD �•: I I SETBACK (TYP.) I I I SETBACK (TYP.) I I I I :`. I I I I I r + I I 645 L--------- � O 0)CB a \ L----J L----J I °, o cD -- — w w I LU z o / o U z OIr a S O � o o U z o O Q PROJ. MGR.: WGB DESIGN BY: CJH a DRAWN BY: CJH PROJ. DATE: DEC. 2019 o lo o zWl< DRAWING NUMBER: o C5.3 2 NOTE: 40 SEE SHEET C3.2 FOR LINE 0 40 80 DICI<SONJ c C WKD PROJ. NO.: 2 = w AND CURVE TABLE „ _ SCALE: 1 - 40 community infrastructure consultants W 20170279.00.CL O. zaw z FOO OJU pow ao¢ wwo F. U= 0¢m �a0 - = w ~ w ozw -o zo. WUz "o z oow wY� =UQ ~o= OY� w�¢ DLL ¢Oo z< z Om¢ z oo < ozz Ow C7 w w¢� ¢3:z D w� Qo 0 wFz w�= ¢�Im_ mm� 0 CrFr ow QO2P F zmz 2P oz83 U-O zzo o2_ YUF U po -=z Y ~U ooo 0 =Zw moo, a�2E OUDO LL VIM 610 610 DDICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 STA 5+37.52 (t) (704) 334-0078 605 605 (fl (704) 334-5348 / WWW.WKDICKSON.COM NC LICENSE NO.F-0374 3.12% 600 / 600 I I ��/��� �����►I HE R0l��� EXISTING GRADE PROPOSED GRADE ���\\0 S = �.� F /2 // A 0 �/ii©N! 595 595 /L ALIGNMENT - BATISTE AVENUE: STA 0+00.00 = 9elo /L ALIGNMENT - DEEP RIVER WAY: 8+11.69 / 3 CB-308 PROFESSIONAL SEAL LEV: 582.92' / / / U U m 590 590 C/L ALIGNMENT - BATISTE AVENUE: STA 7+17.20 = / C/L ALIGNMENT - WHIPCORD DRIVE: 6+49.36 / ELEV: 603.82' 585 585 580 18" RCP @ 0.50"' 580 p z O CB-212 U CB-211 LU Ir z z ch LU Z :E : o O O O U) U U 575 575 w Q Q 10 YEAR STORM HYDRAULIC GRADE LINE (TYP) u_ u_ O O z z O O 570 570 wo wo N � O rn — r— 7 � O M 7 N CD°o � CD co CDN "t 't N O co N °o 0 0ao co co co � °o ,n CDO M N O rn M O O M (0 M O M CD CD O N CD (� (� O O LO LO LO -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 DESIGN SPEED 30MPH BATISTE AVENUE PROFILE VIEW (STA.0+00.00 - STA: 5+47.52) D o 4 0 4 8 w N N � HOR 1 "=40'; VERT 1 "=4' POSTED SPEED SCALE: � T Q 25 MPH SCALE: 1 " = 4' ImIQI6z \ CB-103 ` CB-112 \ \ \ r \ \ \ \ \ I I - - I r- � � I 694 DI-229 {----� r -- r--� CD � - - �-i� 40 0 40 80 0 \ \ DI-231 I I DI-230 I I---- -- ---- FCID SCALE: 1"=40' N s -;\— 1 --------------� Ir _ I I I I I I PHASE LINE TYP I ;.•1 N ,' -_------- I I I ---- � I i III III I I I I I I I� 1 I Z� r STORM DRAINAGE I I I I I I 1 I I 655 ' 693 I I hh 1 1 I EASEMENT (TYP:) w - \ \' ?• ;. j\ \ �- CB-102 + - \ \ I I �I I I'I I I I I I I I I I I I I I I I I I 688 I 687 I I 686 I I 685 I 1 L------ I I --r- Q U Z a .� �'----------- I I 689 I I 691 I 690 I I I I I I I I III III I + ;. — I I c:1 F------- LLi g--- / '- -- a ' _ \ ------------ 15'X15'SITE \ JL II L J O OC \ ' \\ TRIANGLE (TYP.) L--_ C CB 06 6541. Qo \\ �:'• ;1 II�I BA \ PUBLIC n ----_ _ - - - ------ . I L- - - - - U WL-J 622 \ -I----C„ -- STOP SIGN (TYP.) - J - - - - - - ,... � , :; . .., ,...:.,;.. FC _ _ .• , I — — — — — — — 81 W U cal W - ' `` I < = c BATISTE AVENUE (0+00.00) _ _ - - - _ -y ,. °.''='"' ''' i4+00 L11 7 • I •. . _ ' 5+00 5+4 .52 .iA z p� r) � CE DEEP RIVER WAY (8+11.69)% N:431511.5471 .� ,. —�— 3+00 ' I I _= Cn O O cf) LU OW a �,�!,��.:.:;•'r 2+00 10 V 653 U` Q N LU off E: 1466191.0540 : i B- 224 CB - 225 CB-309 1 c 0 m Z CpD 1+00 lo Ro 1 0+0 - �' 1 1 ' CB-211 ,ix_ -- -"' -• _ - - - - - - - - - -� F - 7' UTILITY EASEMENT (TYP.) I t rn CD I < (n W \ \ �' `• // I I I II 672 I I1I III II I II I m 652 OUO O a 3 J a y BATISTE AVENUE (5+47.52) 1 CB -210 ADA ACCESSIBLE 20'FRONT WHIPCORD ROAD (6+49.36) II RAMP (TYP.) SETBACK (TYP.) II 430967.6691 1.* L_______ I - - B-305 _ r oN: T \ 1' \ \\ 1 I a L, �, ' 4 1 ;'.• \ 678 I I I I I I I I ILL o oIII \\ '' I 674 673 i 677 I I 676 I I 675 I I I 6 71 III 5'SIDEYARD III I I 11 I ~; ti 1 I 651 1 •• I I I'`• x'------- W lii Q z lii c� "o 625 o ;.� \\ 101CORNER I 20'REARYARD I I I I-----------� I I SETBACK (TYP.) I I I SETBACK (TYP.) SETBACK (TYP.) I U Z I I 1 I 1 1 r C) I I O p \ 1 - - - -670I I 1 PROJ. MGR.: WGB 2 626 \ \ _ CB- 09 DI-222 DI-223 I I L I�:, is L------- II DESIGN BY: CJH CB-220 --- ----J DI-221� I;. - - DRAWN BY CJH 9 \ ---- - - I r---- --- � � \-I - --------- � 1 I;` PROJ. DATE: DEC. 2019 oo lo o zWl< DRAWING NUMBER: C5.4 o 2 NOTE: 40 0 40 80 SEE SHEET C3.2 FOR LINE DICI<SONJ c C WKD PROJ. NO.: 2 = w AND CURVE TABLE _ SCALE: 1 - 40 community infrastructure consultants W 20170279.00.CL O. zaw z FOO OJU ,oD ¢ wwo o¢oow m �a0 = -w w ozw z -o oz WUZ zzo oow o wY� o< ~o= OY� wow DLL ¢oo z< z OZ¢ oo < ozz Ow C7 w w¢� ¢3:z wD� Qo 0 wFz w�= ¢�Im_ mm� 0 C7Fr Zw °2P z°w �2P oz83 U-O Zw_ . �2 YU~ U po YUQ =Z FU ooa 0 =Zw oo= a�2E O °ow PVI STA = 9+57.42 PVI ELEV = 618.03 A.D. = -5. DDICKSON = 0% K 20.0 PVI STA - 2+45.01 112.15' VC HIGH POINT ELEV = 617.57 M � nity infrastructure consultants PVI ELEV = 592.61 HIGH POINT STA = 9+93.63 + r- 1213 W. MOREHEAD STREET 600 i A.D. - -2.07% 600 620 620 SUITE 300 CHARLOTTE, NC 28208 K — 20100 _ 41 35' VC + o U (t) () 000078 > w (fl (704) 334- O / / \U / m w WWW.WKDICKSON.COM ALIGNMENT - WHIPCORD DRIVE: TA 0+00.00 M r- N (0� +U w / % 1O wQ SE 0 74/L N1 L�/ N\�rC /L ALIGNMENT - DEEP RIVER WAY: 7+72.50 N U = 595 595 n 615 615 LEV: 582.14 U w w m �00 EXISTING GRADE 1NE113E1 / �.F= A ik Cgw RO GRADE � 8 WMEXISTING J / PROPOSED FUTURE GRADE �O`�� o 590 590 610 610 Gf�I AP, i GRADE 6/ �N' ©PROPOSED NG•Z2/1 PVI STA=5+54.43 1fE�1 1CS1/1 I in PVI ELEV = 599.44 N A.D. = 2.41 % / K 35.00 PROFESSIONAL SEAL 84.29'VC 585 585 605 605 CP @ °""— Orn PR v v m CB-304 NL LJ U• > 10 YEAR STORM HYDRAULIC U U w / LINE (TYP) mGRADE m / 580 580 600 8 WM 600 w_ �n wQ _ 575 575 595 n_ 595 2N w Z 1"RCP@141% CB-306 O p 0- w C)z U = - W WWCB-302 z 570 570 590 590 3?0° 10 YEAR STORM HYDRAULIC O O n U U GRADE LINE (TYP) w u3_ u_ O O 565 565 °o 585 °o 585 O O (0 co CV) co O CD N M O r- O � N r r- 00 O O O O O O O O OO 00 M r- In 0 (.0 0 ( (D 0) (0 (.0 0 (0 0) M 0) 0) � 0 � 0) M O (.0 O (000 4 _ r- 00 00 06 00 06 00 0 06 00r 0000 � O L O � O O L O L 0') L L O L O L 00 L O (0 O (0 _ (0 (0 (0 (0 (0 W W� 0- 0- 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 10+95 0+00 4+50 5+00 z z DESIGN SPEED O O MPH WHIPCORD DRIVE PROFILE VIEW (STA: 0+00.00 STA: 4+50. WHIPCORD DRIVE PROFILE VIEW (STA: 4+50.00 4 STA: 10+9 0 4 °NrnrC °r0rnrC POSTED SPEED 25 MPH SCALE: HOR 1 "=40'; VERT 1 "=4' SCALE: HOR 1"=40'; VERT 1"=4' SCALE: 1=4' 0 W N N � 658 665 II L— — -------- _ ---- -- J I _ _ —687 40 0 40 80 .. II?:'�•` o L-----------CB-32 I SCALE: 1=40 0-)zz639 — — — — — — — — — — — — STORM DRAINA — — — — — — — DI-328 n D0 I:•.is:... : ----------- F —JI II _ ------- _ _EASEMENT (TYP.) - D :`�Il 20' REAR YARD SETBACK P.)CID II II II D 0G N r---------- — 657 III 666 II III cWI::X:. 1----------�I 10'CORNER •' I SETBACK (TYP.) (TYI I III IIi I I 686 rT.. III 640 m ------ ------ I J ------ -- I 668 669 p 670 671 — — — - -----m 672 -------- m° :.-327 I N W °0m 10 ------------- ----------- 656 I I SIGN (TYP.) ZI I I TRIANGLE I Cm S 685 m-- XIII1-5III FUTURE U II (TYP.) A MILLBRIDGE LHCnJm_woTTL a —__---__— f ' ,.. 1 I 667 CA ADA ACCESSIBLE CB-331 CB-330 J I— J L----_J Ln C-309 CB-308 I L---- -----__ o PHASE7FCB-319 O 10)o �UooaJ¢a°S/aUr 641 1 �iI I�/I —.:III. II1IIII �0i A RAMP (TYP.) — — — — — / ----- — — — — — ------- --1II1iI -- \ J < ----------J : CB-329 B U1 C307 _ �'._ 1+00 3-17— C2+00 3+00 4+00 5+0 +7+00 8+006+00 LU U w0+00 J LU LL \`• . „ : CB-302 — B3 '�CJI N FC B c_W 0 Ir \ • :I CB-303 •y" .. ._::;_• 4..:_; :;; .III —I : • •I .IIIII —jI ]CID((� 06 l—CB-- .—. --- ---------------- —� —II1II1 =—.—.•.: — — — — — — — WHIPCORD DRIVE — — — — — — — — — — — ---------— -- --------- — — — — — — — — — — — — — — — — PHASE LINE (TYP.) _ p —m Jz z a_ N (51'PUBLICR/w) II 7UTILITY EASEMENT (TYP.) IIIIIII IIII III1IIII IIII I III IIII II1i I1iI I1iI1 a 0•,:�o FES 1 I I—III I II I 645 I 646 III 20'FRONT SETBACK (TYP.) II1 IIII 648 I 649 650 651 647 I 'III IIIIII I1II1I 652 1 1 653 654 655 II IIII III�III Z O T_MH-3o O 31: I 642 643 I I 644 I III1I 1 1 I 1 1 I I III IIII 0) O 1II1 IIII III; IIII IIII I II I III II II I� 1 II II 0w g I II II 5 SIDE YARD wSETBACK 10)—J � -II JIIIIIII � �III J — —I ---�III1IIII I _ 1_ (TYP.) I I — �L_----J � J DI-314 II J III Z 0 J z DI-31•II21IIII DI-313 —-15 —ITESTOP �II - 315 wDI-311 �t /�. zPROJ. \\ //j MGR.: GB DESIGN BY: CJH DRAWN BY: CJH PROJ.DATE: DEC. 2019 10 0 1. 2 PROPERTY LINE (TYP.) NOTE: 40 SEE SHEET C3.2 FOR LINE 0 40 80 Wl< D I C 1<S0 N Z c J DRAWING NUMBER: C5.5 WKD PROJ. NO.: 2 = a AND CURVE TABLE „ _ SCALE: 1 - 40 community infrastructure consultants W 20170279.00.CL O m �wz EL w Foo OJO ozD ao¢ woo 2E,� o= Rw 1ao , -o w ozw F -o wo. ,z ZOO Z oow w . � =OQ ~0= OY� w§w 'oo zwa °Z¢ o< ozz O w 0 a � w¢� ¢3:z o�0 w,¢ wi0 z w§a ¢�� =w� 0 C QO2 ?mw �2P o z 8 o-o z,u o2E_ YUF O p00 Y.4 §=Z �(9 ooa 0 =Zw OOF a� O oo r / \ l lI /,/ - \lll / l l/ l/ iii \\\ / �� I i \ \\ //\ // ///\ \\� / I / I/ \\ %/ \_-_ \ NOTES: _4 LEGEND (EROSION CONTROL) =� _ ��� / / _ _ /�///���/ %, \ , / vv �/ G vv v /// �,�— � - / _ / //// G / \ \ / \ - // ( \\ - I -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE / l/ A / % - WK DDICKSON SYMBOL 111 / /--�—✓/ // //i�A� v / \ % vvv / II /I CAN BE FOUND ON SHEET C8.0 l 1 - l l�l r /��//� �� �� v — v /� _ A v v / / _ ; / l vv- 11�f -JU/ v �� j /� / �/ / \ / \ / — A \ / �� - 7- , J / ll/ p I //, / // ./� \V / / v j //� �s \ / A\ \ A /� / w �� �/ v� / -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS STABILIZED CONSTRUCTION CWD � CLEAN WATER DITCH �=- ENTRANCE - -A��v � _ �� / �A\ \ 1 -A ���\� // �V _ Y,J; - / � - / / � � \\ \ -�v A\� / // \ l / l �� P/V//l �l � communit infrastructure consultants 1213 W. MOREHEAD STREET - ��� _ I / O l �� \\\ Ij /) / , A, Z� , / ^- - OF DISTURBANCE WHERE PROPOSED GRADING IS WITHIN Iv\f4/, / /// /I / I � V L \V 1 / I v v / � 7 %� J V A, RESIDENTIAL �� / >> FIVE FEET (5') OF THE LIMITS OF DISTURBANCE. SILT FENCE IS I / V / - / // \ / / = / I �I , v v / � \ \�I s \ //- \ \ - - _ / / \\ / / r- _ - III I(/ - w \\\\\\ v. \ � \VA - FUTURE MILLBRIDGE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR I 11 r 1 - \�I - - - / 5 � �_� - - � A\ \ � �i \ , A __-�_ _ / �V /j - - _ J/III I\ / - V - �' \\\\\\ \ / AVA / - -- �/ PHASE 7C DEVELOPMENT �� VISUAL PURPOSES ONLY. / -/ \ \ SUITE 300 CHARLOTTE, NC 28208 fit) �704) 334 0078 334-5348 - _ X SILT FENCE STD TEMPORARY DIVERSION DITCH - I/ W � � / -vv / -I \ =� \ \�1 / __ / 11 // / I v vv / / A � � v VV A\\\�A I (\ � Ad II I 1 V v � ZONING: CU-R4-PRD /� / v� r --=-1 / C— l sY \ r � \\ \ `� \ /j;-/ � CONTRACTOR SHALL MODIFY TEMPORARY DIVERSION /////// =L- J z RESIDENTIAL ��\ v \\\\ /\1 \\\\ �_% A v\ / / / "" - I I -- A \ \ I� 1// /j A AV / �. P ((- --,- �-- m // A\\\ / ��� _ v �i A/ A -DITCHES THROUGHOUT CONSTRUCTION TO ENSURE \ V - - ` FUTURE MILLBRIDGE\\\ /� A \ \� V �, / - - _ �j/%/ v� )\� vA - I \ /- - \ / � DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. �`� v� \ IBC\ O // / v �� (�(704) WWW.WKDICKSON.COM NC LICENSE NO.F-0374 X vA\\ Il/Illj / �� PHASE 7D DEVELOPMENT // Q \\ /% \�A\� _- -- �� A�\ /� ' / / vv / / %/ DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE � V /� / ��,� / - C-� /� FUTURE \ J VA A\ ` J \ \ �` /� CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT X � / A V I \ / /// _�, / � � I / ZONING: CU-R4-PRD ' =��� � V � J y v// ��\� � / ��� /A/V FENCE THAT IS SUPPOSED TO GO TO EROSION CONTROL / I --L// i� VI AMENITY // ` V� �� I \ s /iii �v� i-V / A �� \ �\ ///IIII I 1 __ I Q �II v AA � i A - i // l v \,�/ f l) s / A - ll(\ _� / / / �� / PONDS. a CENTER �� w� i V _ \ �//Ill l 1 ��;� III \\\V //l I - \ \ \ ) / / / �v�. ))\� �/ v v,,( ,l 1 / �I - �__ _ / w �� IIII I // 0�, vvv < / \ \ \ \ - - - \ \\ /� // -ALL EROSION CONTROL MATTING SHALL BE BIODEGRADABLE SEDIMENT BASIN BAFFLE /� / \ \ � / \ / \ \ :A�\� \\ i / \ O\ \\ �/\ j TEMPORARY SILT FENCE OUTLET \ / / \ � \ - _ \ /__\ IIIII \ IIII / �\ \\\ // // s ,� / \ / \ / -L \ \ \ / )\ �/� � USING PRODUCT SPECS PROVIDED IN CALCULATIONS / // \ \\ `- S G / �\ \\ \ / o / d / V > ���� - ,Ay / m ` III IIII ��� _/ =,- � \ V �/ \\�\ \ \� ��6 � V / �� //AV�/�//// /�'_ PACKAGE. VERIFY MATTING USING REQUIRED STRENGTH PER v A A �Nv� ��N�111ii//// 1 RO 1 �� i1 - FES�! ' .i T° QIa.' �1 ` � ��� I - / = V I —j � _i A \ �v (-�//C �v TABLE ON SHEET C9.3 \VVA ,v \ ����� / G V 1 V — �� l A \ \ AV �A) i 1 I ( \\ \ � � II A VA V - A �( j A / �A \ STONE INLET \\\\ \ \ \ \ - i 1 I \ \ \/ s \ ,ri \ `\` `i \\\ \ \ \\\ \\ \\\ \ ® ❑ ORANGE HIGH HAZARD FENCING \\\\\ \ / / �\ // ' IIII \\ \ \ \ i \ \ - - \ \ \\\ \\ CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION / VA / �� v PROTECTION \ \\ J \�v� /// A \ \ \ / \ V� nd-.\ �� �4'G cP /NEE . ' �. �/� - \ n _ Vvv v� DITCHES WITH POSITIVE DRAINAGE TO EROSION CONTROL J \ /� ) v�____ \ \_ �_ 1 �I �, : �_ /� / / ( /i//�� /// -�', ,�', Vim,_ POND. A ( \ /ice/ ��_ - - �� \\V\\ �j/ LINN / /, ��, v/ -// v�,v_ %�- - , ,�/// v v I I I �� �, I i )` I �'" !���_ ,— =wvv N " I1111\ vv11 Co vv ,� — — SEDIMENT BASIN SKIMMER \\��\ \/� \ / \ 7 / \` \ - - // \ G \ / / \ _ GRAVEL RIP RAP APRON =� v v J / A \ C / )\�VA\ V - - �i �� AVA �� A V A\ �// V / - < � / \ \� I I I i //// / \% �i/�/ - �_ _� �Av_vvv- - \�'\\ \ J , / \ \ \ I / \� IIII IIII II IIII//�/�/\%�//� — ��\\\\� \\\(. �I PROFESSIONAL SEAL _ \ //— \ \-- \�\\\�\ �— /, r iP // I / , \ II — 1 I I /�/ / /�///� %i= \ \\�\\- _ / / A A �) / /I I I I / / / �� //// / j/ AA\ =\�\ �,\�\ �j / /ll l Ill Lam_ -1 (J / \ \ \\ \ \ _ \/ / _ p ^V _� / I l l I I / l l / / /// / A // �\vA \V� �% � �� i__ � __ �\ % _ %�— � A \ // / / AVA \\ V�V /� /� \� II / ///// \ I I I I I I I III I/ / /�� / / /__ % �_ �� A \\ ___� — _— _-�� , ; ; = _ ,� v, � -_ /I� 1 � III — rG — , v\� � � � /// v � , l \ �,w v � - v w �wv /II -- /// v v /// // I /� �� /„/ / , /,/'�/�,/� � _>-,v w � � � � � 0 d ,� _-_� SPILLWAY - - q II — �i _ / / \ cS` '� \ o \ �I�(�\� l / // / l I �/ j/A��/� i�i> — - V��� ��: LOD DENUDED LIMITS /// )II "(I �I III �II A�� - = ��J I I I ( / / \\ �� �J \ �� / // /// l li �I l /j// / / A�i /_ i / \\� = -- ti l /lA/- -- / w_-:z �!_ //�// vv / q� -�— A �/J �iA///\, \ � AI \\ y/ A\ ��V A I/1 IIII II �/� /� ///// //� / ti �IIIII II �vv,�%v �� - v v / /v vv v Ir-- — / -� I III( �I I� - ��- - _; )III �I // % /v O vv />/_ wy y -��/ , v IIII II III //////�////// v / /%--- - - i - v \ l� l 1, ,,— — __ _ v� l �� - - - — -_ ,v I �o „�- / l v v 1 I - I/ll / /v,l / 111 v, // = III ( v -, v / � w II I IIvv v / , /�///// A///� DRAINAGE AREA FLEXIBLE PIPE SLOPE DRAIN (�I I I - ��- - - - _ vv , I I I / v v� � / / / �_ ��� - _ L= _— _ - �a \ \ \ ��� I I / �� s� V \ ��\�� /I / / / II II� II I \\ \� / // ///� ��4 \ \ \ V I I) /- - _ ;_ wv vv v . � A I I I TEMPORARY CONSTRUCTION ENTRANCE. I/ VA I I ( III / / / \ I // //�////� � vvv-\� � , v > AG V A \ / I I I / V( \ \ ,yg5 �� V� SEE DETAIL514.1 ON SHEETC9.1 /%/%/ � I IIII II\I \\VA\\ V I(�/////////� I l (I ( I11 1�1111�1(�� � vs l \�� A ((� / / /// �7 \VA f /// / //// v 1)1 __� Vv V A VA� ( \_ A � v I/ J / 1 �. � \\ / / (� 11� /� 1 Av� v ��.�� t \ ' )��._ A A \ 0 \ \ vij /// F'�R I A\ \\�A� VAS /�/ //�/ \I \\ ��� � //wv \\ \ _ v A �/ /� / \ \ V� I � V I / / / cj9 \ \V A A / d �/� S LEY LONG GAMBLE \V % //� / //// v �� \ \ --- ��/�v v��\ v - � �w V / //// Bb SOILS DELINEATION TEMPORARY WATTLE CHECK DAM \ \ ( \ �w�A- /�////� �� \\ \ \ - / \A ::�1� ) V \ �/i / \ /� v 4 3 TORY PATH RD \v I\ \ I / % / m� \ \� \ I V v A (I\(�(� �) ��� v� / %%� �� I /// �I I 1 I % i �� - // // I �� �/ W HAW, NC 28173 \VA J I )IVI \ \��\ / ///� 1 \ \ \\ \ V A\ _ \�\� l/ll �� l / ' �_//j h 1 \ \ ////� vv //// j 05168014 VA V A \ \� \� / L\\ A - � V 0 / \V A J \ V\ �� \/ \ _ - _/ - / i // / / /� � A�_-,�\r - - - - �vA - - ��\ Jl�l �� - A/ Lz�� �/ l / / v / ZO ING: RA 20 AA ) -- -� �\ V� � / �// // vv � \V A V A xz/� - \/ / / A \ V \ A\\A \ / STEVE & KAREN E HELMS _ - //�' ) III I \� �� v �� _�_— _ �/ A // / A , /ii/ i /� -� \ \ \ \\// / / ( � / \ / 4423 TORY PATH RD v\�/ �� �I ��� VA - - _-- // / /// - V \\ \ / / \ \ \I \\\ �/ / / �� / I �� \V\_-_ A / \ \ ///�/ A \\V� � // \ \ V , A �\ / / % \ - - - V /�_ / �III�IIII ������ _ -_ ���� \ //i - / I VA \ / / \ V A/ %� / v \ \ �� \\ \ A / / WAXHAW, NC 28173 RESIDENTIAL - �- \ - v� / v =11 II EXISTING \v_��: �/ /� i / ll / o / / \\ O V A V A \ ,� \ / / 05168013A / A / - - i /� �� I \ V��- / / I� % -) \ / �� V� V G/ i \ V A V A \ �/ / / ZONING: RA 20 i - POND \ - �' / s /\ - / / s \ / \ \ \ \ \ \ \ EDENMOOR LAND ACQUISITION II, LLC. � �� A \ � IIII x / / III V A // / / / / s \ A� I A A7 v / // , ' „' O � -� I V V V \ , , j I� NOW OR FORMERLY - \ \ \ - / - ( / / / / v - _ / \1 / / \ � V v ( - vv - / // _ _ / \ �/-- /Ill / --- � � -- A � / �// / � � _� I IIII / \ \ /�\ \ v VA� VAV v -- �ll�ll —� �/ --v— ._ I I — - //-- _ --- - � / / / / __�_ - �,1- v v \ \ I v v XvvVv— v //// 1800 AVENUE OF THE STARS, 3RD FLOOR \\� / - J \ \\ /— A /o v I-- �v \� l/// //i / �v -- 1I 11 / / A \ v v II '� / — / / / / / N / /III l I v , �— < \ p 0 LU �� 0 z LOS ANGELES, CA 90067 / - _ - - - �� I v vv vv ;�' - vl / _ - - l ,�� / / v-- - � / / / � / � � , v v v /// / /dot �,, / _ ,__ /, v v vv v / vv� —_— v DB:639 PG:170 / V ACOS / / // / A �� \ / / / / i �� �� 555 / ® >� /� �� / / \\ J //- VJ/ / // ��� ii I /l l '( \ 1 v_� �l z/�A( V I ��/ w /� \ - - l / _ �� / / / V PARCEL ID # 0015-00-013.00 A // - SG A / I / AAV\ v 1 ) Ir w w � w z p O 0 0 V /�/ v i \ \ V v - 0 VA\ i ,' - - /\ / \ / �� %��/ 56 - J / I/ ZONING:NLN /_A �/\ �� �� // G / // // -_ / / I ( - ] �� � / - / / A //// _I IIII l �� � \ i v v V / v 565 - - z; v A�[560" // // /� / / �/ % \ I I l l V i - _ - / / ✓ v A v \ g65 / �� \ \ � -� �-- / / (I / - V v / / v �� 560 / %� v \\�\I l / / / A A U) O O LU v �� / v �� \ V / - 560 _ /- /o vvVw��/ / / / / l v� \ � / j / - - v 56p �// �� �� 565 565 / / / / , v� / /, JV II / / \ \ _ v - ,� - vA // /-- v - // /-vA\\ 0 // �_, �__ - AI I / / ? \ \ V -;� v A / �- , i // / - -X - �/ - - \ 565 / 5�V, I I ( / � - - i /i- \ A' `� A\ VVAA V I I I ( / v A \ - - - = / - VA \ _ �l /�� v� \�\�� -/// 1 �� AVAv ��/\� /v i v v�vV��_�__ �VA / - � \ V AV / I I � --_' -_ �� >\ V v v// r vv— J �/ �/ v -- ��I�-- - - / \ A l ��w�� // /�/ / / �: v A\\ v\ -zv // / - / / l l V v 1%I / I I v \ \ / / G I ✓ / \�\ I / oC z z � � 0 0 v / _ _ - / \ V �/ / VAI -� / / / / �/ / �/ / / ip - - vVAv VAA VI� I I \ V \ - _� v _j / //� - - -_ v v� ,/v/ v - // v ,,; / // / ,/ �/ /� , �Nw, 11 v v v I \ v v I - - v v v l JN - _ _ _ , - , v/ // I / - - 56 /_ -- / v� I//I / / �7- T/ // /v vv I I , v v vv v v v v v , I ��--_ \ / / \ / / / /� //- II)I) I �A \ \ 1 \ zz -- AA V I / / / - - - 565 VA(/ I \\ -�� V \ �VE�2WAY// \// / G � AAA v��, I \\ \ / - \ \ 'IZ\ bEE RI / / \ / / / - - - - v- - vvv- /� j, — Iv �� / '�` vv / /_ v v- \ vA III I v \ v-- v v —� \�� �\ \�� �\ \ \ w w v_� 51�/ SEDIMENT BASIN #1 -/ - - - A \ \ \ �A \v - \ \ \ \ \ \ - / / / ��, _ V� 20' PERIMETER BUFFER (TYP.) v �A ;- - / / / / / 5�5 A \ VA\ V� A\ \56� v - // // A\ \ V A\ G G/ / D.A. - 13.31 ACRES _ A A A VA \ I I I \\ \\ V v - \ i - _ vv _ - , o� v , v - �- / I ,� / --_ - - il/ 58 v \� A J /A /\ \ vv / // / / / A A \ \V�\ (I \ \ V A v - \ / / -� // - v 1 �I / - !--/ /� \VA\IJII I / l / 1 A \ VA\ \VI \ \ -� V A \ n / 1 A z z O O - - �� \� / / \ V -� i // ,/ - _ —_, � , /, , , v/ // vvv v\ — — �- , -- , / , ,Vv vv_ ��/� / ;-_- v v ,-� �-- vv v�I� v v / / v / , //�, - -/ -/ _ , / v SEDIMENT BASIN #2 / - - �l( \— � ��/ /� vvvv IIII�I�II///� / / I/ vv `\vvv\v �I'Ivvvvvv,�— �v,� ,/, v//� _—,— /� / /I // �/ / - - ( l IrIr ��� \v- / / I // �'-' DA.=11.38ACRES - / ///�/ _ �vVw II I / / �/ A \ \ \VA\ II \ \ -_ I ' / i i / __ -._ / - v v v _ �/ �-JI IIII 1 / I rI III, � vvv v vvv Ivvv - v v � v ///, /� // _ I // �_ �— —vvv— // � / � � /V / \ v� `v �"`� ; �Tl/7�/' - — l// 1ii =� v\\VA IIII I I IIIV A VA I I I , 0 \ \ V� \ \V,v�A ��IA�\v v v� v v v v i/ /�/ //// , / A�_ __-- 4/1, \ - v A \ \ V A\ II / l A/ -i/ / �\ A\\ (\ I \�A\ \ al ( I \ \��-/ \� \ A V A \ r / // / - -- (\A \ \ v \A\ al �� v-vvv A / A I� \V A\ /// / /// - \� \ AVA VVV IV ,/ V I -// \ - A \ / V A A A/ // A , , /% - --- /\ —V V // I V II I I 'i/ / ///�� �/ //,,—_�A V A\ \ \ \� V V I I I I \ \ \ \_/ / V A / — 1 / — —__ —�// / \ �� 1� \\ II //�lr-�— ��Jl //'��AV-\�\�AVAA� V�\�\ ��� VAA III I /� V I�\V A� ///� I A ))�/i� V� \� A—//�///�/////// � --v, I/ T � //, v vvv--�] vvv II v vv --, -� \ I \ / / / /// / / // // /�� -I OO N Q —�0 N �/ - - - A � \ \ V i / - �J \�� �\ - -- - A� I I \ v \ / � \ �// 7 -- A / / / / / / - —�--•� —/ \ \ \ / II�IIII�II��\/�\///I II�� _ �— A\ I I �\ I — // / // — v // / /, // �_ — v\ /v� I I v v v — // / v __ m � I I I I I 1 1 1 v— —�v HA \ NC A l \ I I \ W - - / / / vvv \\ V A \ VA \ \ V A \ - / / % \ 20' PERIMETER R \T P A — cKRo v v� 111 v A /�/ I �z �-� _ / / = w ��� A \�\ \ V A \\ v v V� \� — �� ( i) 1 AD — / i __ — —� ; - � v� \ \ VA \ VA \ \ \ V / /� L ��L_ — — — — — V " / / / / /— / — _5* — \ V AV Avg / l_ JJ// /� _- —�� —_= z vv �4\ \ V \ \ v�V v / �-_v -- v \, // w � v \ S r z �� �- vv -�\v vv�� / //ij/ vw % �'� _ -\�wv�\v vAvvvvvv w� VA yI�� v t - ---- v� v� /vv ( �— \ \ \ / -- / / ->� \ \� I l -- �� i -- --, v`vAv v vv v ��—` ?� / / / / // // -Q �w wv vvv vv v �v\ v I /� v � --- -- vv — �� � — 7 vv\vvv w v v � ��v v A /� — � -- i v� \vvAvv� o_ ( I w-� v vv v� \ V v v 1 v _ A �� / - -� - _- � ��v\_ _ '_1 v��\\\V Ix1 // �'� v-��/� �-�� v��\v v\vvvvv�v��v v v v %/ I \ v ��-_ - / O N DO //�� v vv / — v� % vvv �IQ ( - / �=/ VA vvv vv v V / v — v� \ \ \ \ \ \ \ \\ \ \ // / \ \ FRED E BAKER — �_ /__� / v v v vvv�A\I\ m \ I / / Iv vv vvvv v v v v // v v v -- ��-- / \ V A / A / Q v \ �v v / \_ / \ \ - v v ` \ v �� / 4312 TORY PATH RD v � V A v v �� � � \C�7 \ I � � / m _ v -- \ 1A \/ V A \ V A /j / � � �/ / I� _ � - - / - - - / - -��►- / / -\ � �� � - v I / � j�\�\ � / / /// / /_ \ \� '_, v _ A ) G� // v / / / A / A �� - WANDA D OUTLAW / WAXHAW, NC 28173 v AVA / �,,\ v \ - \ 1311 REFLECTIONS DR. 05168010B � � N / v� A VA 7= v / l l / //\/ r �\ V '- MONROE, NC 28112 / ZONING: RA-20 - - _ / — i \ I / / _ �� ' "\ ' � V�� \ \ I \ \ \ V I / ( � V - - — __ I I I I / I /- ----/ �/ i/ A l / l / i/�A \\� ���� �- A \ I I I ( - -� �� / /A// ///� // / / �I I \V �� \ ( � / - 05168011 � - - / - \ � > \ __ � - \ AVA \ \ - - - / // // / - - A ZONING: RA-20 A ��// �/ / \ = /// // \ / / A ' w - - -_ / - - \ / / �_- _ - / / / / / \ - - - - - I' j�fi vv A\\ v- - A \ I \ - � / A// // -- _ 7 � V -- / - - � - - -/ / / / \-- i // /--__ - V A / A, / / / /� �_\ �- - \ \ A �- --� -- //�\ �i / // \ U ��//_ --;- / \ J SEDIMENT BASIN ��� _ - AVA v v v v / - ---/// �/ �I /> I1� \ �1f %/ - I/ -- _ _ - _ _ �� vim%\�\ vvv/ II�A A -T �� /' �� A ��� L �� Lu /�D.A.=4.49ACRES ��-- v -- -- --�i-%-� - \\v / -___ w� / \ / / \,, :-__� —,,, -- ; _ v v� , , i / �/ v v , ,w �— _ v / I , ?ww� v v l „ I / ; / _ �/ / v/ — '; �' (,v _� v �' 1 1 v , -- _ //� ,,,--� r v — / , r w v v —_ — )1 A A l /_ l�l — — LU Ir (WHIP \ \ v v /// - /� --� G V- ��� \ - -- - ��� -��_ � )) \ — — - A1�V — -)) / + \ / CORD \ \ / / — — v — — — � / /// -- —/ / / / V A ljl) A DRIVE/ — A v v / / l7/�/ / / � — _ — _ _ \vim — 1 I I I I / �'� I � v _ — — _ 51 \� 1 > ) / �/ i -- A ) I -- v �/ /// - - / // � � \ \ l/ � � \ ( � � I R/VV - � ( � � / / � \ \ I I I / V A V A � - - � _ FRED E BAKER i / � \ � /// /� f - J 0- C) a_ U _ //X - -� � [ - v� // / � V I VAA \ /-/ \ \ //r/\ / / �// / -1 / / A / // / \ -A ��� \ \ V \� %/ A -� v\ \ \� / / / / / / // / / / / / A I I V � V A r _ — v � WAXHAW, NC 281D73 / /LU x / \ / / J- / / / //� // / / ///�//�l1 (�I �l \� /� \�\ \ / / / \ �/ / // A // / \ / / // / VA / - �V v� 05168010A AV / �\ I \ �/ // / / v / / III v� \ \/ \ W I- T J J N lr LU V / / v - / / / / / _� - ZONING: RA-20 \AVA - /) / / / /� al / // / // / / / / / �— — I / // //al / // A/ /b/ al v \t--\/ / // // \ // — - �1 = �// / A / � // � / \ ( / / / / I VI- J�,, / / / / / I A II� �// ,- Av \ V �--- l —-- — -- / / � % / / I I /�� -- v � �/v Z J H Q H I — z CEILL O (n �_-- --- - _ -,/ _ v//v /ll/\/// / / I I // // �`-, �- / �///� / l I V � _ /_ /// / // ���� // v/// \ ��- / v _� v � - _�— l / I � � _� / � / / / / / �- - - - - - ____ //I /� v — v -- � 0 — (U LU 0 Q 0 00 z � WAN O __ __11 — - �L - ___�� 4 �_ � I _ � - 4- -�--j I / - - - z / / / v0 � _ — = v /� l hl lL �� �� - - ��- > Iv��>/Uv --- �/ ///�/v/ / �v vvV /v�/ /�v v _-- v / I \ � � --- /I \ � A -7� A� V I/ � / / / / v A —� -� U D co En J z_ Ir J -� / _ jam- - / -- j / -- / \ \�- ( \ _- Jw� ( -� \ v�_A _ v V ( _—x/ / 2fl'�ERIMET R_B - @� \ i \ - - / / /- It/ / / / I I v v / � LU _ - = 'S '( — OTC Q \1\ �( -Ir / � �T MILLBRIDGE SUBDIVISION (` = =_ - \ \ \ _ ` / \ I / J \ ( \ J / -'�i - - -/ ) )-(/ ~ O �� v�� / �� ����PHASE7EANDFBOUNDARY__AI - C-�_—_- �� i / _-- V - v� ��-- - --v - /�/-��-- vvv v �) fI 1 _ --_ —__ _ _ v SX RATER = _ ��� A / — A — — � %��— '�— - _ �� ����—j /— -r tom/ --�_-- _: ---� —. — �_ A ��-- i / i - - - i � // v � � RIGH — v — ��— — — Q O Cl) _ v _ ---- — T --�� — . . - =�� /G — — =--_ —=— r- ——��—�_����/ — — _-- �% �- _� OF-O --_ ��:_ _ - i - - - ,--- - - ///Al// ----� \�\ �( J - -_ - Li= - __— _ _ WAY V == � _� - - = ---�-- /� /. ��%- - -.