Loading...
HomeMy WebLinkAboutNCG030447_COMPLETE FILE - HISTORICAL_20171211 (FIX)PERMIT NO. STORMWATER DIVISION CODING SHEET NCG PERMITS /V iqy --7 DOC TYPE XHISTORICAL FILE MONITORING REPORTS DOC DATE 0 o?b/ / Ion YYYYMMDD M4 Energy, Mineral � Land Resources ENVIRONMENT AL WALITY Division of Energy, Mineral, and Land Resources Land Quality Section / Stormwater Program National Pollutant Discharge Elimination System (NPDES) PERMIT OWNER AFFILIATION DESIGNATION FORM (Individual Legally Responsible for Permit) Use this form if there has been: FOR ACFNCY USF ONLY Date Received 1'eaz Month Da}' NO CHANGE in facility ownership or facility name, but the individual who is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must fill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual" mean? The person is either: • the responsible corporate officer (for a corporation); • the principle executive officer or ranking elected official (for a municipality, state, federal or other public agency); • the general partner or proprietor (for a partnership or sole proprietorship); • or, the duly authorized representative of one of the above. 1) Enter the permit number for which this change in Legally Responsible Individual ("Owner Affiliation") applies: Individual Permit (ar) Certificate of Coverage N I C I S I 1 1 1 1 1 N 'C I G 101,17 10 ILI 4 171 2) Facility Information: Facility name: [o.'�e.�i7 t KGr 1-�1c o'iec�Y44 Company/Owner Organization: [�„ (y c,� y C_ Facility address: Savo c T Address rXn VI) _ r,L C City State Zip To find the current legally responsible person associated with your permit, go to this website: hap: //deg-ne,gov/about/di visions/energy-minera l-1and -resources/enercxy-mineral-land-permits/storm water -program and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed: Previous legally responsible individual: �+✓�<'r VC7sy� ��1��"C V, First MI Last 4) NEW OWNER AFFILIATION (legally responsible for the permit): PersVfftEIVED`r this permit DEC 112017 YC %.1 t v-) V_ ��ui�U5 First M[ Last Page l of 2 SWU-OWNER VW- 1AHERtALITY STORMWATER PERMITTING NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form (if no Facility Name/Ownership Change) Title G76ov Vj awlG Mailing Address 5c,n�!v 4 N C City State Zip (cjn) TT7-Z3-75- -Ac.uhti5 ,L vlv, P e-J,C-rv1 Telephone E-mail Address Fax Number 5) Reason for this change: A result of: Employee or managernent change Inappropriate or incorrect designation before ❑ Other If other please explain: The certification below must be completed and signed by the permit holder. PERMITTEE CERTIFICATION: attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processe i -,'. Z-:V� Signature Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please call (919) 707-9220 or visit the website at: http://deq.ne.p,ov/abotit/divisions/energy-mineral-land-resources/stormNvatcr Page 2 of 2 S W U-OWNERAI'F1L-23Mar2017 CATERPILLAR Caterpillar, Inc. Building Construction Products Division 5000 Womack Road Sanford, North Carolina 27330 Division of Energy, Mineral and Land Resources Attn: DEMLR Central Files 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Tier Three — Copper/Zinc To Whom It may Concern, March 24 th, 2016 In regards to our COC Number NCG030447, it has become apparent that we are now in Tier III due to sample results that show our copper levels are above benchmark for the fourth time during the term of this permit. On February 24'h of 2016 Caterpillar Sanford and Clayton EHS staff contacted Ken Pickle to discuss previous actions, future plans and to seek guidance for both zinc and copper. Since the discovery of benchmark exceedances in copper and zinc we have had many discussions with a range of Caterpillar staff, including upper management, and Divisional EHS staff. Both internal and external housekeeping efforts have been improved, products that contain both constituents have been tracked, and stormdrain filters and socks have been strategically deployed to slow the exposure of metals. One staff member also attended the recent NCMA Annual Water Quality Compliance Workshop. We have been, and continue to, perform monthly sampling due to our previous Tier Two status. Unfortunately there are not enough data points from samples to satisfy a conclusion of improvement or solution from these efforts. Any assistance would be appreciated. To date we have had the last two month's samples come back under benchmark for copper and zinc. Our plan, if the March sample comes back under benchmark, is to return to biannual sampling. We would sample in June and then again in the September -November timeframe. As we discussed with Ken we will be diligent in preventing and controlling this exposure via process and/or engineering improvements that are within technical and financial means. If you have any questions, please do not hesitate to call me. Best Regards, Kevin Staubus EHS Manager Caterpillar, Inc Sanford, NC Business Phone: 919-777-2375 Staubus_kevin@cat.com 