Loading...
HomeMy WebLinkAboutSW6191005_Plan (Grading)_201912182 3 4 1 5 1 6 1 7 Rl Rl 10 G F E BJ C n 1 FOR OFFICIAL USE ONLY °. 171 \ \ + ° i4 8 DRAIN BASIN WITH 8 DI O C 1103 C-504\ STANDARD GRATE BY 6 \ \ NYLOPLAST OR 02 00' \\ \\ APPROVED EQUAL 300. + 300.4' O ES \ \\ \ 6 \ 5 \y \ \ \ FOOTBRIDGE \ \ \ \ ✓ � 1 \ 2ST0RM DRAIN j 299.8', i 'CG103 C-504,FIPE / G _ PROPOSED _ + 302.8,' BUILDING ADDITION FFE=304.80 ` \ \\ /� B-3---�� / �'— 300, �\ +�297.6' \ ° ° — 300.1 ES� 8 ,--- n / `Lg6 - g/ JTLET Vol ° 2g �301.8' \ \\ \ ES 302.0 3 PROPOSED STORMWATER MANAGEMENT `\ CG103 C-505 INFILTRATION BASIN #1 ° / 302.1' BOTTOM STORMWATER = 295.75' — — � — a PONDING = 297.25' \ �\ NO GRADING OR DRAINAGE WORK BEYOND THIS AREA \ \ SEE CD101 & CG102 FOR WORK BEYOND \\ \ \ \ \ ��p \ THIS AREA �� \ \ \ \ J� ASPH HEADWALL / j29 '� \ �� •• J I NV=297.7' / 7 /300.0' 00 18" CMP O� / /i + 301.4 296.2' r � GRAVEL i� � �2g6 • ,e296.2'J od\ 295.4' 00 • MATCH EXISTING GRADE ° 295.L1 ° 0 a 293.2' 1 '° ❑■I XO Zv' O� BLDG 0190M '--' �: E='304.80 APPROXIMATE AREA TO UNDERCUT LOOSE SOILS TO A DEPTH OF APPROXIMATELY 3' BELOW EXISTING GRADE IN AREA OF INTERIOR FOOTINGS. UNDERCUT SOILS CAN BE REUSED AS STRUCTURAL FILL PROVIDED COMPACTION AND MATERIAL COMPOSITION SPECIFICATIONS ARE MET. REFER TO GEOTECHNICAL REPORT DATED 29 JUNE 2018 PREPARED BY BUILDING AND EARTH SCIENCES, INC. 7' / / .1-1r",Il N, Boa XOXC -/ MATCH EXISTING GRAD A299.8' oo i AS PW 10, / / S-4\ \ / 2 4 / B. 0' 1, 112 (-i-) GRADING AND DRAINAGE PLAN - DFAC ADDITION AND TRASH DUMPSTE G103 SCALE: 1 "=20' KEY MAP- CG103 R AREA NOTES: 1. SEE STORM DRAIN SCHEDULE ON SHEET C-601 FOR PROPOSED STORM DRAIN PIPE AND STRUCTURE INFORMATION AND INVERTS. 2. COORDINATE ROOF DRAIN LOCATIONS WITH PLUMBING PLANS. SEE PLUMBING PLANS FOR CLEAN OUT DETAIL. 3. CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE NOTED. CARO 0 SEAL 49 = O �•. F�yG I N .�Q� N ` "lill 1o`8/23/2079 20' 0 20' 60, PERMIT SET 1 "=20' IIIIII IIIIII .. x x O X W .. X X O X 0 m O w o-xFx>- < N < x U X [if O QfqUXX Z X � X w o — c/)XUXUI— z w CD �0 z o m m m 0 JU FLU 0 m 0Lu w z 0 z 3: Y U � 0 — Wcn z� 1: U) S 0 lii N z 00 Oz UDcoof co< 0 0 W Of z cn"T M W J � '0 z U_ 0 W Y ' � Z N ( 0 z Q U "z�0 LLI LL z = z(=70000U) O F— O� z — -i 6 6w cn (.9 O O oQo,o,U c0 W J Z Z °0 Z '^ z O [.�'.� Q 02~ i Q(0 m J Uw Q� LLQ LL J O � Q ~ 0 U) Q� Jcp a� Lu U J T- U Q 0 �LL z= zz �Q �o m" z Z �0) aQ °° ° 0- cD z ?O o� (Q FOR OFFICIAL USE ONLY CORRECTED 100% SUBMITTAL G F E BJ C n 1 1 FOR OFFICIAL USF�ONLY /3 CG104 C CG104 o N CG104 ri // CG 104 6-564 1 GRASS SWALE / CG104 C-106 (D#1) % H\ 293.9' H C, Iry ao CO °Q> xz� / Y / T c913 c9 00 0 H H A fi \ Oo% / 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 C3U I I UIVI 01 UMMVVHI