- -� ���� ��� - -_1 � / -- ----- v -=- --- - _// - -�- -� _ �� -� --- %���-/= U r o --- - � - ����� � S� / _ �W � � � _-� 1 _� - - - - __- _� --- ice/ - ___ i �� / SEE SHEET C6.1 ='�// _\ _ r ; _�_—_�_ �_ =_, —__ _ _='� _ —, --_— — --- =—%=—_ _ — � � ��— w i�i Q �� / w= v vv v�� �- -_ - — -__ - --- — - , / // /- ) /_ ��i� -v v ,)/�-- - < �� -- _ — —_: �— — — �_ --- =_=_ _ _— _ _ _ //- —� w�_� ������ / / / ; — � -- —v ;� — , = 1� � �_E— — __ _� / � � �— ; � — _ � � � _ —w vim— ��` / —_� ; -:� - =--= _--_ _-- /��_ _,-- ----� ),--f \�\�—,\1���\ N p o� °` __ / � vv,v v , -v - -__--- -------- _ - _,',-� may- v \ \ V � - _ _ — - - _ - - - - - � ) )!' \ 100 0 100 200 I / O PROJ. MGR.: WGB DESIGN BY: CJH - / v ' - - - - -� - - _ - - - / / � A �_ \ \ / __—� � � - � v \ ) ( \ \ � _ / � � / - SCALE: 1" = 100' =- � � DRAWN BY: CJH / / / / � �_ -__ -� I I M PROJ. DATE: DEC. 2019 / / . Wl< z DRAWING NUMBER: I . / / C6.0 WKD PROJ. NO.: . DICI<SON J / / / community infrastructure consultants LU 20170279.00.CL �� / 1 o. �ww Foo oJU OZw QO¢ wwo 2E,� U=w g¢m �a0 =�o ~ w ozw F-p o� Wj zz z °om wY� =UQ ~p= o Ye wow ¢oo °wa °Za ¢ ° pZZ O w 0 a w¢� ¢3z o � 0 w�¢ O wFz wQ =al w C7Zw w z°w �2P oZ8 U- ZwO p °�_ YU~ U p00 §mz oFr oo¢ 0 =Zw � O OUa�DLL \ / / v� •� / 1 I I�I II�I�II �� ��\��_ - w - STREAM BUFFER ZONE (TYP.) - - 4 // �_ �- _ -v AVA ,/ ��� WK ��III�IIIIII I - PROPERTY / / I EXISTING � / // STORM DRAINAGE OUTLET _ y � � _ - ,(TYP.) SEE CHART ON SHEET j -,, ® _ ® / r #1" / // � � � '� �I - �� v \ � \ �� \ � A � \ 1 .�_ � � � � � � � 4DICKSON communit infrastructure consultants �� � III ,BOUNDARY (TYP.)- v / // _ - ��� III POND i - J I I C8.2 FOR INVERT ELEVATIONj�BMP v��v RIP RAP APRON (TYP.)- Z - - /�� -A 56 / I � O \ \ 1213 W. MOREHEAD STREET SUITE 300 I SURVEYED WATERS - - - , SEE DETAIL 306.1 SHEET C9.5_ FES - BMP #1 / - / / / ``� 5- / / v TEMPORARY DIVERSION DITCH #1.1 SEE DETAIL 506.1 SHEET C9.4 CHARLOTTE, NC 28208 (t)(704) 334-0078 v EDGE (TYP.) - - , DOUBLE ROW SILT FENCE (TYP.) .A / - - - "' / / / - - _ (4) 18 DIAMETER PLASTIC �A / / / % �/ / / / // _ v (fl (704) 334-5348 SEE DETAILS 507.1 & 508.1 SHEET C9.5 / _ = �_ _ _ CORRUGATED PIPE► A / SEE DETAIL 505.1 SHEET C9.6 r / / / /�/ j �/ / / h 5�0 / / / h (4) 18" DIAMETER PLASTIC CORRUGATED PIPE I WWW.WKDICKSON.COM _ SILT FENCE OUTLET DEVICE (TYP.) -20' NATURAL PERIMETER v 16 / / - - / SEE DETAIL 509.1 SHEET C9.5 - - v A \ C� / _ = �� A - _ I / , o, / / / x h _ SEE DETAIL 505.1 SHEET C9.6 \\` NC LICENSE NO.F-0374 BUFFER (TYP.), ��S BM M � FES -#2 � I / v / 555 bb V / \ \.r pEO � I I_ 11- 5 / v v � moo.• es _ / v 565 = - J� / - l I / A / - - i / / ' S'10 / � v Q ; �'•o o ' ICI " p ` v / 560�/ 560 / _ / _ _ V �. � 565 / � I ,� � /� / /R` �_ /�0 � / / / v v � � �• ' • 4'G � •' 565© \ \ 565 _� cP •....����� AlG.11����� I / / \\ I � v / - - - - / / A / - "ZD Q - _ - _ _ / / ` \ v / / / / \ \ / h TEMPORARY GRADING BY CONTRACTOR IN PHASE 1 �v / ` / / 5 / /' ` / V A �� PROFESSIONAL SEAL -FOR TEMPORARY DIVERSION DITCH INSTALLATION. 5��1 I / ` �i „ / CONTRACTOR SHALL HYDROSEE AND STABILIZE SLOPE. GRADING TO BE REMOVED IN PHASE 2 / / 0 0 - - � - - - - � \ \ \ (7) 18 DIAMETER PLASTIC - _ - � � � / I / / , / o O- - �- CORRUGATED PIPE // 5e� / / v V I _ i �I / / v� �� // � SEE DETAIL 505.1 SHEET C9.6 � _ 56 5 I I �V� / / , - 5� I / / / TEMPORARY DIVERSION DITCH #2.1 - SEE DETAIL 506.1 SHEET C9.4 SEDIMENT BASIN #1 D.A. = 9.72 ACRES C` SEE DETAIL 504.1 SHEET PDEEP ` ` ` \ A \ A v RIVER WAY / Q - / �5 \ V VA V 569 / /� / - _ v A v 51'R/W / ` / v TEMPORARY GRADING BY CONTRACTOR IN PHASE 1 `vvv V� � _ 1 I I I � � IMMEDIATELY. CONTRACTOR SHALL HYDROSEED / o IF STABILIZATION DOES NOT / � // / _ VA V FOR TEMPORARY DIVERSION DITCH INSTALLATION. v v v v v I I CONTRACTOR SHALL HYDROSEE AND STABILIZE v VA / I I I � OCCUR, CONTRACTOR SHALL INSTALLS T 570 v A I SLOPE. GRADING TO BE REMOVED IN PHASE 2 \ v VA�\ I EROSION CONTROL MATTING (TYP.) / \ SEDIMENT BASIN #2 D.A. = 14.94 ACRES / SEE DETAIL 504.1 SHEET C9.5 / // / / " --TEMPORARY DIVERSION DITCH A� �\\ \ z O 18" DIAMETER PLASTIC �/ I/ PIPE / / SEE DETAIL 506.1 S`HjEET C9.4��_1 / /� v �� = \A A\ A v A 0 z(1) w wwCORRUGATED SEE DETAIL 505.1 SHEET C9.6 CONTRACTOR SHALL HYDROSEED ®' v 1A IMMEDIATELY. IF STABILIZATION DOES NOT -� _� ' - / TEMPORARY DIVERSION DITCH #2.2 / \ / OCCUR, CONTRACTOR SHALL INSTALL g V v v - / �� J v v v v V 1 - - - / I / / v V �� J A - - - ` `` �`�� �- ` v \ / A O � O 0 O 0 SEE DETAIL 506.1 SHEET C9.4 EROSION CONTROL MATTING (TYP.) LU Q Q SILT FENCE (TYP.) SEE DETAILS 507.1 & 508.1 SHEET C9.5 V / / / / v v / / �� ` - - - -� \ A \� V 1 \ LIMIT OF DISTURBANCE \ �- I \ _ A V -�- � _ -- - / - _ _ v ,C;' (TYP.) 25.58 \ ACRES V � � 1 \ � O O O O / HgNc� - -_ - 56�KRpA�/�� 0 v �- ` �� C/) C/) ` 190 --/- v A� A V� v v � v� �� ►- ►_ ` / = v \\V A\ v� �� v �� v v v v vvv vvv AV\ V� Vv�v� \ V oc oc COMPOST WATTLE TYP. v v ,-- ( )�� v �� \ \ V A v i / A /` i /` / � �� ��� / �� / /-- m SEE DETAIL SHEET /C9.4� TEMPORARY DIVERSION DITCH #3.1 \ `v A =vv vv v J A SEE DETAIL 506.1 SHEET C9.4 = v 58S v _ A �� v A \ / / / / / / \ 1 , 7��-v_ , `v `v `vv v` v v \V A \ `� A \ \ \ ` v v v v v \ v � ��� FUTURE PHASE w � � � � v� vv vvv v, 7F MILLBRIDGE \ NOTES: r r I I I I I ImIQI0 r o , /� / v _- v - - - - \ \\� �V -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE 0) - V A TEMPORARY GRADING BY CONTRACTOR IN PHASE 1 _ AV ,v v v A \ \ \ V V - o V v v v _ - _ CAN BE FOUND ON SHEET C8.0 T O FOR TEMPORARY DIVERSION DITCH INSTALLATION. _/ A _ = v v` ` v / l v CONTRACTOR SHALL HYDROSEE AND STABILIZE v_= \ \ \ V A ��[ _ \ \ V \ \ 1 V v v v v v - - - - v /I v v vvv i / / - l / % A `- -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS OF DISTURBANCE WHERE PROPOSED GRADING IS WITHIN N QC) (SLOPE. GRADING TO BE REMOVED IN PHASE 2 _ _V/� A� -� \ - / \ V A V 1 V _ _ - - v / / /' _ FIVE FEET (5) OF THE LIMITS OF DISTURBANCE. SILT FENCE IS0. r o / - /� _ A�\ ��� - - v T _ V _ _- A \ V A \ \ \ v _ - - - - - _ - _ i / / / / / / SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR VISUAL PURPOSES ONLY. N (2) 18" DIAMETER PLASTIC -CONTRACTOR SHALL MODIFY TEMPORARY DIVERSION W / /_ CORRUGATED PIPE _ DITCHES THROUGHOUT CONSTRUCTION TO ENSURE g v� - _ - _ A SEE DETAIL 505.1 SHEET C9.6 / / v v A� h`O o _ / / / ` / - - v - _ _ _ V `� `� v _ v - v v - _ / - -- _- - % �/ _ / / / `/ ` ` DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT Q Z Ld U SKIMMER DEVICE (TYP.) / / - - / SEE DETAIL 503.1 SHEET C9.4 _ \ / \ / v \ A _ l / / ! / FENCE THAT IS SUPPOSED TO GO TO EROSION CONTROL PONDS. 0 0 �' 1. / 569 A BAFFLES (TYP.) �.` \ \ \ \ ' v v v v v v V v v - / v % / / / / ' - / -ALL EROSION CONTROL MATTING SHALL BE BIODEGRADABLE USING PRODUCT SPECS PROVIDED IN CALCULATIONS J <- I SEE DETAIL 524.1 SHEET C9.4 / V / 3 = WH/pC v v v v v / _ - - / / / / / / - - - / PACKAGE. VERIFY MATTING USING REQUIRED STRENGTH PER U W W SEDIMENT BASIN D.A. 4.49 ACRES D \ / \ / �/ _ / ° - i TABLE ON SHEET C9.3 o Q 51ORD SEE DETAIL 504.1 SHEET C9.5 R/VI/ RIVE �� / / V / / / / / , - - / J N T_ I A CONTRACTOR SHALL HYDROSEED - / v� / / / / -CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION Q JLU 0 1 0 S� / + \ -� ^ �, IMMEDIATELY. IF STABILIZATION DOES NOT V � � / 'o _ �� v / / / /` / / / / / � DRAINAGE AREA / v \ / /\ ` / / / / / / / / / / � / / / � / / / ` DITCHES WITH POSITIVE DRAINAGE TO EROSION CONTROL POND. Z T c) O (n � 0 OW 0 OCCUR, CONTRACTOR SHALL INSTALL \ / \ DELINEATION (TYP.) / / ��/ / / / / / / 0 Q 0 co z /� v EROSION CONTROL MATTING (TYP.) \ / / / / / / LEGEND EROSION CONTROL SYMBOL - W En _ z 0 10 BMP#31 _ ` V A J / /o/ / / s/ /� I p / I / / �� / / / ��� _ \ / - - / / / / / / / / / / STABILIZED CONSTRUCTION CLEAN WATER DITCH ENTRANCE U m W J z z 0 \ / S� '�/ /'� / `CLASS I RIP -RAP EMERGENCY / / / / / / / -SPILLWAY (TYP.) / / ` / / 20' NATURAL PERIMETER `FES-BMP#3 / SEE DETAIL 504.1 SHEET C9.5 / /� f BUFFER (TYP.) v v / - - / / \ v - / ` / / / / p0 l --� / 00v J / / / I / SILT FENCE STD TEMPORARY DIVERSION DITCH ~ (%� z W L Ir W T / � /� /� // i � /l � , / / / l / I � � � -- -/ � / / � � � , � Ca / l i Y � J - � v X DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE O 3 o j / / / HIGH VISIBILITY TREE C / / / - - / / / / / / \ _ _ \ V A t- _� v X Cn o_ o o �� / I PROTECTION FENCING / / ANTI -SEEP COLLARS (TYP.) / / _ \ (TYP.) ON HIGH SIDES SEE POND DETAIL SHEETS - / v ) / TEMPORARY SILT FENCE OUTLET SEDIMENT BASIN BAFFLE ILL _ °� U - FOR DESIGN CRITERIA - - -_ /_ / / ` / / I / 7 / I I I ���� / / _ - �� _ - - j / - v v /J - - r ` _ - / J �� / / / - _ - / ` I �� �J �� - - - sTONE INLET ❑ ORANGE HIGH HAZARD FENCING PROTECTION F Lij � W 6 i ¢ J < 1._ _ _ - _ / - _ - - \ �� _ �\ I / �/ / / _ / GRAVEL RIP RAP APRON SEDIMENT BASIN SKIMMER 0 0 z _ SPILLWAY 0 \ _ DENUDED LIMITS � p / / -� J j-� �_- - _ _ J _ \ - r = - - __�_ / I \ \ \ \ �y SLY\ \ \ 50 0 50 1 00 DRAINAGE AREA , FLEXIBLE PIPE SLOPE DRAIN O PROD. MGR.. WGB d _� _ _ _ / = - \ \ \ \ I C =-_- `\\\ - - - _ _ - \ \ \ \ CSX `-- \ _ \ CJH RAILR - - - -= =-- _ - _ \ RIGHT- OAO , \ \ -- \\-__ - _ OF -WAY \ \ \ _ SCALE: 1" 50' B SOILS DELINEATION TEMPORARY WATTLE CHECK DAM DESIGN BY: DRAWN BY: CJH PROJ. DATE: DEC. 2019 0 / r _ _ Wl< DRAWING NUMBER: >0 WAXH AY \ =_�_ \`�\\ C6. 1 WKDPROJ.NO.: __ cJ= - ` - --� - -_--= _ \ \ D I C 1<S0 N 2 - - - - - - - --\ \ \-�� community infrastructure consultants W 20170279.00.CL o. zww ao 0 w ,z pow QO¢ wwo gym; U = w o¢m �a0 =gip ~ w ozw F-p o� WUZ z wY� =UQ ~p= OY� y w ¢oo °wa °Z¢ oa ozz o w 0 a w¢< Z ¢� o�0 w¢ 0 wFz w�Q =w� p Clow °2P zYz �2P oz83 U-O zzo ow= U YUF p00 zm § �Ft oo¢ =Z0w pup aE2E O OUDLL ANTI -SEEP COLLARS (TYP.) EXISTING SEE POND DETAIL SHEETS \\ \ VA \ \ VA vv / / / //Jv- - - v - - _ -_ _ - _ _ _ _ POND FOR DESIGN CRITERIA A \V�VAA \\ VAA \ VA v vs�� vv �v/j�/ / //� ���/lll I / \ V - -c - - _ / �> > �� v / MILLBRIDGE i LEGEND EROSION CONTROL SYMBOL ( ( WK 4DICKSON vvvv v vv IIII SURVEYED WATERS . 7D ROW SILT FENCE fsEDGE _ / W CLEAN WATER DITCH ENTRANCEDOUBLE flt infrastructure consultantsPHASE 1213 W. MOREHEAD STREET (TYP.) (TY _ SEE DETAILS 507.1 & 508.1 SHEET C9.5 \ \ /j\ �� V�\ \� �V ����wv� /lll I �/� I \ \ I / \\V vvV� \ v \\ v vA� AAA��� \ j \ \ / SILT FENCE OUTLET DEVICE(TYP.)-,,\ \� \ \\\\ \\ \\ �s \ \�\\\ \ \ / \ V / v \ \ VA \ \ \ s \� l I II I \ SILT FENCE �� TEMPORARY DIVERSION DITCH - SUITE 300 CHARLOTTE, NC 28208 DETAIL 509.1 SHEET C9.5�1 \ \ V \v vA�vv - - r II I 0078SEE (t) (704) 334 334-5348 A STORM DRAINAGE OUTLE595- (TYP.) SEE CHART ON SHEET DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE �fl (704) WWW.WKDICKSON.COM V�� V / \vvvv A �- - - �/ \ V A _ - - - - - - - - - v V C8.2 FOR INVERT ELEVATION'--V�v / % A�V/ A \ A S�.-� ���� \ ���V A� A \ V A - - SEDIMENT BASIN BAFFLE ti \ - - - COS v A v Vvvy-_ vA / / v ��� �- A V------- STREAM BUFFER \ \_�590 _� TEMPORARY SILT FENCE OUTLET --� v-_ NC LICENSE NO. F 0374 ZONE (TYP_) j / / _ - - \ \ �\ \ \ -_ - - - \ \ - I / / / S \ \ _\� / i \ �- 1 / ® STONE INLET PROTECTION ORANGE HIGH HAZARD FENCING ss / /\ � �\\\ \ \ \\\ \\\��\\ -, ; / S / / \ \ �� i'_i \ \� SKIMMER DEVICE (TYP.) \ - T SEE DETAIL 503.1 SHEET C9.4 v A� ` 560-� \ \ \ \ \\ \ I I \ `�� -� - \\ \\ \� / \ \ \ I / v s� �/ /���-� Ste\ \ / / / / / �.. / I 10'� GRAVEL RIP RAP APRON SEDIMENT BASIN SKIMMER R .• / �.�c �Q A / / \ V A FES -BMP # \ s - CLASS IRIP-RAP EMERGENCY V \ V \ V SPILLWAY (TYP.) SEE DETAIL 504.1 SHEET C9.5 N I DENUDED LIMITS SPILLWAY - S _ RIP RAP APRON / / /V I (TYP.) / _ v v l I \ / A / - 56 ® ��� / WETLANDS TYP. I 1 / / / / I SEE DETAIL 306.1 SHEET C9.5 / � �� I (TYP.) I / \ / � TEMPORARY DIVERSION DITCH #2.1 \ \ \ � / / ' '' � 5 \ _- - / i / �� s I / / / , l , i / \ V / / / / SEE DETAIL 506.1 SHEET C9.4\ 60�/ 570 v / / % I / / / / / ' I \ I I \ �� �� FLEXIBLE PIPE SLOPE DRAIN/���•.����� DRAINAGE AREA III ••���A i ©�G. 11111� \ V /�/ j _ - - // \ ,n FUTURE PHASE / / v 56 \ \ � 65 / / � 1 / / - - / �-_ � � 7F MILLBRIDGE / v \ \ 565 �_ / / \ � I � _/� i� - - - S) A � • � I I I / � /� IIII � SOILS DELINEATION � TEMPORARY WATTLE CHECK DAM PROFESSIONAL SEAL I � .I b_70 L / BMP #1 v TEMPORARY GRADING BY CONTRACTOR IN 567 / / / ,I I FOR TEMPORARY DIVERSION DITCH INSTALLATION. s f - �� /\\/ - NOTES: \ V v CONTRACTOR SHALL HYDROSEE AND STABILIZE -� p �� v v / / / / - - - v) / / / \) . v / / / v ) ( \ \ SLOPE. GRADING TO BE REMOVED IN PHASE 2\ �i - / / / - - - v TEMPORARY DIVERSION DITCH #1.1 I/// I �/ -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE ��/ �/ CAN BE FOUND ON SHEET C8.0 v v 00 v / v / / / \ \ _ \ _ / / / /\ / / X -TEMPORARY DIVERSION DITCH #1.2_ / _ - - / \ / '/ / v v SEE DETAIL 524.1 SHEET C9.4� F,a SEE DETAIL 506.1 SHEET C9.4� / / -� - - - v / / / / / / - ' X �� / - 595 / / I I MILLBRIDGE _ PHASE 7C -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS i / / / i -/� � �� - � / / / / � � , � \ / / l/ram � -590 iD • //�//�� / // �� / / 56 I OF DISTURBANCE WHERE PROPOSED GRADING IS WITHIN - FIVE FEET (5) OF THE LIMITS OF DISTURBANCE. SILT FENCE IS - - SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR 580 v v- / �vv� ��/' 'I / / / / 5 v v 7- i = -___=� _ - /\� VISUAL PURPOSES ONLY. - -CONTRACTOR SHALL MODIFY TEMPORARY DIVERSION (4) 18" DIAMETER PLASTIC - _ y5� �o o/ / I I I COMPOST WATTLE (TYP.) / dP DITCHES THROUGHOUT CONSTRUCTION TO ENSURE \ \ \ V CORRUGATED PIPE ' - _ - 570" �� V p / / I SEE DETAIL ON SHEET C9.4 v / SEE DETAIL 505.1 SHEET C9.6 I I I I DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. I CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT �I I I III (4) 18" DIAMETER PLASTIC I apt _-575 _ / / / A A CORRUGATED PIPE / 40� - - % v adi� I FENCE THAT IS SUPPOSED TO GO TO EROSION CONTROL I I (� PONDS. \ V _580_ _ / A SEE DETAIL 505.1 SHEET C9.6/ �q0 / / / / V / v \ / / _ BAFFLES (TYP.) /� - 585 - �'�A V A\ \ / / �vALL / Ill- EROSION CONTROL MATTING SHALL BE BIODEGRADABLE - - - USING PRODUCT SPECS PROVIDED IN CALCULATIONS z 0 p o SEE DETAIL 524.1 SHEET C9.4 / \ \ V� v O� / / 590 / I A PACKAGE. VERIFY MATTING USING REQUIRED STRENGTH PER U LU XA //� V A vv v� / - \ I I / // // / / / SEDIMENT BASIN #1 D.A. = 9.72 ACRES / -595- _ VA \ V A A v v v / / 00 \ / / A \ I / // SEE DETAIL 504.1 SHEET C9.5 - - - \ '� v v / / / \ / o� o _ / /� / A \ / / / / / _ _ �"�� \ \ / / _ �� �� �! \ �� I v \ I DEEP RIVER WAY / ;, TABLE ON SHEET 50 R/W -CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION \ \ z z � z � LIJ o O v) ODITCHES Oz A SHALL HYDROSEED/ WITH POSITIVE DRAINAGE TO EROSION CONTROL POND. LU604z oCCONTRACTOR V IMMEDIATELY. IF STABILIZATION DOES NOT OCCUR, CONTRACTOR SHALLINSTALL EROSION CONTROL MATTING (TYP.) II/I � OD js /\/ LL LL o 0 z z v v \ v�V A / /� / /-A 5g5\- AAA v V I I / / \ �8) /J/ \ I \ i-� w w W W TEMPORARY CONSTRUCTION ENTRANCE. \ \ \ \ / / V / - \ \ SEE DETAIL 514.1 ON SHEET C9.1, / / // / ( VA� v �A V� \ VA / 0A VA\\\ VA vvv\vv � V A o o w 00 N Q \ v / / / / / / A V A\\V/ \ / / / / / / / / / / / HIGH VISIBILITY TREE v A \ / / / / / FENCING �\ / A / \ v O zPROTECTION (TYP.) ON HIGH SIDES vv 0 CV oN J I v v Co LIMIT OF DISTURBANCE V A - (TYP.) 25.58 ACRES v<Q0 U o QW z LU � FUTURE PHASE vvvvv�v v v v v v v v v v v v v v v v v v vv v v 7F MILLBRIDGE vvv / vv I v O 0 o v v v A vv v v v 1 v v v \ v I v vvv PROPERTY BOUNDARY TYP. A f v O �, J a - LU - I®I v � 'x v v w U) z LU J N a_ m J W J z Ir 0 LU 0 O N � Qco z LU N 0 p m U m z Z oo / / v �, v v - , ,/ �/ �v / �� �� v ) I LU �z o 0 o -� - vv v vv v -- /-/ / / �� // z LU LU �A� - 5_ vv v __ �-�// v _/- _ l v) A O / / / / �- 6� \ / / / / / V - i - / / -�/ `v ' v I v / I I I / Z 0 0 3 /s'°�� ------v�=� -- _ ,-/� _ _vvv ;v l l ,-' ,/-,-- =- /' 1 / O Oo ��l w l /\ �/ / / w w \� � �\ W J v DRAINAGE AREA DELINEATION (T - U) z U U z LU Ir \� 0 /I� F / / \ \ v v v v / r / Z / A A v v \/ \ v A� \ \ \ / - - / 50 0 50 100 0 PROJ. MGR.: WGB DESIGN BY: CJH SCALE: 1" = 50' DRAWN BY: CJH PROJ. DATE: DEC. 2019 o oN / / \ \ \ 1-1/ ) / / v A V �\ \\ v _-------/ �/ / / / / / V / / / / / / v� \\ \V 6p5 vv \� - Wl< Z DRAWING NUMBER: v i, �/ i -� , C6.2 �/ / / v DICI<SO WKD PROJ. NO.: a vv v v _ _ -615 / / /' / / / / / �/ / _ _ v vv vv _ /� _ �/ / / / / / / / / �� v v _� \ wv� community infrastructure consultants LU 20170279.00.CL v�� // O. zwz EL w Foo oJU ozD ao¢ wwo 2E U=w o¢o �a0 =gip ~ w ozw F-p oz zo zo ° om wY� =UQ o Ye w§w 'oo zwa OZ¢ o< ozz O w 0 w w¢� ¢3:z o�(9 wD¢ w0 Fz w�= =w� p C7Zw Fr awe z°W -3:Eg o z 8 U-O zzo °w_ YUF U po YUQ =Z �(D ooa 0 =Zw oom Fr E O oo LEGEND (EROSION CONTROL) �I �l A l/ NOTES: A / %� -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE ��/K DDICKSON SYMBOL 111 / /--�—✓/ // //i�A� / � I � I l�lr,l�� ,/� / \/ �� /� / �/ / J / ll/ p I 11 / /l �V v CAN BE FOUND ON SHEET C8.0 �vv-- \ / \ / �� / / \ A\\ V /� / �� �� �/ v� / communit infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 STABILIZED CONSTRUCTION CWD � CLEAN WATER DITCH �=— I � � � / / � �- � \\ \ I —�v A\v / // \ -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS ENTRANCE — I I / O l �� �� P/V//A�l ��� /�V//v l �� \\ �� / VA\ \ 1 �A A�\\� /\ �V — _ I I I V V �� / �� A, ����� �� j ^_ - OF DISTURBANCE WHERE PROPOSED GRADING IS WITHIN RESIDENTIAL FIVE FEET (5) OF THE LIMITS OF DISTURBANCE. SILT FENCE IS \\ / / vv \\\\\\ s V AVA FUTURE MILLBRIDGE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR _ / �V Aj / \VA — -- PHASE 7C DEVELOPMENT X SILT FENCE STD TEMPORARY DIVERSION DITCH — III \ W I —� vv A =V�\ ---\1 I ICE I sY / 11 // / I v vv / / A � v � \V �_ lllllll =�- J RESIDENTIAL \\\\\\ \ �� �� VISUAL PURPOSES ONLY. \ / \\ l�I / � A\\\�A I (\ � �V I� � 1 V v � ZONING: CU-R4-PRD /� / �� r -CONTRACTOR SHALL MODIFY TEMPORARY DIVERSION A \ (�(704)334-5348 WWW.WKDICKSON.COM P ((— —�-- - \ \ FUTURE MILLBRIDGE °\\\ � � I / � _ DITCHES THROUGHOUT CONSTRUCTION TO ENSURE �+ /� A \ \� �, / — — =//%/ v� \�� �A � X DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE X vA\\ lI/IIIj / w PHASE 7D DEVELOPMENTIBC\ V /� I ��_ / �� I FUTURE / A V I \ /��l/ _� ZONING: CU-R4-PRD ' =��� AMENITY v \vim/ V / / � DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. ��\ �� / vv / %/ \ \ VA A\ ` \ \ \ �` /� CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT // FENCE THAT IS SUPPOSED TO GO TO EROSION CONTROL AA 1001, l� s PONDS. w�/ NC LICENSE NO.F-0374 SEDIMENT BASIN BAFFLE TEMPORARY SILT FENCE OUTLET V A� �//IIII /vim 1 ��;� a CENTER\\\V III LU- / / �/ V� v� A �/, �_ I V / / v MILLBRIDGE //l �� �i/ \ \ \ A / �v�. ))\� -ALL EROSION CONTROL MATTING SHALL BE BIODEGRADABLE A\ \\�// // /�L USING PRODUCT SPECS PROVIDED IN CALCULATIONS v o PACKAGE. VERIFY MATTING USING REQUIRED STRENGTH PER CA 1 RO i � i F .- •' p p . _ Q' S STONE INLET\\ ® ❑ ORANGE HIGH HAZARD FENCING V TABLE ON SHEET C9.3 PHASE 7D ��vv \ e — _ 1 I \ ` / \ \ s� \ \ \ `i / \\\ \ \\\ \ \ \ \ \ \`�_ ' II \\ \ / \ \ \ \\\\\\\ � lI I � � � � \ / \ �i \ \ , � � \�\ �\\\\�\ CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION ��.� — - 8` - �� �4'G �cPj.•., /NEE,.•��`. PROTECTION � \�� _ ��� /Av // _ v % V A / \ DITCHES WITH POSITIVE DRAINAGE TO EROSION CONTROL vvv_ � POND. / s MILLBRIDGEv� N u I1111� GRAVEL RIP RAP APRON SEDIMENT BASIN SKIMMER 11 v LiNN C ���— �f \ ��\ � — 5�� OV ' \ T — f \ \ R/W / / C A v /i// / / / w VA /�l//� �\ \ PHASE 7C / \ I _ /// \ I I11 l \�\� \ \\\ \ — / / \\ \ \ l l / ///�j� — -- \ \ - I l //� PROFESSIONAL SEAL � � IN, // I I I I I IIII I O� 0 0 SPILLWALOD DENUDED LIMITS "II FUTURE PHASE\ O, -y0� /l � I A/�/�/ i� �� ✓/i \ ��_ DRAINAGE AREA FLEXIBLE PIPE SLOPE DRAIN 7F MILLBRIDGE— //��— �,_---_ �_ �i��LE,,,.,�1����lll vl Ill / ll ll SHI�RY LONG GAMBLE ( I I ///� �_ ��v — _� �� _= — a \ I I / ��, s� \ \ �/I I / / 4303 TORY PATH RD \ \� v '�s \ TEMPORARY CONSTRUCTION ENTRANCE. i a� _ _� ;_ �v vv ��` \\\� / �) / / //�/ //�-- vv v� \ ) / — \ //I \ 9�J WAXHAW, NC 28173 A SEE DETAIL 514.1 ON SHEET C9.1 A� l/l l 111 v 05168014 T� I ZONING: ✓ � / /�EXISTING I v\ Bb SOILS DELINEATION TEMPORARY WATTLE CHECK DAM POND � m \\\� V\\\A 1�1IIV�JI1� � AVv I\ L \R\\\AV\\\2�0 \\l� _ �\ — —/ \x _ � / — — i� _ �) /vI II III RESIDENTIAL \ �I V� ��_�: --_ // / SEDIMENT BASIN #1- — / i / STEVE & KAREN E HELMS A \ \ /II\VA �// / 4423 TORY PATH RD \ \ \\V� / / \ \�A \ �/ / 28173 \ \ \ / / / — v \ \ / / WAXHAW, / /� \\ / _ EDENMOOR LAND ACQUISITION II, LLC. v V — / _�I I I /�—�A/ D.A. = 12.98 ACRE - i / ' / \\ ,1� �/ %S Vv�A / V �A\ 01 — ll AV 05168o13A _ G //� % \ \ V \ �s VAS/ A \ A \ ZONING:RA-20 _��I NOW OR FORMERLY \ — v v 1800 AVENUE OF THE STARS, 3RD FLOOR_, LOS ANGELES, CA 90067 / VA� // _ �— x / v _ VA l ���V s V v \ �v / , , — �� — — — 0 z 0- _ \ V� / v v © DB:639 PG:170 \ / ® J / / A — �� \ � � k / — v AA IT /� vvv — �v I / / � \ V� \ \ VA v � - // / _ �� I l I A V A \ V A / �� �� JI I z LU z C5 LU � PARCEL ID # 0015-00-013.00 // 55��\ 565 /vv l l\ 60X / 5/ _ / v —_v \ v � v o I / V i— —= L/ A / v ZLLJ 056p U) 0 > LU 0ZONING:NLN / — 565— Ir z z vAv / //%x A \ ' —_ -- u z u z _ SEDIMENT BASIN #2 �. _ .. � -•- , , WA _ _ / v� v I � I�) I I� 1 I 1 \ \ \ \ � � — / � _ \ \ \ \ \ ) i / / / / �/ — � / v A \ V A / / —- oc oc \VA� �7 ACRES 2 I / D.A.D.A.-9.6 -.. y� / / V / �I \ V A \ �v-- V — / .� _ v_ LU LU / 20' PERIMETER BUFFER (TYP.) vA ; _ — / / / 5 \ v / / / A 51� RlW 5� \ 569 �\ \ \ V A �/ /� VA \ � I l \ \ v _ A \ \ \ A \ / / � � — � '� � �% —_ V � \ V A \ � — cn cn cn co PROPERTY BOUNDARY (TYP.Ejo A N o w N — — _ / / \ \ \ I // / A�VA�_ ✓ I / \ A I I \ \ — j/ / \ /��� G /�_ �\ \\ \V/ A / ///� �� /)�� A C � — NA) �// /// \ A /�/ � / \ 1 0 LU 0 /4312 00 FRED E BAKER TORY PATH RD \ WANDA D OUTLAW WAXHAW, NC 28173 1311 REFLECTIONS DR. 05168010B MONR 5ZONING: A-20 01681128112 W ZONING: RA-20 7-- \ \� — Q z SEDIMENT BASIN #3 v — — / > �� 1A \/ �� — — — u1 vL Q Q /� j/�// �// �� l / // 51 / / / FUTURE PHASE vI I / ��v�v v _ v v — FRED E BAKER 7F MILLBRIDGE �) A \ — v 4404 TORY PATH DR A LU O o_ / X x _— v v- / � / � \ WAXHAW, NC 28173 v III A A v 05168010A — I� T LU U LU LU J O CIS\ \ ZONING: RA-20 \ Ill J z F ZO Lv CY) >CvI / \ C3 C\Jz- �� / //� / // �" Il \� � LU z LU Cl) O --- /�/ j / / / \/ I _ �v / \ J 2 a_ LU 5 / , — - ! I \ \ \ / , J All RIG ROADS u) H7- —_ AY HWY� AWHIG / — )NAN iLi � SEE SHEET C6.4 - — —=—_� _—\_�--_-�� � — ---� _— ,,—_� �� � � -- � � / ,__��-— w Q co z LU— / orIr _ — _ , — _ ) �!' \ 100 0 100 200 PROJ. MGR.: WGB DESIGN BY: CJH — SCALE: 1" = 100' DRAWN BY: CJH PROJ. DATE: DEC. 2019 Wl< z DRAWING NUMBER: - C6.3 WKD PROJ. NO.: DICI<SON J ` / / community infrastructure consultants LU 20170279.00.CL ow �ww °°o pJU pow a0¢ wwo 2E U=w .o. ..o =gip w ozw .