HomeMy WebLinkAbout20191730 Ver 1_BR-0111_BufferDrawing_20191217ROAD
CROSSING BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
-L- 16+25 to 17+25 X 1653 2345 3998
-L- 16+25 to 17+25 X 1384 1384
-L-30+26 to 31+91 X 2607 2491 5098
-L-30+26 to 31+91 X 1157 1157
-L-35+08 to 36+73 X 990 1368 2358
-L-35+08 to 36+73 X 2955 1374 4329
TOTAL:10746 7578 18324 0 0 0 0 0
10/24/2019
100' Bridge
165' Bridge
165' Bridge3
2
1
IMPACT
BUFFER IMPACTS SUMMARY
TYPE
SITE NO.
STRUCTURE SIZE /
TYPE
STATION
(FROM/TO)
ALLOWABLE MITIGABLE
BUFFER
RESTORATION
BR-0111
4 of 5
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
EDGECOMBE CO.
Rev. May 2006
ZONE 1
(ft2)
ZONE 2
(ft2)
1 -L- 15+50 to 18+17 2636 1864
2 -L- 29+30 to 32+40 3046 1269
3 -L- 34+65 to 36+70 2804 692
TOTAL:9564 3825
WETLANDS IN BUFFER IMPACTS SUMMARY
SHEET 5 OF 5
EDGECOMBE CO.
10/24/2019
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
BR-0111
WETLANDS IN
BUFFERS
SITE NO.
STATION
(FROM/TO)
Rev. Jan 2009