CK = LZI1.Lo PONDING = 298.75' QQ / L� /o / H CAT POLE o / °Q> / / 00' H\ H 5 G RA )CG104 6-566 (D#4 ".0, i `'u� 307��p " / 3 i a0-1 — 001 00 \CG104 C-506 (U#2) ��- -` / pu H.:::>:;.. N 298.1 299.3':: 5654 0 TIE TO EXISTING / 9A3 1 \ \ P!7- r0 - - - - - 302 1 •�� CG10\4 C�-503 / // y PROJECT LIMITS OF \ DISTURBANCE, (TYP.) -303'- - - 30 PROJECT LIMITS OF - 4 " CONSTRUCTION, (TYP.) 306, \b 30>f\\ ,\ \ MLMORJAL \ \ I /J I ST�NE \�\ GRADING AND DRAINAGE PLAN - P G104 (BID OPTION 1) SCALE: 1 "=20' / ARKING LOT KEY MAP: N O \ \\ c9 \ \ \ \ \`Jc9\ °� - - 299 50' ��- - PEA GRAVEL PRETREATMENT, \ \ `\ \ jV X - (TYP.), SEE DETAIL3 ON SHEET \\ C-505 ASPH p \ \ \ \ J ,gg ° 3 PROPOSED STORMWATER MANAGEMENT \ \ \ \ o> CG104 C-505 INFILTRATION BASIN #2 \ \ `\\\ \ G BOTTOM STORMWATER - 297.25 \ \\ \ Qo, _ oo PONDING = 298.75' 301' - , \ \ 1 CONCRETE DROP LC-504 INLET QO \ \ P (TYP) % 5001 \ O \ \ \ \ o> \ \ \ FOOTBRIDGE \ `' O NO GRADING OR \ DRAINAGE WORK BEYOND THIS AREA \ \ SEE CD101 & CG102 \�, FOR WORK BEYOND 0�?- THIS AREA >� N ELEC OUTLET NOTES: 10 1. SEE STORM DRAIN SCHEDULE ON SHEET C-601 FOR PROPOSED STORM DRAIN PIPE AND STRUCTURE INFORMATION AND INVERTS. 2. CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE NOTED. 3. GRASS DITCH (D#1-D#4) SHALL BE STABILIZED WITHIN 7 DAYS FROM LAST LAND DISTURBING ACTIVITY. �N CARO SE 4 = II11\96\2099 ISSUED FOR CONSTRUCTION US Army Corps of Engineers® IIIIII ARKING LOT KEY MAP: N O \ \\ c9 \ \ \ \ \`Jc9\ °� - - 299 50' ��- - PEA GRAVEL PRETREATMENT, \ \ `\ \ jV X - (TYP.), SEE DETAIL3 ON SHEET \\ C-505 ASPH p \ \ \ \ J ,gg ° 3 PROPOSED STORMWATER MANAGEMENT \ \ \ \ o> CG104 C-505 INFILTRATION BASIN #2 \ \ `\\\ \ G BOTTOM STORMWATER - 297.25 \ \\ \ Qo, _ oo PONDING = 298.75' 301' - , \ \ 1 CONCRETE DROP LC-504 INLET QO \ \ P (TYP) % 5001 \ O \ \ \ \ o> \ \ \ FOOTBRIDGE \ `' O NO GRADING OR \ DRAINAGE WORK BEYOND THIS AREA \ \ SEE CD101 & CG102 \�, FOR WORK BEYOND 0�?- THIS AREA >� N ELEC OUTLET NOTES: 10 1. SEE STORM DRAIN SCHEDULE ON SHEET C-601 FOR PROPOSED STORM DRAIN PIPE AND STRUCTURE INFORMATION AND INVERTS. 2. CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE NOTED. 3. GRASS DITCH (D#1-D#4) SHALL BE STABILIZED WITHIN 7 DAYS FROM LAST LAND DISTURBING ACTIVITY. �N CARO SE 4 = II11\96\2099 ISSUED FOR CONSTRUCTION US Army Corps of Engineers® IIIIII IIIIII X W 0 O O 0 o X I-L�j O M U X> of O N � Q X O WpUN Xwo Z J — Z — !�2NU) OUXU z ui 0 �0 z o UJ 0 m 0 Lu z 0 z Y U � 0 - u; p0 0z UOcoof c5Q 0 0 W Of z ZD cf)� M LLI W J �o z W U_ 0 Ye ZN(O '0 z Q � U "z(0r-* 1Wi z = z (=7 0000 U) O 00 O J w cn 0z O Q oQo,o,U 10 2' z z Q 1(D2 ? O V Gi U Q mom~ (D cd M J M J 0 z Y LL J Q oU Q z� U J J z T- 0-0 o " w � Qa zz 0 0z z Q � Q� mo 0 �0 o LL o0- Q CD z Q SHEET ID CG104