--o o� -Uo ZOO DzOm wY� oQ ~p= OY� m§w ¢oo °wa o.w Do< ozz O wu a � w¢� ¢5z o-0 wI¢ 0 A z w�a mmD p c7Zw °2 Z°w oZ8 U- ZwO p °Eg_ YU~ U p0o Y U1Q =Z FU OO¢ 0 =Zw 2 a�� O oo • � STOCKPILE LOCATION =10,500 CY=28,000 SQ. FT. I I� = SEDIMENT BASIN #1 D.A. = 12.98 ACRES- �\��- �_ _ - - - - �� MILLBRIDGE � _SEE DETAIL 504.1 SHEET C� �/ / � � �_� �� �� 9.5 / \ V \ \ _ PHASE 7D� �� WK _ PROPERTY 7 IICONTRACTOR TO STABILIZE AND / EXISTING BOUNDARY (TYP.), IJ II� JI INSTALL SILT FENCE 5' FROM TOE OF POND � ���� �� - / / �� �� - — _ ��'� - _ - �� - _ �/ / ` ���V- - - - ® i BMP #1��'�( _ /i /� /�-�� � •F--�• � J ) � � � � � DICKSON communityinfrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 STOCKPILE. CONTRACTOR SHALL � �� - - � , _ _ DOUBLE ROW SILT FENCE (TYP.) % �� _ ��! ,� - � - - SEE DETAIL 507.1 & 508.1 SHEET C9.5 ENSURE DRAINAGE PATTERNS ��� _ _ % �j / / / �X �5o - - I REMAIN AS DESIGNED. - _' �� 6 ' —X �^ - - o �O = X I I SILT FENCE OUTLET DEVICE (TYP.) - - - - SURVEYED WATERS - FES -BMP #1 56 �,� — - / CHARLOTTE, NC 28208 ' SEE DETAIL 509.1 SHEET C9.5 EDGE (TYP.) ' - - A - / - - - A \ / - - / ANTI -SEEP COLLARS (TYP.) � _ � ,,°� - - - \ - FUTURE PHASE � s0 (t)(704) 334-0078 (fl(7o4) 334-534s \ SEE POND DETAIL SHEETS / STREAM BUFFER FOR DESIGN CRITERIA - / 13 \ ZONE (TYP.) - - - - - �/ �� _ �� _ - _ - ��� VA - - 5'10 = 7F MILLBRIDGE — k� WWW.WKDICKSON.COM V� x - CB-109� Ar NC LICENSE NO. F 0374 �SSS FES-BMP#2 `��I �� -� J J COSH �/ 560 / SEDIMENT BASIN / D.A. = 9.67 ACRES / SEE DETAIL 504.1 f\ / AA\ - - _ X ` - - / _ HATCHED AREA INDICATES AREAS ' �- 1 CAR 'i / V SHEET C9 5 \ \\ 560 565 �\ 560 A A - 560 - - 56� / ' / STABILIZED IN PRIOR PHASE. /i - y� / - _ �Q� � / - 0) ���0 ••FES' �• ' o !o , / 560 56ICI 5- 565 x X x 5�� #2 + - 32 565 A V�x 565 // - / - 5 �� ��i�©N G. X / \ PROFESSIONAL SEAL - x / \ / / - g60 X CONTRACTOR TO TEMPORARILY' / TERMINATE PIPE AT SEDIMENT CB-106 X X, x x o CB-104 f CONTRACTOR TO TEMPORARILY / CB-103 _ _ STORAGE ELEVATION / TERMINATE PIPE AT CB - 220 /y�2 STORAGE ELEVATION SEDIMENT `CB-� )2 5� 0 V �� CB - 204 = � / CB-105_ f / ILL \ Q Q \ \ \ \ \ _ , � WAIF I3_203 _ _ C ` _ �CB-209CB-2 � / \ CB - 202 � � � / / � I CB- 211 CB 215 p i ,SEE DETAIL 524.1 SHEET C9.4 570 580 CB - 206 / U l / CB - 207 / W DI-216�/ \ \ \ z O / 585 V / / - '/ / / / / / o \ �\ \� V `° o \ \ o W w O w w / \ I _ C S J I / A -\V DI-325. A \ \ - = V/ �` �� / h4' / o �� % / / '� �� ����� _ _ - 212 CB - 225 2:1 SLOPES WITH SB-114 BENCHING. SEE DETAIL 520.1 z � O - O O > : o O O / - - - � 9S V � I � � � � / / / � - _ - - � � � �� �\,\ V � \ \ � A � � 6� 0 z 0 z _ CB-323 � 585 � " \ / ` h V '� \ CB - _ � / _ _- - �� - / / _ S� � �O- 219' Sg'g DI - 222 = _ A A \ \ \ \ ��' 05 ✓ CONTRACTOR SHALL HYDROSEED \ 6 \ \ = O O NgNO �� _� \ \ "�� V�S �� / �� I �B - �18 _ - �� V A IMMEDIATELY. IF STABILIZATION DOES NOT A A � CB-322 - \ VA �S / / CB- 24 — _ Z = V OCCUR, CONTRACTOR SHALL INSTALL ,EROSION CONTROL MATTING (TYP.) LU co LU co _ z O z O - - - - _ - CB-321 V �� \ S8� - / / / / - �� V A / ELI ELI 85� \ Q ` ` ` ` o o � CB-320 \ �_ _ J \ V V A \ � _ r a _ NOTES: co \ V �I _ 22jr IV -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE 0 I I I I ImIQ10 z \� \ \ \ �� S� - CAN BE FOUND ON SHEET C8.0 r 0 �n DI-328 40 -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS ` - / OF DISTURBANCE WHERE PROPOSED GRADING IS WITHINCID N 00 - - - - FIVE FEET OF THE LIMITS OF DISTURBANCE. SILT FENCE ISo _ VAS - V 590 A _ _ / (5) - INLET PROTECTION r o - - ' / CB-319 ` / 585 \�� ' - ��O o / / / / \\ - - V - 595 - \ 600 - (TYP.) / / / SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR 60p SEE DETAIL 510.1 & 512.1 SHEET C9.5' / / // / / VISUAL PURPOSES ONLY. / N r It � /VA\� - - / SHALL MODIFY TEMPORARY DIVERSION 30 - SKIMMER DEVICE (TYP.) \ _ = - -CONTRACTOR - - - _ - - DITCHES THROUGHOUT CONSTRUCTION TO ENSURE o SEE DETAIL 503.1 SHEET C9.4 _� - , - V A\V _ - - - - A I % // / DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. Q Z _� / / �� CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT ` Ld w / A A / / FENCE THAT IS SUPPOSED TO GO TO EROSION CONTROL 575 \ CB-317 I V _ / - _ / PONDS. o 1./ I `'�� CB-326 CB-330 CB-302- - �31 ` \ �� V I % `�'�_ ` / ` -ALL EROSION CONTROL MATTING SHALL BE BIODEGRADABLE / / J < I _ �569 V / O .` V / �' / USING PRODUCT SPECS PROVIDED IN CALCULATIONS U - ' ( + CORD pRIV \ \ F PACKAGE. VERIFY MATTING USING REQUIRED STRENGTH PER / / ��' / DRAINAGE AREA TABLE ON SHEET C9.3 Lu p UU)) Q Al B-30 51' E R/Vtr _ V \ / / / ` DELINEATION (TYP.) r Lu U c� T_ + \ yg5 \ / CB-309 -CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION CB-308 _ Q J LU -cy) o f S� \ _ / 1 \ V I / �� / / / / ��, / / / FUTURE PHASE DITCHES WITH POSITIVE DRAINAGE TO EROSION CONTROL / / Z T_ � OC O O OC -� Mh�301 B-304 \ V / / V / POND. v v / / ,' /1 �� / 7F MILLBRIDGE 0 U) o Q o 0 z mE �30 \ / I / / ` v / �o�o/ sv // 05 / ` / LEGEND EROSION CONTROL)w O 00 CONTRACTOR TO TEMPORARILY /o / o TERMINATE PIPE AT SEDIMENT ��� �� / SYMBOL / � \ - - B-305/ IbP / / STABILIZED CONSTRUCTION CLEAN WATER DITCH U m Z z J J Z z O D X / �� STORAGE ELEVATION l A \ / / ENTRANCE a_ U) O Sip " ► / / / FES-BMP#3 / / / — — - / O_ A- / / I SILT FENCE � � TEMPORARY DIVERSION DITCH Z Ljj LU / / DI-311 i / / / �� _-- 600 — / / / l �v I / / _�/� MH-310 j I IQ� / / \ X — DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE O I / / / _ �O1/ 10 a / _ I �� _ / / / > % > Y — Q TEMPORARY SILT FENCE OUTLET SEDIMENT BASIN BAFFLE I _ - _ / / / / / n / \ I I \ ® 313-595 -------� I O — — — — / J \ \ - co / _ �) / ` ` C _ _ _ — — — STONE INLET ❑ ORANGE HIGH HAZARD FENCING I PROTECTION `/ W J Q ° SILT FENCE (TYP.) �' / ' %` z 10 - _ / / �� I / SEE DETAIL 507.1)& 508.1 SHEET C9.5 600 _ _ _ — _ _ _ _� �� A - -/ /��� - I - 314 I / `� / — _ V GRAVEL RIP RAP APRON SEDIMENT BASIN SKIMMER � � 0 LU Z W _ - / -;SEDIMENT BASIN #3 D.A. = 6.90 ACRES° �� � - - 0 O SEE DETAIL 504.1 SHEE_T_C9.5 A _ x CLASS I RIP EMERGENCY � _ _ _ DENUDED LIMITS SPILLWAY �� 0 � -RAP _-_ �_ __I�-�315 y _ m p w� _ SPILLWAY (TYP.)�_ / / —� ��_�� a --�— ���� _ SEE DETAIL 504.1 STET C9.5 _ _� - _ _ _ _ I q� \ \wl\1� V lX 1 - 31 ' S0 0 50 100 DRAINAGE AREA �� FLEXIBLE PIPE SLOPE DRAIN at PROJ. MGR.: WGB - - RAID —-_= HIGH VISIBILITY TREE- - - 20' NATURAL PERIMETER CSX - - - `� DESIGN BY: CJH DRAWN BY: CJH FENCING- -BUFFER (TYP.) _- NIGH -_OF w'4D� _ PROTECTION FENCING AY (TYP.) ON HIGH SIDES _ _ _ A _ „ _ � SOILS DELINEATION TEMPORARY WATTLE CHECK DAM SCALE: 1 50 r Wy75 -_ -- Wl< Z PROJ. DATE: DEC. 2019 DRAWING NUMBER: - - \ \ \ WAX / -- —i==�= _ _ _ __�_ -_ _---__- �\ HAW HIGH — J - ^ —__ —_- WAY - ---- ___ ----_ ___ \�_—� \ _ --== C6.4 __— DICI<SON J 2 _— ---- — / __—_ _—_—--� `_ - =_ _ \ ` / --\ \ \— =- = _ — _ _ = _ _ �� —_ —_ = =—__a —_ community infrastructure consultants W 20170279.00.CL o. �ww ouo OnJU OZw 'OD w w 0 001> 0'0. .a0 =�O ~ -w ozw z_o oZ zo zo z 0 wY� =UQ ~O= 0Y� ¢00 zwa 0Z¢ 0< ozz O w 0 a W ¢ J ¢5 0 � 0 wl¢ wF0 z w Q mm� 0 C7zW w Z Ow -� 2E 0 z 8 U- ZW 0 ow= YUF 00 §MZ �_ oo_ =Z0 w Pm aE_ O 00 EXISTING POND�, WATERS /// /MILLBRIDGE I I LEGEND (EROSION CONTROL) SYMBOLSURVEYED DDICKSON EDGE TYP.)� PHASE 7D STABILIZED CONSTRUCTION CLEAN WATER DITCH ENTRANCE flt IfffaStfUCtUf2 COfSUltaftS 1213 W. MOREHEAD STREET STREAM BUFFER � \ ZONE (TYP.) STOCKPILE LOCATION �j/ / %�\\�\ VA VA V� \ \ (��� �� / l l v / i \ I \ \ /\\ / //0 I \ / I� //\ \\ \\\ \\ \\\\ \ \�\ \\\ \ \ // \ / =10,500 CY (=28,000 SQ. FT.) // / A \ \ VA \���A V / I I I \ \ / \ \ \ �` A� \�� % (� / l� I \ �/ l ��\V VA 1 I I I _ X SILT FENCE �� TEMPORARY DIVERSION DITCH — SUITE 300 CHARLOTTE, NC 28208 CONTRACTOR TO STABILIZE AND VAA �� t I I V�\ \ \ \ _ �I \ — — — // \\\\ \\ / \ \ — — — 6p INSTALL SILT FENCE 5 FROM TOE OF -�_ �A /� �Vp \ V �� A ����� t�� v� 1 II I I I///� V A \ V v - _ - _ - - / / I � �- \ \ _ — — / STOCKPILE. CONTRACTOR SHALL �I595 `� i X I I DOUBLE ROW SILT FENCE PROPOSED STORM DRAINAGE fit) (704) 334-0078 fl 704 334-5348 �'/ ENSURE DRAINAGE PATTERNS �� v ///// / // / v \ ` \�v v� ������ 1- �� I �� - -� DOUBLE ROW SILT FENCE (TYP.) - - - _�t REMAIN AS DESIGNED. / / /� v\ ���1s /v v ���� v���vvv _ - - =SEE DETAIL 507.1 & 508.1 SHEET C9.5 - - - - - - U = /III - _ -_ _ SEDIMENT BASIN BAFFLE WWW.WKDICKSON.COM \ �V \ V A / V� — / / \ — = — — — — — — — _ _ _ _ _ �\ \ \ \ \� \ / COS v ���V AA�� ��-�� �/i%/� \�� �s�'� �� _ ---- - vv590 _ I / /IV — — — — — — — — — — — - TEMPORARY SILT FENCE OUTLET - NC LICENSE NO.F 0374 �� ��� — A� \ -_- - - \ A \ 560/ �� �V A\ �'��_ � v�v�� ��� \ \ V �V vv _ - ANTI -SEEP COLLARS (TYP.) s \ V A v v A A \ A \ 1x \ \\�s ; _ SEE POND DETAIL SHEETS \ \ \ � \ vv / i \ I I � ice- f- STONE INLET / ® ORANGE HIGH HAZARD FENCING III � PROTECTION \\\ S6 � FOR DESIGN CRITERIA \ v,v,`se"_ >IIII s _ v v CLASS I RIP -RAP EMERGENCY 560 A \V A I I �,•-__ \� / A / / - \�� ` - _ / _�. \ SPILLWAY (TYP.) v t / I I II GRAVEL RIP RAP APRON SEDIMENT BASIN SKIMMER ��. • • , , • • R •. 0 �. FESSsI� x9 �33' �� SEE DETAIL 504.1 SHEET C9.5 / / \/ / \/ FES - BMP #1 SKIMMER DEVICE (TYP.) V / / / / \ / V i - = _ _ = _ �—�-�� - _ � DENUDED LIMITS SPILLWAY = S SEE DETAIL 503.1 SHEET C9.4 / / / / I / I WETLANDS I / FUTURE PHASE � I I 11 \y III . i ,• _ (TYP.) I 7F MILLBRIDGE V \ I DRAINAGE AREA FLEXIBLE PIPE SLOPE DRAIN � ©'• ••••' to A C% Lo/ / /v/ / // / / /// / SOILS DELINEATION - 560 V� \ V / V 3 - 204- \ ' / \ / '�� /ice S \ ; .:. SEDIMENT BASIN #1 D.A. =12.98 ACRES / /\ A / ) I SEE DETAIL 504.1 SHEET C9.5 / I I I I TEMPORARY WATTLE CHECK DAM - _- - PROFESSIONAL SEAL _ _ _ �' 570 v ?0 MP fi I �I / / � � / I / / / / � I'' i � � -�_ 7 -_ — - ✓ - v\\ _ NOTES: 1 \ --- - � I / I -EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE 0 00 x I I I MILLBRIDGE �� CAN BE FOUND ON SHEET C8.0 x + 6� - � / / / / / /,�� -590 iD • _5�5 _ CB - 208 - -.. I I PHASE 7C -CONTRACTOR SHALL INSTALL THE SILT FENCE AT THE LIMITS i) I OF DISTURBANCE WHERE PROPOSED GRADING IS WITHIN FIVE FEET (5') OF THE LIMITS OF DISTURBANCE. SILT FENCE IS - / - v A / / 5S5 / V CB - 207 - 580 CB - 220 / i / _� = SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR k \ 4- \ / SILT ENCE (TYP.)I�� SEE DETAIL 507.1 & 508.1 SHEET ./ „. DE � C9 �. ,„UT5 VISUAL PURPOSES ONLY. - - �I FENCE OLET VI DEVICE (TYP.)- GCB - 209 �- �v / SEE DETAIL 509.1 SHEET C9.5 l \ - �i O o CONTRACTOR TO TEMPORARILY67 v � I I 1 - CONTRACTOR SHALL MODIFY TEMPORARY DIVERSION I DITCHES THROUGHOUT CONSTRUCTION TO ENSURE 0 � p� TEMPORARY CONSTRUCTION ENTRANCE. I I A TERMINATE PIPE AT SEDIMENT \ V A V © DI - 221 \. I ' STORAGE ELEVATION f� ' \ V \ \ v / SEE DETAIL 514.1 ON SHEET C9.1 I I i I I I I I� I DRAINAGE AREAS FOR EACH BASIN REMAINS THE SAME. CONTRACTOR TO ENSURE NO STORMWATER IS SEND TO SILT �I I I I III FENCE IS SUPPOSED TO GO TO EROSION CONTROL 575 / _ BAFFLES (TYP.) \ \ / x�- - SEE DETAIL 524.1 SHEET C9.4� \ / / / v x a (I PONDS.THAT �I/IIIII 210 / � - sue- — � HATCHED AREA INDICATES AREAS/// / x t l l t 600 � � STABILIZED IN PRIOR PHASE. 6p0 I I / J � - ///�/ -ALL EROSION CONTROL MATTING SHALL BE BIODEGRADABLE — _ _ w v = USING PRODUCT SPECS PROVIDED IN CALCULATIONS 0 I z O - PACKAGE. VERIFY MAT TING USING REQUIRED STRENGTH PER 0LU � F- / ��`° -� _ v VA \ \ v / / ,�- CB-211 / � `- A v / O B-111 0 TABLE ON SHEET C9.3 �� I DEEP RIVER WAY / 50' R/W -CONTRACTOR SHALL INSTALL TEMPORARY DIVERSION Ir w z :E O O w w : o O CB-109� v / // / v DITCHES WITH POSITIVE DRAINAGE TO EROSION CONTROL POND v) > LU Ir 595 /\v DI - 222 590 _ - CB-104 /' � / / / OD I \\\ / // O O B - �1 � CCB-2251 S O O �1 �o,� v _ ��� I 1 1 I I I i / / / / \ / \ V A ��� � ® �116 \ / CB-107' �� i �__��� \\ V AVA cn z cn z V v�� \ �A 590 5 5g5 \ 600 0 LIMI�OF DISTURBANCE / / \/ 595 g00 A \ \\ V I I/ / / / (TYP.) 25 58 ACRES / / SBSSB-114' \ vvvv / / / v / / / \ / % i t A \ / / \ �/� �� \ --' LLJ � � Q N o ImIQ10 v/ 605 6�0� V A // /// / / / / ��' / z 610 615— I,- 2 v v v vs� v\ v vv �— I /// i CV 00 r SLOPES WITH I I //� /j / o / BENCHING. SEE \ \ V A \ V A / // / �•� � DETAIL 520.1 I 605 / / / ,n I '�' / / v �O '� A / v �A v t N o .: � , v / I I � v v � I I � I III , v 1v \vAv vV �o o —v w z o A \ \\Ao \ CONTRACTOR SHALL HYDROSEED ! //� / v Q u1 o IMMEDIATELY. IF STABILIZATION DOES NOT / I / I I \ \ \ \ V A V A A \ \ \ OCCUR, CONTRACTOR SHALL INSTALL EROSION CONTROL MATTING (TYP.) // // / / / / V v �v 1 \ V A \ \ \ \ V // / I / / v \ \ \ INLET PROTECTION (TYP.) _ _ A v V v A \ v / �\ v / v �� \ Ir Q \ DETAIL 510.1 & 512.1 SHEET C9.5 HIGH VISIBILITY TREE L_u-SEE PROTECTION FENCING LV If . L o cv Q1-231 I a_ -309 / / 6�p� V V A A / / / /A\ \\ V A / v V / —C—,- V V \ V A / / Cl) - F / I- / \ \ 1 I cY) J 0 / / CV v / � B-308 A A OC 0 I�Z Lu 0 > cv OC H — _ i / / / / v v - // I v \ , LL QLLJ " � Z / / / // \� I En CB-307 /�i// �V ��� �--// // �\/ ///i/ // /l 1---� l �V A A / / — vv v� — ' // �/ / / / l l / \ /� l _ _ a_ z 0 0 �, / h // �/ / v v /i /g FUTURE PHASE % / // �\ v/ v — — �/ v\ v ' / �-- / / / / \ V / I vv A // /' C� z Ir `� - �� v _ ,B-3 s y��� / / _ — vv ----- -� -� 7F MILLBRIDGE ` 'v-�� v) // v // / / / Z 2 2 3 6�5- -; _ _ _--�� -/ / O v �/ s,, ��o \ \ -- vv�—�� — /� �v vv / / vv v —� /—�— ,' /v/ -�� /I — I /' I ,' ° o --- __--- // v / v v /� __ _—� — / ��,� /,— �_ —v /I o o� ��/ /—� --- /\ v/ 0)o v DRAINAGE AREA / DELINEATION (TYP.��� v \ / / \ v A \ J / / / / V / / / A V A \ V A / /� / v v / v \ v \ w H U � — / _ ,/ // , �v v v v �„ — �� /I /l �� -//— vv `, vv vv ,v �v vv vv �� — �� u, z 0 z LU o V �V 7 0 // II � / / \ \ \ / r / A\ \v �v v� A \ / / ( \�vvvV� ( v� I \ \ / \ / \ \ \ \ A \ V \ i�--� /� 50 0 50 100 \ / / PROJ.MGR.: WGB E ♦ \ \ \ \ \ i A \ DESIGN BY: CJH SCALE: 1" - 50' DRAWN BY: CJH PROJ. DATE: DEC. 2019 Cd 10 \ \ v v / / / / / V / / v A v A \\ \� A v v� ---- --- �/ / / / / / V / / / / �\ V 6oS� �v �� Wl< Q Z DRAWING NUMBER: // / \/\/ \ C6.5 ��------------/ / / // / / �/ / /v �v �� / i / vv �v V Aoor v—, �� �v WKDPROJ. NO.: /// // \ _ ��� / / / / / / 1 J w vv // // / / / / / / \I V / V -615 1 / community infrastructure consultants v LLJ 20170279.00.CL I O. zwz EL w pOo w 'z pow ao¢ woo ww� U=w o¢m �a0 - = w ~ W ozw z -p oz zo zo z ° om wY� =UQ ~p= OY� W w w ¢oo zwa OZ¢ ozz O w 0 ¢k� w W ¢ J ¢�z o�0 w D Q 0 wFz w�= ¢�Im_ =a� p Fr o z°w �2P o z 8 U-O zzo o2E= YUF U po Y Q =z FU 00¢ O =Zw o zo a�-o Ow¢ Up �.•..�..I.... ............................ NNW. \ . (. ../. RESIDENTIAL / . // �. . �................................................... RESIDENTIAL '�, EDENMOOR LAND ACQUISITION II, LLC. % . SmAr.0 ... FUTURE MILLBRIDGE — — NOW OR FORMERLY /. . . . . . . . . . . . . . 1800 AVENUE OF THE STARS, 3RD FLO 1.................................................................10 PHASE DEVELOPMENT .........� �. LOS ANGELES, CA 90067 . . . . . . . . . . . I. ... . .... . . . . . . . . r.� . .—. D8:639 PG:170 . ZONING: CU-R4-PRD . r.�. PARCEL ID # 0015-00-013.00 . . . . . . . . . . .1. \ / �/ . l y� . ZONING:NLN ............1. \ �.�.�.. ON DEEP RIVER WAY LDEEP R WAY— ♦ . R a+�� wry►'��WA ■ ♦ ��Ar,+-��=�'�I�I��`G, flit �� __ ._ • ♦♦ ie, !'�.'!.r �'^' - - '„' rriIW jam■ C::�PROPOSED STREET LIGHT (TYP.) -__ STREET TREE PLANT SCHEDULE QTY. BOTANICAL NAME COMMON NAME MATURE HEIGHT MATURE WIDTH MIN. CALIPER MIN. HEIGHT COND. ROADWAY SYM. 41 ACER, CAMPESTRE MAPLE, HEDGE 25'- 35' 25' 2" 8' B&B DEEP RIVER WAY (7E) 22 ACER TRUNCATUM X PLATANOIDES MAPLE, SUNSET 25'- 35' 25' 2" 8' B&B DEEP RIVER WAY (7F) 8 ACER BUERGERIANUM MAPLE, TRIDENT 35' 30' 2" 8' B&B HANCOCK ROAD 0 15 ACER TRUNCATUM X PLATANOIDES MAPLE, SUNSET 25'- 35' 25' 2" 8' B&B GABARDINE LANE 19 ACER BUERGERIANUM MAPLE, TRIDENT 35' 30' 2" 8' B&B BATISTE AVENUA 0 25 ACER, CAMPESTRE MAPLE, HEDGE 25'- 35' 25' 2" 8' B&B WHIPCORD DRIVE LIJ 7D QTY. STRUCTURE NAME SYM. 14 PROPOSED LIGHT POLE 0 FUTURE PHASE 7F MILLBRIDGE MAPLE, SUNSET (22 QUANTITY) ON DEEP RIVER WAY '10 _ PER. i'I h PHASE LINE (TYP.) I II / / —� _ FUTURE PHASE 7F MILLBRIDGE L � � J �Te / LEGEND (STAKING) SYMBOL DETAIL SYMBOL DETAIL PROPOSED SIDEWALK - ADJOINING PROPERTY LINE - PROPOSED HANDICAP RAMP - PROPERTY/BOUNDARY LINE - t PROPOSED STOP SIGN - PARCEL LINE - / I STORM DRAIN - EASEMENT NATURAL BUFFER - /I. SANITARY SEWER - EASEMENT — — — BUILDING SETBACK - Ir _ PROPOSED 2'-0" - GUTTER COMMON OPEN - '.' SPACE IVALLEY PROPOSED - MAILBOX KIOSK LANDEA Irw MA F N 50 0 50 100 SCALE: 1" = 50' Wl< DICI<SON community infrastructure consultants rz1.0 N co N LU Q O Z O U VJ Z O U Ir O LL rLU V I— O Z O 1 Q Cz G J LU WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ��O.oFEs�so.l0 Q' S b � %�G'�NEE�.�c�`�� Al PROFESSIONAL SEAL U U m p z Ir O O Ir z z C15 U LU w Z � : LU O O U) U U W Ir O O 00 Ir Ir LU LU z z O O �C/) IrIr rn rn 0 0 w H 00 N N � ImIQI z Lu O QT 1 T U r o LU LU U cal = J (n �(n wgo nNo, LU J � LU Ir m m z LU Q J Z LL Q J Z Z IY LU I— O 0 W W J z U Z LU j IZ IZ o PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C7.0 WKD PROJ. NO.: 20170279.00. C L O. zwz EL w °oo w ,z pow QO¢ wwp o¢oow m .ao =gip ~ w Ozw F-p o. wUz " o oz ow w. =UQ I Fn OY� w ¢op z< z OZ¢ pzz O w 0 w W ¢ J ¢�z o�0 wom �¢ w 0 z w 2 Q ¢�Im_ =a� p Clow ¢o< Q2P zmz -3: 2 o z 8 U-o ZZO °w_ YU~ U po0 YUQ �=z oFt ,0o 0 (D F�� Fr o owUDLL \ \ \ I \ LEGEND (STAKING) SYMBOL DETAIL SYMBOL DETAIL VIM DDICKSON . : EXISTIN.G POND \\ \ MILLBRIDGE , I PHASE 7D I. \ . _ _ PROPOSED SIDEWALK — ADJOINING PROPERTY LINE nity infrastructure consultants 1213 W. MOREHEAD STREET 1. \ \ \ \ - - PROPOSED HANDICAP RAMP PROPERTY/BOUNDARY LINE SUITE 300 CHARLOTTE, NC 28208 /. PROPOSED STOP SIGN — PARCEL LINE — (f) (704) 334-553348 WWW.WKDICKSON.COM STORM DRAIN — NATURAL BUFFER — / NC LICENSE NO.F-0374 J \`Emi�:EASEMENT T.8 s I SANITARY SEWER — — — — BUILDING SETBACK — EASEMENT C-bS. / j 1 111 / \ % \ /�\ \ \ ' / ' T \ ✓ 1 ' PROPOSED 2'-0" — COMMON OPEN — VALLEY GUTTER '.'.' SPACE �- (1 ••• \\\ 0`' • —SS/ �Cr �.11 — / f PROPOSED — MAILBOX KIOSK . %,°Nl \ jjD .I �/ l'.••i o MILLBRIDGE — PROFESSIONAL SEAL \ PHASE 7C oOro �� / MAPLE, HEDGE (41 QUANTITY) /� ON DEEP RIVER WAY \ /\ % // FUTURE PHASE 7F MILLBRIDGE — — — — \° i / 1 / O — / \ O � W z z U / P� MAPLE, SUNSET `���� (22 QUANTITY) CEP EZ p / . - % DEEP RIVER WAY 50' R/W \ w w LU w zp � : U) O O \ ON DEEP RIVER WAY � 51 K r > w / 15' X 15' SIGHT TRIANGLE (TYP.) ` / . \ Ir LL LL O O z z k441/ -• .. / -*\A7PROPOSED STREET / \ LIGHT (TYP.) 00 o Q / o MAPLE, TRIDENT \ (19 QUANTITY) \ \ \ ® T �00�Q� Oz ON BATISTE AVENUE T N a \N 0\0 U / Q U z Q z p 3 \ \ / � PHASE LINE (TYP.) \ ~ w r 0 J U o o \ \ Q = N U w wo lo \ w U N = U \\ \ \ z (n J w Cl) Ir 0 n� g o \ FUTURE PHASE 7F MILLBRIDGE FUTURE PHASE 7F MILLBRIDGE O 0 Q o N a_ o m N a / / a_ z Q z Cl) oo / s,,�°Roo z z w o U) T- Q ♦off 2 w / V T O z 3 _ / U— W W W J Q � o o / /. \� c /� v z 0 LU O IIr MAPLE, HEDGE (25 QUANTITY) % ON WHIPCORD DRIVE / \ z o a - FUTURE PHASE 7F MILLBRIDGE 50 0 50 100 SCALE: 1" = 50' Q PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH \ / >- PROJ. DATE: DEC. 2019 DRAWING NUMBER: o lo o zWl< o C7. 1 DICI<SONJ WKD PROJ. NO.: 2 a community infrastructure consultants W 20170279.00.CL w w n 1.. o. zaw z FOO w pz wwo g¢oow m oo Sa =� -w ozw F _o o. WUz Zoo oow z o wY� =UQ ~F_ oY� w�Q m w ¢oo z< z om¢ z oo < ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 wFz w�Q ¢�Im_ mm� 0 C7zFt w z°w �2P o z 8 U-O zzo °w_ YU~ U po Y.4 �=z o�(D oF 0 =Zw 0o= a�2E 0 ool GENERAL NOTES: vw DDICKSON 1. CONTRACTOR SHALL ENSURE THAT ADJOINING PARCEL'S UTILITIES REMAIN IN SERVICE AT ALL TIMES. PERMANENT SEEDING SPECIFICATION TEMPORARY SEEDING SPECIFICATION nity infrastructure consultants 2. SURVEY INFORMATION WAS OBTAIN FROM AN ALTA SURVEY COMPLETED BY McKIM &CREED SIGNED JUNE 24, 2008 AND A SUPPLEMENT SURVEY COMPLETED BY SUMMIT OF THE CAROLINAS, P.0 ON FEBRUARY 2018. 1213 W. MOREHEAD STREET 3. TOPOGRAPHY FOR THIS SECTION OF MILLBRIDGE IS A COMPILATION OF AERIAL SURVEY OBTAINED FROM LANDDESIGN, 3.1 SLOPES OR FLATTER: TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SUITE 300 INC. ON OCTOBER 30, 2013. ROADWAY CONNECTION ELEVATIONS FOR PHASE 7C WERE OBTAINED FROM MILLBRIDGE CHARLOTTE, NC 28208 PHASE 7ABC CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL VERIFY ELEVATIONS PRIOR TO CONSTRUCTION AND 1. APPLY AGRICULTURAL LIME AT THE RATE OF **75 LBS/1000 S.F. SEEDING MIXTURE RATE (LB/AC) (t)(704) 334-0078 (f)(704) 334-5348 NOTIFY ENGINEER OF ANY DISCREPANCIES. 2. APPLY COMMERCIAL FERTILIZER AT THE RATE OF 48 LBS/1000 S.F. FOR 5-10-10 4. SURVEY HORIZONTAL REFERENCE: NAD 83 FERTILIZER, 24 LBS/1000 S.F. FOR 10-20-20 FERTILIZER, OR 20 LBS/1000 S.F. FOR 18-24-6 FERTILIZER. RYE (GRAIN) 120 WWW.WKDICKSON.COM 5. SURVEY VERTICAL REFERENCE: NAVD88 3. SEED IN ACCORDANCE WITH THE FOLLOWING SCHEDULE AND APPLICATION RATES: 6. CONTRACTOR SHALL MAINTAIN ACCESS TO ADJOINING PARCEL THROUGHOUT THE CONSTRUCTION PROCESS. ANNUAL LESPEDEZA (KOBE IN 50 NC LICENSE NO.F-0374 7. SHORING WILL BE IN ACCORDANCE WITH OSHA TRENCHING STANDARDS PART 1926, SUBPART P OR AS AMENDED. DATE: TYPE: PLANTING RATE: PIEDMONT AND COASTAL 8. ALL NEWLY CREATED ROADS ARE PROPOSED FOR ACCEPTANCE INTO THE TOWN OF WAXHAW ROADWAY SYSTEM. AUG. 15 - NOV. 1 TALL FESCUE 300 LBS/AC OR 7 LBS/1000 S.F. PLAIN, KOREAN IN 9. PIPE SYSTEMS, CHANNELS, OR RETAINING WALLS LOCATED IN COMMON OPEN SPACE AREAS ARE THE MAINTENANCE RYE GRAIN 120 LBS/AC OR 3 LBS/1000 S.F. MOUNTAINS) RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION FOR THIS DEVELOPMENT. NOV. 1 - MAR. 1* TALL FESCUE AND 300 LBS/AC OR 7 LBS/1000 S.F.ABRUZZI 10. PIPE SYSTEMS, CHANNELS, OR RETAINING WALLS LOCATED ON LOTS ARE THE MAINTENANCE RESPONSIBILITY OF THE RYE 25 LB/1 000S F OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. � INDIVIDUAL HOMEOWNER MAR. 1 -APR. 15 TALL FESCUE 300 BS AC/OR 7OLBS/1000 S F.1/2 ®,,�f 11. PIPE SYSTEMS, CHANNELS, OR RETAINING WALLS LOCATED IN COMMON OPEN SPACE ARE THE RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION. APR. 15 - JUL. 30 HULLED COMMON BERMUDA GRASS 25 LBS/AC OR 1/2 LB/1000 S.F. SEEDING DATES: MOUNTAINS - ABOVE 2500 FEET, FEB. 15 - MAY 15 _ ? 12. ALL STORM DRAINAGE PIPES ARE TO BE CLASS III NCDOT APPROVED RCP UNLESS OTHERWISE NOTED JUL . 1 AUG.15 TALL FESCUE AND 300 LBS/AC OR 7 LBS/1000 S.F. BELOW 2500 FEET, FEB. 1 -MAY 1� 13. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER CONVEYANCE. BUILDINGS ARE BROWN TOP MILLET 35 LBS/AC OR 3/4 LB/1000 S.F. OR SORGHUM SUDAN PIEDMONT - JAN. 1 -MAY 1 ° -. d %`�' ��'° PERMITTED IN THE EASEMENT ANY OTHER OBJECTS WHICH IMPEDE STORM WATER FLOW OR SYSTEM HYBRIDS 30 LBS/AC OR 3/4 LB/1000 S.F. COASTAL PLAIN - DEC. 1 - APR. 15 /�j� Ad MAINTENANCE ARE ALSO PROHIBITED.NOT t I I1\0�\`\���g/� 14. WETLAND INFORMATION OBTAINED FROM WETLAND AND ENVIRONMENTAL PLANNING GROUP DATED 10/14/16 & 5/12/17. 'X' 4. MULCH WITH STRAW APPLIED AT THE RATE OF 95 LBS/1000 S.F. SOIL AMENDMENTS: SOIL FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. PER FEMA MAP PANEL 4463 & 4473, THE FLOODPLAIN IS NOT BEING DISTURBED. THE PROPERTY IS LOCATED IN ZONE * HEAVILY MULCHED DURING JANUARY - MARCH PERIOD. MULCH: PROFESSIONAL SEAL DEMOLITION/EXISTING CONDITIONS NOTES: ** CONTRACTOR MAY OBTAIN SOIL TEST TO DETERMINE AMOUNT OF LIME REQUIRED TO OBTAIN A PH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET RANGE OF 6.5 TO 7.0. NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE *** SEED TYPE, RATES AND/OR SOIL AMENDMENTS SPECIFIED ABOVE MAY BE MODIFIED AND/OR �j 0 m LOCATED PRIOR TO BEGINNING CONSTRUCTION. ELIMINATED IF REQUIRED BY OTHER LOCAL, STATE OR FEDERAL AGENCIES (EG. NRCS, NC MAINTENANCE: 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES, USING FLAG MEN, ETC AS NECESSARY TO ENSURE THE SAFETY OF THE COOPERATIVE EXTENSION OFFICE, ETC.). PRIOR TO MODIFICATIONS OR ELIMINATIONS, CONTRACTOR RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PUBLIC. SHALL SUBMIT WRITTEN DOCUMENTATION SUPPORTING THE REQUEST FOR APPROVAL PRIOR TO 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE PLACED IN ACCORDANCE WITH THE STANDARDS OF THE NORTH CAROLINA MAKING MODIFICATION. TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER DEPARTMENT OF TRANSPORTATION AND THE TOWN OF WAXHAW. 