HomeMy WebLinkAboutWQ0040782_Enforcement (Payment)_20191219FAST TRACK SEWER ENGINEERING CERTIFICATION Envirimmenta! C.r: t;r
Received
PERMITTEE: City of Mebane 'DEC' 12 2019
PERMIT#: WQ0040782 Winston-Salern
PROJECT: NCIC Phase 3 Infrastructure (Construction Only)
:r'
ISSUE DATE; April 9, W19
Regional �`'i,"�
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this.permit until the Division has received this Certificotion.and all required: supporting documentation. It
should he submitted in a manner that documents the. Division's receipt. Send the required documentation
the Regional Supervisor, Water Quality Regional Operations. Section atth.e.address at the:bottom.
Any wastewater flow made tributary to the wastewater collection system extension' prior to completion
of this -Certification -shall be considered a.violation .of the permit and shallsubject.the. Permittee to.
appropriate enforcement actions. The Permittee.)sresponsible fortracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete. set of record drawings and
design calculations regardless of whether partials have been submitted..
PERMITTEE's CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project hasbeen constructed pursuant
to the applicable standards & requirements; the Professional Engineer below has provided .applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
;f� . 4 85a
�
Printed Name,.Title T Signature Date
ENGINEER'S CERTIFICATION
as.a dui registered ProfessionalEn Ineer in the State of North Carolina,
having been authorized to observe (periodically, ❑ weekly, L] full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care anddiligence was used in the observation of the following; construction:
of approximately 3,422 linear feet of 10-inch gravity sewer to serve future development as. part of the
NCIC Phase 3 Infrastructure project, and the discharge of'0 gallons per day of collected wastewater
(Constructlon. Only Permit) into the City of Mebane s existing sewerage system; pursuant to the
application. received April 8, 2019; such that the construction was observed to be built, within substantial
compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer
Minimum Design Criteria adopted February l2,:T996 as applicable; the. Division's Minimum Design Criteria
for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, No as applicable; and
other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date " �`1Rp'y ...
Final ❑ Partial.,(include description) SEAL
e 15809
L i
'a ,�FNC,INEFP.•• ate.;
6 --
�G•<
Certification Comments/Qualifiers (attach if necessary):
NCDWR.—Water Quality'Reglonol Operations Section 450 West 'Hanes.MIII Road, Suite 300,, Winston-Salem, NC 27105
Winston-Salem Regional Office Phone: (336) 776-9800 .FAX: (336) 776-9798.