'Mr®, NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Robert Van Gorder Caterpillar Inc 5000 Womack Rd Sanford, NC 27330 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Caterpillar Incorporated COC Number NCG030447 Lee County In response to your renewal application for continued coverage under stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal,ncdenr.ore/web/wq/ws/su/current,- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury st. Raleigh, North Carolina 27604 Phone: 9 1 a-807-63001 FAX: 919-807-6492 IntemeL %,vw.ncw8terQuaI1ty-Orq An Equal C., aor:;,,nity t Affirmative Action i-. •alo; er None rthCaro ina Aaturt7ll Robert Van Gorder To December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C: The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely,, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030447 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Caterpillar Inc is hereby authorized to discharge stormwater from a facility located at: Caterpillar incorporated 5000 Womack Rd Sanford Lee County to receiving waters designated as Gum Fork, a class WS-IV waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1, I11, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 41h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Ai® NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 23, 2010 Tyrell C. Britt Caterpillar, Inc. 5000 Womack Rd. Sanford, NC 27331 SUBJECT: Compliance Evaluation Inspection Caterpillar Inc. (Sanford Facility) NPDES Permit No: NCG030447 Lee County Dear Mr. Britt: On June 22, 2010, 1, Vicki Webb, of the Raleigh Regional Office conducted a compliance evaluation inspection of the subject facility. You represented the facility during the inspection. All of your help was appreciated as it eased the inspection process. The following observations were made: 1. The Caterpillar Inc. is permitted to discharge stormwater into the receiving waters designated as an unnamed tributary to Gum Fork, class WS IV water, in the Cape Fear River Basin. 2. Caterpillar Inc. is located at: 5000 Womack Rd., Sanford, NC in Lee County. 3. All components of the Stormwater. Pollution Prevention Plan (SP3) were present including: detailed site map with labeled storm outfall, a list of potential contaminants, a spill and response plan, a narrative describing BMPs, and a contact list of whom to contact in an emergency. 4. Qualitative and quantitative inspection records were available for review and appeared complete. The updated inspection form can be found at http://portal.ncdenr.or,g/web/wq//ws/su/np(lessw#AppIication_Forms NPDES under NPDES Stormwater Monitoring Forms and Documents. Analytical monitoring performed on December 2, 2009 exceeded the bench mark for TSS. The facility implemented Tier one response on December 20, 2009. Erosion was found to be the culprit. The facility installed sedimentation fences and sowed grass seed around the area where equipment is tested to help with erosion. 6. Stormwater from the site is channeled where it flows to a sediment pond prior to discharge. This pond was cleaned in the summer of 2009. one� NhCarolina . Jlirtura!!� North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Customer Service Internet: w wr,ncwaterquality.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Cateipi114r,�[nc. (anfdfdeSacility) NPDE�.i �io:,„yj G.030447 Lee County The overall condition of Caterpillar Inc. is compliant with Division standards. If you have any questions regarding the attached report or any of the findings, please contact Vicki Webb at: (919) 791-4200 (or email: vicki.webb wncdenngov). Sincerely, Vicki Webb Environmental Specialist Cc: RRO files Central Files Permit: NCG030447 SOC: County: Lee Region: Raleigh Compliance Inspection Report Effective: 11/01/07 Expiration: 10/31/12 Effective: Expiration: Contact Person: Sandra H Jackson Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Certification: Owner: Caterpillar Inc Facility: Caterpillar Incorporated 5000 Womack Rd Sanford NC 27330 Phone: 919-777-2000 Phone: Inspection Date: 06/22/2010 Entry Time: 07:10 AM Exit Time: 08:45 AM Primary Inspector: Vicki Webb zo C " 'zp ` a Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG030447 Owner - Facility: Caterpillar Inc Inspection Date: 06/22/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NCG030447 Owner - Facility: Caterpillar Inc Inspection Date:'0612212010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 00011 # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ Cl # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ Cl # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ Cl ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Employee training done on 03/24/2010. No spills in last three years. Facility is doing a great job. