Loading...
HomeMy WebLinkAboutNCC193176_ESC Approval Submitted_20191218Art CA GUILFORD COUNTY PLANNING AND DEVELOPMENT Letter of Approval 04/08/2019 J&S Homes,LLC PO BOX 10376 Greensboro, NC 27404 RE: Project Name: Whisper Creek Ph. 9 Acres Approved: 8.9 Project ID: 19-03 — GCRP-02636 County: Guilford Greensboro River Basin: Cape Fear Submitted By: Fleming Engineering Date Received by Erosion Control Section: 11-6-18 Plan Type: Residential Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasO-ncdenr.gov or Paul Clark at Paul.clarka-ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please be advised that Title 15A NCAC 46 .0118(a) requires that a copy of the approved erosion control plan as well as any approved deviation be on file at the job site. This title also requires to have the NCG01 permit with the COC and records of inspection made during the previous 30 days to be in the onsite file. You should consider this letter to give the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. This letter does not supersede the grading permit card. The grading permit card is issued by Erosion Control Staff at the pre -construction meeting conducted on the permitted site. Grading without a signed permit card is a violation of County and applicable local ordinances. Please notify our office to schedule the pre -construction conference. Your cooperation is appreciated. Sincerely, i Guilford County Planning and Development Erosion Control Section cc: Fleming Engineering Earl Davis, Soil Erosion Control Section Chief, (336) 641-3803 James Tardiff, Soil Technician (336) 641-2259 Post Office Box 3427 Greensboro, North Carolina 27402