HomeMy WebLinkAbout20191723 Ver 1_B-4977_HYD_EC_12062019_20191216DETOUR ROUTE
LOCATION
PROJECT
TYPE OF WORK:
LOCATION:
(NOT TO SCALE)
1441
1435
1442
1313 1313
1313
1313
1313
1378
1143
1206 1183
1205
1203
12341143
1226
1146
1207
1147
1147
1146
1147
1313
1314
1391
1391
1392
1419
1374
1315
1315 1424
1423
1385
1317
1376
1371 1386
1388
1387
1318
1318
1319
1320
1395
1384
1382
1415
1390
1337
1375
1373
1339
1401
1337
1316
1421
1388
1373
1632
1325
1433
1383
1383
1421
1437
1440
1374
1325
1147
1381
1379
1316
1182
1449
421
Buck
Congo
1263
NA 2007NAD 83/4
VICINITY MAP
Fish Dam Creek Millers Creek
421
16
1315
16
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
11/18/2019...\B-4977_HYD_EC_TSH.dgn$$$$USERNAME$$$$PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
EC-1
1606.01 Special Sediment Control Fence
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
EW
CFW
TO THE LIMITS ESTABLISHED BY METHOD II
CLEARING ON THIS PROJECT SHALL BE PERFORMED
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
GRAPHIC SCALE
Prepared in the Office of:
NAME LEVEL III CERTIFICATION NO.
Designed by:
ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES.
AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF
GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019
THE APPLICABLE REGULATIONS SET FORTH BY THE NCG-010000
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH
David R. Wagner II, PE 4286
0
PLANS
1020 20 40
GRADING, DRAINAGE, PAVING, AND STRUCTURE
WILKES COUNTYB-4977-Y- POC STA 11+00.00
BEGIN CONSTRUCTION
FISH
D
A
M CREEK
-L- POT STA 13+80.00
BEGIN TIP PROJECT B-4977
-L- POC STA 17+80.00
END TIP PROJECT B-4977
-DR2- POT STA 10+50.00
BEGIN CONSTRUCTION
CONGO RD. SR 1313TO N. MINTON RD
-DR
2-
-DR1-
-L-
-Y-
-
L-
TO BOONE TRAIL
CONGO RD. S
R 1313TIP PROJECT:CREEK ON SR 1313 (CONGO RD)
BRIDGE NO. 960075 OVER FISH DAM TO NC
16
-DR1- POC STA 11+20.00
BEGIN CONSTRUCTION SR 1315FISH DAM CREEK RD.BOTTOMLESS CULVERT
28' x 9'
B-4977
39896.1.1
39896.2.1
39896.3.1
BRZ-1313(004)P.E.
R/W & UTIL.
CONST.
FLOW
A A
WIDTH
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
12"
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
NOT TO SCALE
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
H = 2' MIN
1' MIN
1' MIN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
NOTES:
B-4977 EC-2
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
4
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
TOTAL
SIDESTATION
TO
STATION
FROM
LINESHEET NO.
CONST
ESTIMATE (SY)STATION
TO
SIDESTATION
FROM
LINE
SHEET NO.
CONST
ESTIMATE (SY)
11+20 12+30 LT 280
685
500
1185
MATTING FOR SLOPES
LT18+0016+00-L-4
PERMANENT SOIL REINFORCMENT MAT (PSRM)
B-4977 EC-3
-DR1-
16+75 LT 26515+254
17+00 RT 14015+304
-L-
-L-
65
4 -Y-10+85 11+90 LT 40
TOTAL
SLOPE TOTAL
105
1200SAY
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
B-4977
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3A
CLEAN WATER DIVERSION
OFFSITE CLEAN WATER
1' MIN.
1:2
SOIL STABILIZATION GEOTEXTILE
STABILIZE EXCAVATED MATERIAL
1' MIN.
(Not to Scale)
1175
11751175117511751175
117511751180118011801180
1180118011801180
118
0
1180
118011801180
118511851185
1185
1185
1185118511851185118511851
1
8
5
118511851
1
8
5
118511901190
119011901190
1190119011901190119011901190
1190
11901190119511951195
11951195
1195119511951195119511951195
1195120012001200
1200
1200120012001200120012001
2
0
0
120012051205
1205
1205120512051205120512051205
120512101210121012101210121012101210
1210
1215
121512151215121512151215
1220122012201220
1220
1220
12251225122512251225
123012301
2
3
0
123512351
2
3
5
12401240124512501250MARGIE W. WYATT
WALTER LEE WYATT
JERRY RAY JONES
VIRGINIA M. JONES
HELEN T. CHURCH
HOHN G. CHURCH
4SBW
GATE
MTL
4S
B
W4SB
W
1SBW
1S
B
W18" CMP INV=1181.68'INV=1179.70'VAR. GR
VAR. GR
18" HDPE
VAR. GR
2SB
W2SBW
INV=1189.58'
INV=1178.71'WOODS
18' BST
VAR. BST
FISH D A M C R EEK R D . SR 1315
CONGO RD. SR 1313
CONGO RD. SR 131319' BST
19' B ST
(TYP.)
CONC WW
BRIDGE#75
TO WILKESBORO
TO MILLERS CREEK
TO HWY 421
WOODS
1
8
" CMP
INV=1191.97'
24" HDPE
24" HDPE
18" CMP
I
NV=1188.11'
IN
V=1174.53'
WD RAIL
WD RAIL
12" HDPESEAT=1183.61'SEAT=1183.58'SEAT=1
1
8
3.