4. SHORING WILL BE IN ACCORDANCE WITH OSHA TRENCHING STANDARDS PART 1926, SUBPART P OR AS AMENDED. SLOPES GREATER THAN 3:1 SEEDING MIXTURE RATE (LB/AC) 5. A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO COMMENCING ANY WORK. CONTRACTOR SHALL ESTABLISH EROSION CONTROL MEASURES PRIOR TO DEMOLITION OF EXISTING STRUCTURES AND AN EROSION CONTROL INSPECTION IS REQUIRED UPON 1. APPLY AGRICULTURAL LIME AT A RATE OF **90 LBS/1000 S.F. GERMAN MILLET 40 COMPLETION OF THE EROSION CONTROL INSTALLATION BEFORE ANY FURTHER CLEARING OR GRADING CAN BE COMMENCED. 2. APPLY COMMERCIAL FERTILIZER AT THE RATE OF 48 LBS/1000 S.F. FOR 5-10-10 6. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE AND FEDERAL RULES AND REGULATIONS CONCERNING THE DEMOLITION AND FERTILIZER, 24 LBS/1000 S.F. FOR 10-20-20 FERTILIZER, OR 20 LBS/1000 S.F. FOR 18-24-6 FERTILIZER. IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE. 3. SEED IN ACCORDANCE WITH THE FOLLOWING SCHEDULE AND APPLICATION RATES: REMOVAL OFFSITE OF ALL CONSTRUCTION DEBRIS. 7. CONTRACTOR SHALL COMPLETE DEMOLITION WORK IN AN EXPEDITIOUS AND TIMELY MANNER. DATE: TYPE: PLANTING RATE: SEEDING DATES MOUNTAINS - MAY 15 - AUG. 15 8. EXISTING STRUCTURES SHALL BE DEMOLISHED UNDER A SEPARATE DEMOLITION PERMIT OBTAINED BY THE DEVELOPER/OWNER. MAR. - JUN. 1 SERICEA LESPEDEZA 50 LBS/AC OR 1 1/2 LBS/1000 S.F. PIEDMONT - MAY 1 - AUG. 15 9. ABANDONMENT OR REMOVAL OF EXISTING WELLS, SEPTIC SYSTEMS AND ASSOCIATED APPURTENANCE SHALL BE PERFORMED IN RYE GRAIN 25 LBS/AC OR 3/4 LBS/1000 S.F. COASTAL PLAIN - APR. 15 - AUG. 15 ACCORDANCE WITH REGULATORY GUIDELINES AND PROCEDURES ESTABLISHED BY THE NORTH CAROLINA DEPARTMENT OF NATURAL (SCARIFIED) AND RESOURCES, AND ANY ASSOCIATED REGULATORY AGENCIES. MAR. - APR. 1 ADD TALL FESCUE 150 LBS/AC OR 3 1/2 LBS/1000 S.F. SOIL AMENDMENTS: p z 10. DEMOLITION CONTRACTOR, AND ASSOCIATED SUBCONTRACTORS, ARE RESPONSIBLE FOR CONTACTING AND COORDINATING WITH JUN. - SEPT. 1*** TALL FESCUE AND 120 LBS/AC OR 2 1/2 LBS/1000 S.F. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. O EACH AFFECTED UTILITY COMPANY PRIOR TO THE REMOVAL OR DISCONNECTION OF ANY EXISTING SERVICES ON SITE. BROWN TOP MILLET 35 LBS/AC OR 3/4 LB/1000 S.F. O 11. SURVEY WAS PERFORMED PRIOR TO DEMOLITION OF SOME STRUCTURES ON SITE. CONTRACTOR SHALL CONFIRM ITEMS TO BE OR SORGHUM SUDAN MULCH: W ~ ~ v DEMOLISHED. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A DEMOLITION PERMIT AND ANY ANCILLARY PERMITS FOR HYBRIDS 30 LBS/AC OR 3/4 LB/1000 S.F. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET w w w DEMOLITION OF REMAINING ITEMS. SEPT. - MAR. 1 SERICEA LESPEDEZA 70 LBS/AC OR 1 3/4 LBS/1000 S.F. NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. O O O 12. CONTRACTOR SHALL CONTACT ALL AFFECTED UTILITY COMPANIES PRIOR TO BEGINNING DEMOLITION. (UNHULLED - UNSCARIFIED) v v TALL FESCUE 120 LBS/AC OR 2 1/2 LBS/1000 S.F. MAINTENANCE: MILLET OR SUDAN 20 LBS/AC OR 1/2 LB/1000 S.F. RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. w Q Q SITE NOTES: 4. MULCH APPLIED AT THE RATE OF 95 LBS/1000 S.F. AND ANCHOR WITH ASPHALT EMULSION TACK COAT TEMPORARY SEEDING RECOMMENDATIONS FOR FALL APPLIED AT THE RATE OF 10-15 GAL/1000 S.F. OR 450 GAL/AC. O O 1. ALL RADII DIMENSIONS SHOWN ARE TO BACK OF CURB, UNLESS OTHERWISE NOTED. SEEDING MIXTURE RATE (LB/AC) z z 2. MINIMUM CROSS SLOPE ON ALL ASPHALT TO BE 3/8" PER FOOT. * TEMPORARY RESEED SEPT. 1 AT RECOMMENDED RATES. O O 3. ALL HANDICAP ACCESS RAMPS SHALL COMPLY WITH THE LATEST EDITION OF THE ADA ACCESSIBILITY GUIDELINES. ** CONTRACTOR MAY OBTAIN SOIL TEST TO DETERMINE AMOUNT OF LIME REQUIRED TO RYE (GRAIN) 120 ~ 4. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. OBTAIN A PH RANGE OF 6.5 TO 7.0. Ir 5. NO OBSTRUCTIONS, PLANTINGS, OR FENCES SHALL BE PERMITTED WITHIN SIGHT TRIANGLES, STORM DRAINAGE EASEMENTS AND *** SEED TYPE, RATES AND/OR SOIL AMENDMANTS SPECIFIED ABOVE MAY BE MODIFIED SEEDING DATES: SANITARY SEWER EASEMENTS. AND/OR ELIMINATED IF REQUIRED BY OTHER LOCAL, STATE OR FEDERAL AGENCIES (EG. NRCS, NC MOUNTAINS - AUG. 15 - DEC. 15 z O z O COOPERATIVE EXTENSION OFFICE, ETC.). PRIOR TO MODIFICATIONS OR ELIMINATIONS, COASTAL PLAIN AND PIEDMONT - AUG. 15 - DEC. 30 �5 Cn CONTRACTOR SHALL SUBMIT WRITTEN DOCUMENTATION SUPPORTING THE REQUEST FOR APPROVAL PRIOR TO MAKING MODIFICATION. SOIL AMENDMENTS: oc oc FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MATERIAL/STREET/SIDEWALK NOTES: PERMANENT SEEDING NOTES 0 0 w MULCH: 00 N Q 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET N r (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE SPECIFIED IN THIS MANUAL. 1. PERMANENT SEEDING, SODDING, OR OTHER MEANS OF STABILIZATION ARE REQUIRED WHEN ALL NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. T T 2. ALL ASPHALT CUTS SHALL BE MADE WITH A SAW WHEN PREPARING STREET SURFACES FOR PATCHING OR WIDENING STRIPS. CONSTRUCTION WORK IS COMPLETED ACCORDING TO THE "SEEDING STABILIZATION TIMEFRAMES" MAINTENANCE: 00 Q Oz 3. PAPER JOINTS SHALL BE USED TO SEAL THE ENDS OF AN ASPHALT POUR SO THAT FUTURE EXTENSIONS CAN BE MADE WITHOUT CAUSING CHART. ROUGH JOINTS. REPAIR AND RE -FERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND T 4. WHEN PLACING ASPHALT AGAINST EXISTING SURFACES, A STRAIGHT EDGE SHALL BE USED TO PREVENT "HUMPING" AT THAT LOCATION. 2. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHOULD BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND PH TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN 5. STONE SHALL BE PRIMED IF PAVING IS NOT COMPLETE WITHIN SEVEN DAYS FOLLOWING STONE BASE APPROVAL. ADJUSTING PRODUCTS SHOULD BE INCORPORATED TO THE SOIL. LATE FEBRUARY OR EARLY MARCH. N N 6. SURFACES SHALL BE TACKED WHEN ASPHALT IS BEING PLACED OVER EXISTING ASPHALT STREETS OR ADJOINING CONCRETE, STORM 3. USE A SEEDING MIX OF NON-INVASIVE, NATIVE SPECIES THAT WILL EVENTUALLY PROVIDE A PERMANENT OO DRAIN AND SANITARY SEWER STRUCTURES. GROUNDCOVER. EROSION CONTROL/GRADING NOTES: r 7. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR 4. IMMEDIATE VEGETATIVE COVER WILL ALWAYS REQUIRE ADDITIONAL FERTILIZATION, SOIL TESTS, N INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. OVERSEEDING AND MAINTENANCE UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. 1. ON -SITE BURIAL PITS REQUIRE AN ONSITE DEMOLITION LANDFILL PERMIT FROM THE ZONING r a 8. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3600 PSI AT 28 DAYS. THE CONTRACTOR SHALL PREPARE CONCRETE ADMINISTRATOR. TEST CYLINDERS IN ACCORDANCE WITH SECTION 1000 OF THE NCDOT STANDARD SPECIFICATIONS AT THE DIRECTION OF THE PROJECT 2. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE TOWN'S EROSION W INSPECTOR. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND CYLINDER MOLDS. IT SHALL BE THE RESPONSIBILITY OF THE SEEDBED PREPARATION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. I- U CONTRACTOR TO PROTECT THE CYLINDERS UNTIL SUCH TIME AS THEY ARE TRANSPORTED FOR TESTING. AN INDEPENDENT TESTING LAB 3. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE Q Z Z SHALL PERFORM TESTING FOR PROJECTS, AT NO COST TO THE CITY/COUNTY. THE CONTRACTOR SHALL PROVIDE EQUIPMENT AND TOWN'S EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. Q Ld PERFORM TESTS ON CONCRETE FOR A MAXIMUM SLUMP AND AIR CONTENT AS DEFINED IN SECTION 1000 OF THE NCDOT STANDARD 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF 4. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 SPECIFICATIONS. THESE TESTS SHALL BE PERFORMED AT A FREQUENCY ESTABLISHED BY THE INSPECTOR. THE CONTRACTOR SHALL AVAILABLE. HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH 0 w 0 REMOVE MATERIALS FAILING TO MEET SPECIFICATIONS. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LASTIr z 9. ALL CONCRETE SHALL BE CURED WITH 100% RESIN BASE, WHITE PIGMENTED CURING COMPOUND WHICH MEETS A.S.T.M. SPECIFICATIONS 3. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE LAND DISTURBING ACTIVITY. J Q C-309, TYPE 1, APPLIED AT A UNIFORM RATE AT ONE (1) GALLON TO 400 SQUARE FEET WITHIN 24 HOURS OF PLACEMENT OF THE CONCRETE. SEED SCHEDULE). DO NOT USE LIME OR FERTILIZER ON STREAM BANKS OR IN WETLAND AREAS. MULCH 5. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH U o' 10. ALL CURB AND GUTTER SHALL BE BACKFILLED WITH SOIL APPROVED BY THE INSPECTOR WITHIN 48 HOURS AFTER CONSTRUCTION TO DOES NOT NEED TO BE USED IN WETLAND AREAS. GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST W o PREVENT EROSION. 4. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR LAND DISTURBING ACTIVITY. s 11. ALL BACKFILL SHALL BE NON -PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL OR OTHER CULTIPACK AFTER SEEDING. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE J N LU W OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND THE MATERIAL SHALL 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. OF THE TOWN OF WAXHAW ENGINEERING DEPARTMENT DIVISION. Q J ~ OZ a HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 6. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10, HIGH REQUIRE z Ir D c� 12. MATERIALS DEEMED BY THE INSPECTOR AS UNSUITABLE FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH SELECT SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL ADEQUATE TERRACING. W p N J m BACKFILL MATERIAL. LIME, FERTILIZER AND SEEDING RATES. 8. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT O 0 W Q j � Ir 13. ALL TRENCHES IN THE STREET RIGHT-OF-WAY SHALL BE BACKFILLED WITH SUITABLE MATERIAL IMMEDIATELY AFTER THE PIPE IS LAID. THE 7. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PREVIOUSLY APPROVED. 0 LU J W FILL AROUND ALL PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX (6) INCHES AND EACH LAYER SHALL BE COMPACTED PERMANENT COVER IS ESTABLISHED. 9. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT-OF-WAY MUST BE PRESENTED AT U m z m LU W a THOROUGHLY. PRE -CONSTRUCTION MEETING. � J z J 0 14. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. 10. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH THE INSPECTOR. 15. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL COMPACTION METHODS. EACH SIX (6) INCH LAYER OF 11. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD z o BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION SHALL BE OBTAINED BY CONTRACTOR FROM THE W 0 16. STRAIGHT FORMS SHALL NOT BE USED FOR FORMING CURB AND GUTTER IN CURVES. AFFECTED PROPERTY OWNERS. _ 17. ALL EXCESS CONCRETE ON THE FRONT EDGE (LIP) OF GUTTER SHALL BE REMOVED WHEN CURB AND GUTTER IS POURED WITH A MACHINE. 12. IN ORDER TO ENSURE PROPER DRAINAGE, CONTRACTOR SHALL MAINTAIN A MINIMUM OF 0.5% SLOPE ON z 1. 18. ALL SUBGRADE SHALL BE COMPACTED TO 100% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST TO A DEPTH THE CURB. O 0 OF EIGHT (8) INCHES, AND A DENSITY OF 95% STANDARD PROCTOR FOR DEPTHS GREATER THAN EIGHT (8) INCHES. THE DEVELOPER SHALL 13. PE SEALED SHOP DRAWINGS FOR RETAINING WALL MUST BE SUBMITTED TO CITY ENGINEERING PRIOR TO U U) PERFORM ALL TESTS AT NO COST TO THE CITY/COUNTY. CONSTRUCTION. ENSURE TIE BACKS ARE OUTSIDE RIGHT OF WAY OR 8' BELOW GRADE. o 19. A CANVAS COVER OR OTHER SUITABLE COVER SHALL BE REQUIRED FOR TRANSPORTING PLANT MIX ASPHALT DURING COOL WEATHER 14. THE CONTRACTOR SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED 0) WHEN THE FOLLOWING CONDITIONS ARE PRESENT: STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, O o A. AIR TEMPERATURE IS BELOW 60 DEGREES F. TRASH, JUNK AND OTHER ACCUMULATIONS. LL iLi lii _' B. LENGTH OF HAUL FROM PLANT TO JOB IS GREATER THAN FIVE (5) MILES. 15. NON-STANDARD ITEMS (IE: PAVERS, STAMPED CONCRETE, IRRIGATION SYSTEMS, ETC.) IN THE w 2 J C. OTHER OCCASIONS AT THE INSPECTOR'S DISCRETION WHEN A COMBINATION OF FACTORS INDICATES THAT MATERIAL SHOULD BE RIGHT-OF-WAY REQUIRE ARIGHT -OF -WAY ENCROACHMENT AGREEMENT WITH THE (TOWN OF WAXHAW) Z oo COVERED IN ORDER TO ASSURE PROPER PLACEMENT TEMPERATURE. BEFORE INSTALLATION. 0 0 lo 20. CONCRETE OR ASPHALT SHALL NOT BE PLACED UNTIL THE AIR TEMPERATURE MEASURED AT THE LOCATION OF THE CONCRETING 16. CONTRACTOR SHALL CONTACT INSPECTOR 48 HOURS BEFORE CONSTRUCTION. E) U Z W OPERATION IS AT 35 DEGREES F AND RISING BY 10:00 A.M. CONCRETE OR PAVING OPERATIONS SHOULD BE SUSPENDED WHEN THE AIR 17. THE LOCAL ENGINEERING DEPARTMENT HAS NOT REVIEWED AND DOES NOT ASSUME RESPONSIBILITY FOR 0 Q TEMPERATURE IS 40 DEGREES F AND DESCENDING. THE CONTRACTOR SHALL PROTECT FRESHLY PLACED CONCRETE IN ACCORDANCE THE STRUCTURAL STABILITY OF ANY EXISTING OR PROPOSED RETAINING WALLS ON THE SITE. DESIGN OF O s WITH SECTION 420 OF THE NCDOT STANDARD SPECIFICATIONS WHEN THE AIR TEMPERATURE IS AT OR BELOW 35 DEGREES F AND THE ALL RETAINING WALLS IS TO BE PER NC BUILDING CODE SECTION 1610.3. DETAILED RETAINING WALL DESIGN z CONCRETE HAS NOT OBTAINED AN AGE OF 72 HOURS. DRAWINGS, SEALED BY A NC LICENSED ENGINEER. UPON COMPLETION OF WALL, A NC LICENSED ENGINEER 0 21. THE CONTRACTOR SHALL MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR WILL SUBMIT A SEALED LETTER TO W.K. DICKSON & CO. INC. THAT RETAINING WALLS WERE CONSTRUCTED I SHALL PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAGMEN TO DIRECT TRAFFIC IN PER THE ENGINEERING DRAWINGS. Q PROJ. MGR.: WGB DESIGN BY: CJH a ACCORDANCE WITH NCDOT STANDARDS 18. CONTRACTOR SHALL NOT GRADE WITHIN THE 100 YR FEMA FLOOD LINE. m 22. THE CONTRACTOR SHALL DO THAT WHICH IS NECESSARY TO CONTROL EROSION AND TO PREVENT SEDIMENTATION DAMAGE TO ALL DRAWN BY: CJH ADJACENT PROPERTIES AND STREAMS IN ACCORDANCE WITH THE APPROPRIATE CITY/COUNTY SEDIMENT AND EROSION CONTROL PROJ. DATE: DEC. 2019 o ORDINANCE. lolo 23. 24. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. NON-STANDARD ITEMS (IE: PAVERS, STAMPED CONCRETE, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE APPROVAL FROM Wl< Q z DRAWING NUMBER: ^ ^ (V_}V{ 0 TOWN OF WAXHAW AND DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION) BEFORE _ 2 25. INSTALLATION. CONSTRUCTION SHALL BE IN STRICT COMPLIANCE WITH SPECIFICATION, CONSTRUCTION DOCUMENTS, TOWN OF WAXHAW STANDARDS, LANDEAV*R WDICI<SON CC G J . WKD PROJ. NO.: a2 NCDEQ STANDARDS, AND NCDOT STANDARDS. LLJ 20170279.00. C L a community infrastructure consultants 1= w n o. zwz EL w OJU pow ao¢ wwo oo g¢m Sao =�o w ozw F-o o. WUZ Zoo oZ ow AYE =UQ I oY� w ,00 °wa FZ¢ °a ozz o w 0 al w¢� ¢�z o�0 >o¢ 0 wi-Z w�a a =c, 0 FZw Fr °2P z°w �2P o z 8 U-O Zwo o2= Yo~ U po Y.4 �=Z oFt 000 0 =Zw oo- a�2E o 0 °ow EROSION CONTROL MAINTENANCE PLAN 1. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. 2. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. 4. ALL AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 5. STONE CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE OR SEDIMENT IS TRACKED ON TO THE PAVEMENT. THE FIRST 50' OF THE ENTRANCE ADJACENT TO THE ROAD WILL BE PERIODICALLY TOP DRESSED WITH 2 INCHES OF #4 STONE TO MAINTAIN A 6 INCH DEPTH. THE REMAINDER OF THE CONSTRUCTION ENTRANCE WILL BE CLASS A STONE. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 6. CONTRACTOR SHALL TAKE ADDITIONAL STEPS AS NEEDED TO ENSURE REESTABLISHMENT OF VEGETATION IS ACHIEVED IN WETLAND AREAS ON A CASE BY CASE BASIS. CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM TOWN OF WAXHAW. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR FROM TOWN OF WAXHAW TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION AND IS SUBJECT TO A FINE. 3. INSTALL CONSTRUCTION ENTRANCE (INCLUDING TEMPORARY CONSTRUCTION ENTRANCE CULVERT AND ASSOCIATED GRADING, SILT FENCE, AND TREE PROTECTION, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. INSTALL SEDIMENT BASINS, DIVERSION DITCHES, AND OTHER DEVICES CALLED FOR ON THE PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 5. COORDINATE WITH THE TOWN OF WAXHAW INSPECTOR TO OBTAIN APPROVAL THAT EROSION CONTROL MEASURES ARE INSTALLED CORRECTLY. WHEN APPROVED, INSPECTOR SHALL ISSUE THE GRADING PERMIT. 6. CLEAR AND GRUB SITE. 7. MAINTAIN ALL EROSION CONTROL MEASURES OUTLINED ON THE EROSION CONTROL PLANS, NOTES, AND DETAILS. 8. PROCEED WITH CONSTRUCTION. 9. ADJUST EROSION CONTROL MEASURES AS NEEDED DURING CONSTRUCTION. COORDINATE WITH TOWN OF WAXHAW INSPECTOR. 10. STABILIZATION TIME FRAMES APPLY TO ANY PERIOD OF INACTIVITY. SEE SEEDING STABILIZATION TIME FRAMES. 11. ONCE SITE IS STABILIZED, COORDINATE WITH THE TOWN OF WAXHAW INSPECTOR TO OBTAIN APPROVAL TO REMOVE EROSION CONTROL MEASURES. EROSION CONTROL NOTES: 1. ALL EROSION CONTROL MEASURES SHALL BE IN STRICT ACCORDANCE WITH LOCAL AND/OR STATE STANDARDS. 2. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE SEDIMENTATION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE CONDUCTED AT APPROPRIATE STAGES OF CONSTRUCTION. 3. THE TOTAL DENUDED AREA IS 25.58 ACRES. 4. THE TOTAL SITE ACREAGE IS 45.14 ACRES. 5. FINAL LOCATION OF SILT FENCE, DIVERSION DITCHES, ETC. SHALL BE ADJUSTED IN THE FIELD BY CONTRACTOR BASED ON SITE CONDITIONS AND INSPECTOR'S RECOMMENDATIONS. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF WAXHAW. 7. THE SITE SHALL BE GRADED DURING CONSTRUCTION TO ALLOW ALL STORM WATER TO DRAIN TO EROSION CONTROL DEVICES. 8. ALL INLETS AND CATCH BASINS SHOULD BE PROTECTED AND MAINTAINED BY SILT SACK OR EQUAL INLET PROTECTION IN ADDITION TO THE MEASURES SHOWN. 9. AN EROSION AND SEDIMENT CONTROL PLAN REQUIRED FOR ANY OFF -SITE BORROW OR WASTE AREA ASSOCIATED WITH THIS SITE WILL BE CONSIDERED THE RESPONSIBILITY OF THE PERSON(S) FINANCIALLY RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY. THE DELEGATION OF THIS RESPONSIBILITY TO THE CONTRACTOR IS CONSIDERED AN OWNER/CONTRACTOR AGREEMENT. 10. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE -CONSTRUCTION MEETING. 11. FOLLOWING EVERY RAINFALL EVENT GREATER THAN 0.5 INCHES AND EVERY (7) SEVEN DAYS, CONTRACTOR SHALL INSPECT AND REPAIR, AS NECESSARY, ALL DAMAGED EROSION CONTROL MEASURES. THIS INCLUDES BUT IS NOT LIMITED TO SILT FENCE, CONSTRUCTION ENTRANCES, SILT FENCE OUTLET DEVICES, AND INLET PROTECTION. TYPICAL MAINTENANCE INCLUDES CHECKING FOR STRUCTURAL DEFICIENCIES SUCH AS UNDERMINING AND DEBRIS BUILDUP AROUND SILT FENCE. 12. CONTRACTOR SHALL TAKE ALL PRACTICAL MEASURES TO MINIMIZE DISTURBED AREA AND TO ENSURE THAT THE DISTURBED AREAS ARE STABILIZED WITH VEGETATION AS SOON AS POSSIBLE. 13. LOCATE AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO ALTERNATIVES ARE REASONABLY AVAILABLE. 14. LOCATE EARTHEN -MATERIAL STOCK PILE AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 15. SILT FENCE SHALL BE INSTALLED AT LEAST 5 FEET OFF THE TOE OF ALL FILL SLOPES. 16. SILT FENCE SHALL BE INSTALLED AT LEAST 10 FEET OFF THE TOE OF ALL FILL SLOPES GREATER THAN 10 FEET IN HEIGHT. 17. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. 18. ADDITIONAL MEASURES MAY BE REQUIRED - THE APPLICANT IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON -SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE APPLICANT MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE. 19. NO CONCRETE WASHOUTS OR ANY SIMILAR TYPE USE MAY BE LOCATED WITH FIFTY (50') OF A CATCH BASIN, DRAINAGE INLET OR ANY OTHER SIMILAR STRUCTURE. 20. AN EROSION CONTROL INSPECTION IS REQUIRED AT THE BEGINNING AND END OF EACH PHASE OF THE EROSION CONTROL PLAN. UNTIL ONE PHASE IS INSPECTED AND PASSED ANOTHER CANNOT BEGIN. NPDES Stormwater Discharge Permit for Construction Activities (NCG01) NCDENR/Division of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS ;It - Perimeter dikes, swales, ditches, slopes 7 days None s High Quality Water (HQ" Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 flatter 14 days 7 days for than 60' in length. or slopes greater All other areas with slopes Flatter than 4:1 14 days None, except for perimeters and HQW Zones. TOWN OF WAXHAW EROSION CONTROL NOTES-- 1 . IF DISTURBING LESS THAN 1 ACRE, ADD THIS NOTE: GROUND COVER ON EXPOSED SLOPES SHALL BE APPLIED WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE APPLIED WITHIN 15 WORKING DAYS OR 60 CALENDAR DAYS, WHICHEVER IS SOONER. SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 2. IF DISTURBING 1 ACRE OR MORE, ADD THIS NOTE: AS REQUIRED BY THE NPDES GENERAL PERMIT NCG010000, ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. GROUND STABILIZATION TIMEFRAME EXEMPTIONS CAN BE FOUND IN THE NPDES GENERAL PERMIT NCGO10000 UNDER SECTION 2.B. GROUND STABILIZATION. 3. NO LAND DISTURBING ACTIVITY, EXCEPT THAT WHICH IS REQUIRED TO INSTALL EROSION CONTROL MEASURES, MAY COMMENCE PRIOR TO APPROVAL BY THE SEDIMENTATION AND EROSION CONTROL INSPECTOR. 4. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BASED UPON SPECIFIC SITE CONDITIONS. 5. CONTACT THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR, AT 704-843-2195, FOR A PRE - CONSTRUCTION MEETING PRIOR TO ANY LAND DISTURBING ACTIVITY. 6. REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AND STRUCTURES ONLY AFTER SITE IS FULLY STABILIZED AND APPROVAL HAS BEEN OBTAINED FROM THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR. 7. ALL EROSION CONTROL DESIGNS SHALL BE IN ACCORDANCE WITH THE TOWN OF WAXHAW ENGINEERING, STANDARDS AND PROCEDURES MANUAL, AND THE NCDEQ EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. 8. FOR PHASED EROSION CONTROL PLANS, THE CONTRACTOR SHALL MEET WITH THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR PRIOR TO COMMENCING EACH PHASE OF EROSION CONTROL MEASURES. 9. SITE GRADING IS TO BE COVERED UNDER THE GENERAL STORMWATER PERMIT NCG010000. ANY LAND DISTURBING ACTIVITY > 1 ACRE REQUIRES COMPLIANCE WITH ALL CONDITIONS OF THIS GENERAL PERMIT UNDER THE NPDES. ANY NONCOMPLIANCE IS A VIOLATION OF THE CLEAN WATER ACT AND MAY REQUIRE ENFORCEMENT BY TOWN OF WAXHAW. 10. CONTRACTOR IS TO KEEP STREET CLEAR OF MUD, DEBRIS AND/OR ANY OBJECTIONABLE MATERIAL WILL BE REMOVED IMMEDIATELY PER TOWN OF WAXHAW ORDINANCE. 11. THE PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF NORTH CAROLINA WHO PREPARED THE EROSION CONTROL PLAN IS SOLELY RESPONSIBLE FOR IDENTIFICATION AND LOCATION OF ALL ENVIRONMENTAL WETLANDS, PERENNIAL AND INTERMITTENT STREAMS AND BUFFERS SHOWN ON THE PLANS. 12. THE TOWN OF WAXHAW IS NOT RESPONSIBLE FOR THE ACCURACY AND ADEQUACY OF THE DESIGN, DIMENSIONS, AND ELEVATIONS, WHICH SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE. THE TOWN OF WAXHAW, THROUGH THE APPROVAL OF THIS DOCUMENT, ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS AND/OR ACCURACY OF THIS DOCUMENT. 13. SILT SACKS WILL BE PLACED IN BASINS/INLETS ALONG ROADWAYS IMMEDIATELY UPON INSTALLATION OF BASINS AND INLETS. 14. THE FINANCIALLY RESPONSIBLE PARTY/AGENT OR THE LANDOWNER/AGENT OF A LAND DISTURBING ACTIVITY, ONE ACRE IS REQUIRED TO SELF -INSPECT THE PROJECT. A SELF INSPECTION, AS WELL AS DOCUMENTATION OF A PROJECT AFTER EACH PHASE OF THE PROJECT, IS REQUIRED. SELF INSPECTION REPORTS, APPROVED PLANS AND THE EROSION CONTROL CERTIFICATE SHALL BE KEPT ON SITE AT ALL TIMES. 15. ALL EROSION CONTROLS (SLOPE DRAINS, CHECK DAMNS, SILT FENCE OUTLETS, ETC..) MUST BE INSTALLED PER PLAN OR THE APPROVAL OF THE SEDIMENTATION AND EROSION CONTROL COULD BE ADVERSELY AFFECTED. 16. SILT FENCE SHOULD BE LOCATED (10) TEN FEET FROM TOE OF SLOPE WHERE POSSIBLE. 17. STONE SILT FENCE OUTLETS SHOULD BE LOCATED ONE FOOT ABOVE LOW POINTS. 18. FABRIC MUST BE INSTALLED UNDER STONE USED IN ALL ROCK OUTFALLS, FOREBAY BERMS, EMERGENCY SPILLWAYS, ETC.. THE FABRIC MUST BE EXTENDED AROUND SIDE SLOPES OF RIP -RAP OUTFALLS EVEN IF FLARED END SECTION IS USED. 19. MATERIAL FOR BASIN BAFFLES IS TO TIE STRAIGHT INTO BANK OF BASINS AS SHOWN IN DETAILS. IF END OF BAFFLES IS TURNED DOWN TO TIE IN TO BANK THE SEDIMENTATION AND EROSION CONTROL INSPECTION COULD BE FAILED. 