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all.illicit (non stormwater) discharges? ■ Cl ❑ ❑ Comment: Page: 3 . November 11, 2005 Jennie Atkins, Ph.D. Environmental Chemist NC Division of Water Quality ' NC Department of Environment and Natural Resources Re: Stormwater Compliance Evaluation Inspection / r Caterpillar Sanford Facility General Permit NCG030000 Certificate of Coverage NCG030477 Lee County L (` Dear Jennie Atkins, �r We appreciate the visit in September and want to provide you with an update of the action items that were identified during your inspection. Over the past month the sediment basin has been cleaned out and the erosion area noted was repaired. Copies of the monitoring reports for the past 3 years have been added to the on -site records and Mike Outlaw with Atlantic Environmental Associates has agreed to provide those going forward. Since analytical reporting is not required until the last year of the permit annual monitoring will not be conducted until that time. Please see the attached storm water discharge monitoring report and letter from Tritest stating the lower detection limit. This should address the discrepancy in the previous monitoring report. Sincerely, T.C. Britt Environmental Coordinator I _ , STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 .y CERTIFICATE OF COVERAGE NO. NCG03_ 41 / FACILITY NAME 1 / i'' .� h c PERSON COLLECTING SAMPLE(S) e G CERTIFIED LABORATORY(S) — Lab # Lab #F Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: �OT (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from tV laboratory.) COUNTY PHONE NO. () 7 7 7 2 3 0 49 SIGNATURE OF PERMITTEE OR DESIGNEE) By this signature, I certify that this report is accurate complete to the best of my knowledge Outfall No. Date Sample Collected 50050 00530 00400 01051 00556 78141 Total Flow Total Suspended Solids pH Lead Oil and Grease Total Toxic Or anines' moldd/ r MG m units m m u Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_ yes —no (if yes, complete Part B) Part B: Vehicle Maintenance Ac ivity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow Oil and Grease Total Suspended Solids pH New Motor Oil Usage moldd/ MG m m unit al/mo STORM EVENT CHARACTERISTICS: Date G- Z% - a-5 Total Event Precipitation (inches): Z Z 11 S Event Duration (hours): Wro,t 414 fT (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): Mail Original and one copy to: Division of Water Quality Attn: Central Files - - l 1617 Mail Service Center Raleigh, North Carolina 27699-161.7 Of 1 J S WU-245-120399 Page I of 2 �• ram'- �/ Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433. l 1; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that develop a solvent management plan to be incorporated into the Stormwater Pollution Prevention Plan may matte a request to DWQ that monitoring of total toxic organics be waived. The solvent management plan shall include a list of the total toxic organic compounds used; the method of disposal used instead of dumping, such as reclamation, contract hauling, or incineration; and the procedures for assuring that toxic organics do not routinely spill or leak into the stormwater. For those facilities allowed such a waiver, the discharger shall include the following signed certification statement on the discharge monitoring report: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the solvent management plan included in the Stotmwater Pollution Prevention Plan." I "rrll i. B, Name (Print name) E�7 r�00Y�iYJr.%s�� Title (Print title) awl 11-41-0s (Signatu e) (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Perm ee) (Date) S WU-245-120399 Page 2 of 2 0 0 Telephone: (919) 834-4984 Fax: (919) 834-6497 UROOTEST 6701 Conference Drive Raleigh, NC 27607 Laboratory Report -- Prepared for --- MIKE OUTLAW ATLANTIC ENVIR. ASSOC., INC. P.O. BOX 6182 RALEIGH, NC 27628 ** AMENDED REPORT ** Report Date: Date Received Work Order #: Page 1 of 1 NCIWW Cert. M 067 NCIDW Cert. #: 37731 7/1212005 6/29/2005 0506-02010 Project No.: CATERPILLAR Cust. Code: AT6524 Project ID: CATERPILLAR STORMWATER Cust. P.O.#: No. Sample ID 001 SDO GRAB Date Sampled Time Sampled Matrix Sample Type Condition 6/29/2005 8:30 SW Grab 4 +1- 2 deg C Analyzed Test Performed Method Results Date Time Qualifier Lead EPA 200.8 <0.005 mg/L 7111/05 8:29 Oil & Grease EPA 1664A 5.2 mg1L 711/05 7:00 Total Suspended Solids EPA 160.2 16.8 mg/L 711105 11:40 *AMENDED REPORT; LEAD RESULT REFLECTS CORRECTED REPORTING LIMIT. Reviewed by: fTrite&r- or TRITEST October 26, 2005 Mr. Mike Outlaw AEA, Inc. P. O. Box 6182 Raleigh, NC 2762 Dear Mr. Outlaw: Enclosed is an amended copy of our work order #0506-02010. The lead, results"were originally reported using a detection limit of 0.050 mg/L. Our normal detection limit for lead is 0.005 mg/L. I do not know why the analyst reported the lead at "a detection limit that differed from our normal one. However, the sample was analyzed using the normal detection limit, and review of the data'showed no lead was detected' at the normal reporting limit of 0.005. Therefore, we have amended the report to reflect the proper detection limit, and our quantified result for the sample was <0.005 mg/L. I am sorry for any inconvenience this reporting error may have caused. The technician who analyzed this sample is no longer with Tritest. Our new metals analyst will report all metals for your client at the proper levels. The employees who review our reports are also aware of this situation, and will hopefully catch any errors" in reporting levels before the report is finalized. Please feel free to call me if you need any additional assistance. Sincerely, Marya Sims Director- Client Services TEL: 919.834,4984 FAX: 919.834.6497 WEB: www.tritestinc.com P.O. Box 33190, Raleigh, NC 27636 6701 Conference Drive, Raleigh, NC 27607 Michael F. Easley, Governor X. w a r6q4 Qk �.