Loading...
HomeMy WebLinkAboutWQ0040782_Enforcement (Payment)_20191219FAST TRACK SEWER ENGINEERING CERTIFICATION Envirimmenta! C.r: t;r Received PERMITTEE: City of Mebane 'DEC' 12 2019 PERMIT#: WQ0040782 Winston-Salern PROJECT: NCIC Phase 3 Infrastructure (Construction Only) :r' ISSUE DATE; April 9, W19 Regional �`'i,"� This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this.permit until the Division has received this Certificotion.and all required: supporting documentation. It should he submitted in a manner that documents the. Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations. Section atth.e.address at the:bottom. Any wastewater flow made tributary to the wastewater collection system extension' prior to completion of this -Certification -shall be considered a.violation .of the permit and shallsubject.the. Permittee to. appropriate enforcement actions. The Permittee.)sresponsible fortracking all partial certifications up until a final certification is received. A Final Certification shall be a complete. set of record drawings and design calculations regardless of whether partials have been submitted.. PERMITTEE's CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project hasbeen constructed pursuant to the applicable standards & requirements; the Professional Engineer below has provided .applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. ;f� . 4 85a � Printed Name,.Title T Signature Date ENGINEER'S CERTIFICATION as.a dui registered ProfessionalEn Ineer in the State of North Carolina, having been authorized to observe (periodically, ❑ weekly, L] full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care anddiligence was used in the observation of the following; construction: of approximately 3,422 linear feet of 10-inch gravity sewer to serve future development as. part of the NCIC Phase 3 Infrastructure project, and the discharge of'0 gallons per day of collected wastewater (Constructlon. Only Permit) into the City of Mebane s existing sewerage system; pursuant to the application. received April 8, 2019; such that the construction was observed to be built, within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February l2,:T996 as applicable; the. Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, No as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date " �`1Rp'y ... Final ❑ Partial.,(include description) SEAL e 15809 L i 'a ,�FNC,INEFP.•• ate.; 6 -- �G•< Certification Comments/Qualifiers (attach if necessary): NCDWR.—Water Quality'Reglonol Operations Section 450 West 'Hanes.MIII Road, Suite 300,, Winston-Salem, NC 27105 Winston-Salem Regional Office Phone: (336) 776-9800 .FAX: (336) 776-9798.