20. ALL EROSION CONTROLS (RISERS W/ TRASH RACKS, SKIMMERS, OUTFALLS, DITCHES, ETC...) MUST BE INSTALLED PER THE APPROVED PLAN OR THE SEDIMENTATION AND EROSION CONTROL INSPECTION COULD FAIL. IF CHANGES ARE PROPOSED THEY NEED TO BE APPROVED BY THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR. 21. EXCAVATION OF TEMPORARY BASINS THAT ARE INTENDED TO BE CONVERTED TO PERMANENT BASINS CAN BE EXCAVATED TO PERMANENT BASIN CONFIGURATION BUT THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR MUST BE NOTIFIED. 22. ALL TEMPORARY BASINS, TEMPORARY DIVERSION DITCHES, ETC... MUST BE STABILIZED PRIOR TO CALLING FOR THE SEDIMENTATION AND EROSION CONTROL INSPECTION. 23. A PRE -CONSTRUCTION MEETING MUST BE SCHEDULED 48 HOURS PRIOR TO COMMENCING ANY TYPE OF WORK ON SITE. 24. AFTER THE PRE -CONSTRUCTION MEETING IS HELD, THE AREAS THAT NEED TO BE CLEARED FOR INSTALLATION OF EROSION CONTROL CAN BE CLEARED AND GRUBBED ONLY. IF IT IS INTENDED TO CLEAR OTHER AREAS OF THE SITE AT THIS TIME THE CONTRACTOR MUST CONTACT THE TOWN OF WAXHAW SEDIMENTATION AND EROSION CONTROL INSPECTOR TO RECEIVE APPROVAL TO DO SO. IF THIS IS ALLOWED, THE TREES MAY BE REMOVED BUT THE STUMPS CANNOT BE GRUBBED (REMOVED) UNTIL THE EROSION CONTROLS HAVE BEEN INSTALLED AND RECEIVED APPROVAL DURING THE SEDIMENTATION AND EROSION CONTROL INSPECTION. 25. IF EROSION CONTROL FEATURES ARE NOT FUNCTIONING PROPERLY, TOWN OF WAXHAW EROSION CONTROL INSPECTORS HAVE THE AUTHORITY TO REQUIRE ADDITIONAL CONTROLS. 26. A 10 FOOT CLEAR ZONE FOR SILT FENCE SHOULD BE PROVIDED AT TOE OF GRADED SLOPES. IF THIS CLEARANCE IS NOT POSSIBLE, REINFORCED SILT FENCE MAY BE NECESSARY AS DIRECTED BY THE TOWN OF WAXHAW EROSION CONTROL INSPECTOR. LANDSCAPE GENERAL NOTES: 1. ALL PLANTS TO BE WELL FORMED SPECIMEN QUALITY WITH FULL, VIGOROUS GROWTH OF THE SIZE INDICATED. ALL TREES SHALL BE NURSERY GROWN AND MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI 1990, PART 1,"SHADE AND FLOWERING TREES"). MINIMUM TREE SIZE AT PLANTING IS 2" CALIPER, 8' TALL IF SINGLE STEM, MINIMUM 8' TALL AND 3 STEMS MAXIMUM IF MULTI -STEM. MULCH IS REQUIRED; STAKING/GUYING IS OPTIONAL. 2. APPLY ANTI -TRANSPARENT TO EVERGREEN STOCK AND TO ALL DECIDUOUS STOCK IN LEAF PRIOR TO DIGGING OR SHIPPING. 3. BACKFILL PLANTS WITH A PREPARED SOIL MIX OF 8 PARTS TOPSOIL, 3 PARTS MULCH, AND ONE PART WELL ROTTED MANURE. ALL STRAPPING AND TOP 2/3 OF WIRE BASKETS MUST BE CUT AWAY AND REMOVED FROM THE ROOT BALL PRIOR TO TO BACK FILLING PLANTING PIT. 4. FERTILIZE WITH 6-6-12 FERTILIZER BEFORE MULCHING AT THE FOLLOWING RATES: TREES: 1.5 POUNDS/CALIPER INCH SHRUBS: .25 POUND /FOOT OF SPREAD GROUND COVERS: 30 POUNDS/1000 SQUARE FEET 5. TREAT SOIL WITH HERBICIDE PRIOR TO PLANTING. 6. APPLY WATER AS NEEDED TO MAINTAIN HEALTHY GROWTH. CONTINUE UNTIL THE OWNER HAS ACCEPTED THE PROJECT. 7. APPLY 3" OF PINE STRAW MULCH IN ALL PLANTING BEDS AND A MIN 4' DIA. AROUND ALL NEW TREES. 8. BED LINES ARE TO BE SMOOTH FOR EASE OF MAINTENANCE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION. 10. QUANTITIES SHOWN ON THE PLANT SCHEDULE ARE FOR CONVENIENCE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTITIES AS SHOWN ON THE PLAN. 11. PLANTS ARE TO GUARANTEED ONE YEAR FROM THE DATE OF ACCEPTANCE. THE CONTRACTOR SHALL SUBMIT WRITTEN INSTRUCTIONS TO THE OWNER FOR CARE OF THE MATERIAL. THE CONTRACTOR SHALL VISIT THE SITE PERIODICALLY AND NOTIFY THE OWNER IN WRITING IF THESE INSTRUCTIONS ARE NOT BEING FOLLOWED. THE CONTRACTOR IS RESPONSIBLE FOR PLANT MATERIAL UNTIL THE OWNER HAS ACCEPTED THE PROJECT. 12. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS: REMOVE COMPACTED SOIL AND ADD 24" NEW TOPSOIL/PLANTING MIX OR UNCOMPACT AND AMEND TOP 24" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES (WITHIN ENTIRE MINIMUM AREA OF 274 SQUARE FEET PER TREE). 13. IF TREES CONFLICT WITH POWER LINES OR SIGNS, CALL TOWN OF WAXHAW AND UTILITY COMPANY TO RESOLVE BEFORE PLANTING. 14.15. MINIMUM TREE SIZE AT PLANTING IS 2-INCH CALIPER (FOR SINGLE STEM TREES). 15. ALL MULTI -STEM PLANTS MUST BE TERR FORM, MAXIMUM 3 TO 5 TRUNKS, AND MINIMUM 8 FEET TALL. 16. ALL STRAPPING AND TOP 2/3 OF WIRE BASKET MUST BE CUT AWAY AND REMOVED FROM ROOT BALL PRIOR TO BACKFILLING PLANTING PIT. REMOVE TOP 1/3 OF THE BURLAP FROM ROOT BALL. 17. LARGE MATURING TREES MAY NOT BE PLANTED WHERE DISTRIBUTION OR TRANSMISSION LINES EXIST. IF TREES CONFLICT WITH POWER LINES OR SIGNS, CALL TOWN OF WAXHAW PLANNING DEPARTMENT TO RESOLVE BEFORE PLANTING. SEE UTILITY PLANS TO KEEP STREET TREES FROM BEING PLANTED ON OR CLOSE TO PROPOSED UTILITIES. 18. STREET TREES SHALL BE PLACED 40 FEET TO 65 FEET ON CENTER 19. SMALL MATURING TREES SHALL BE LOCATED INSIDE OF RIGHT-OF-WAY PLANTING STRIP. 20. EXTERIOR PERIMETER: EXISTING TREES EIGHT (8) INCHES OR LARGER DBH AND UNDERSTORY TREES FOUR (4) INCHES OR LARGER DBH SHALL BE PRESERVED WITHIN TWENTY (20) FEET OF THE EXTERIOR PERIMETER OF ANY SUBDIVISION. 21. STREET TREES SHALL BE PLACED BETWEEN 40 FEET AND 65 FEET ON CENTER. 22. SMALL MATURING TREES SHALL BE LOCATED INSIDE THE RIGHT OF WAY IN PLANTING STRIP. 23. TREES SHALL BE SELECTED FROM THE APPROVED WAXHAW TREE SPECIES LIST AND MUST MATCH THE GENUS & SPECIES IDENTIFIED FROM THE APPROVED SMALL MATURING TREE LIST(SECTION 9.21.15), PROVIDED THAT ADDITIONAL SPECIES MAY BE USED SUBJECT TO SPECIFIC APPROVAL OF THE ADMINISTRATOR. 24. APPROVED GENUS AND SPECIES NAME SHOULD MATCH TREE SPECIES LIST. 3/4" NYLON STRAP ROOT CROWN TO BE AT FINISH GRADE 4" HIGH / 6" WIDE MAXIMUM BERM OUTSIDE OF ROOTBALL 3 - 1 "x2"x18" WOOD STAKES - WITH CENTERED 3/8" HOLE DRIVEN IN LINE WITH STRAP EQUALLY SPACED AROUND TREE REMOVE TOP 1/3 BURLAP AND ANY NAILS/PINS, ETC. REMOVE TOP 1/3 OF WIRE BASKET WHERE PRESENT RAISE PIT BOTTOM TO SET ROOT CROWN ' AT THE CORRECT HEIGHT. FIRM SOIL UNDER R007 BALL. ROOT BALL DIA. - VARIES - NtITFC- 1. REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION. 3. STAKING IS REQUIRED FOR ALL TREES IN -/ R.O.W. OR UPON REQUEST OF ARBORIST. 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN A LEGAL MANNER. 5. RESEED UNMULCHED, DISTURBED AREAS. 6" SLIP KNOT WITH STOP KNOT. 6" LARGER THAN TREE DIAMETER KEEP MULCH AWAY FROM TRUNK 1" TO 2" UNDISTURBED SOIL 12" 4" MAXIMUM LAYER OF MULCH FINISH GRADE BACKFILL AS SPECIFIED ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) CALIPER HEIGHT (RANGE) MAX. HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH 2" 12-14' 16' 24" 16" PLANTING IN STREET RIGHT-OF-WAY GENERAL NOTES: 1. TREE GRATES AND ASSOCIATED IRRIGATION SYSTEMS REQUIRED BY TOWN ARE TO COMPLY WITH THE TOWN ZONING REQUIREMENTS. ALL INSTALLATIONS OF IRRIGATION SYSTEMS WITHIN THE RIGHT-OF-WAY OF STATE MAINTAINED STREETS REQUIRE AN ENCROACHMENT AGREEMENT EXECUTED THROUGH NCDOT. TREES INSTALLED WITHIN TOWN MAINTAINED RIGHT-OF-WAY LIMITS SHALL BE PER TOWN REQUIREMENTS. TREES INSTALLED WITHIN THE RIGHT OF WAY OF STATE MAINTAINED STREETS REQUIRE A PLANTING PERMIT FROM NCDOT. NCDOT'S REVIEW AND APPROVAL PROCESS MAY INCLUDE ADDITIONAL REQUIREMENTS. 2. A DRAINAGE SYSTEM IS REQUIRED FOR ALL IRRIGATED PLANTING AREAS LOCATED ADJACENT TO STREETS. ALL IRRIGATION/DRAINAGE SYSTEMS REQUIRE AN ENCROACHMENT AGREEMENT EXECUTED BY NCDOT FOR STATE -MAINTAINED ROADS. CONTACT NCDOT FOR ADDITIONAL INFORMATION REGARDING COST, SUBMITTAL AND LIABILITY INSURANCE COVERAGE REQUIREMENTS. 3. LANDSCAPE INSPECTIONS MAY INCLUDE THE FOLLOWING: SUBDRAINAGE INSPECTION TREE PIT/WELL OR PLANTING STRIP INSPECTION SOIL MIX APPROVALS/INSPECTIONS TREE APPROVALS/INSPECTIONS TREE PLANTING INSPECTION IRRIGATION INSPECTION FINAL WALK THROUGH ALL INSPECTIONS SHALL BE PERFORMED BY TOWN AND/OR COUNTY. STREET LIGHTING NOTES: 1. ALL PUBLIC STREET, SIDEWALK, AND OTHER COMMON AREAS OR FACILITIES IN SHALL BE SUFFICIENTLY ILLUMINATED TO ENSURE THE SECURITY OF PROPERTY AND THE SAFETY OF PERSONS USING SUCH STREETS, SIDEWALK, AND OTHER COMMON AREAS OR FACILITIES. 2. STREETLIGHTS SHALL BE RATED A MINIMUM OF 9500-LUMEN, AND SHALL BE 100 WATT HIGH PRESSURE SODIUM VAPOR LOCATED AT ALL INTERSECTIONS AND MID -BLOCK LOCATIONS WITH INTERVALS NOT EXCEEDING 250 FEET. 3. ALL STREETLIGHTS SHALL BE PLACED AT LEAST TWO (2) FEET INWARD (I.E. AWAY FROM THE STREET) FROM THE SIDEWALK. 4. STREET LIGHTING, STREET SIGNS, MAILBOXES - WILL BE SIMILAR TO EXISTING MILLBRIDGE DEVELOPMENT. (SEE PRELIMINARY SUBDIVISION PLANS FOR PHASE 4) SEEDING NOTES: 1. SCARIFY SOIL TO A DEPTH OF FOUR INCHES. REMOVE ALL CLUMPS, STONES, AND FOREIGN MATERIAL. 2. APPLY LIME AT THE RATE OF 90 POUNDS PER 1000 SQUARE FEET AND 0-14-14 FERTILIZER AT THE RATE OF 6 POUNDS PER 1000 SQUARE FEET. THOROUGHLY MIX WITH SOIL. 3. RAKE LAWN SMOOTH AND INSURE POSITIVE DRAINAGE. 4. APPLY 18-5-9 TURF GRADE FERTILIZER AT THE RATE OF 6 POUNDS PER 1000 SQUARE FEET. 5. SEED SHALL BE FESCUE - REBEL APPLIED AT THE RATE OF 5 POUNDS PER 1000 SQUARE FEET OR AN APPROVED EQUAL. 6. ROLL WITH A WEIGHTED ROLLER AND MULCH WITH 75 POUNDS WHEAT STRAW PER 1000 SQUARE FEET. LANDEANI/0Wl< community infrastructure consultants 1.0 z O U U) z O U Ir O LL W U) O Z O t Q z 2 J W Ir n WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \��11111111//�� D 11111\ / PROFESSIONAL SEAL U U m p z Ir O O IM z z � U w w z � : LU O O U) U U LU Ir = _ O O O O LULU tz tz z z O O LD LD E E rn rn 0 0 w 0000 N Q N r ImIQI ° z LLI I- I- O tr _ U W o r W J N W Q J � O~ _ Ir w 0 0� N z 0 W LU J W OC 0 Inz OJ0 z LU LU J z_ 0 z Ir W _ I- O 0 rn J Q ~ z Ill 0 z LU Ir Ir � 0 PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C8.1 WKD PROJ. NO.: 20170279.00. C L o. zaw °°o w pow Qo¢ wwo oo o Sao - = w ~ w ozw -o zo. WUz Z,�o z °om wY� =UQ oY, W Q w D moo ¢ z< z om¢ z o< ozz o w 0 ¢k� w w¢� ¢3:z o�0 >o¢ 0 wFz wQ ¢�� mm� 0 C7zw Fr Qo2P z°w �2P oz. U-O zzo o2E_ YUF U po Y.Q �=z oFt 000 0 =Zw oo= a�2E 0 °ow PIPE TABLE: BMP #1 UPSTREAM NODE DOWNSTREAM NODE LENGTH (FT) CONSTRUCTED SLOPE SECTION SIZE (IN) UPSTREAM INVERT ELEVATION DOWNSTREAM INVERT ELEVATION CB-102 MH-101 146 2.27% 36 570.20 566.90 CB-103 CB-102 77 1.53% 36 571.49 570.30 CB-104 CB-103 86 1.05% 30 572.89 571.99 CB-105 CB-104 25 1.39% 24 574.73 574.39 CB-106 CB-105 96 3.87% 24 578.45 574.73 CB-107 CB-106 46 5.65% 24 581.04 578.45 CB-108 CB-107 144 6.04% 24 589.74 581.04 CB-109 CB-108 20 0.50% 18 592.31 592.21 CB-110 CB-109 62 6.66% 18 596.42 592.31 CB-111 CB-110 39 6.44% 15 599.21 596.67 CB-112 CB-103 20 2.00% 36 572.49 572.09 �c MH-101 FES-100 26 0.70% 36 562.18 562.00 MH-113 CB-112 33 4.93% 36 574.13 572.49 SB-114 MH-113 104 0.55% 36 574.90 574.33 SB-116 CB-108 52 0.50% 24 590.50 590.24 * SEE STORM DRAINAGE NOTES FOR GASKET CALL -OUT SEE C9.7 - DETAILS - BMP #1 FOR PERMANENT POOL Structure Table Structure Name Structure Details RIM = 580.439 CB-102 INV OUT = 570.204 RIM = 579.482 CB-103 INV OUT = 571.490 RIM = 580.393 CB-104 INV OUT = 572.890 RIM = 580.745 CB-105 INV OUT = 574.730 RIM = 584.454 CB-106 INV OUT = 578.450 RIM = 587.063 CB-107 INV OUT = 581.040 RIM = 596.805 CB-108 INV OUT = 589.741 RIM = 596.805 CB-109 INV OUT = 592.310 RIM = 600.934 CB-110 INV OUT = 596.420 RIM = 603.489 CB-111 INV OUT = 599.210 RIM = 579.482 CB-112 INV OUT = 572.490 FES-100 RIM = 565.417 RIM = 571.667 MH-101 INV OUT = 562.180 RIM = 582.035 MH-113 INV OUT = 574.134 RIM = 579.733 SB-114 INV OUT = 574.900 RIM = 595.500 SB-116 INV OUT = 590.500 Structure Table Structure Name Structure Details RIM = 580.819 CB - 202 INV OUT = 566.762 RIM = 578.097 CB - 203 INV OUT = 567.241 RIM = 577.445 CB - 204 INV OUT = 567.528 RIM = 578.755 CB - 206 INV OUT = 567.886 RIM = 578.454 CB - 207 INV OUT = 567.998 RIM = 578.455 CB - 208 INV OUT = 571.790 RIM = 580.458 CB - 209 INV OUT = 572.308 RIM = 582.461 CB - 210 INV OUT = 577.530 RIM = 583.860 CB - 211 INV OUT = 578.720 RIM = 587.339 CB - 212 INV OUT = 579.360 RIM = 580.821 CB - 215 INV OUT = 576.581 RIM = 583.832 CB - 218 INV OUT = 573.410 RIM = 583.833 CB - 219 INV OUT = 573.510 RIM = 580.459 CB - 220 INV OUT = 576.208 RIM = 583.868 CB - 224 INV OUT = 579.618 RIM = 587.339 CB - 225 INV OUT = 579.660 RIM = 577.445 DCB - 205 INV OUT = 567.628 RIM = 579.678 DI - 216 INV OUT = 576.740 RIM = 583.500 DI-217 INV OUT = 579.750 RIM = 577.500 DI-221 INV OUT = 573.000 PIPE TABLE: BMP #2 UPSTREAM NODE DOWNSTREAM NODE LENGTH (FT) CONSTRUCTED SLOPE SECTION SIZE (IN) UPSTREAM INVERT ELEVATION DOWNSTREAM INVERT ELEVATION CB - 202 MH - 201 145 3.81 % 36 566.76 561.21 CB - 203 CB - 202 94 0.51 % 36 567.24 566.76 CB - 204 CB - 203 59 0.48% 36 567.53 567.24 CB - 206 DCB - 205 51 0.50% 30 567.89 567.63 CB - 207 CB - 206 22 0.50% 30 568.00 567.89 CB - 208 CB - 207 54 0.57% 30 571.79 571.48 CB - 209 CB - 208 104 0.50% 30 572.31 571.79 CB - 210 CB - 209 105 1.90% 18 577.53 575.53 CB - 211 CB - 210 51 1.95% 18 578.72 577.73 CB - 212 CB - 211 88 0.50% 18 579.36 578.92 CB - 215 CB - 202 20 0.50% 15 576.58 576.48 CB - 218 CB - 206 141 0.64% 15 573.41 572.51 CB - 219 CB - 218 20 0.50% 15 573.51 573.41 CB - 220 CB - 209 20 0.50% 15 576.21 576.11 CB - 224 CB - 211 20 0.50% 15 579.62 579.52 CB - 225 CB - 212 20 0.50% 18 579.66 579.56 DCB - 205 CB - 204 20 0.50% 30 567.63 567.53 DI - 216 CB - 215 32 0.50% 15 576.74 576.58 DI - 217 DI - 216 144 2.10% 15 579.75 576.74 DI - 221 CB - 209 38 0.50% 24 573.00 572.81 DI - 222 DI - 221 159 3.15% 18 578.50 573.50 DI - 223 DI - 222 100 2.99% 15 581.75 578.75 DI - 229 CB - 225 144 1.64% 15 582.22 579.86 DI - 230 DI - 229 56 1.66% 15 585.75 584.82 DI - 231 DI - 230 156 3.85% 15 591.75 585.75 DI - 232 MH - 201 93 0.50% 15 562.50 562.03 DI - 233 DI - 232 195 0.64% 15 563.75 562.50 * MH - 201 FES - 200 27 0.50% 36 554.14 554.00 * SEE STORM DRAINAGE NOTES FOR GASKET CALL -OUT SEE C9.8 - DETAILS - BMP #2 FOR PERMANENT POOL Structure Table Structure Name Structure Details RIM = 582.498 DI - 222 INV OUT = 578.496 RIM = 585.497 DI - 223 INV OUT = 581.746 RIM = 590.030 DI - 229 INV OUT = 582.220 RIM = 589.500 DI - 230 INV OUT = 585.750 RIM = 595.500 DI-231 INV OUT = 591.750 RIM = 568.500 DI - 232 INV OUT = 562.502 RIM = 568.500 DI - 233 INV OUT = 563.750 FES - 200 RIM = 557.417 RIM = 569.722 MH-201 INV OUT = 554.138 Structure Table Structure Name Structure Details RIM = 584.146 CB-302 INV OUT = 571.470 RIM = 587.934 CB-303 INV OUT = 572.820 RIM = 595.019 CB-304 INV OUT = 584.440 RIM = 599.930 CB-305 INV OUT = 591.480 RIM = 605.120 CB-306 INV OUT = 593.100 RIM = 605.120 CB-307 INV OUT = 593.200 RIM = 601.806 CB-308 INV OUT = 593.420 RIM = 601.806 CB-309 INV OUT = 593.520 RIM = 584.136 CB-317 INV OUT = 571.820 RIM = 582.615 CB-318 INV OUT = 572.670 RIM = 582.552 CB-319 INV OUT = 572.800 RIM = 583.740 CB-320 INV OUT = 573.250 RIM = 583.592 CB-321 INV OUT = 573.480 RIM = 583.591 CB-322 INV OUT = 577.580 RIM = 582.413 CB-323 INV OUT = 578.060 RIM = 582.413 CB-324 INV OUT = 578.160 RIM = 587.902 CB-326 INV OUT = 576.870 RIM = 595.019 CB-329 INV OUT = 584.740 RIM = 592.569 CB-330 INV OUT = 584.970 RIM = 592.569 CB-331 INV OUT = 585.320 PIPE TABLE: BMP #3 UPSTREAM NODE DOWNSTREAM NODE LENGTH (FT) CONSTRUCTED SLOPE SECTION SIZE (IN) UPSTREAM INVERT ELEVATION DOWNSTREAM INVERT ELEVATION �c CB-302 MH-301 80 2.76% 24 571.47 569.27 CB-303 CB-302 90 1.28% 24 572.82 571.67 CB-304 CB-303 225 0.86% 18 584.44 582.50 CB-305 CB-304 201 3.40% 18 591.48 584.64 CB-306 CB-305 115 1.41 % 18 593.10 591.48 CB-307 CB-306 20 0.50% 18 593.20 593.10 CB-308 CB-307 43 0.51 % 18 593.42 593.20 CB-309 CB-308 20 0.50% 18 593.52 593.42 CB-317 CB-302 20 0.50% 18 571.82 571.72 CB-318 CB-317 63 0.56% 15 572.67 572.32 CB-319 CB-318 22 0.60% 15 572.80 572.67 CB-320 CB-319 97 0.47% 15 573.25 572.80 CB-321 CB-320 45 0.51 % 15 573.48 573.25 CB-322 CB-321 20 0.50% 15 577.58 577.48 CB-323 CB-322 95 0.50% 15 578.06 577.58 CB-324 CB-323 20 0.50% 15 578.16 578.06 CB-326 CB-303 20 0.50% 24 576.87 576.77 CB-329 CB-304 20 0.50% 18 584.74 584.64 CB-330 CB-329 46 0.50% 18 584.97 584.74 CB-331 CB-330 20 0.50% 15 585.32 585.22 DI-325 CB-323 50 0.57% 15 578.34 578.06 DI-327 CB-326 72 0.50% 18 577.23 576.87 DI-328 DI-327 54 0.50% 18 577.50 577.23 DI - 311 MH - 310 13 4.07% 18 578.40 577.88 DI - 312 DI - 311 140 4.07% 18 584.12 578.40 DI - 313 DI - 312 158 2.44% 18 588.17 584.32 DI - 314 DI - 313 164 2.42% 15 592.34 588.37 DI - 315 DI - 314 156 4.67% 15 599.82 592.54 DI - 316 DI - 315 126 4.31 % 15 605.47 600.02 �c MH-301 FES-300 14 0.50% 24 569.07 569.00 *MH - 310 MH-301 87 7.06% 181 575.43 569.27 * SEE STORM DRAINAGE NOTES FOR GASKET CALL -OUT SEE C9.9 - DETAILS - BMP #3 FOR PERMANENT POOL Structure Table Structure Name Structure Details RIM = 582.500 DI-325 INV OUT = 578.342 RIM = 582.500 DI-327 INV OUT = 577.230 RIM = 582.500 DI-328 INV OUT = 577.500 RIM = 583.500 DI - 311 INV OUT = 578.398 RIM = 589.500 DI - 312 INV OUT = 584.115 RIM = 593.500 DI-313 INV OUT = 588.170 RIM = 597.500 DI - 314 INV OUT = 592.340 RIM = 604.500 DI - 315 INV OUT = 599.820 RIM = 613.600 DI - 316 INV OUT = 605.470 FES-300 RIM = 571.333 RIM = 574.479 M H-301 INV OUT = 569.072 RIM = 583.765 MH - 310 INV OUT = 575.425 Structure Table Structure Name Structure Details RIM = 565.733 BMP #1 INV OUT = 561.900 RIM = 557.733 BMP #2 INV OUT = 553.900 RIM = 568.056 BMP #3 INV OUT = 565.306 FES - BMP #1 RIM = 564.344 FES - BMP #2 RIM = 556.885 FES - BMP #3 RIM = 567.333 PIPE TABLE: Outfalls UPSTREAM NODE DOWNSTREAM NODE LENGTH (FT) CONSTRUCTED SLOPE SECTION SIZE (IN) UPSTREAM INVERT ELEVATION DOWNSTREAM INVERT ELEVATION BMP #1 FES - BMP #1 194 0.50% 36 561.90 560.93 BMP #2 FES - BMP 42 74 0.58% 36 553.90 553.47 BMP #3 FES - BMP #3 1 61 1 0.50% 1 24 1 565.31 1 565.00 STORM DRAINAGE NOTES: CONTRACTOR SHALL USE THE FOLLOWING DETAILS FOR STORM STRUCTURES. ANY CHANGES SHALL BE APPROVED BY ENGINEER AND THE TOWN OF WAXHAW. DROP INLET (DI): NCDOT DETAIL #840.14 AND NCDOT #840.26 FOR PIPES 36" AND LARGER CATCH BASIN (CB): NCDOT DETAIL #840.02 DOUBLE CATCH BASIN (DCB): SEE DETAILS MANHOLE (MH): NCDOT DETIL #840.31 ALL STORM DRAINAGE PIPE IS CLASS III RCP UNLESS OTHERWISE NOTED. ALL STORM DRAINAGE PIPES ARE - 36" AND ALL STORM DRAINAGE EASEMENTS PROVIDED ARE 20' THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER CONVEYANCE. BUILDINGS ARE NOT PERMITTED IN THE EASEMENT AREA. ANY OTHER OBJECTS WHICH IMPEDE STORM WATER FLOW OR SYSTEM MAINTENANCE ARE ALSO PROHIBITED. STORM DRAINAGE PIPES SHALL NOT BE CONNECTED TO BOXES AT THE CORNERS OR AT SEVERE ANGLES *PIPE SHALL BE INSTALLED WITH PRESS -SEAL 4G NITRILE PIPE GASKETS OR OTHER APPROVED EQUAL WHERE PIPE INVERT IS BELOW PERMANENT POOL ELEVATION NOTED ON POND DETAIL SHEETS RETAINING WALL NOTES: 1, CONTRACTOR IS RESPONSIBLE FOR HAVING ALL RETAINING WALLS DESIGNED, SEALED, AND CONSTRUCTION CERTIFIED BY REGISTERED PROFESSIONAL ENGINEER LICENSED IN NORTH CAROLINA IN ACCORDANCE WITH ALL STATE AND LOCAL BUILDING CODES/ORDINACES. 2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A BUILDING PERMIT FOR RETAINING WALL PER STATE AND LOCAL BUILDING CODES. 3. CONTRACTOR AND CONTRACTOR'S REGISTERED PROFESSIONAL ENGINEER ARE RESPONSIBLE FOR PERFORMING OR CAUSING TO BE PERFORMED ANY REQUIRED TESTS, STUDIES, ANALYSIS, ETC THAT MAY BE NEEDED TO SUPPORT THE DESIGN OF THE RETAINING WALLS INCLUDING GLOBAL STABILITY ANALYSIS, TRIAXIAL SHEAR TESTS, AND OTHER TESTS, STUDIES, ANALYSIS, ETC AS MAY BE IDENTIFIED DURING THE DESIGN OF THE WALLS - MINIMUM REQUIREMENTS INCLUDE THE FOLLOWING: A C COMPONENT REINFORCED ZONE SOILS RETAINED ZONE SOILS FOUNDATION BEARING ZONE SOILS WALL DESIGN STABILITY ANALYSIS FAILURE TYPE TEST STANDARD PROCTOR ATTERBERG LIMITS GRAIN SIZE ANALYSIS TRIAXIAL SHEAR STANDARD PROCTOR ATTERBERG LIMITS GRAIN SIZE ANALYSIS TRIAXIAL SHEAR STANDARD PROCTOR ATTERBERG LIMITS GRAIN SIZE ANALYSIS TRIAXIAL SHEAR GLOBAL STABILITY SLIDING OVERTURNING ECCENTRICITY BEARING FAILURE EXCESSIVE SETTLEMENT INTERNAL STABILITY OUTSIDE INFLUENCING FORCES INCLUDED IN DESIGN OTHER INFORMATION FOR EACH COMPONENT (REINFORCED, RETAINED, AND FOUNDATIO FRICTION ANGLE (PHI) PROVIDED BY GEOTECHNICAL ENGINEER COHESION COEFFICIENT (C) PROVIDED BY GEOTECHNICAL ENGINEER SOIL UNIT WEIGHT PROVIDED BY GEOTECHNICAL ENGINEER RECOMMENDED LATERAL EARTH PRESSURE COEFFICIENTS PROVIDED BY GEOTECHNICAL ENGINEER SOIL CLASSIFICATION PROVIDED BY ENGINEER 4. CONTRACTOR IS RESPONSIBLE FOR HAVING THE REGISTERED PROFESSIONAL ENGINEER WHO DESIGNED THE RETAINING WALLS CERTIFY THAT THE RETAINING WALLS WERE BUILT AND ARE IN CONFORMANCE WITH THE RETAINING WALL DRAWINGS, THESE SPECIFIC NOTES, AND THE CONSTRUCTION DOCUMENTS. 5. CONTRACTOR AND HIS REGISTERED PROFESSIONAL ENGINEER MAY NOT EXCLUDE OR ASSIGN TO OTHERS ANY OF THE OBLIGATIONS OR ITEMS NOTED. 6. FENCING SHALL BE INSTALLED ALONG THE TOP OF RETAINING WALLS. FENCE TYPE, LENGTH, AND HEIGHT SHALL BE PER THE DEVELOPER'S SPECIFICATIONS. ALL RETAINING WALL DESIGNS SHALL BE SUBMITTED AND APPROVED THROUGH THE TOWN OF WAXHAW PRIOR TO ANY CONSTRUCTION. 1w,momwi< LANDEAVOR WDICI<SON community infrastructure consultants 1.0 z O U U) z O U Ir O LL LU U) O z O 0 Q z_ 2 J LU Ir WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 0 S 0/ �O PROFESSIONAL SEAL U U m p z Ir O O CE z z � U LU w z � : LU O O U) U U W Ir 0 0 O O Ir w 0- 0- z z O O L L E E rn rn 0 0 w 0000 N Q o r r ImIQI z C) LLI I- I- 0 _ U W o r W J N W Q J � 0 w 0 00 Ir u) N z fp W LUJ � W Ir In z OJ0 z LU LU J z_ 0 z 0= W _ I- O 0 rn li.i li.i J Q ~ z U z LU Ir Ir � p PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C8.2 WKD PROJ. NO.: 20170279.00. C L I 0. WW aw z °oo w pow ao¢ w ww o 2E � U= o¢m Sao =�o ~ w ozw -o zo. wUz " o oz ow wY� =UQ oY� w�4 o o m ¢ zz< oQw "o< o ozz o w (D mF A, ¢�z D w� woo 0 w F_z w 2 Q .FF =a: 0 0zw Qo2P zmz oz� U-o zwo ow= YUF U poo Y 4 �=z o 1r 00¢ 0 =Zw oo= F a� ow¢UD BEGIN TRANSITION AT AT END OF RADIUS SEE STD. NO. 121.' ARIES FOR MORE DETAIL 2'-0" VALLEY GUTTER i p EXPANSION JOINT 6 z o;n STEEL HOOD CATCH BASIN 3'-0" z F Gm N EXPANSION JOINT 2'-0" VALLEY GUTTER NOTE: 1. WHERE 2'-6" CURB AND GUTTER IS USED, CATCH BASINS MAY BE LOCATED AT END OF RADIUS. 2. RADIUS AT INTERSECTION MAY VARY. �I��il�i►��7_1�� TOWN OF WAXHAW CATCH BASIN PLACEMENT AT INTERSECTIONS LAND DEVELOPMENT STANDARDS 122.1 z 3 in 4'-0" MIN. BACK OF WALK EE NOTE'1 EXP. JOINT Q I < EXP. JOINT SIDEWALK �_ t FRONT OF WALK BACK OF GUTTER PLANTING STRIP - +_+ + + + GUTTER LIP NOTES: 1. IF TURNING SPACE IS CONTINUE JOINT AT 4'-0" MIN. CONFINED BY CURB OR BACK OF GUTTER Fl OWLJNE VERTICAL SURFACE AT VARI VARIES BACK OF THE TURNING TRUNCATED DOMES SPACE, THE MINIMUM PLAN VIEW -PARALLEL PER STD. NO. 132.1 WIDTH MUST INCREASE TO 5'-0" MIN. RAMP WITH PLANTING STRIP 2. ENSURE FLUSH CONDITIONS AT CURB RAMP TO GUTTER TRANSITION. PLANTING STRIPW CONTINUE JOINT AT BACK OF GUTTER BACK OF WALK FRONT OF WALK r BACK OF GUTTER currER UP FLOWUNE TRUNCATED DOMES PER STD. NO. 132.1 SLOPE "A' 1.5% (2.00R MAX) SLOPE "B" 7.5X (8.33X MAX) SLOPE "C" 1OX MAX PLAN VIEW -DIAGONAL RAMP WITH PLANTING STRIP NOT TO SCALE TOWN OF WAXHAW ACCESSIBLE RAMP STANDARD LAND DEVELOPMENT STANDARDS 2'-0" VALLEY GUTTER 127.1 NOTES: 0M4-3 1. WHEN A DEAD-END OR STUBBED STREET REQUIRES A GUARDRAIL SECTION, END -OF -ROADWAY MARKER SIGNS 0) (OM4-3. 24"x24 SOLID RED) SHALL BE PROVIDED. I PAVEMENT PROPERTY 2. SIGNS ARE TO BE PLACED BEHIND THE BARRICADE (SEE LINE DETAILS 706.1), EVENLY SPACED WITH ONE SIGN PLACED AT THE CENTERLINE LOCATION AND ADDITIONAL SIGNS AT 6' O.C. BEET BARRICADE (MINIMUM OF 3 SIGNS, MAXIMUM OF 5 SIGNS). 