•n m� September 8, 2005 Tyrell C. Britt Environmental Health and Safety Coordinator Caterpillar Inc. PO Box 3667 Sanford. NC 27331-3667 Re: Stormwater Compliance Evaluation Inspection Caterpillar Sanford Facility General Permit NCG030000 Certificate of Coverage NCG030447 Lee County Dear Mr. Britt, William G. Ross, Sr., Secrctary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality SEP 0 7 2005 �— rti--rar--rrr---r—rrrrr� On August 29, 2005, 1 conducted a stormwater compliance evaluation inspection of the Caterpillar facility in Sanford, NC. Mike Outlaw of Atlantic Environmental Associates and yourself represented the facility during the inspection. Your aid was greatly appreciated. The Caterpillar Sanford facility discharges stormwater into an unnamed tributary of Gum Fork (Class WS IV) in the Cape Fear River Basin. Most industrial processes are conducted within the plant though metal parts are stored outside prior to use. The stormwater is directed into a drainage ditch on the perimeter of the property prior to discharge. Sediment fences are in place at sites around the property. Chemicals are stored outside in a tank farm which contains secondary containment and an alarm. Stormwater from the proving ground flows into a sediment pond prior to discharge. According to DWQ records and our conversation, the facility has had no spills that have reached the surface waters during the last three years. There appeared to be erosion damage near the drainage ditch prior to the sediment fences. Also, at the time of the inspection, the sediment pond required cleaning. According to Mr. Outlaw both of these areas are scheduled for maintenance within the month. Copies of the monitoring reports for the last three years should be kept on -site. Analytical monitoring is only required during the first and last years of the permit if the facility meets the cut-off concentrations as defined within the general permit. The Caterpillar facility meets these requirements and is, therefore, not required to conduct analytical monitoring until the last permit year. However, if you choose to continue analytical monitoring, the facility is required to submit the data to DWQ in the monitoring reports. For total lead concentrations, the lab analyzing your samples has reported concentrations of < 0.50 mg/L, significantly higher than the cut-off concentration. This data was then passed to the DWQ in the monitoring reports. After a conversation with the lab, Mr. Outlaw stated that the limit of detection for lead is actually 0.003 mg/L and that no lead had been detected at these levels. Please submit to the DWQ a revised monitoring report for Spring 2005 that reflects this new information. I also ask that you submit a letter to me at the Raleigh Regional Office explaining the discrepancies to be included in your permit file. 0;>e ----- - — - — -- --- --- - vurthCarolina. North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 . Customer .Service lntemet: h2o enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 571-4718 1-877-623-6748 An Equat OpportunitylAltirmative Action Employer- 50% Recyded114% Post Consumer Paper Overall, I found the stormwater program at the facility to be well maintained. If you have any questions concerning the inspection, please contact me at (919) 791-4200 orjennie.atkins@ncrnall.net. Sincerely, (— Jennie R. Atkins, Ph.D. Environmental Chemist cc: Central Files t ..... ..� .� =ate W A TF Michael F. Easley, Governor 0 TQG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director > Division of Water Quality 0 Coleen H. Sullins, Deputy Director Division of Water Quality September 30, 2003 r JCGC)-?OqH7 Memorandum: To: Alan W. Klimek, P.E. Through: Coleen Sullins From: Tom S. Poe, Division of a r Quality, (DWQ) Construction Grants and Loans Section (CGL) (919-715-6205, tom.poe@ncmail.net) Subject: Industrial Project, Industrial Revenue Bonds (IRB) Lee Central LLC, Caterpillar Logistics Lee County, Sanford, NC The Industrial Revenue Bond (IRB) information submitted by applicant is attached to this memo. Based on submitted documentation, there are no identified water quality issues that should delay or prohibit this project, however this letter does not affect the legal requirements to apply for, obtain, and comply with ALL permits and ordinances as required. The bond funds associated