Loading...
HomeMy WebLinkAbout20191724 Ver 1_PCN Form Submission_20191217DWR Dlrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20191724 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Replacement of Bridge 35 over Otter Creek on SR1616 (BR-0112 Central) 1a. Who is the Primary Contact?* NCDOT 1b. Primary Contact Email:* jldilday@ncdot.gov Date Submitted 12/17/2019 Nearest Body of Water Otter Creek Basin Tar -Pamlico Water Classification C; NSW Site Coordinates Latitude: Longitude: 35.731036-77.613576 A. Processing Information County (or Counties) where the project is located: Edgecombe Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* IT Yes r No (NCDOT only) T.I.P. or state project number: BR-0112 WBS#M 48821.1.1 1a. Type (a) of approval sought from the Corps: Version#* 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (919)707-6111 V W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express FJ Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? V Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 1000 Birch Ridge Drive Address Line 2 city Raleigh Fbstal / Zip Code 27610 2e. Telephone Number: (919)707-6000 2g. Email Address:* State / Rovince / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No pharris@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: frf appropriate) 1c. Nearest municipality/ town: Crisp Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Address Line 2 (Sty State / Province / Region Postal / Zip Code Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Otter Creek 3b. Water Resources Classification of nearest receiving water:* C; NSW 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201030203 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* Land use in the project vicinity consists primarily of forested communities, agricultural fields and low density residential sites. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknovm 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 3.3 4g. List the total estimated linear feet of all existing streams on the property: 620 4h. Explain the purpose of the proposed project:* The purpose of the project is to replace a structurally deficient bridge. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* This project involves replacing the ebsting 3 span, 122-foot bridge with a 3 span, 148-foot bridge on the existing alignment. Traffic will be maintained on an off -site detour. Standard road building equipment, such as trucks, dozers and cranes will be used. 4j. Please upload project drawings for the proposed project. BR0112_BufferDrawings_20191209.pdf 1.1 MB BR0112_PermitDrawings_20191209.pdf 3.57MB BR-0112_UtilityBuffer_20191209.pdf 1.09MB BR-0112_UtilityDrawings_20191209.pdf 2.8MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: PJD package submitted 4/29/2019, no written verification received to date. 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Sd1. Jurisdictional determination upload 6. Future Project Plans James Mason Three Oaks Engineering 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Open Waters r Pond Construction 2. Wetland Impacts W Buffers 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. 2d. W. name * 2e. Forested * 2f. Type of 2g. Impact Jurisdicition*(?) area* U 1 Fill P Riverine Swamp Forest �WA Yes Corps 0.009 (acres) Mech. Clearing P fferine Swamp Forest WA Yes Corps 0.009 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.018 2g. Total Wetland Impact 0.018 2h. Comments: There will be 0.05 ac of handclearing in wetlands associated with the bridge replacement and utility relocation. 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * r3e- Stream Type 3f. Type of 3gSwidth * 3h. Impact Jurisdiction* length* S1 Abutment/Ri rap P Permanent Fill Otter Creek Perennial Both 70 Average (feet) 32 (lir�rfeet) S2 Abutment/Riprap Temporary Dewatering Otter Creek Perennial Both 70 Averge(feet) 40 (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 32 3i. Total stream and ditch impacts: 72 3j. Comments: 3i. Total temporary stream impacts: 40 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r" Neuse P Tar -Pamlico r Catawba r Randleman r Goose Creek r Jordan Lake r Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact 1-Bridge-Allowable P Otter Creek No 1,808 14 1-Road Crossing -Allowable P Otter Creek No 594 1,835 1-Utility Relocation -Allowable P Otter Creek No 1,063 1,062 6h. Total buffer impacts: Total Temporary impacts Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Supporting Documentation Zone 1 Zone 2 0.00 0.00 Zone 1 Zone 2 3,465.00 2,911.00 Zone 1 Zone 2 3,465.00 2,911.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The bridge will be replaced on the epsting alignment. There will be no deck drains. See stormwater management plan for additional minimization measures. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: An offsite detour will be used during construction. NCDOT's Design Standards for Sensitive Watersheds will be adhered to. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts to streams and wetlands are considered minimal and do not require mitigation. All buffer impacts are considered allowable without mitigation. v F. Stormwater Management and Diffuse Flow Plan (required by DWR) u 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen W Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r- No Comments: G. Supplementary Information 1. Environmental Documentation U la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r- No 1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House?* r Yes r- No NEPAor SEPA Final Approval Letter 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r- Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r' Yes r No 3b. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r- Yes r- Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r- No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r- No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N.C. Natural Heritage Program database; USFWS-Raleigh Field Office website; biological surveys for protected species listed for Edgecombe County, which include Tar River spinymussel, yellow lance, dwarf wedgemussel, red -cockaded woodpecker. All current listed species received biological conclusions of "No Effect". Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes f• No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA documentation 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes f No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA. 8c. What source(s) did you use to make the floodplain determination?* FEMA maps Miscellaneous Comments Miscellaneous attachments not previously requested. U Signature v W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark, III Signature haq C. A(gw&r , V Date 12/17/2019