3. WHEN BARRICADE IS USED ON A STREET STUB, THE SIGN AT THE CENTERUNE SHALL BE SUPPLEMENTED WITH A STREET 3' END ROAD FILL CONNECTIVITY SIGN. SEE DETAIL 708.1 SIGN LOCATION DETAIL 4. ALL SIGNS/MARKERS SHALL MEET OR EXCEED MUTCD STANDARDS FOR RETROREFLECTIVITY. CROSS SECTION OF POST (2 LB./FT.) CONNECTIVII SEE NI TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS CONNECTVITY cRoss o SEE NOTE SECTION OF POST (14 GAUGE) BASE (SLEEVE) END OF ROADWAY MARKER NOT TO SCALE 705.1 10'-0" MAX. • 3'-6" MIN. 10'-0" MAX. ■ V-6" MIN. PLAN *ALL CATCH BASIN FRAME TRANSITIONS SHALL BE 3'-6"* NOTE: * TRANSITION FROM 2'-6" STANDARD CURB TO VALLEY CURB AT A DRAINAGE INLET ONLY. SEE STANDARD 104.1 FOR CROSS SECTION GEOMETRY. =� TOWN OF WAXHAW CATCH BASIN FRAME LAND DEVELOPMENT STANDARDS IN VALLEY GUTTER `-� JOINT SEALER -N j 1/8" RADIUS (TYPICAL) NOT TO SCALE ee 4 •. JOINT FILLER TRANSVERSE EXPANSION JOINT NOTES: 1. CONTRACTION JOINTS SHALL BE SPACED AT 10-FOOT INTERVALS. FOR VALLEY GUTTER, A 10-FOOT SPACING MAY BE USED WHEN A MACHINE IS USED, JOINT SPACING MAY BE ALTERED BY THE TOWN ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1/2" SHALL BE OBTAINED. 3. ALL EXPANSION JOINTS SHALL BE SPACED AT 90-FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. JOINTS SHALL MATCH LOCATIONS WITH JOINTS IN ABUTTING SIDEWALK. 4. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 P.S.I. IN 28 DAYS. 5. CURB SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS. 6, TOP 6" OF SUBGRADE BENEATH THE CURB AND GUTTER SHALL BE COMPACTED TO 100% STANDARD PROCTOR DENSITY. 7. SEE ALSO 106.1 121.1 NOT TO SCALE TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TRANSVERSE EXPANSION JOINT STD. No. REV. 102.1 GENERAL NOTES: 1. A GROOVE JOINT 1" DEEP WITH 1/8" RADII SHALL BE REQUIRED IN THE CONCRETE '"•i •• SIDEWALK AT 5' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 45' INTERVALS NOT TO EXCEED 50' AND MATCHING EXPANSION/CONSTRUCTION JOINT IN ADJACENT CURB. A SEALED 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE 4• $ `.. ,`. ': �.' SIDEWALK JOINS ANY RIGID STRUCTURE. p. Q.+ 2. SIDEWALK AT DRIVEWAY ENTRANCES TO BE 6" THICK. ` 3. WIDTH OF SIDEWALK ON THOROUGHFARE STREETS SHALL BE A MINIMUM OF 6'. WIDTH OF SIDEWALKS IN THE CERTAIN DISTRICTS WILL BE DETERMINED BY THE DEVELOPMENT a p' �: ° '� • SERVICES. 4. WIDTH OF SIDEWALKS ON NON -THOROUGHFARE STREETS SHALL BE BASED ON TYPICAL STREET SECTION, A MINIMUM OF 5'. SIDEWALK TO BE POURED TO END OF RADIUS AT GROOVE JOINT N SIDEWALK INTERSECTING STREETS. 5. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 PSI. IN 28 DAYS. 6. ZONING CONDITIONS MAY REQUIRE ADDITIONAL WIDTH SIDEWALKS WHICH SHALL SUPERSEDE THESE STANDARD DIMENSIONS SHOWN. 7. LIDS FOR JUNCTION BOXES AND UTILITY VAULTS SHALL BE NON-SKID AS SPECIFIED BY ENGINEER. 1/8" RADIUS 8. JOINT MATERIALS SHALL LIMIT SHRINK/SWELL SO POST CONSTRUCTION INSTALLATION RESULTS IN A MAXIMUM OF 1/4" FROM FLUSH. 9 SEE ALSO 1021 4. 1/13" TO 1/4" T °' 4" °- ` 4 1/2 EXPANSION JOINT d. •a..° " LLI II JOINT FILLER o 1.50% (2.00% MAX.) 1/2" u7 JOINT IN SIDEWALK TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS EXAMPLE SIDEWALK CONSTRUCTION DIMENSIONS: WIDTH RISE CROSS -SLOPE 1.56% 4' 5' 1 , 1.67% 6' 1.56% 8' 1-4" 1.56% PROPOSED CURB & GUTTER PROPOSED 4" CONCRETE SIDEWALK DETAILS SHOWING EXPANSION JOINTS IN CONCRETE SIDEWALK CONCRETE SIDEWALKS NOT TO SCALE 106.1 0 4Know what's below. Call before you dig. n NOTE: 'fELLON OF THE RAMP FLOOR AS SHOWN ON NHL DETAILS RAMP WDTH AREA IS VARIABLE iR BASF GIAMF'FR. TO 1.40" R Q O @ O Q ° AM T R F N THAN 50% TO NO MARE � 0o � '�.:J @O' g THAN FS$ OF THE BASE DIAMETER oaaoc�a CONCRETE PAL) FOR MQUNTING IN A 1W+MX8) 0' -D •"7 O.0' 76.5 *r8' 0 0' 8' 6.5••' 7' '2.5' 84.51'5' -3 0' 8 4-05' 15, 9' 4.1'5,.4.5' 16' 3.4' 15 10.8' 8.8' 3.I' B " DISTANCE FROM FRONT EOOE C< S:OEWALd ' • To BACK FRINT OF 17:1 (8.33%* SI DRAT. ' BACK OF SIDEWALK DROP REQUIRED FCR ALL SIB=WALK SLOES. DETECTABLE WARNING DOMES SIDEWALK SLOPES 6.04- RE REQUIRED FOR SECTION B • B CURB RAMP FOR CLUSTER BOX UNIT(S) N.T.S. NOT TO SCALE TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS CURB RAMP FOR CLUSTER B 0 X UNITS - �9NO 0.65" (1.6" TO 2.4") O N (1.6" TO 2.4") 4'-0" MIN. WIDTH COVERED WITH DETECTABLE WARNING MAT t'0 00 /`-,� (MATCH WIDTH OF RAMP) �J OJ TRUNCATED DOME PLAN VIEW NOTES: 1. ALL DETECTABLE WARNING DEVICES USED IN NEW CONSTRUCTION SHALL BE OF A RIDGID PRECAST OR TRUNCATED DOME SPACING EMBEDDED PRODUCT APPROVED BY THE TOWN ENGINEER. RETRO FIT MATS WILL ONLY BE ALLOWEED ON EXISTING RAMPS WITH PRIOR APPROVAL OF THE TOWN ENGINEER FOR MATERIAL TYPE AND INSTALLATION (IE. RESURFACING). 2. RAMP AND DETECTABLE WARNING AREA SHALL BE A MINIMUM OF 4 FEET IN WIDTH, BUT NOT BE LESS THAN THE WIDTH OF SIDEWALK LEADING TO BACK OF RAMP. 3. DETECTABLE WARNING SURFACES SHALL EXTEND 2.0 FT MINIMUM IN THE DIRECTION OF PEDESTRIAN 50%-65% OF BASE DIAMETER TRAVEL. 4, DETECTABLE WARNING AREA CAN BE SQUARE WHERE USED IN A CURB RADIUS. 5, THE ROWS OF TRUNCATED DOMES IN DETECTABLE WARNING SURFACES SHOULD BE ALIGNED 0 2" PERPENDICULAR TO THE GRADE BREAK BETWEEN THE RAMP RUN AND THE STREET. WHERE DETECTABLE WARNING SURFACES ARE PROVIDED ON A SURFACE WITH A SLOPE THAT IS LESS THAN 5 PERCENT, DOME ORIENTATION IS LESS CRITICAL. 6. DECTECTABLE WARNING AREA SHALL BE COLORED BLACK IN ALL LOCATIONS. 0 9"-1 4" 7, IF PAVERS ARE TO BE USED, PAVERS SHALL BE 6" THICK AND CAST FROM 5000 psi CONCRETE. 8, MATS ARE TO BE RIGIDWITHTURNDOWN EDGES EMBEDDED IN CONCRETE TO ELIMINATE TRIP HAZARD. TRUNCATED DOME SECTION 9, DIMENSIONS PER N 480 NOT TO SCALE TOWN OF WAXHAW TRUNCATED DOMES LAND DEVELOPMENT STANDARDS 1 /2- 1'-6" MEDIAN CURB AND GUTTER TO BE USED IN MEDIANS WHEN LANES ARE SLOPED FROM ISLAND OR AS SPECIFIED 13Y THE DEVELOPMENT SERVICES DEPARTMENT. PLAN AND CROSS-SECTION STD. N0. REV. 132.1 J 25" RADIUS B 1 2' ',. • .." "B" RADIUS �� ��• ,I 3�.yy.•S� A ..S t 1 3" RADIUS .4 : . '4 RADIUS 1/B' RADIUS �a a' R4 ADIUS -1 8 RADIUS a 1'-6" MOUNTABLE CURB AND GUTTER TO BE USED IN MEDIANS ONLY: WHEN SPECIFIED BY . 1 3/4" RADIUS THE DEVELOPMENT SERVICES DEPARTMENT. L 4 A.A. • I TOWN OF WAXHAW DEVELOPMENT STANDARDS CURB AND G U TT E R LANDEA NOT TO SCALEI 101.1 V*R WDICI<SON community infrastructure consultants T 0 N 0o T N W Q 0 O J DWK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 0 -��'OFES�l0'�i/� ©NI G 11io�\\\/�j� U U m � 0 Z O 0- LU Z w Z w U � z � O : O o U) W U U 0 0 �: O �: O w o_ w o_ Z O_ Z O_ w W O Do O N w H N � ImIQI ° O CV LU H- LU cy) 07 I- T LU 000No JJN W W Q -COU 2 LL�0LU (n LU0>ZLU 0 LL < a: V) cr O J I < r J U W O 0 O 6 i LLi Z U Z w � � o PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.0 WKD PROJ. NO.: 20170279.00. C L W o. zaw z °°o w ,z Qo¢ wwo om U=> o'. Sao =�o � w ozw �-o zo. IUz Z,�o z °om wY� =UQ oY, w�Q DLL ¢oo zwa om¢ z o< ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 1Fz w�Q ¢�Im_ =a� 0 0Fr zw Qom zmz �2P oz. U-O zzo o2_ YU~ U po Y.Q �=Z �(D oo¢ 0 =Zw oo= a�2E Ow¢ UD 0 0 GENERAL NOTES: ALTERNATE WALL 1. SEE NCDOT STANDARD 840.01 FOR DETAILS BASED ON PIPE SIZE PER CROSS SECTION. CONFIGURATION 2. CONSTRUCT TWO SINGLE BASINS PER NCDOT STANDARD WITH DOUBLE INTERIOR WALL 3. ALL CONCRETE TO BE 3600 P.S.I COMPRESSIVE STRENGTH. SLAB TO BE MONOLITHIC 4. BASE SLAB SHALL BE MONOLITHIC. AN D REINFOO RCINGTO BE W 5. SEE STANDARDS 121.1 AND 122.1 FOR PLACEMENT OF CATCH BASIN. CONTINUOUS ri o ----- ------ ------ 6. PIPE SECTION D2 CONNECTING CATCH BASINS SHALL HAVE A MINIMUM DIAMETER SAME AS OF z OUTLET PIPE D3. I- - ~ 7. ALL REINFORCING STEEL SHOWN ON NCDOT STANDARDS IS TO BE PROVIDED AS CONTINUOUS } 1 J-J MEMBERS. (NO LAPS, USED AS A SINGLE CONTINUOUS BAR IN THE SLAB) J-J � C - � B. WEEP HOLES SHALL BE PLACED IN BACK WALL WITH FILTER FABRIC OR STONE ON BACK SIDEt�770 T PLAN Y � Y PLAN INLET OUTLET 3' 1 SLOpF ' � �o a 3- 14 BARS PLAN 1� ° ao 3- #4 BARS SECTION 1'-6' � SEE STD. 306.1 AND 3b8.1 16' 8' 8" ' IN LOPS OUTLET I = INLET �4 � SLOPE " o SECTION J-J 30" TO 36" PIPE _..IT! E ITS z SECTION Y-Y 15" to 24" ~ ~' END VIEW NOT TO SCALE TOWN OF WAXHAW BRICK DOUBLE CATCH BASIN TOWN OF WAXHAW .� LAND DEVELOPMENT STANDARDS LAND DEVELOPMENT STANDARDS IV 15" THRU 36" PIPE 303.1 ' 1/2" RADIUS �6" 2'-0 3" RADIUS 4. 2'-6" STANDARD 2'-6" CURB AND GUTTER �6. V-6„ 11 3" RADIUS 44 .o � d fD 4 AO e. n 2'-0" STANDARD CURB & GUTTER TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS 1/2" RADIUS �6 1'-0" 1/8' RADIUS I 3" RADIUS .d d' e 1/8" RADIUS N 4 A c} \ pa m �V-6 1'-6" STANDARD CURB AND GUTTER f 6" 1 -6 3" RADIUS <�4 4 02 FT/FT m d �. d . A Arr °. .03 FT/FT z'-0" SLOPE FOR VARIABLE SUPERELEVATION RATES STANDARD CURB AND GUTTER NOTES: 1, A STABILIZED ENTRANCE PAD OF #5 WASHED STONE AND RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 515.1 6. THE TOWN MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 108.1 & 109.1) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. EXISTING GROUND SOIL STABILIZATION FABRIC UNDER #5 WASHED STONE z m .03 FTlF-I.�. NOT TO SCALE PUBLIC STREET F- LU Ld Of I - In U J M O_ 100.1 36" MIN. SPACING TYP.* TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TABLE OF DIMENSIONS D T A B C E L WT. 12" 2-1/4' 4" 2'-0" 4'-1" 2'-0" 6'-1" 730 15' 2-1/4" 6" 2'-3" V-10" 2'-0' W-1" 730 18" 2-1/2' 9' 2'-3" 3'-10' 3'-0" W-l" 1190 24' 3' 10' 3'-6' T-6" 4'-0' 6'-2' 1770 30" 3-1/2' V-0" 4'-8" V-8' 5'-0" 6'-2" 2380 36" 4" 1'-3" 5'-3" 2'-11' 6'-0" 8'-2" 5320 42" 4-1/2' V-9" 5'-3" 2'-11' W-B" 8'-2" 5920 48' 5' 2'-0" 6'-0" 2'-2" 7'-0' 8'-2' 7470 54" 5-1/2- 2'-3" 5'-6' 2'-10' 7'-6" 8'-4' Bela W. 6' 2'-6' 5'-0' W-3" 8'-0' 8'-3' 11180 66' 6-1/2- 3'-0- 6'-0- 2'-3' 8'-6' 8'-3' 12530 3'-0- W-6' 1'-9" 9'-0' 8'-3' 13980 GENERAL NOTES: 1. SEE FORMER NCDOT STANDARD 310.01 FOR DETAILS. 2. REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF REINFORCED CONCRETE PIPE OF LIKE DIAMETER PER AASHTO M170, TABLE 2. WALL B. 3. ALL CONCRETE TO BE 3600 P.S.I COMPRESSIVE STRENGTH. 4. PROVIDE TONGUE OR SPIGOT JOINT AT INLET END SECTION. 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 8. THE DIMENSIONS FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE TABLE. MINOR VARIATIONS WILL BE PERMUTED BASED ON THE MANUFACTURER'S STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USED IN NCDOT MAINTAINED RIGHT OF WAY. FLARED END SECTION 12" THRU 72" PIPE 12" MIN. SPACING TYP.* � t i C � t �I z 6„ OVERLAP IN SLICE WATER TABLE NOT TO SCALE 307.1 KEY/ANCHOR MATERIAL AT TOP OF SLOPE. GENERAL NOTES: 1. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. ❑O NOT STRETCH. 2. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE M ET. 3. SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 4. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. NON -WOVEN GEOTEXTILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING D ETAI L 1. 10' X 70' AND 35' X 35' SIGHT TRIANGLES SHALL BE PROVIDED ON BOTH SIDES OF THE CONNECTING ROAD WHEN A MAIN ENTRANCE ROAD FOR A SUBDIVISION IS CONNECTED TO AN EXISTING ROAD IN ACCORDANCE WITH (A). THESE DIMENSION SHALL BE MEASURED FROM THE POINT OF INTERSECTION OF THE TWO RIGHT-OF-WAY LINES LONGITUDINALLY ALONG THE RIGHT-OF-WAY LINES 2. 15' X 15' SIGHT TRIANGLES SHALL BE PROVIDED ON ALL CORNERS OF AN INTERSECTION FOR ALL INTERIOR SUBDIVISION STREETS IN i VARIES ACCORDANCE WITH (B). THESE DIMENSION SHALL BE MEASURED FROM io ip THE POINT OF INTERSECTION OF THE TWO RIGHT-OF-WAY LINES I I w LONGITUDINALLY ALONG THE RIGHT-OF-WAY LINES VARIES 3. NO TREES, PLANTS, SHRUBS OVER 2'6" HEIGHT IN SIGHT TRIANGLE, (AZ_j�� �S�B) rNo1,MAAN/� ��� C q�n• R/W. 10'X70' -------- EOP-------------- R/W POINT OF INTERSECTION ---------------------------------------------------------------EOP------ R/W NOT TO SCALE 525.1 NOT TO SCALE NOT TO SCALE TOWN OF WAXHAW TOWN OF WAXHAW REV. DATE L0AND DEVELOPMENT STANDARDS STABILIZED CONSTRUCTION ENTRANCE LAND DEVELOPMENT STANDARDS TYPICAL SIGHT TRIANGLES 514.1 STD. NO. s 726.1 ' ;Wl< / W� Know what's below. R DICI<SON Call before you dig. community infrastructure consultants 1.0 T 0 N \ 00 T N T w Q 0 O J z 0 U I..L VJ z 0 U IIr 0 LL �W V i 0 z 0 I Q z 2 J W rr 'DWK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \��11111111///e ��o.OFESS'/®.�/�J 5.4 / Ede •.• `.. NE PROFESSIONAL SEAL U U m Z Ir 0 O CE z z C15 U LU LU LU O :E : 0 0 LU Ir O O O O I- IIr Ir __ LU 0- 0 0 LD LD O O LlJ 0000 N Q r r � Oz C T C\I LU H LU c) N Cl) I- Cl) J i N W LLJ a_ I CO Z ''_^^ LLJv) LU 0 0 Z LU Ir wper_j J m Z LU Ir Q __J W� U 0 O rn W LLI J Q ~ z U Z W Ir Ir 0_ 0 PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.1 WKD PROJ. NO.: 20170279.00. C L O. zaw z - FOO oJU ozw ao¢ wwo 2E� ,m< o = w o¢m �a0 =�o ~ w ozw zw,�o -o o� U Z °zOm wY� em=UQ s= OY� m§w ¢op zwa OZ¢ FOQ ozz Ow 7 a , w¢� ¢5Z ono w,¢ O wFz w�a ¢FF mm 0 0Fr zw QO2P F zOw �2P oz. U-O zzo o�= 6 U p00 YU4 =z oFt 00¢ =Z 0 w O'OF a�2E 0 °mLL NOTES: POST CONSTRUCTION 1. 4-6 INCH LAYER OF AMENDED CONTROLS EASEMENT (PCCE) OUTLET STRUCTURE WITH TRASH RACK. 6" MIN. FREEBOARD FROM TEMP. POOL ELEV. LITTORAL SHELF W/ WETLAND SIGN STREET NAME SIGN POST SQUARE -FIT SLEEVE POST INSTALLATION DICKSON SOIL IS RECCOMMENDED ON LITTORAL SHELF AREA WHERE PLANTINGS, 10' MIN. WIDTH (14 GAUGE) (12 GAUGE) communit infrastructure consultants PLANTINGS ARE REQUIRED SEE ; - ( ^� 4 j SOIL PARAMETERS IN BMP '� Y N, " •�., ALL BERM SLOPES TO BE DESIGN MANUAL) �' b'tS�°',', r� i e �: • , STABILIZED WITH GRASS. 2. PROVIDE 20 ACCESS EASEMENT "^•';t, a'FsL'�r�'_,ynY •r. •,• .,.�'=" '�,.,..•° .�z� tt� ' r,•.. + +?� TO CONNECT WETPOND ,E ~ y, � � �y"i-4�nA4-� - r,„'` �'_ +: N r'�' - # f� INVERTED WATER QUALITY ORIFICE LOCATED THIS SIDE (SEE DETAIL) 6" FREEBOARD 50 YEAR EVENT EMERGENCY WEIR STORMWATER STORAGE IF USED ■ a ■ ■ ■ o M a, C4 N 1213 W. MOREHEAD STREET SUITE 3 C CHARLOTTE, NC 28208 EASEMENT TO DEDICATED RIGHT i ;, _� "', = �` ' %-�� ' + 3:1 SLOPE OF WAY. ACCESS ROAD SHALL "1;3;,ra �•;; ;,_ s,;, s 2.1 SLOPE '?,_;4' ', ' ;_ 1+'' = 6" MIN. FREEBOAR N N o t 704 334 0078 (17(704) 334-5348 HAVE MIN. 12' STABILIZED ra 1• ,n•, k �,- t. ' `'��' „s �. .,. , �� .- t�'. .�. : �'' :.� WIDTH MAX. LONG. GRADE OF '_" ,- ' * } 15%, MAX. CROSS -SLOPE 5%. �' ' y>,., '.iw + t� 'y ' ','," TEMPORARY POOL QF. O �/ �� �� (THICKNESS) IL Lu n':,1i -'"" F 4 4k• ' _��;,_ # . -, . * #'„ *' - - - - PERMANENT POOL 6„ �. EMBANKMENT WWW.WKDICKSON.COM NC LICENSE NO F 0374 !'-RISER . Eo o PERMANENT PDOL'ELEY.' W .HOOD - o _ SEDIMENT ::.R/Tf2ASEf'..:.. +� yz1 OUTFACE EBAY . w RACK x ;w PROTECTION = 10y S�Op MAIN POND �pQ� 10'-0" COLLARANTI-SEEP O O KEY TO FASTENERS: O O REL 3;;';a=, ac x: - ' " �Ts• 10-24 x" HEX HEAD MACHINE. ZINC- DEAD END O O 10-24 FLANGE NUT, ZINC- DEAD END :,; t *. < - RIP RAP INLETLl " ' * fir: p PROTECTION _ r* `SLifPE OR INLET PIPE ` , ,?:� BACK OF OUTLET STRUCTURE 00 " #16 X 3" CARRIAGE BOLT, ZINC o O © " O O \��\ C ��� �� .. ...10�'/ �� O.•' [S �i �jY , , MAINTENANCE DRAIN A'CC ANC x f.••-,, VALVE IN BERM' S s } # *# ( ) LOCATED AT TOE OF 10:1 SLOPE ANTI -FLOTATION PAD DUCTILE IRON MAINTENANCE #15 HEX NUT, STEEL ® X 2-' CORNER BOLT (BREAKAWAY), ZINC O o O / .. S' ,.. v '�" Ot� DRAIN PIPE WITH SLUICE GATE OR VALVE. (OFFLINE FROM OUTLET AND LOCATE ,16 �; O O_ O 1�" i�16 HEX NUT, STEEL O O O O �i .=E -' VALVE IN BERM 0.5% SLOPE ) o MIN. o o C NOTES: B mPa �.1 W /iVla POND PROFILE o ' STRUCTURE o G. POND MAINTENANCE INFORMATION � = %v, ;, _ MERGENCY SPILLWAY MUST BE POSTED AT SITE v':;;;_ MUST BE LINED AND STABILIZED 1. POST SHALL BE 14-GAUGE GALVANIZED 2" OVERLAP STEEL, QUIK-PUNCH, HOLES, 1" ON (10' MINIMUM LENGTH) ` OPTIONAL: OUTLET STRUCTURE PERMANENT POOL 1#" O CENTER, ALIGNED ON ALL SIDES, AND 2" // / 100 MAY BE DESIGNED AS 50 YEAR 20' ACCESS OVERFLOW IN LIEU OF EMERGENCY - SQUARE, 10 FEET IN LENGTH. / O O A �\/\ O O \ PROFESSIONAL SEAL EASEMENT TO PUBLIC SPILLWAY. 2. THE SLEEVE SHALL BE 12-GAUGE \ R/W, (TYP) 1'-O" GALVANIZED STEEL:. 1&" HOLES, 1" ON (TYP-) EMBED 28" O O CENTER, ALIGNED ON ALL SIDES. AND 2.25' O O SQUARE, 30" IN LENGTH. % O O WETLAND PLANTING ON 10 FOOT 10:1 LITTORAL "QUIK O O O SQUARE -FIT U U m PLAN VIEW SHELF AROUND PERIMETER WATER QUALITY ORIFICE 3. ALL STREET NAME SIGNS ARE SUBJECT TO PUNCH" O o SLEEVE THE APPROVAL OF THE TOWN MANAGER AND HOLES WATER QUALITY ORIFICE DETAIL TOWN ENGINEER. NOT TO SCALE NOT TO SCALE NOT TO SCALE TOWN OF WAXHAW W ET P O N D PLAN TOWN OF WAXHAWW ET P O N D LAND DEVELOPMENT STANDARDS STD. No. REV. LAND DEVELOPMENT STANDARDS LITTORAL SHELF AND BERM DETAIL STD. NO. - TOWN OF WAXHAW I REV. LAND DEVELOPMENT STANDARDS N 0 N THOROUGHFARE STREET NAME S I G N 405.1 408.1>_ 702.1 ZONE6 µ INTERSECTION with ZONE 5 INTERSECTION with CURB and GUTTER ZONE 4 SIDEWALK, CURB, and GUTTER OUTLET STRUCTURE WITH POST CONSTRUCTION TRASH RACK. 6" MIN. CONTROLS EASEMENT FREEBOARD FROM TEMP. t ZONE 2 ` � .r .r;. �':•�, - ++" i 1 NOTES: _ �" .. `-'k ,fit �.�- :. 3: NO TREES ON EMBANKMENT STREET NAME SIGN STREET R/W NAME SIGN ,-0" STANDARD 0 0 POOL ELEV. LITTORAL SHELF 10' OFFSET FROM RIP RAP BERM AND W/ WETLAND SLOPE BREAK WEIR CLASS B RIP c-� . ....-'.,4.- ,.. a ONE 1 ' , I '..' 1. PLANTINGS ZONES AND PLANT SELECTION 'ZOl\E;1 `: L�_ CURB dt GUTTER STOP SIGN O � C) RAP 15" MIN. DEPTH. INVERTED WATER PLANTINGS - 50 YEAR EVENT QUALITY ORIFICE 10' MIN: STORMWATER STORAGE WIDTH r" .. ,. PER THE NCDEQ STORMWATER BMP MANUAL, �� - --�__ 3 ; .' :,.; ..� : 's 2 CHAPTER 6 & APPENDICES. ■ + STOP SIGN R/W cr W Ir Z Z � LOCATED THIS SIDE 6" FREEBOARD EMERGENCY WEIR , _-;-',--.cEDGE 2•-6" STANDARD OF SIGN SET CURB AND GUTTER0 W W W ��EM USED J 2. ALL PLANTINGS SHALL BE LOCAL NATIVE ,. • .:...r,«`•�'* `' 2' MIN. FROM FACE 4' MIN. (TYP) MINOR VALLEY o 'oo O 0 0 - --- --- F - 6" MIN- FREEBOARD EMBANKMENT F.E.S. OR TEMPORARY P0� OL� Q POST CONSTRUCTION HEADWALL c}� CONTROLS EASEMENT - - - - - - - � - - 1' -0' 6^ '. 10' OFFSET FROM PERMANENT POOL 'S• SLOPE BREAK �.. SPECIES. �' �..` �,.� 3. IRRIGATION MAY BE PROVIDED FOR INITIAL •' � �� � ESTABLISHMENT AND DRY SEASONS. �..� OF CURB (TYP) STREET GUTTER MINOR STOP SIGN NAME SIGN H R + U U W Q Q � SLOP ANTIL SEEP �� i III I I -III ?.� ••1 � LL LL H""a, Q COLLARS taa sLo S�Op 9 1 O'_O" � p STOP SIGN INLET PIPE ai-., . *..+- ��O > L 10' UTTORAL SHELF F a .0 : ,,..`• D, _0" LL LL O O ENERGY DISSIPATOR I -III III' I I' I -III= III- 2:1 SLOPE STABILIZED III+ III- -III 1 II III -III -III- I - -III-III PLAN To VIEW = TO POND BOTTOM -� "I - ANTI -FLOTATION PAD STREET NAME SIGN O O BACK OF DUCTILE IRON MAINTENANCE SEDIMENT FOREBAY OUTLET STRUCTURE DRAIN PIPE WITH SLUICE ZONES: 5/6 4 3 2 1 _21- 2 1 2 3 4 SEED W W LOCATED AT GATE OR VALVE. (OFFUNE MAIN POND TOE OF 10:1 FROM OUTLET AND LOCATE INTERSECTION with 0_ 0_ (n (n SLOPE VALVE IN BERM} 0.5% SLOPE MIN. DITCHES, and NO CURB and GUTTER z z O O 0 0 STREET WE NOTES MARKER NOTES: -...-...- - -.._....�... _.. _...-...-...-... _..._... �' 1. TWO STREET NAME MARKERS ARE REQUIRED IF - R/W -1 R/W THE MAJOR STREET HAS 3 OR MORE LANES. 1, 4-6 INCH LAYER OF AMENDED SOIL IS RECOMMENDED IN ANY _ _ _ _ _ g _ _ _ _ _ _ _ 0 O AREA WHERE PLANTINGS ARE REQUIRED (SEE NCDEQ STORMWATER BMP MANUAL). 2. ANY VARIANCE FROM THIS STANDARD MUST BE LU 111=IIIII I III=11=I1�IIMai" MINOR APPROVED BY THE TOWN ENGINEER. - p N r I=1 11=1 I I=1 I I=1 I I=1 I I� I I=1 I �I I I� i 1= =1 I I� 11=1 I 11= , I I -1 I I� I I �, ,, ITCH STREET NAME MARKER 3. ENSURE STOP SIGN SIZE AND INSTALLATION PER STOP slc MurcD STANDARDS. I I I I I 100 I Q Iz R/W F R/W �O POND CROSS SECTION r NOT TO SCALE NOTM SCALE NOT TO SCALE N TOWN OF WAXHAW TOWN OF WAXHAW W ET P 0 N D NOT TO SCALE CID LAND DEVELOPMENT STANDARDS W ET P O N D PROFILE STD. No. REV. LAND DEVELOPMENT STANDARDS PLANTING PLAN STD. NO. T` REV. - TO111\ OF WAXHAW STREET SIGN INSTALLATION 406.1 409.1 LAND DEVELOPMENT STANDARDS N LOCATIONS 1704.11T W NOTES: I. REMOVE MARE AND NYLON TWINE FROM BALL AND CANOPY. SMALL TREATURING Q 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION. 51' R/W (MINIMUM) I- 3. STAKING IS REQUIRED FOR ALL TREES IN R.O.W. OR UPON REQUEST OF ARBORIST. 7'-0" STREET LIGHT - 25'-6' (MIN) 25'-6" (MIN) 7'-0" UTILITY EASEMENT UTILITY EASEMENT O 0 T N 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN A >� _j 0- LLI LEGAL MANNER. 5. RESEED UNMULCHED, DISTURBED AREAS. (MIN) 13'-0' (MIN.)- 12'-0" 12-0" 13'-0' (MIN.) (MIN) 1 -0" 1'-0• (MIN) (MIIJ) (MIIJ) (MIN) F LLI ::) CO Cy) U) N 3/4' NYLON STRAP 5'-0" 7' -6" -. 10'-0" 1 a'-0" 7'-6„ ,-0, PLAIVfING TRAVEL LANE TRAVEL LANE PLAIf•ING 51F;IP STRIP LL.I U 0 C0 uj (n J > (V Q J J w I" SLP KNOT ffm STOP KNOT 6' LARGER THAN TREE DIAMETER y 2.OX 4.C9' ,,0% 2.0% 2:1 CUT MAX. 2:1 CUT MAX. -- SLOPE 3/B" PER FT. _^ `� ~- �` 3:1 FILL MAX. z (, m z LLI V) ROOT CROWN TO BE AT FINISH GRADE TRUMULCH AWA6Y NK 1' TOY FROM 4' M O / ID WIDE MAXIMOOTBAIY " WUGMUM LAYER OF MULCH BERM OUTSIDE OF ROOTBALL 3:1 FILL MAX. p PHONE _ PHONE ABLE CABLED o G s R s WATER POWER R GAS O O POWER O I- O Lij w O > z � /t� Q_LL<a: �/� Lu z O J Ir 0 3- 1't!4'x1E' WY000 STAKES SEWER MAIN U cr J m Z T_ < WITH CENTERED 3/B' HOLE _ DRIVENIN LIE WITH STRAP uj EQUALLY SPACED "R0°"D TI'� FINISHaRAOE ACORN STYLE FIXTURE RESIDENTIAL LOCAL STREET 0 U Q C%) ' NOTES: o -',r;� •..' MODEL REMOVE TYPICAL EXCESS SOIL ,Y BACxFlLL AS SPECIFED FINS ROOT �, DUKE ENERGY ACORN W/ STYLE A POLE SURFACE COURSE 1. SIDEWALK SHALL BE PROVIDED ON 1 1/2" S9.5BA - FINAL LIFT BOTH SIDES OF THE STREET. O 0) REMOVE TOP 1/3 BURLAP uNpls,uRBED BOIL 2" 59.5A - INITIAL LIFT V AND ANY NALS/FINS. ETC. MOUNTING BASE COURSE ROOT BALL OI0. ,r ANCHORED TO FOOTING s" ABC OR 4" ACBC TYPE B25.OB ROXIVE TOP 1/3 OF URE BASKET WOE PPRESEWT VARES NOTES: _ -SUBGRADE 0 RAISE PIT BOTTOY TO SET ROOT CROW COLOR LL AT THE CORRECT HEIGHT. FIRM SOIL UNDER ROOT BALL. BLACK 1. STREET LIGHTS PROVIDED TYPICAL PAVEMENT SECTION W 2 J BY DUKE -ENERGY. LLI Q ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) HEIGHT 2. ALL PEDESTRIAN LIGHTS KEY (n z ~ FOR EXAMPLE CALIPER HEIGHT (RANGE) MAX, HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH 12' TO BE FITTED WITH FULL ® 2'-0" VALLEY CURB AND GUTTER U z LLI 2" 12-W 16' 24' 16" 3" 14-16' IV 21" CUTOFF FIXTURE 32' NOT TO SCALE CONTACT INFORMATION: 4" CONCRETE SIDEWALK Q TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TREE PLANTING SM NO I REV. TOM GRANTHAM WILKINSONCBLVD. 6325 CHARLOTTE, NOT TO SCALE TOWN OF WAXHAW RESIDENTIAL LOCAL STREET IB DAB 8�19 z o_ o (FOR SINGLE AND MULTI -STEM TREES) 600.1 If STYLE "A" POLE PH: 704-382-7675 STREET LIGHT N.T.S. LAND DEVELOPMENT STANDARDS NO ON STREET PARKING sz'n. NO. TYPICAL SECTION 200.3 0 0 PROJ. MGR.: WGB DESIGN BY: CJH I DRAWN BY: CJH PROJ. DATE: DEC. 2019 � Q DRAWING NUMBER: • 0 Wl< z 2 C9.2 WKD PROJ. NO.: DICI<SONJ Know what's below. Call before you dig. community infrastructure consultants Lu 20170279.00.CL o. d w z - °oo w pz ao¢ w wwo gF� om> oo o¢m �a0 =gip ~ w ozw zw-p oz iz Zzo z oom wY� o< ~p= oY� w�¢ DLL ¢op z< z FZ¢ Fo< o ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 wFz w Q ¢FF mm� p 0Fr zw Qom zmz 2P oz. U-o zzo ow= YU~ U po0 z m Y oFr oo¢ 0 =Zw oo, aLj2E oo0LL - OR 10' 1/8' 5/18' 24.00 24.00 BROOM FINISH MIN MIN I- 4.00 4X 0,50 ANCHOR BOLTS, DICKSON 1 5/18 a I 2 00 USE TEMPLATE T4 ENSURE ALIGNMENT CHAMFER EDGES, IN LANDSCAPE AREAS, TOOL EDGES FLUSH WITH ADJOINING SURFACES COIT11T1Urllt infrastructure consultants 1213 W. MOREHEAD STREET SUITE3 GENERAL NOTES: 24.00 qoIN PAVED AREAS. t'-e' APPRox t2'-5' MAX. NC-2 2 FOR POST BOLT MIN u ° e CHARLOTTE, NC 28208 C_/8' DETAIL OF BOLT 1. STEEL BEAM TYPE GUARD RAILS SHALL BE INSTALLED AT THE END OF ALL DEAD-END STREETS, EXCEPT CUL-DE-SAC STREETS a u (t)(704 334-0078 ) 5/8' DW r ppST BOLT PLAN 2 1/2' WHICH HAVE BEEN IMPROVED WITH A PERMANENT TURN -AROUND. t 1❑.v0 u u 5.00 704 334 5348 (fl( ) 1 1/4" SPLICE BOLT 4 4 UIRED BEAM 4 1/4' 1/4' TYPE GUARD RAIL 2• _�E 15 1e Dk >< 1�8" DFEP RECESS �15/B" 2, FOR STREETS 26' IN WIDTH THE GUARD RAIL SHALL CONSIST OF TWO(2) 12'-6" SECTIONS OR ONE 1 25' SECTION, THREE 3 STEEL ( ) ( ) ( ) u u 24.v0 a u WWW.WKDICKSON.COM TERMINAL I A POSTS, AND TWO (2} TERMINAL SECTIONS. FOR STREETS GREATER THAN 25 IN WIDTH THE GUARD RAIL SHALL SPAN THE MIN gee eee: SLOPE SURFACE . 