with this project are identified as an "industrial project". As required in N. C. G. S. 159C-7, in the case of a proposed industrial project, this project will not have a materially adverse effect on the environment. It is recommended that the Environmental Certification for this "Industrial Project" be issued. filename: IRB,Lee,Central,LLC, Caterpi ll ar,Lee,Co. doc attachments: Lee Central LLC, Caterpillar IRB Documentation (7 pages) cc: Tom S. Poe, DWQ, CG&L (w/o attachments) Ken Scheuster, DWQ-Raleigh Regional Office (wl attachments) Garry B _Thomas Director Public Works, Sanford, NC (wl attachments) NCDEN:t Constr4lion Grants and Loans Section 1033 Mail Service Center Raleigh, North Carolina 27699-1633 (919) 733-6900 Customer Service .. ite: www.nccgl.net FAX (919) 715-6229 3-877-623-6748 ULJ/ by/ LbbJ 11: bb '31yy:3400bl ULN I NALMOANKL I IPAU r"uC- U/- Lee Cerr>tl LLC Smh*fid4NC27577 919-934-2700 MEMORANDUM To: Tom Poe, DENR — Water Quality Raheul Thaker, DENR — Air Quality Fmm: C. F. Fuller (Contact number 919-961-7273) CC: Charles McEachern Date: May 21, 2003 Re: Request for Air and Water Quality Letter of Determination This memorandum is to provide a summary of our project in Sanford, North Carolina and request NC DENR provide a letter of determination that air and water quality permits are not requiredfor this project. DENR's expeditious completion would be most helpful. We are constructing a 77,500 square foot manufacturing facility which will be leased to Caterpillar Logistics. The manufacturing facility will be located on Elwin Buchanan Drive in Sanford, NC. Also, we plan. to add an additional 50,000 square feet to the existing building as Caterpillar. Logistics expands its volume. The manufacturing process will not change with the addition space. Summary of Manufacturing Process by Caterpillar Logistics: Caterpillar Logistics is part of Caterpillar, a world wide leader in the manufacture of construction and mining equipment, engines and gas turbines. Caterpillar Logistics provides a full range of logistics services to Caterpillar and third party clients through a network of manufacturing facilities. Lee County will be the home of Caterpillar Logistics' newest assembly facility to scree the Caterpillar skid steer loader plant located at Lee County Industrial Park in Sanford. The new facility in Sanford will involve the assembly of engine, hydraulic tank, and tire/rim parts that arrive from various locations — this means this facility will be responsible for third -part. logistics, receiving production materials and providing sub/light assembly services for the Caterpillar plant locatedin the industrial park The new facility will operate two shifts with approximately 30 employees, Specifically, Caterpillar Logistics will complete the following manufacturing processes: 1. Tire and Rim sub -assembly process 2. Engine sub -assembly process 09/09/2003 11: 56 9199341Jd61 ULN I KALMi4NKt l irqu 3. Hydraulic tank sub -assembly process 4. Dose and seal cuttingprocess 5. Receiving and replenishing parts inventory as needed for complete manufacturing processes. Caterpillar Logistics will use manual and air -powered tools to complete the manufacturing process. Caterpillar Logistics will not use any paint, chemicals, or hazardous materials of any kind. In their manufacturing process, no resulting by-products are produced as this is an assembly facility. Likewise, no exhaust or air emissions of any kind occur due to their assembly process. County water and sewer will be utilized. Normal HVAC will be provided throughout the building. SurnmNy of Building Construction: The new manufacturing facility will be located on 12,97 acres of land on the comer of Deep River Road and Elwin Buchanan Drive in Lee County Industrial Park. This property is approximately 1.3 miles from the existing Sanford Caterpillar. facility. The new facility will be a 77,500 square foot facility with expansion capability to . 125,000 square feet. The facility will have a 30' eave height, 12 depressed dock doors, two drive-in doors, a 26,000 pound air compressor, sprinkled to specifications of NC State Fire Code, six 36" fans for cooling, 2,500 square feet of office space, 40 tractor -trailer parking spaces, 30 car parking spaces, and all roads and driveways paved with curbs and gutters. Lee Central LLC is .financing this project with tax free bonds and requests that NC DENR provide a letter of determination that air and water quality permits are not required for this project. Please call me if you have any additional qucstions. I can be reached at 919-961-7273. Lee Central LLC memo to NC DENR, May 21, 2003 2 U'�l L41 Zur)j 1 b: 4u y11: .iq Ubi ULN I MF4L1Y1kMNt I INU r HUC ri/- 09/24/2003 16:32 9199382909 TALON CONST PAGE 02 State of North Carolina Department of Environment and Natural Resources Raleigh Regional Mice Michael F. Easley, Govemor William G. (Bill) Ross, Secretary William Frank Lee P. O. Box 148 Smithfield, NC 27577 Dear Mr, Lee: