Loading...
HomeMy WebLinkAbout20191730 Ver 1_BR-0111_BufferDrawing_20191217ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) -L- 16+25 to 17+25 X 1653 2345 3998 -L- 16+25 to 17+25 X 1384 1384 -L-30+26 to 31+91 X 2607 2491 5098 -L-30+26 to 31+91 X 1157 1157 -L-35+08 to 36+73 X 990 1368 2358 -L-35+08 to 36+73 X 2955 1374 4329 TOTAL:10746 7578 18324 0 0 0 0 0 10/24/2019 100' Bridge 165' Bridge 165' Bridge3 2 1 IMPACT BUFFER IMPACTS SUMMARY TYPE SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) ALLOWABLE MITIGABLE BUFFER RESTORATION BR-0111 4 of 5 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS EDGECOMBE CO. Rev. May 2006 ZONE 1 (ft2) ZONE 2 (ft2) 1 -L- 15+50 to 18+17 2636 1864 2 -L- 29+30 to 32+40 3046 1269 3 -L- 34+65 to 36+70 2804 692 TOTAL:9564 3825 WETLANDS IN BUFFER IMPACTS SUMMARY SHEET 5 OF 5 EDGECOMBE CO. 10/24/2019 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS BR-0111 WETLANDS IN BUFFERS SITE NO. STATION (FROM/TO) Rev. Jan 2009