25 INCH PER FOOT ON ALL SIDES FOR DRAINAGE. NC LICENSE NO.F-0374 SECTION ENTIRE WIDTH OF THE STREET. Ij ® If 3. GUARD RAIL SHALL CONSIST OF RAIL ELEMENTS FABRICATED TO DEVELOP CONTINUOUS BEAM STRENGTH AND INSTALLED AS SHOWN. POSE MAX 12'-8' C TO ENTER OF POSTS POST DETAIL OF NUT 4. MINIMUM THICKNESS OF GUARD RAIL SHALL BE 12 GAGE U.S. STANDARD. CBU OUTLINE BUTYL RUBBER PAD (WITH METAL PEDESTAL ONLY) TYPICAL ELEVATIONT H1OLEMIN THE RAIL ELEMENT INCLUDING SPLICES, SHALL HAVE A MINIMUM ULTIMATE TENSILE STRENGTH OF 80,000 LBS. CBU PEDESTAL MATCH EXISTING GRADE IN PAYED AREAS \\\llllllll///7 �, , �Q®/ Dui /lk GUARD RAIL PARTS FURNISHED SHALL BE INTERCHANGEABLE WITH SIMILAR PARTS REGARDLESS OF THE SOURCE OF MANUFACTURER. 4X 0.50 \���� ' Ske ER-1 SEE SfD. } 1/s 1/1�/32 I �W S X 8 rJ �I Imo. �1 F--s" THE HOLES FOR CONNECTING BOLTS SHALL BE PUNCHED OF DRILLED, BURNING WILL NOT BE PERMITTED. 5, THE GUARD, BOLTS, NUTS, STEEL POSTS. AND ALL OTHER METAL PARTS SHALL BE GALVANIZED TO CONFORM TO THE REQUIREMENTS ANCHOR BOLTS SLOPE SURFACE .25 INCH PER FOOT I ON ALL SIDES FOR DRAINAGE 4x 4.50 MIN ' 4 RODS ON 14.00 CENTERS MAXIMUM, I �.' O� `�70'• Gj- = S ta 2:1 SLOPE (MIN. 3') N0. 50.06A PROPERTY LINE FOR THE COATING CLASS, OUNCES PER SQUARE FOOT) OF THE CURRENT SPECIFICATIONS FOR ZINC -COATED IRON, AND EACH WAY _ t3/18' 111N. (2.50 (GALVANIZED) DW, HOLE-,,^ mSTEEL L 12' DYL HOLE SHEETS, COILS. AND CUT LENGTHS, IN ACCORDANCE WITH ASTM 123A. * OPTIONAL COMPACT GRAVEL OR CRUSHED STONE (OMIT WHERE SOLID ROCK OCCURS) �`r •,fY� 'C , cf' /NEE t EDGE OF PAVEMENT 3 I/4' NEUTRAL AXIS GROUNDr m I TO BE FILLED MRIH CONIC.�:;a 6. IF THE AVERAGE SPECTER COATING AS DETERMINED FROM THE REQUIRED SAMPLES IS LESS THAN TWO (2) OUNCES OF SPELTER PER SQUARE FOOT, OR IF ANY ONE SPECIMEN HAS LESS THAN 1.8 ONCES OF SPELTER PER SQUARE FOOT OF DOUBLE EXPOSED SURFACE, THE a ,$ n o�"9 °� .� a s.Do MIN MAXIMUM FROST DEPTH ;:aaq:aa;:a a;;a ;ga;aQa:S Y 4x 4.00-1°.'�°''•'a:`•:m`'. °?'•� 1 1/B' a/4' x 2 t/z' Posr BOLT SLOT + • , P: •;' m LOT SAMPLED SHALL BE REJECTED, THE FINISHED SHEETS SHALL BE OF FIRST CLASS COMMERCIAL QUALITY, FREE FROM INJURIOUS DEFECTS, s.00 MIN DEAD-END STREET BARRICADE 3 1/4•`FR SLOT BOLT •.M SUCH AS BLISTERS, FLUX, AND UNCOATED SPOTS. 7. THE GUARD RAIL SHALL BE INSPECTED TO DETERMINE THAT THE MATERIAL, DIMENSIONS, AND WORKMANSHIP ARE IN ACCORDANCE FIRM UNDISTURBED sell OR WELL -COMPACTED FILL 3.DD PROFESSIONAL SEAL NOTE 2 s/1 i ', /�sg WITH THIS PLAN. m THIS DETAIL IS NOT A GUARDRAIL DETAIL. FOR SP�CE BOLT SLAT a' • �•:, a' • : �•;, `= �= NOTES: U U ROADSIDE GUARDRAIL, SEE NCDOT STANDARD T 8. WHERE A DEAD-END STREET REQUIRES GUARD RAIL, END OF ROADWAY MARKER SIGNS SHALL ALSO BE REQUIRED. 1. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 3400 PSI 0 28 DAYS, CONTAIN 4% MIN - 6% MAX DRAWINGS 862.01-8fi2.03 DETAIL OF POST T (SEE STD.707.1 & 708.1) AIR ENTRAINMENT AND BE PLACED WITH A 3.50 - 4.5D SLUMP IN ACCORDANCE WITH ACI 301. APPROVED DATE 2. RFINFORCING STEEL RODS SHALL CONFORM TO ASTM A615, GRADE 60. 3. ANCHOR BOLTS SHALL CONFORM TO ASTM A193, GRADE BBM, TYPE 316 STAINLESS STEEL. NOT TO SCALE NOT TO SCALE NOT TO SCALE TOWN of WAXHAW LAND DEVELOPMENT STANDARDS DEAD END STREET BARRICADE TOWN OF WAXHAW END OF ROADWAY STREET BARRICADE LAND DEVELOPMENT STANDARDS ST°' N°' �°��'�- �� Rom. ����'�% TOWN of WAXHAW USPS APPROVED SPECIFICATIONS LAND DEVELOPMENT STANDARDS CONCRETE PAD (SINGLE UNIT) I REV, 706.1 GENERAL NOTES 7nq 1 0 724.1 3/4" OUTSIDE 1 /2" WIDE RADIUS (TYP.) WHITE BORDER 24.00 2MIN MIN MIN 4X v�.SD ANCHOR BOLTS, PER CBU �4.00 USE TEMPLATE TO ENSURE ALIGNMENT 2.00 I. M FINISH 1 1 1/4" INSIDE RADIUS (TYP.) 1 z4.aG MIN ; 1 1 1 Ax 0 z O 32.00 MAX MAX O SIGN POST FUTURE DEVEL PMENT2.DD I I I I (34.00) ;= W �� U LU LU W z � : 1 1 10.00 PER CBU 192.00 MAX I 0 � U U UARD RAIL WILL EXTEND1 2" SEE NOTE 4 I I I I _ 1 CHAMFER EDGES, IN LANDSCAPE AREk$, I I I TOOL EDGES FLUSH WITH ADJOINING SURFACES IN PAVED AREAS. I LU Q Q ...............{,vi;{s},v,';{�}:•Y �f Jam- � 1 1 I SLOPE SURFACE .25 INCH PER FOOT O O .......... _ } :4=:1i' ,: _.•: _.- •:•µ•{W{q}E{i}}:{{g}g{}" GREEN 1 1 1 1 ON ALL SIDES FOR DRAINAGE MIN ".. .............,v,{ GUARD RAIL CLAMP (TYPICAL) 724.00 BACKGROUND 2" (TYP.) HIS STREET-1 1 I ►.� as BUTYL RUBBER PAD (WITH METAL PEDESTAL ONLY) CBU PEDESTAL - CBU MATCH EXISTING GRADE IN OUTLINE PAVED AREAS O O 0- 0- }{;@t}g{{g}}{ }: 4X P.50 ANCHOR BOLTS SLOPE SURFACE .25 INCH PER FOOT Z Z •""""...... PER CBU I ON ALL SIDfs FOR DRAINAGE O O TENSION SCREWS -:wr�iw •{}}�giw: >'{_f;_w{F{> WHITE TEXT (TYP.) 4X 4.50 MIN I 4 RODS ON 14.00 CENTERS MAXIMUM, EACH WAY T� OPTIONAL COMPACT GRAVEL OR CRUSH EO STONE (OMIT WHERE 24" Ia5 SOLID ROCK OCCURS) G; 3 b°%° 39°.oti}r .of.g s v 11II 8.00 MIN MAXIMUM FROST DEPTH 4X 4.00 /� •. :°,.;�'.a'•. •'a;� O) O) O O LU NOTES: 8.00 MIN rif'i FIRM UNDISTURBED SOIL OR WELL -COMPACTED FILL N N Do r 0 N � 1. SIGN SHALL MEET OR EXCEED MUTCD STANDARDS FOR RETROREFLECTNnY 3.00 2. SIGN MATERIAL SHALL BE 0.080 THICK ALUMINUM " NOTES: 1- CONCRETE SHALL HAVE A COMPRESSNE STRENGTH OF 3000 PSI O 28 DAYS, CONTAIN 4% MIN - 6% MAX AIR ENTRAINMENT AND BE PLACED WITH A 3.50 - 4.50 SLUMP IN ACCORDANCE WITH ACI 3D1. /'�� 0 I I I I I I m I Q l° 3. ALL LETTERS SHALL BE SERIES B-2000 FROM THE 2004 STANDARD HIGHWAY 2. REINFORCING STEEL RODS $HALL CONFORM TO ASTM A615, GRADE 60. V/ T SIGNS MANUAL (AND ANY REVISION THERETO) PUBLISHED BY THE FEDERAL 3. ANCHOR BOLTS SHALL CONFORM TO ASTM A193, GRADE BBM, TYPE 316 STAINLESS STEEL. O HIGHWAY ADMINISTRATION. NOT TO SCALE 4. A 3 CBU CONFIGURATION IS DEPICTED. A 2 OR 4 CBU CONFIGURATION MAY BE USED AS LONG AS THEY ARE ARRANGED IN GROUPS SUCH THAT THE OVERALL DIMENSION OF THE CONCRETE BASE DOES NOT ^ I - TOWN of WAXHAW NOT TO SCALE TOWN of WAXHAw STREET C 0 N N ECTIVITY SIGN LAND DEVELOPMENT STANDARDS EXCEED 192 INCHES. NOT TO SCALE Toww of �rAxHA�r USPS APPROVED SPECIFICATIONS � 1100 LAND DEVELOPMENT STANDARDS END O F ROADWAY MARKER F 0 R END -OF -ROAD BARRICADE LAND DEVELOPMENT STANDARDS CONCRETE PAD (MULTIPLE UNIT) N .. `-� GUARD RAIL CLAMP INSTALLATION 707.1 . •6 725.1 T W 'NO PARKING' SIGN MUTCD R7-1 (TYP.) RIGHT OF WAY 15' I GROOVE JOINT NOTES I I , l ,I w L = 10 FEET IN LONGITUDINAL SECTION L I - Q - SIDEWALK _ TYP, - - - .. 'A 1. TEMPORARY I CO C �C p L/4 L/4 L/4 L/4 la o N Z o w O o .'. �• ' • TURNAROUND MATERIAL - w in U W I A B C m N C� BACK OF CURB cal • . •+ SHALL BE MIN. 3600 o PSI CONCRETE, 6" Lu c� PLANTING STRIP +' I THICK. I N W .• .. A' :. .. •. �:., : • x 2. TEMPORARY FACE OF CURB � J�CNo Q J CO U = 2'-O" VALLEY GUTTER INSTALLATION ONLY - I j 11 r B C LIP OF GUTTER/EOP 7 Z = IZ I w z (n U) w TO BE REMOVED WHEN 1 I ( w 0 0 LU LLi 1 Q I � x FUTURE DEVELOPMENT w - _ 1 PLAN VIEW 0 w Lu VARIES TEMPORARY TURNAROUND CONNECTS TO STREET. CBU Ir 0 fr -i J -- - - - - - o "SIDEWALK" PORTION OF TURNAROUND MAY BE -� 1/2„ U m z Lu Q Q J W uj LEFT IN PLACE IF NOT 8 3/4" O U aZ w DAMAGED. LL_ 3. NOT TO BE USED AS • 1" Cq 4 4 d A4 a A• ^O a • A d . , a. , A PRIVATE DRIVEWAY. a n 4. " 0 " ,,-2'-0" VALLEY GUTTER o MILLBRIDGE CLUSTER MAILBOX " a' 0 r. �' ' " ' .� A. '' -MANUFACTURE: GRAPHICAL CREATIONS, INC. Lu W I 2 -4 1/2"-2'-,3- '-1 1/2 •' 4. DEAD END STREET -DIMENSIONS:-72"(H)X32"(W)X19"(D) PLANTING STRIP .. s' a .+ : :• • r.f.", . -� Y x �` • } �.. I e, $ �•. '• ' ' BARRICADE AND END OF ROADWAY MARKER PER DETAILS 705.1 THRU 709.1 ARE REQUIRED. -UNITS: 16 -COLOR: DARK BRONZE 7 Lu 2' CBU -CUSTOM TOPPER AND PEDESTAL MIN. - I. BERAA CONTACT INFO: :L uLL DENEEN LITZ 704-888-8870 O D .s � SECTION A -A SECTION B-B SECTION C-C O L.I..I L.I..I J DENEENC�GRAPHI-CAL.COM aLU ui Q H_ SIDEWALK ' * 0 0 ~ A -CBU SHALL FACE THE ROAD w Lu NOTES: z 5' (TYP.)�--� ADA RAMP LOC. coNCRere PAD 1. TRANSITION IS NOT TO BE LOCATED WITHIN THE CURB RADIUS. � IU z FOR CBU 2. CURB TRANSITIONS TO BE MINIMUM 3' - 6" TO AVOID EXPANSION JOINT I 11 2, 6„ ��� ROLL-TOP CURBS CATCH BASINS WHEN NECESSARY. NOT TO SCALE O 0 SCALE 1 =10 NOT TO SCALE 0- O-j - TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TEMPORARY TURNAROUND LOCAL RESIDENTIAL STREET � TOWN of WAXHAW CBU PLACEMENT FOR C & G SECTION RESIDENTIAL LAND DEVELOPMENT STANDARDS SUBDIVISION STREETS TOWN OF WAxHAW CURB TRANSITION LAND DEVELOPMENT STANDARDS C STD. _ 2'6" CURB AND GUTTER TO 2'-0" ROLL GUTTER 104.1 z Q PROJ. MGR.: WGB (OPTIONAL) r280.51 �. MODIFIED 7221 DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 � Q DRAWING NUMBER: •wl< z C9.3 WKD PROJ. NO.: DICI<SON J Know what's below. Lu Call before you dig. community infrastructure consultants 1= 20170279.00.CL I o. zwW 00w p00 OJU ozw Q0, wwoo = o¢W ' �ao0 ~ =-- oZww z -0 oz o Zz0 z 0 wY� =UQ OY4 w�0 DLL. ¢00 zz< 0.W _zOQ oZz OO W O a � w¢1< ¢z � 0�0 wD¢ 0 wFz w§Q ¢�x =a� 0 0zw Qo< °w 0zC8 U-O zzo o2E= YU~ U p00 �=z �aa ooa 0 =Zw ooF Ow¢ UD MATTING ---'JRE WATTLE WITH UPSLOPE AND NSLOPE STAKES AND STAPLES. STAKE STAPLE EARTHEN BERM INLET ZONE 35X OF SURFACE AREA INLET ZONE 25X OF SURFACE AREA INLET ZONE 21% OF SURFACE AREA OUTLET ZONE 15% OF SURFACE AREA X Inset A \ X SLOPE �L� 11��!111 = I �III���' 2' UPSLOPE & -III_=III- -II III- DOWNSLOPE STAKES, TYP. �- MIN. 10 LF EXCELSIOR MATTING 2' MIN. ON UPSLOPE NOTES: AND 8' MIN. ON DOWNSLOPE 1. USE MINIMUM 12" DIA. COMPOST WATTLE. 20" WATTLES ARE ALSO SPECIFIED 2. USE 2"x2" WOODEN STAKES 2-FT IN LENGTH ON THE UPSLOPE AND DOWNSLOPE AT AN ANGLE TO WEDGE THE WATTLE TO THE BOTTOM OF THE SWALE. 3. STAPLE ON BOTH SIDES OF THE WATTLE TO SECURE IT TO THE BOTTOM OF THE SWALE. MAINTENANCE NOTES: 1. INSPECT WATTLES AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. REPAIR ALL DAMAGE IMMEDIATELY. COMPOST WATTLES N.T.S. � � EARrH / eERM 0 /X.01 4'-0" MAX. SPACING `X XJ YN?. 6" X 5" TRENCH BACKFlLL AND COMPAC FENCE AND FABRIC BURIED IN WENCH GENERAL NOTES: 1. DRIVE 5' STEEL POST AT LEAST 24" INTO SOLID GROUND. 2. USE STAPLES 1' APART HORIZONTALLY AND VERTICALLY TO ATTACH THE FILTER FABRIC TO THE WIRE FENCE. 3. MINIMUM BAFFLE SPACING IS 10'. 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. 5. REFER TO NCESCPDM SECTION #6.65 FOR ADDITIONAL SPECIFIATIONS. ou" e CH q g N NOT TO SCALE TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS BAFFLE INSTALLATION f524.1 DEPTH I BOTTOM WIDTHI TOP WIDTHI SIDE SLOPES I CHANNEL LINNING WATTLE SPACING TDD #1.1 2.00 6.00 18.00 3 RoIIMax Temporary Bionet 31 TDD #1.2 2.00 4.00 12.00 2 RoIIMax Temporary Bionet 77 TDD #2.1 2.25 3.00 12.00 2 RoIIMax Temporary Bionet 225 TDD #2.2 2.00 2.00 10.00 2 Straw with Net 133 TDD #3.1 2.00 2.00 10.00 2 Straw with Net 80 TDD #2.3 2.00 1 1.50 1 9.50 1 2 1 Straw with Net 61 TDD #3.1 2.00 1.50 9.50 2 Straw with Net 19 TDD #3.2 2.00 0.00 8.00 2 1 Straw with Net 46 NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE TOWN INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE AND/OR CLOSE OUT OF GRADING PERMIT. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS MAY BE INSTALLED IN EXISTING TOWN OR NCDOT ROADS AS LONG AS STORM DRAINAGE IS NOT IMPEDED. GRATE 1" REBAR FOR REMOVAL FROM FILTER BAG REQUIRED WHEN USED ON `DEFLECTOR EXISTING MAINTAINED STREETS. DUMP LOOPS DEFLECTOR SHALL BE PLACED SUCH THAT IT WILL NOT COMPLETELY OBSTRUCT STORM NEATER FLOW FROM ENTERING VIA THE CURB OPENING. ENSURE NO MORE THAN 25X OF I CURB OPENING IS OBSTRUCTED. CATCH BASI I I I OUTLET INSTALLATION RGIMEGA&W. lip TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS CATCH BASIN INLET PROTECTION D 519.1 FILL SLOPE CONTRACTOR SHALL USE MATTING OUTLINED ABOVE OR TOWN OF WAXHAW APPROVED EQUAL SYNTHETIC MATTING MANNINGS N-VALUE = 0.025 STRAW WITH NET (JUTE) MANNINGS N-VALUE = 0.022 PVC END CAP ' MIN COMPACTED BERM SILT FENCE FINISH GCE (SEE NOTE 2) G�UND PVC TEE MAINTENANCE NOTE: tiq� WIDTH AND INSPECT TEMPORARY DIVERSIONS ONCE A DEPTH TO BE DESIGNED WEEK AND AFTER EVERY RAINFALL. BY ENGINEER (1' MIN) IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA NOTE: PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1%. BLEND WITH THE NATURAL GROUND LEVEL 2. SILT FENCE MAY BE REQUIRED BEHIND BERM AND APPROPRIATELY STABILIZE IT. NOT TO SCALE TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TEMPORARY SILT DITCH 50fi.1 "C" ENCLOSURE TFR FNTRY IINTT PERSPECTIVE VIEW PVC VENT PVC ELBOW PIPE ti WATER SURFACE - - PVC END CAP �r PVC PIPE 15 / 1/2" HOLES IN UNDERSIDE ��aG� MAN PVC TEE FLEXIBLE ! HOSE 6 SCHEDULE 40 PVC PIPE END VIEW FRONT VIEW SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANLA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. "H" REFERS TO THE HEIGHT FROM INVERT OF FLEXIBLE HOSE ON SKIMMER TO THE INVERT OF THE PRIMARY SPILLWAY. TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS SKIMMER :ODD FOR LATE WINTER AND SOIL AMENDMENTS: EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER: 501E AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,DOD LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL SEEDING DATES: MAY 1 - AUG. 15 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR FALL: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11. TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TEMPORARY SEEDING SCHEDULE STD. NO. I REV. 521 .1 1 • 0 Know what's below. Call before you dig. SCHEDULE 40 PVC PIPE ORIFICE PLATE DATA BLOCK NOT TO SCALE 503.1 BASIN N0. DRAINAGE ACRE(ACRES) DENUDED BASIN VOLUME BASIN SURFACE AREA DEPTH (FT.) H 2 (FEET) REQUIRED CUBIC FT. PROVIDED CUBIC FT(SO REQUIRED FT. PROVIDED SQ FT. 05 WASHED STONE CLASS I RIP RAP 6" MIN. THICK x 3' HIGH (MIN) \ tra F { PIPE o � PERSPECTIVE VIEW GENERAL NOTES: 1. GRAVEL AND RIP RAP FILTER BERM BASIN SHOULD BE USED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 5 ACRES OR LESS. 2. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTED UNLESS OTHERWISE NOTED. 3. CLEANOUT PRIOR TO SEDIMENT REACHING HALF OF BERM HEIGHT. TOWN OF FARBAII LAM) DEVELOPMENT STANDARDS VOLUME 3600 FT' PER ACRE DISTURBED TO TOP OF BERM ELEVATION. SURFACE AREA REWD - 4w SQ. FT. PER us 010 #5 WASHED STONE CLASS I RIP RAP FINISHED GRADE ' H MIN. ----- CLEANOUT ELEVATION (SEE NOTE 3) SECTION NOT TO SCALE GRAVEL AND RIP RAP FILTER BERM BASIN R7V 516.1 LAND EA DICI<SON OR community infrastructure consultants T N CO T N T w Q 0 O J Z O U I..L 'I- V ) Z O U O LL �Uj v) O Z O 1 Q z 2 J LL] n 4vW DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \N\\\IIII/////I �o'oFE88so e fir. ��P/ E�. 11111\ / PROFESSIONAL SEAL U U m p z O O Ir z z � U w w z � : p O O U) U U W Ir O O O O Ir Ir 0- 0- z z O O >L_ W w rn rn 0 0 w 0000 N Q o N r ImIQIOz O T CV W F c) LO I- (n I- N Cn JiN W Q W Cc m z = Lu 0 0 z Lu 0 LL < EL LJ rr J 170 z W Ir Q J_ D w U 0 0 O O W LLI J Q ~ z U z W > I � o PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.4 WKD PROJ. NO.: 20170279.00. C L I o. zaw z o-°oo OJU ,zw Qo¢ wwo 2E � F. U=w o¢m Sao =�o ~ w ozw z -o oz woz o zz z oom wY� =UQ w§4 °wa oww z, ozz o w o ¢G� w W ¢ J ¢3:z ono wF>oo z z w�Q =w� 0 U'Zw ¢o'< om Q °w oz-o U-O Zwo o2E_ Yo~ U poo Y Q =z oo¢ o =Zw oo= moIR Ow¢ UD ie Overlap B' 050mm) mirlimurn Excavate Channer to Design . Grade Oral Cro55 $Kbon f rti • �� Design DeDt OUERCUTCgANNEL f , Longitudinal 2'(50mm) TOALLOW f anchor trench BULKiNGDUPiN'GSEEDBED PREPAPA TON ♦ti: .:�:t�". TYPICAL INSTALLATION WITHEROSIONCONTROL BLANKETSORTURF POA4FOR CEMENTMA TS Intermittent Check Slat Shingle -lap spliced ends orbegin new roll in an intermittent check slat Prepare soil and apply seed h efore - installingblankets,matsorother W temporary channel liner system r TAr vk � I Longitudinal Anchor Trench NO TES: ' 1 Design velocities exceeding 2 ftfsec (0.5misec)require tern porary blankets, mats or srnilarliners to protect seed and soil until vegetationbecomes established. 2 Grass -lined channels with design velocities exceeding 6 ftfsec (2mIsec) should include turf reinforcement mats. TEMPORARY CHANNEL LINERS AND EROSION CONTROL MATTING SPECIFICATION 1. SEE DIVERSION DITCH CHART FOR LINER TYPE AND WATTLE SPACING. 2. MIN. SHEAR STRENGTH: STRAW WITH NET (OR APPROVED EQUAL) - 1.45 LBS/FT CURLEX I (OR APPROVED EQUAL) - 1.75 LBS/FT CURLEX II (OR APPROVED EQUAL) - 2.25 LBS/FT PSRM (PERMANENT SOIL REINFORCED MAT) - 3.0 LBS/FT *ALL RATINGS ABOVE ARE MINIMUM SHEAR STRENGTH REQUIREMENTS FOR THE MATTING BASED ON UNVEGETATED CONDITIONS. " RIPRAP IN CHANNELS AS REQUIRED PER THE ERODES SPREADSHEET MAY BE REPLACED WITH A COIR MATTING OR SYNTHETIC MATTING AS LONG AS THE MATTING MEETS THE MINIMUM SHEAR STRESS AND VELOCITY REQUIREMENTS OF EACH INDIVIDUAL DITCH. SHEAR STRESS REQUIREMENTS AND VELOCITY REQUIREMENTS FOR EACH DITCH ARE OUTLINED IN THE DITCH SCHEDULES. TEMPORARY CHANNEL LINER N.T.S. NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2. REFER TO THE TOWN OF WAXHAW STORM WATER DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. B. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. USE USDA NOMOGRAPH FROM INC SEDIMENT AND EROSION CONTROL MANUAL OR THE TOWN OF WAXHAW STORM WATER DESIGN MANUAL FOR DESIGN DATA. z 9 a PLAN ELEVATION (IF NEEDED) V ... I SEE TABLE 9.2 NATURAL �RAOE RIP RAP 9!T Q: (THICKNESS)=10' MIN. • d50 (see fig 8.06 n&h "NC SEDIMENT AND EROSION CONTROL MANUAL" dmox = 1.5 x d50 T = 1.5 X dmox. NOTE: LAYER OF FILTER FABRIC T(min.)=10" MINIMUM H=2/3 PIPE DIAMETER SECTION B-B TOWN OF WAXHAW RIPRAP APRON AT PIPE OUTFALLS LAND DEVELOPMENT STANDARDS OTHER THAN AT SWIM sr0. No. 306.1 TABLE 9.1 Silt Fence Outlet 4 Area Phase 1 (Ac.) Area Phase 2 (Ac.) Silt Fence Outlet 4 Area Phase 1 (Ac.) Area Phase 2 (Ac.) 1 0.015 0.015 13 0.047 0.047 2 0.032 0.032 14 0.056 0.056 3 0,059 0.044 15 0,097 0.097 4 0.072 0.070 16 0.049 0.049 5 0.040 0.039 17 0.241 0.064 6 0.055 0.054 18 0.192 0.064 7 0.041 0.059 19 0.056 0.054 8 0.143 0.123 20 0.043 0.043 9 0.216 0.121 21 0.056 0.054 10 0.097 0.054 22 Phase II Only 0.141 11 0.125 0.072 23 Phase II Only 0.059 12 0.072 0.051 TABLE 9.2 RIP RAP SUMMARY CHART OUTLET La (ft) W1 (ft) W2 (ft) T* (ft) H (ft) d50 (ft) FES-13MP#1 20 9 23 0.56 2.00 0.25 FES-BMP#2 20 9 23 0.56 2.00 0.25 FES-BMP#3 12 6 14 0.56 1.33 0.25 FES-100 15 9 9 0.56 2.00 0.25 FES-200 15 9 9 0.56 2.00 0.25 FES-300 8 6 5 0.56 1.33 0.25 TABLE 9.3 STAKES :� _ iWAM w MWJ� H=II=,1=11=11=11=II-11-11=II-I1-11�=II=11' �,=11 'li= ■ ■ ■ 111i=11=11=11-u=a=n=11=�1=11-�I=11=u:I- 1 ■ ■ ■ ■ SPECIFIC APPLICATION: THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. TOWN OF WAXHAW BLOCK AND GRAVEL LAND DEVELOPMENT STANDARDS STONE INLET PROTECTION GENERAL NOTES: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP NCDOT #5 OR #57 OF THE WIRE MESH UNDER THE WASHED STONE - GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES - AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE NCDOT #5 OR #57 ACCUMULATED SEDIMENT, AND WASHED STONE ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER. NOT TO SCALE 510.1 4' MAX. r-19-GAUGE HARDWARE CLOTH 2' NOT TO SCALE TOWN OF WAXHAW HARDWARE CLOTH AND GRAVEL LAND DEVELOPMENT STANDARDS INLET PROTECTION 512.1 SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN_ LENGTH TO WIDTH RATIO 2:1 MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. Fr. REQUIRED PER AC. DISTURBED) 435 SURFACE (SQ. FT, AREA PER CFS REQUIRED 010) PLAN VIEW BAFFLE_ _.,--, "� 3RD BAFFLE: HARDWARE ' CLOTH SURROUNDING SKIMMER NOTES: f 1. REFER TO NCESCPDM 10^ SECTION #6.61 FOR INFLOW MIN. ADDITIONAL DESIGN STRUCTURE SPECIFICATIONS -- REGARDING SEDIMENT BASINS. 2. REFER TO STD. #524.1 -"" - FOR BAFFLE SPACING ISER AND INSTALLATION. SKIMMER 3. FIRST BAFFLE IS TO BE AVERAGE AREA* DEWATERING CONSTRUCTED OF WIC W - DEVICE RIP -RAP AND #5 WASHED STONE, WITH A • AREA OF BASIN WATER L=20' MIN. HEIGHT OF 3' AND SURFACE AT TOP OF PRINCIPAL SPILLWAY MIN. MIN. TOPWIDTH OF 2'. 4. FLASHBOARD RISER NOT PERMITTED FOR USE IN CROSS-SECTION VIEW SEE NOTE #3 THE TOWN OF WAXHAW 1' FREEBOARD W 6" MIN. INVERT ELEVATION EMBANKMENT INFLOW OF EMERGENCY SPILLWAY STRUCTURE T PRIMARY SPILLWAY (RISER) MIN.-= -- DEWATE ONG Z ZONE H EMERGENCY FILTER FABRIC SPILLWAY SEDIMENT _F�:u_ w ANTI -SEEP STORAGE ZONE BAFFLE COLLAR DATA BLOCK NOT TO SCALE 4SIN DRAINAGE DENUDED BASIN VOLUME BASIN SURFACE AREA CLEANOUT H Z L T W SKIMMER SKIM AREA AREA Oio REQUIRED PROVIDED REQUIRED PROVIDED DEPTH (FT.) (FEET) (FEET) (FEET) (FEET) (FEET) PIPE ORIF (ACRES) (ACRES) (CUBIC FT.) (CUBIC FT.) SO FT. SQ FT. HI DIAMETER DIAMI SEE TABLE 9.3 TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS SEDIMENT BASIN BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 BASIN VOLUME REQUIRED PROVIDED (CUBIC FT.) (CUBIC FT.) BASIN SURFACE AREA REQUIRED PROVIDED (SQ. FT.) (SQ. FT.) CLEANOUT DEPTH (FT.) H/2 H (FEET) Z (FEET) L (FEET) T (FEET) W (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER SEDIMENT BASIN #1 PH1 9.72 9.72 41 17496 75399 17835 28450 2.65 5.3 6 20 1.2 10 3 2.5 SEDIMENT BASIN #1 PH2 12.98 12.98 55 23364 75399 23925 28450 2.65 5.3 6 20 1.2 10 3 2.5 SEDIMENT BASIN #2 PH1 14.94 14.94 63 26892 76761 27405 28946 2.73 5.45 6 20 1.05 10 3 2.5 SEDIMENT BASIN #2 PH2 9.67 9.67 41 17406 64928 17835 24883 2.73 5.45 6 20 1.05 10 3 2.5 SEDIMENT BASIN #3 PH1 4.49 4.49 19 8082 37020 8265 14424 2.75 5.5 6 20 1 10 3 2 SEDIMENT BASIN #3 PH2 6.90 6.90 29 12420 37020 12615 14424 2.75 5.5 6 20 1 10 3 2 504.1 0 Know what's below. Call before you dig. WOVEN FILTER FABRIC 0 I 01 B' UA. STE- --- WIRE FENCING WOVEN FILTER FABRIC q GENERAL NOTES: 1. WIRE FENCING SWILL BE A MINIMUM OF 32' IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 12- STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. S. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 7. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 8. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS. STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDEWnFKA'nON OF ENVIRONMENTALLY SENSITIVE AREAS. 9. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 10. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL 11. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. STEEL POST WIRE FENCING FILTER FABRIC �d #5 WISHED STONEFLOMW MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY REPAIRS NEEDED SWILL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. " TOWN OF WAXHAW HIGH HAZARD LAND DEVELOPMENT STANDARDS TEMPORARY SILT FENCE F717a =.' �� _-,] _ ',. -_ -•, .,,._ -T •III'• ' • '11=11 I_ -II 11=11 II_ 11=11 11=11 11=11 11-.11=11-11=11-11-11 II_ I =11 11-1 II�11i1 �lril=1i° Illi�ill -11 II=11= II=11 11=11=11=11=11-11=11=11=11=11=11=II=11= II=11=11 = II �� II=� - II=11 II=11 II=11=11 11=II=11=11 II=11=11 II=11 11=II=11=� =11 II=1-IL�H�II JI IL II= =II=11 IL 11=II=11=11 11=1[ 11=11=11=11=11=11= II 11=11 11=II=11 1=11=11=11=II=11=1-11=11=11-11=11 11=11=11= 11=11= - -=II^11=II=11-=11=11=11=11=11-11-11 11=1 STEEL POST FILTER FABRIC NOT TO SCALE 508.1 GENERAL NOTES: 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE MAINTENANCE NOTES: 3. TURN SILT FENCE UP SLOPE AT ENDS. 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS PROLONGED RAINFALL ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. ADJACENT TO SWIM BUFFERS, STREAMS OR WE1.ANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END ENVIRONMENTALLY SENSITIVE AREAS. OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.52A NORTH CAROLINA THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE. PREPARED AND SEEDED. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TOP OF SILT MUST BE AT ABOVE THE T THE WASHED STEEL POST WOVEN WIRE FABRIC., HARDWARE CLOTH FILTER OF #57 WASHED STONE � SECTION VIEW 16"MIN 3' FILTER FABRIC APRON /ON GROUND f \BURY 6" UPPER EDGE OF BURY WIRE FENCE AND 4" I FILTER FABRIC APRON IN TRENCH HARDWARE CLOTH u TOWN OF WAXHAW LAND DEVELOPMENT STANDARDS TEMPORARY SILT FENCE NOT TO SCALE 507.1 FILTER FABRIC, u AND HARDWARE CLOTH IN TRENCH. STEEL POST SET MAX 2' APART MIN 2' INTO SOLID GROUND NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. FOR DRAINAGE AREAS SEE TABLE 9.1 STANDARD SILT FENCE OUTLET NOT TO SCALE 509.1 Wl< DICI<SON community infrastructure consultants T 0 N CO T N T W Q 0 O J Z O U U) Z O U O U- ��W U) O Z O 0 1 Q z 2 J �" j rr DWK DICKSON communit infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334 0078 (fl (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 ��A111111//�� 41 • � 1) ?