NCDENR ErmRONMENT AND NATURAL R1C50LRGr9 DIVISION OF LAND RESOURCES LETTI R OF APPROVAL December 19, 2002 RE: ; Project Name: Caterpillar Site County: Lee Submitted by. Ken Bright, P.E. Date Received: December 2, 2002 Date Processing Initlated: December 2, 2002 Watershed: Cape Fear#1103-06-11 New Submittal (X) Revised ( ) This office has reviewed the subje4t Erosion and Sedimentation Control Plan. We find the plan to be acceptable and hereby issub this letter of approval. if any modifications, performance reservations, or recommendations are applicable, a list is enclosed and is Incorporated as a part of this letter of epprbval. The enclosed Certificate of Approval should be posted at the job site. In addition, It should be noted that this plan approval shall expire three (3) years following the date of approval, if no I6nd-disturbing activity has been undertaken, in accordance with Tftle 16A, North Carolina �dminlstrative Cade (NCAC) 4E1.0029. If any modifications are not Incorpr. rated into the plan and implemented in the field, the site will be in violation of the Sedlmantatioi i Pollution Control Act of 1973 (North Carolina General Statute (NCGS), 113A e1.1). 15A NCAC 45.4018(a) requires thot a copy of the approved plan be on file at the job site. Also, this letter gives the notioe required key NCGS 113A-61.1(a) concerning our right to perform periodic inspections to ensure compliance with the approved plan. North Carolina's sedimentation I requiring protection of the natural resou project it is determined that the Erosion the requirements of the Sedimentation 1 66), this office may require revisions In with the Act. Alon control program Is performance oriented, 3 and adjoining properties. If at any time during this i Sedimentation Control Plan is inadequate to meet utlon Contra[ Act of 1973 (NCGS 113A-51 through plan and its implementation to ensure compliance 1828 Mail SeMce Center, Raleigh, Na 2T609.16is Talenhottle (919)571-4700 FAX (919)671..4718 An Equal Oppartunity Af mutNe Action Empi+r SO/. racyclaW10% peat -consumer paper 1,1W 241 ZUBJ 1b: 415 yly 341717b1 Lr-N I KHLIVIHKNG I INN •09/2412993 16:32 9199382909 TALON CONST PAGE H William Frank Le® December 19, 2002 Page 2 Acceptance and approval of this pl ts, is oondltloned upon your compliance with applicable federal and state water quality I regulations and rules. This could include the Division of Water Quality under stormwater or other spacAc welter quality standards, and the U.S. Army Corps of Engineers under Article 404 Jurisdiction. Our approval does not supersede any other required permit or approval. Since this project disturbs five or rr1lore acres, one such approval relates to the stomrwMar that will discharge from your project. This runoff Is permMad pursuant to the NMlonal Pollutant Discharge Elimination S tem (NPOES) administered in North Carolina by the Division of Water Quality (DWQ). Attached is the General Stormwater NPDES Permit, NCG010000, as revised October 1, 2001, vering your activity. You are responsible for complying with the General Permit requirements and are subject to enforcement by DWQ for any violations of the General Permit. Please note that this appmvail is based In part on the accuracy of the information provided concerning financial responsibilit. f. You are requested to file an amended Financial Responsibility Form If any changes becorre necessary. In addition, it would be helpful if you would notify this office when the proposed land -disturbing activity covered by this plan is initiated. Your cooperation is appreciated arld via look forward to working with you an this projec. If there are any questions, please do not h6sitate to Contact this office, Sincerely, bl--ez� Wya L. Brown, LSS, CPESC .Asst. Regional Engineer Land Quality Section WLB:cirn cc; Ken Bright, P.E. Mr. lien Schuster, P.E., DWQ CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and 113A, - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0007 (c). TIds certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0027 (b). 'Decmbet 19 2002 Date of Plan Approval Caterpillar Site — Lee County Project Name and Location &10, -I--* I Ar HCDENR -v r 9 g�NEp\ PUBLIC WORKS DEPARTMENT CITY OF SANFORD P. O. BOX 3729 TELEPHONE 919-775-8247 FAX 919-776-0265 North Carolina 2 7331-3 729 OR919-775-8336 April 29, 2003 Mr. Bob Heuts 130 Wicker Street P.O. Box 1968 Sanford, NC 27331-1968 Dear Mr. Heuts: The City of Sanford has a 12" water line on Elwin Buchanan Road near Deep River Road. The Water Plant serving this line pumps 6 MGD and has a capacity of 12 MGD. In addition, there is an 8" sewer line on Elwin Buchanan Road which is served by a Wastewater Treatment Plant that treats 4 MGD with a capacity of 6.8 MGD. The water and sewer facilities should be more than adequate to serve Caterpillar. If you have any questions or need additional information, please give me a call. Sincerely, Larry B. Thomas, P.E. Public Works Director LBTIrd To: Tom Poe, DENR —Water Quality Rahul Thaker, DENR — Air Quality From: Bob Heuts Date: May 9, 2003 Re: LEE CENTRAL, LLC Lee Central, LLC hereby requests from NC DENR a letter of determination that air and water quality permits are not required for Caterpillar Logistics in their new warehouse and light assembly operation located on Elwin Buchanan Drive in Sanford, NC. Caterpillar Logistics is part of Caterpillar, a world wide leader in the manufacture of construction and mining equipment, engines and gas turbines. Cat Logistics provides a full range of logistics services to Caterpillar and third party clients through a network of distribution facilities. Lee. County will be the home of Cat Logistics' newest distribution facility to serve the Caterpillar skid steer loader plant located at Lee County Industrial Park in Sanford. The new facility in Sanford will be responsible for third part logistics, receiving and warehousing production materials and providing sub/light assembly services for the Caterpillar plant located in the industrial park. The new facility will operate two shifts with approximately 30 employees. Cc Charles McKethum Chuck Fuller 130 WICKER STREET PO BOX 1968 SANFORD NC 27331-1968 9191774-8439 FAX 9191775-5410 e-mail: fnfoCs Icedc.com web page: www,icedc.com Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P,E., Director Division of Water Quality August 23, 2002 T C BRITT CATERPILLAR INCORPORATED 5000 WOMACK ROAD SANFORD, NC 27330 Subject: NPDES Stormwater Permit Renewal CATERPILLAR INCORPORATED COC Number ncg03O447 Lee County Dear Permittee: [n response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is Forwarding herewith the reissued Stormwater general permit. "Phis permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (9I9) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Raleigh Regional Office ern NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1-800-623-7748 ��� W A TFRp �O G� rr, 7 Q `C SANDRA H JACKSON CATERPILLAR INCORPORATED 5000 WOMACK RD SANFORD, NC 27330 Dear Perntittee: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality December 27, 2001 Subject: NPDES Stormwater Permit Renewal CATERPILLAR INCORPORATED COC Number ncg03O447 Lee County Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would he eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will he expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may he assessed depending on the delinquency of the request. Discharge of stormwater from your facility withow coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the 1 1 categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e, the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff tnemher listed below or check the Stormwater & General Permits Unit Web Site at http://l12o,enr.sta(c.nc.us/su/stornlwater.litrttl If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Joe Albiston of the Raleigh Regional Office at 919-571-4700 or Bill Mills of the Central Office Stormwater Unit at (919) 733-5083. ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit CC'. Central Files Raleigh Regional Office ern NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1. 800-623.7748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Ms. Sandra H. Jackson Caterpillar 5000 Womack Road Sanford, North Carolina 27330 Dear Ms. Jackson: LIM. MAI 1"41 NCDENR September 25, 1998 Subject: General Permit No. NCG030000 Caterpillar COC NCG030447 Lee County In accordance with your application for discharge permit received on August 7, 1998 we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after noticeto the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Tony Evans at telephone number 919/733-5083 ext. 584. Sincerely, ORIGINAL. SIGNED BY MLLIAM C. MILES A. Preston Howard, Jr., P. E. cc: Raleigh Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper . w q4 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030447 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Caterpillar, Inc. is hereby authorized to discharge stormwater from a facility located at Caterpillar, Inc. 5000 Womack Rd. Sanford, NC Lee County to receiving waters designated as an unnamed tributary to Gum Fork, Class WS IV, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, I11, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective September 25, 1998. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 25, 1998. ORIGINAL SIGNED BY WILLIAM G. MILLS A. Preston Howard, Jr.,Director Division of Water Quality By Authority of the Environmental Management Commission z;', -1,jG{• �J�"Le a�'.