• 0 \~ PROFESSIONAL SEAL U U m Q z O O ~ C) cn cn fr LLI z z � W W LU O � : O O L�LI Ir _ _ O O � � O O W W 0- 0- z z O O d) d) 0 0 W 0000 N Q N r ImIQI ° O CV w H ''^ULI O V) I- (n JiN W w T- Imz //2�/� V) w 0 0 Z w , oLLQELI Cc 0 ozC 0 J m zwor Q J_ LU � U 0 0 O O) LLI Li; z C) z W I o_ o PROD. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.5 WKD PROD. NO.: 20170279.00. C L o. zaw z o-°oo w ,z pow ao¢ w ww0 gF� o= o¢m Sao =�o ~ w ozw zo. wUz " o oz ow wY� =o< I Fn oY� w ¢oo z< z FZ¢ Fo< o pzz o w 0 w w¢� ¢3:z o�0 wD¢ 0 1Fz w�= ¢�Im =w� p CrFr ow °2P z°w �2P oz. U-o zzo °2_ YU~ U po0 Y.Q �=z o�(D oa 0 =Zw oo, a�2E 0 olLL WK DDICKSON TYPICALLY 8" REFER TO NOTE 5 nity infrastructure consultants LENGTH AS NECESSARY TO 00 THRU DIKE 1213 W. MOREHEAD STREET SEDIMENT PR SUITE 300 RIP RAP do WASHED STONE NOT REQUIRED IF BASIN FILTBERM IS LOCATED DOWNSTREAM ER NOTES: CHARLOTTE, NC 28208 4' MIN. PIPE (518.1) OF PIPE OUTLET. (VOLUME PER 501.1) #4 0 6" (t)(704) 334-0078 0.C.E.W. 1. ALL CONCRETE TO BE 4000 PSI; (f) (704) 334-5348 1.5' MIN. 1 EDIMENT PIT MORTAR JOINTS = 1/2" f1/8" THICK. FLEXIBLE PIPE RING AND COVER CLDSM WWW.WKDICKSON.COM TIE DOWN 10' MAX. SPACING , •+ ; • ; ; STD 20.05B 2. THE POURING OF BASE SLAB TO BE ,' + " " ' •�+r PIPE O.D.+ 12" ACCOMPLISHED BY FORMING. NC LICENSE NO.F 0374 TIE DOWN AT END • ,+ .++ T• 4' (MIN)* " + • + • CONCRETE 3. ALL YARD INLETS OVER 3'-6" IN DIAMETER (D) • ; " • • + ; ' • . +' +" RIM OF YARD INLET SLAB TOP 48" x 8" OPEN DEPTH SHALL BE PROVIDED WITH STEPS AT 12" ON CENTER VERTICALLY. PROFILE • + • + " • • ' • + MEASURED HERE THROAT EACH SIDE, TYPICAL 4. CONCRETE BLOCK OR JUMBO BRICK333 CARO�i� 11 ��(� • � �; <.. a. . WILL BE PERMITTED. ��0,•*FEss*- e -, + ' • + .+ EARTH DIKE • AT LESS THAN 1T SLOPE RIP -RAP AP " ; ; WEIR MEASURED HERE a. 5. FOR 8'-0" IN DEPTH OR LESS USE 8" _ s 2 ` + • ' ; • • 1 1 2" I WALL. OVER 8'-0" IN DEPTH USE 12" _ WALL TO 6 FT. FROM TOP OF WALL, 01 \. EXTEND TO EDGE OF DISTURBING \%����\��\��\��\ BRICK, �\ AND 8" WALL FOR THE REMAINING 6 '7 %�ci'l .�''/NEE,. ��`�� BLOCK OR FT. OF WALL. �i�©AI 0 Z0��\"PREC�� `%� lllfl\� \ %• CONCRETE CONCRETE 6. ALL PIPES IN YARD INLET STRUCTURE CONSTRUCTION SPECIFICATIONS: 6„ BASE SLAB SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED AND BRUSHED 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SMOOTH. PROFESSIONAL SEAL DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1.5 FEET SECTION SHALL BE HAND TAMPED IN 4" LIFTS TO THE TOP OF HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE. THE EARTH DIKE. e a. 6" c ' ' < ' ` 'a 7. WEEP HOLES MAY BE PLACED IN BACK 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING 5. FOLLOW—UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL WALL AS DIRECTED BY THE ENGINEER, BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE. BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE IF REQUIRED. ATTACH HARDWARE U U m 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF PARTY OR HIS AGENT. SECTION A -A' CLOTH (ALUMINUM OR GALVANIZED EMPTYING INTO A DISTURBED AREA. 6. OUTLET PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, STEEL NO. 4 WIRE REINFORCEMENT) TO TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE. THE OUTSIDE OF THE STRUCTURE WITH HEAVY DUTY CONSTRUCTION ADHESIVE OVER THE WEEP HOLE. PLACE A NOT TO SCALE 3 #4 BARS 3 POROUS FABRIC BAG FILLED WITH ONE CUBIC FOOT OF #78 STONE AT EACH TOWN OF WAXHAW � SPACED 6" O.C. WEEP CLOTHHOLE AGAINST THE HARDWARE LAND DEVELOPMENT STANDARDS FLEXIBLE PIPE SLOPE DRAIN REV., Q 8. BLOCK TO BE PLACED IN ALL CORNERS 505.1 TO SUPPORT SLAB TOP ABOVE WALLS _ _ _ _ FOR 8—INCH ARCH OPENINGS. BLOCK 2' —2 1/2" TO EXTEND TO EDGE OF 48" OPENING. 9. IF PRECAST CONCRETE WILL BE USED BY THE CONTRACTOR, SHOP DRAWINGS d WILL BE REQUIRED IN ADVANCE FOR N o a t I #4 ADDITIONAL REVIEW. 00 o REINFORCING BARS (TYP.) IE) z O a I I OC O N 2' — 8'� LU � F o Ir www z :E : o L — — — — O 0 0 W PLAN OF COVER LL LL 0 0 0 0 2 SLAB TOP INLET NON—STANDARD DETAIL S 1 NOT TO SCALE co co O O E E rn rn 0 0 LU 0\D N Q � � 0 N r I I I I I ImIQI 6z L TT V! T N CO T N T W Q O O J N LU LU N) ~ (n I- LU 0 w cn J i N ta..I = z a_CrImz O U) O 0 F EL 00 W I pz0O J U co zLUIr Q J = Q 00U C) o z O U z 12' MIN. O PROPOSED/EXISTING GRADE I I- � li.i iLi 0 ��� 0 � o 1 1 — LU _j C3 ���� LU z o 0 0 O Q Ir Ir 1= I O o_ o ' � II � II � �� �--1� 1 � z 11 I IIIIIIIIIIIIIIIIIII—III— OQ NOTES: ABC STONE PROJ. MGR.: WGB DESIGN BY: CJH —BMP ACCESS DRIVE SHALL BE A MINIMUM OF 12' WIDE. ' DRAWN BY: CJH — ALL ACCESS DRIVES SHALL HAVE A MINIMUM 20' ACCESS EASEMENT COMPACTED SUBGRADE >- PROJ. DATE: DEC. 2019 — MAXIMUM LONGITUDINAL SLOPE OF 15% AND CROSS SLOPE OF 5%. SEE GRADING PLANS FOR SPECIFIC GRADES FOR INDIVIDUAL BMP ACCESS DRIVES. Q DRAWING NUMBER: 0 0 Wl< z C9.6 WKDPROJ. NO.: BMP POND ACCESS DRIVE N.T.S. DICI<SON J Know what's below. Call before you dig. community infrastructure consultants 1 CL 20170279.00. I O. zaw z pOo OJU ozw ao¢ woo ww� U= O¢m �a0 =�o ~ w ozw z-o oz zo zo z ° om wY� =UQ ~F_ OY� y w ¢op zwa Om¢ z ozz O w 0 w w¢� ¢3:z o�0 wD¢ 0 1Fz w�= ¢�Im_ =w� 0 0Fr zw °2P z°w �2P o z 8 U-O zzo o2= YU~ U soo YUQ =z �F oo¢ 0 =Zw F, -'m a�2 Ow¢UD INLET PIPE -/ ENERGY DISSIPATOR NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH ENGINEER. ALL WORK REGARDING THE DAM EMBANKMENT MUST BE MONITORED AND APPROVED BY GEOTECHNICAL ENGINEER. DEPENDING UPON SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. LITTORAL SHELF WITH WETLAND PLANTINGS (6' MIN. WIDTH) RIPRAP BERM AND WEIR CLASS B RIP INVERTED WATER QUALITY ORIFICE RAP 15" MIN. DEPTH 10 YEAR = 569.84' YEAR = 567.75' PERMANENT POOL - 566.50' - - - - - 1 ' -0" 1" = 566.50' - - - - - - - 6: 1 SLOPE ST _ O Q� o ono 6' LITTORAL SHELF ....~:...:: .... .:...'.` .. .'.:t.+:.±::.: .. POND BOTTOM 558.00' L 2:1 SLOPE STABILIZED I TO POND BOTTOM MAIN POND � TOP OF BERM 2 SEDIMENT FOREBAY 2 _ 12" SEDIMENT STORAGE 557.00' I 10, -' EMERGENCY SPILLWAY 571.80 - L � I III1 I I1 I I= I' GEOMEMBRANE LI- NER - (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION IS EMERGENCY SPILLWAY DETAIL GENERAL NOTES AT THE TOP OF LINER 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. 5. BARREL (36"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #1 -ANTI-SEEP i p i COLLARS(TYP.)' // b i TURTLEHEAD WHITE 6" PVC SCREW - TYPE PLUG 6" PVC TEE TOP OF BERM 10.0' 573.00 (MIN.) EMERGENCY SPILLWAY 571.80 6.1 -DL 6'- 0' 6'-0$$ x 6 -0$$ x 1'-6" I I I I I I I CONCRETE ANTI -FLOATATION PAD #4 REBAR, 6" OC EACH WAY 3" COVER OF ALL REINFORCEMENT TEMPORARY POOL PERMANENT POOL 6" PVC STUBBED INTO BOX 6" PVC CAP WITH 1.7" HOLE DRILLED WATER QUALITY ORIFICE DETAIL TOP OF STRUC CLASS I RIP RAP SPILLWAY (8) ANTI -SEEP COLLARS R 7n' TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) WQ i (SEE SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE WATER QUALITY ORIFICE PIPE CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL \ I I LEGEND A rE SECTION A -A N TS OUTLET STRUCTURE DETAIL PLAN VIEW A URE N.T.S. GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE TOTAL AREA: 2,248 SF LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY TOTAL PLANTS REQUIRED: 562 PLANTS (2,248 SF x 0.25) ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. J I TOTAL PLANTS PROVIDED: 576 PLANTS 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. I 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO \ I BMP PLANTING NOTES INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT \ \ STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND \ \ - 1. SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY SHALL CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN ENGINEER OF RECORD. \ \ STANDARD FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES \ \ NURSERY AND LANDSCAPE ASSOCIATION. REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 40\ \ \ 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE JSE MALLOW \ \ \ CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL o \ \ \ MATERIAL BY OWNER. BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE C� \ 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL /1 '20 DUCK i / 24 DUCK S� O \ \ \ \ \ CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS. BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER POTO �L POTATO 6, \ \ \ \ '_1 THE IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM TA OW- 572 573 570 568 \ 566 564 \ 562 5 \ \ \ 6- / FORB/ / � Ss / 66 - � S \ S�0 ES-100 o O622 ---- FFE: 583.00 �/ J i WET DETENTION POND #1 PLANTING DETAIL OTANICAL NAME COMMON NAME SIZE QTY GITTARIALATIFOLIA DUCK POTATO 2"x5" PLUG 125 CORNUS CALAMUS SWEETFLAG 2"x5" PLUG 122 K ISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 107 BELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 91 HELONE GLABRA WHITE TURTLEHEAD 2"x5" PLUG 131 EI 69 , \ SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT SURFACE WITH SLOPE OF 10:1 IS PROVIDED. 24 SWEETFLAG WILL BE A WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE 6j \ � \ IN, PROVIDED INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE 25 SWEETFLAG i PROVIDED WITH CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO 26 WHITE S6 6' \ \ AND GROW AS OPTIMALLY AS POSSIBLE. SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. R SO \ 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY SEVERAL # 23 SCARLET TURTLEHEAD �6 � \ � ( 8. APPLY FERTILIZER PER SPECIFICATIONS. TIMES DAILY WHEN WEATHER IS HOT). 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 16 SWEETFLAG i ROSE MALLOW S� � 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE � 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS / \ BOTTOM OF POND WITH 12" BENT WIRE PINS. ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. \26 CARDINAL \ \ 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE TRANSPLANTING. SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE 24 CARDINAL , i - \ FLOWERS 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT FLOWERS - - - 24 WHITE SHOULD NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. TURTLEHEAD UNTIL THEY ARE PLACED IN THEIR PERMANENT POSITIONS. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP MAIN POND 29 DUCK 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE POND. POTATO TIME OF TRANSPLANTING. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH �N , 25 SWEETFLAG ° 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE ROSE MALLOW - BOTTOM LAYER OF THE FABRIC TO THE GROUND WITH 10-12" PINS. SS8 / FENCING TO REMAIN IN PLACE FOR A PERIOD OF ONE YEAR POST / S6 24 DUCK 56 \ - _ INSTALLATION OF PLANT MATERIAL. 28 WHITE 6 %` 11. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON / S6 TURTLEHEAD, 56 ° \ \ PLAN. 27 WHITE \ \ 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN 5664 �69 TURTLEHEAD / \ THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER 6 ��1 _ 3' \ IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 28 DUCK S6> % 5� 5'1 \ 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO POTATO 17 CARDINAL 15 / INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN / 3?0 , FLOWERS ° j__ \ \ \ PLANTED. ° 32 SWEETFLAG \ ° 30 SCARLET \ \ \ S>S ROSE MALLOW f (90 ebb Wl< L D I C 1<S0 N community infrastructure consultants N.T.S. Know what's below. Call before you dig 1.0 T N 00 T N z O U D U) z O U IIr O LL LU U) O Z O i Q z 2 J LU WK DICKSON community infrastructure consultants 1211% FS6HEET 8bA2828P ww*0131828N:880 N8 LIERE N8:F=8M As0 o .l' S b � 2 i��4d�"� PROFESSIONAL SEAL U U m p z O O CE z z C15 U w w z � : p O O Cn U U w Ir = _ O O 0 0 0- 0- z z O O rn rn 0 0 w N N � ImIQI ° C CV W H LU c) cf) I- _ W _j� <cf) _j_jU a_ CO CE LU z 0�0 CrO 0 LU r- Ir 0 z 0 Q _j Z W IY W J_ � 0 U O 0 rn Ili lii 2 _j z w z Ir Ir � 0 PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.7 WKD PROJ. NO.: 20160181.00.CL I w 0. waw z pOo OJ0 ozw 'OD woo Wow U= 0'. .ao0 ~ =--w ozw F-0 o. WUZ ZOO z ° O m TY UQ ~0= 0.1 w§w ¢00 zwa 0 w OZZ OO W O a � w¢� ¢3:z o � 0 I woo Fz w�a = a� 0 7zw °< z°W oz,8 U-O zzo ow= ,)o U soo §.,< =Z ~ ih oo¢ 0 =Zw °°_ Ow¢ UD NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH 10.0' ENGINEER. ALL WORK REGARDING THE DAM LITTORAL SHELF WITH (MIN.) EMBANKMENT MUST BE MONITORED AND APPROVED WETLAND PLANTINGS BY GEOTECHNICAL ENGINEER. DEPENDING UPON (6' MIN. WIDTH) �. SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- SRO (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. �F RIPRAP BERM AND INVERTED WATER �/3 WEIR CLASS B RIP QUALITY ORIFICE RAP 15" MIN. DEPTH 10 YEAR = 562.13' OQ 2 YEAR = 561.16' - III I I I 1 1 1 III PERMANENT POOL 558.50' �7 -0" 1" = 558.74' -_ - - - -_ - - - - - - - - - SLOPE 6. de- 6:1 SLOPE Sow �oP�..:.:' 6 6„ 6' LITTORAL SHELF INLET PIPE _ Q _ _ _ POND_BOTTOM I 553.00' `L ENERGY DISSIPATOR _ .. .... ..:.. :.: ::. ..., 2:1 SLOPE STABILIZED TO POND BOTTOMd M I = 7 6'-0" x 6'-0" x 1'-O" CONCRETE ANTI -FLOATATION PAD TOP OF BERM MAIN POND #4 REBAR, 6" OC EACH WAY3" 2 SEDIMENT FOREBAY 2 -_ 12" SEDIMENT STORAGE COVER OF ALL REINFORCEMENT 1 1 I 552.00' 1 10' EMERGENCY SPILLWAY 563.95 I 1 GEOMEMBRANE LINER I I - IIIIII-III- II ' (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION IS GENERAL NOTES AT THE TOP OF LINER EMERGENCY SPILLWAY DETAIL 6" PVC SCREW TYPE PLUG 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE 6" PVC TEE TEMPORARY POOL WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. PERMANENT POOL 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. 5. BARREL (36"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS 6" PVC STUBBED INTO BOX SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 6" PVC CAP WITH 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 2.5" HOLE DRILLED 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH WATER QUALITY ORIFICE DETAIL TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #2 \ 560 ANTI -SEEP J COLLARS (TYP.) L 1 29 DUCK POTATO 30 SCARLET _ ROSE MALLOW :•1.!i 31 SCAF \ 22 DUCK ROSE M. POTATO \ # \\ 28 SCARLET /ROSE MALLOW \ 9 S �^ h N 31 WHITE SSA \- TURTLEHEAD / 27 WHITE TURTLEHEAD \\ \ MAIN POND\ \ \ \ 32 CARDINAL \ \ FLOWERS,, 34 CARDINAL \ \ \ \ 22 SCARLET FLOWERS 34 DUCK ROSE MALLOW POTATO SWEET LAG- ' - � -,37 SWEETFLAG�- 32 CARDINAL-c WHITE FLOWERS - RTLEHEAD 570 - 575 580 \ IN 585 WET DETENTION POND #2 PLANTING DETAIL LANDEA I 558 - 560, \ 565 _ JVY 562 -560 558 c 556 554 e FOR 560 _ 1 565 57� S� - I � Wl< DICI<SON community infrastructure consultants • 77� TOP OF BERM 565.00 -EMERGENCY SPILLWAY 563.95 CLASS I RIP RAP SPILLWAY (4) ANTI -SEEP COLLARS T: �: �: I I I I I I I 11 1L�Fl�i TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE TOP OF STRUC rE WATER QUALITY ORIFICE PIPE CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL LEGEND BOTANICAL NAME COMMON NAME SIZE QTY SAGITTARIA LATIFOLIA DUCK POTATO 2"x5" PLUG 115 ACORNUS CALAMUS SWEETFLAG 2"x5" PLUG 90 HIBISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 111 LOBELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 1 123 CHELONE GLABRA WHITE TURTLEHEAD 2"x5" PLUG 1 92 TOTAL AREA: 2,091 SF TOTAL PLANTS REQUIRED: 523 PLANTS (2,091 SF x 0.25) TOTAL PLANTS PROVIDED: 531 PLANTS BMP PLANTING NOTES 1. SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED SHALL CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN STANDARD FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION. 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT MATERIAL BY OWNER. 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS. 4. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT WILL BE A WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE PROVIDED WITH CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE AND GROW AS OPTIMALLY AS POSSIBLE. 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY (SEVERAL TIMES DAILY WHEN WEATHER IS HOT). 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE BOTTOM OF POND WITH 12" BENT WIRE PINS. 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF TRANSPLANTING. 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SHOULD NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY UNTIL THEY ARE PLACED IN THEIR PERMANENT POSITIONS. 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE TIME OF TRANSPLANTING. 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE BOTTOM LAYER OF THE FABRIC TO THE GROUND WITH 10-12" PINS. FENCING TO REMAIN IN PLACE FOR A PERIOD OF ONE YEAR POST INSTALLATION OF PLANT MATERIAL. 11. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON PLAN. 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN PLANTED. A WQ i (SEE SECTION A -A N TS OUTLET STRUCTURE DETAIL PLAN VIEW A �TURE N.T.S. GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY ENGINEER OF RECORD. 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM SURFACE WITH SLOPE OF 10:1 IS PROVIDED. 7. INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. 8. APPLY FERTILIZER PER SPECIFICATIONS. 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP POND. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. N.T.S. • a Know what's below. Call before you dig Q 0 0- z 0 U U) z 0 U 0 U_ W O Z 0 i Q z 2 J LU rr, DVW DICKSON community infrastructure consultants 1211% ES aHEET 8bA2828P ww*0131828N:880 N8 LIERE N8:�=883 01����,/ �O.OFE8Sso,����� SAl PROFESSIONAL SEAL U U m p z Ir O O 0- Ir z z ch U w w z � : LU O O Cn U U w O O 0 0 w w o_ o_ e e L L rn rn 0 0 w 0000 N Q r r � ImIQI ° C CV W H LU D c) r U) I` (2 JiN Q i J U D_ En 0_ Ir W z 0�0 CrO 0LL<a:0 LU J tr Oz00 Q C00 z LU r I j � _ J D U O 0 rn li.i li.i J H z U z LU Ir o PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.8 WKD PROJ. NO.: 20160181.00.CL I w 0. waw z pOo OJ0 ozw 'OD woo WWI U= 0'. .ao0 ~ =--w ozw z oZ WOZ zoo z 00 z 0.Y. TUQ 0.1 w§w ¢00 zwa 0.W ozz OO W O a ¢1 w1 ¢3:z 0�0 WD¢ 0 wFz w§a =a� 0 0zw °2P z°w z, ozD U-O zzo 0�= ,)o U soo Y Q �=Z �F oo¢ =00 M moo a�2 Ow¢ UD NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH 10.0' ENGINEER. ALL WORK REGARDING THE DAM LITTORAL SHELF WITH (MIN.) EMBANKMENT MUST BE MONITORED AND APPROVED WETLAND PLANTINGS BY GEOTECHNICAL ENGINEER. DEPENDING UPON (6' MIN. WIDTH) �. SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- SRO (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. �F RIPRAP BERM AND INVERTED WATER �� WEIR CLASS B RIP QUALITY ORIFICE RAP 15" MIN. DEPTH 10 YEAR = 571.85' OE 2 YEAR = 570.92' - I I I III III III PERMANENT POOL 568.50' �7 -0" 1" = 568.6T -_ ° - - - -_ - - - - - - - - - SLOPE 6 6:1 SLOPE Sow �oP�..:.:' Y 6 0„ INLET PIPE 6' LITTORAL SHELFa.... .. ::.,.+..:.7%��D ... . . BOTTOM 564.00' `L ENERGY DISSIPATOR 2:1 SLOPE STABILIZED I TO POND BOTTOM I = SEDIMENT FOREBAY 6'-0" x 6'-0" x 1'-6" CONCRETE ANTI -FLOATATION PAD TOP OF BERM MAIN POND #4 REBAR, 6" OC EACH WAY3" 2 2 -_ 12" SEDIMENT STORAGE COVER OF ALL REINFORCEMENT 1 1 I 563.00' 1 10' EMERGENCY SPILLWAY 574.00 I 1 GEOMEMBRANE LINER -I _ IIIIII-III- II ' (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION Is AT THE TOP OF LINER EMERGENCY SPILLWAY DETAIL 6" PVC SCREW GENERAL NOTES TYPE PLUG 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE 6" PVC TEE TEMPORARY POOL WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. PERMANENT POOL 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. TOP OF BERM 575.00 -EMERGENCY SPILLWAY 574.00 CLASS I RIP RAP SPILLWAY (3) ANTI -SEEP COLLARS I I I I I I I 11 1L�Fl�i TOP OF STRUC 5 9:V TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE A WQ i (SEE SECTION A -A N TS A 5. BARREL (24"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS 6" PVC STUBBED SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. INTO BOX WQ ORIFICE PRECAST CONCRETE ELEV. 568.50 STRUCTURE 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 6" PVC CAP WITH 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 1.7" HOLE DRILLED WATER QUALITY 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH WATER QUALITY ORIFICE DETAIL ORIFICE PIPE PRECAST STRUCTURE TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL OUTLET STRUCTURE DETAIL 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE PLAN VIEW 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #3 N.T.S. LEGEND w 0 \ O N GAKLtz I \ E MALLOW 19 CARDIN WRYLY", Im y_x � \ 1 TF \C ANTI -SEEP ROSE COLLARS (T ENCY/SECONDARY /2�/ V STONE SPILLWAY / WET DETENTION POND #3 PLANTING DETAIL WHITE RTLEHEAD \ s�7 BOTANICAL NAME COMMON NAME SIZE QTY SAGITTARIA LATIFOLIA DUCK POTATO 2"x5" PLUG 80 ACORNUS CALAMUS SWEETFLAG 2"x5" PLUG 85 HIBISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 93 LOBELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 76 CHELONE GLABRA WHITE TURTLEHEAD 2"x5" PLUG 87 1 I TOTAL AREA: 1,655 SF - I ) ) TOTAL PLANTS REQUIRED: 414 PLANTS (1,655 SF x 0.25) TOTAL PLANTS PROVIDED: 421 PLANTS \ ° BMP 1. PLANTING NOTES SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED SHALL _ CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN STANDARD FOR \ NURSERY STOCK" AS PUBLISHED BY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION. 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT MATERIAL BY OWNER. \ I I 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS. ° 4. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT WILL BE A \ I WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE PROVIDED WITH N, I \\ \ I\ I I CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE AND GROW AS ) \ \ ` - OPTIMALLY AS POSSIBLE. \I\ \ \ 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY (SEVERAL TIMES \ \ \ DAILY WHEN WEATHER IS HOT). \ \ 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE BOTTOM i 3 ° \ \ \ \ \ \ ) OF POND WITH 12" BENT WIRE PINS. 0 I \ \ \ \ \ 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF \ \ TRANSPLANTING. \ \ \ \ \ \ \\ 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SHOULD I \ \ \ 6� NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY UNTIL THEY \ \ �71l45\ \ ARE PLACED IN THEIR PERMANENT POSITIONS. \ \ FT. ) FIDE: 587.0 \ ) 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE TIME \ )) ) ) ) ) OF TRANSPLANTING. E 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL o / / / / WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE BOTTOM LAYER OF THE M co 00 / / / FABRIC TO THE GROUND WITH 10-12" PINS. FENCING TO REMAIN IN PLACE FOR ° // 11. A PERIOD OF ONE YEAR POST INSTALLATION OF PLANT MATERIAL. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON PLAN. 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN ° / / PLANTED. ) 7T Wl< LD I C 1<S0 N community infrastructure consultants GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY ENGINEER OF RECORD. 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM SURFACE WITH SLOPE OF 10:1 IS PROVIDED. 7. INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. 8. APPLY FERTILIZER PER SPECIFICATIONS. 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP POND. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. N.T.S. Know what's below. Call before you dig rOZ Q 0 z 0 U U) z 0 U 0 LL LU Co O Z O i Q z J LU DVW DICKSON community infrastructure consultants 1211% ES aHEET 8bA2828P ww*0131828N:880 N8 LIERE N8:HM U U m p O z O 0- Ir z w z w U 60 z :E O :ELU O U) LU U U O O 00 LU LU e e LD LD Ir Ir rn 0 00 rn 0 w N N � ImIQI C N LU I- cy) LU 07 I` U) J i N Q J J U a_ a_ °CWz IrO m 0LL<a-0 LU ~ J Ir cr 0 Q m zwor J w H = 0 U O 07 0 rn Ii.i < Ii.i � z I-__ 0 z w Ir Ir � 0 PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.9 WKD PROJ. NO.: 20160181.00. C L