*t� F•� — it t F CATERPILLAR Inc. IN CASE OF EMERGENCY DIAL 2002 Evacuation - Continuous Alarm Congregation - Interrupted Alarm l ' G 514 3 2 1 p � - SATELLUE STORAGE M F1Y AMEA A 4 ICKITErzo C1u7 141JV y #11 EufT UO L E t HAZARDOUS WF.51L SIDVIAGE:. f a� o ebr oo O Fi t:C CA UAHY k-VF.0 HQlI IE 0 AREA EXIT --EXIT 1 Stormwater Permits Subject: Stormwater Permits From: "Candice Brewington"<cand ic e@at I anti cenvironment al. net> Date: Wed, 16 Jan 2008 11:55:54 -0500 To: <sarah.young@ncmail.net> CC: "Mike 1 Outlaw" <MOutlaw_AEA@yahoo.com>, "Janze Taylor" <taylor_janze_r@cat.com>, "Jeremy Riggle" <Riggle_Jeremy@cat.com> Hi Sarah, This email is in reference to our phone conversation on yesterday. Please see that these changes are made and the stormwater information is sent to the appropriate address. Certificate of Coverage No. NCG030447 CATERPILLAR, INC. - SANFORD FACILITY Jeremy Riggle 5000 Womack Rd. Sanford, NC 27330 Certificate bf Coverage No. NCG030211 CATERPILLAR, INC. - CLAYTON FACILITY Janze Taylor PO Box 999 Clayton, NC 27520 Please send/email me a copy of the certificate of coverage and I will download the general permit from the NCDWQ webpage as we discussed. Thank you, Candice Brewington Office Manager Atlantic Environmental Associates, Inc. 919-387-1269: Phone 919-387-1271: Fax of I H 1 /22/2008 1:10 PM Michael F, Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality August 23.2002 T C BRITT CATERPILLAR INCORPORATED 5000 WOMACK ROAD SANFORD, NC 27330 Subject: NPDES Stormwater Permit Renewal CATERPILLAR INCORPORATED COC Number ncg03O447 Lee County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued Stormwater general permit. 'this permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983, The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083. ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Raleigh Regional Office eA* NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1-800.623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030447 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, CATERPILLAR INC is hereby authorized to discharge stormwater From a facility located at CATERPILLAR INCORPORATED 5000 WOMACK RD SANFORD LEE COUNTY to receiving waters designated as a UT to Gum Fork, a class WS-IV stream, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective September 1, 2002. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 23, 2002, for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources O� W A r�9QG 4 a ,., .. �-Mwz SANDRA H JACKSON CATERPILLAR INCORPORATED 5000 WOMACK RD SANFORD, NC 27330 Dear Permittee: Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality December 27, 2001 Subject: NPDES Stormwater Permit Renewal CATERPILLAR INCORPORATED COC Number ncg030447 Lee County Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002, The Division staff is currently in the process of rewriting [his permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will he expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must he completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at.least $250.00. Larger pcnalIies may he assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the I I categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of' "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact [he Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Wch Site at http://h2o.cnr.stale.nc.us/su/stormwttier.litrni If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will he notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Joe Albiston of the Raleigh Regional Office at 919-571-4700 or Bill Mills of the Central Office Stormwater Unit al (919) 733-5083, ext. 548 S incerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Centrai Files Raleigh Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ®�, NCDENR Customer Service 1-800-623-7748 l N State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Ms. Sandra H. Jackson Caterpillar 5000 Womack Road Sanford, North Carolina 27330 Dear Ms. Jackson: &T,.K;WA IqT NCDENR September 25, 1998 Subject: General Permit No. NCG030000 Caterpillar COC NCG030447 Lee County In accordance with your application for discharge permit received on August 7, 1998 we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after noticeto the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Tony Evans at telephone number 919/733-5083 ext. 584. Sincerely, ORIGINAL SIGNED BY WILLIAM C. MILLS A. Preston Howard, Jr., P. E. cc: Raleigh Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper '• STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030447 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Caterpillar, Inc. is hereby authorized to discharge stormwater from a facility located at Caterpillar, Inc. 5000 Womack Rd. Sanford, NC Lee County to receiving waters designated as an unnamed tributary to Gum Fork, Class WS IV, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective September 25, 1998. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 25, 1998. ORIGINAL SIGNED BY WILLIAM C. MILLS A. Preston Howard, Jr., P.., Director Division of Water Quality By Authority of the Environmental Management Commission FACILITY: e 4-e,,P - l o, (- loc. COUNTY: Le-Q-1 NPDES: M C G 0 MAP#: E JD, S W DSN FLOW: N/A SUB BASIN: o 3 -o d 17 i LATITUDE: LONGITUDE: I o ! r G 1 r RECEIVING STREAM: LU7 Gum Foc� STREAM CLASS: DISCHARGE CLASS: EXPIRATION DATE: STORIVIWATER