6
2'
S
E
A
T
=1183.62'
SIGN
1SB
W30
"RCP
24
" HDPE
DI
15" HDPE
EXISTING R/W
EXISTING R/W
EXISTING R/WE
XIS
TI
N
G
R/WEXISTING R/W
OPAL L. HAMBY
BOBBY HAMBY
(TRUSTEE)
BETTY S. ELLER
NAOLA N. SMITHEY
GUY ANTHONY SMITHEY, SR.
WOODS
WOODS
CHARLES E. CHURCH
WD WALL
VAR. HT50.00'50.00'
50
.0
0'
EXISTING R/W
60.00'
W/BST OVERLAY
WD DECK
WOODS DWIGHT EDWARD CHURCH
DB 655 PG 159
DB 835 PG 9
E
XIS
TI
N
G
R/WGATESWD & MTLREVISIONS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.12/3/2019...\B-4977_HYD_EC_PSH.dgn3:55:28 PM8/17/99B-4977
NAD 83/ NSRS 2007HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
EC-4/CONST. 4
HH10" STL 10" STL
10" STL
10" STL
F
F
F
F
F
C
C
F
F
F
F
F
F
F
F
C
C
C
C
F
F
F
F
F
F
F
F
4
5
3
1
2
EX. R/W
-L- +54.00
55.00' LT
-L- +15.00
09
0807060504030201
00
01
02
02 0203
0405060708
09
02
01
00
0 1
0 2
EX.EX.03
02
02
01
000101
02
03020
1
00
E
X.E
X.020203EX.EX.02020201000102-
DR1-
-L-1510
-L- PC Sta. 12+50.39
-L- PC Sta. 14+21.06
-L- PT Sta. 13+77.92
-DR1- POT Sta. 10+00.00
-DR1- PC Sta. 10+63.37
-DR1- PCC Sta. 11+29.07
-DR1- PRC Sta. 11+61.26
-L- PRC Sta. 16+63.96
-L- PCC Sta. 18+82.39
-Y- PC Sta. 10+00.00
-Y- PT Sta. 11+63.55
-Y- PC Sta. 11+13.94
-Y- PT Sta. 10+82.84
-DR2- POT Sta. 10+00.00
-DR2- PC Sta. 10+60.62
-L- POC Sta. 15+16.84
-DR2- POT Sta. 11+05.40=
-DR1- POT Sta. 12+41.45=
-L- POC Sta. 16+23.99
-Y- POT Sta. 12+25.67 =
-DR2- PT Sta. 10+89.61
-DR1- PT Sta. 12+30.31
-L- PRC Sta. 16+00.08
-L- POT STA. 13+80.00
BEGIN TIP PROJECT B-4977
-Y- POC STA. 11+00.00
BEGIN CONSTRUCTION
-L- POC STA. 17+80.00
END TIP PROJECT B-4977
-
D
R
2--Y--DR1- POC STA. 11+20.00
BEGIN CONSTRUCTION
-DR2- POT STA. 10+50.00
BEGIN CONSTRUCTION
EX.EX.
GREU TL-2, +20
,+95
CAT-1
+82
AT-1,
+90
AT-1,
+65
AT-1,GREU TL-2, +5575 SY GEO-TEXTILE
EST. 55 TONS
CLASS 'II' RIP RAP
HW
28' SPAN X 9' RISE
BOTTOMLESS CULVERT
0401 18"RETAI
NRETAIN
RETAIN
RETAIN
18" RCP-III
SEE DETAIL 'B'
TOE PROTECTION
SEE DETAIL 'A'
EMBEDDED EST. 49 TONS
W/CLASS 'B' RIP RAP
STANDARD BASE DITCH
0402
0403
0404
0405
80 SY GEO-TEXTILE
EST. 60 TONS
CLASS 'II' RIP RAP
TB DI
GRADE TO DRAIN
54"
F
I
S
H DAM CREEKREMOVE
REMOVE
REMOVE
REMOVE
REMOVE
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
B
B4977-1
0.05 AC
DA=
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
4S
B
W1SBW
18" CMP INV=1181.68'INV=1179.70'
18" HDPE
2SB
W(TYP.)
CONC WW
BRIDGE#75
10" STL
24" HDPE
IN
V=1174.53'
WD RAIL
WD RAILSEAT=1183.61'SEAT=1183.58'SEAT=1
1
8
3.
6
2'
S
E
A
T
=1183.62'
SIGN
1SB
W24
" HDPE
5
0
.0
0'
60.00'
W/BST OVERLAY
WD DECK
E
XIS
TI
N
G
R/WGATESWD & MTL
30
"RCP
C
C
F
F
F
C
F
F
F
F
F
55.00' LT
-L- +15.00
0807060504030201
00
02 0203
0405060708
09 0103020203-Y-+82
AT-1,
+90
AT-1,GREU TL-2, +5575 SY GEO-TEXTILE
EST. 55 TONS
CLASS 'II' RIP RAP
REMOVE
REMOVE
REMOVE
28' SPAN X 9' RISE
BOTTOMLESS CULVERT
REMOVE
18" RCP-III
0402
0403
040554"
PROJECT REFERENCE NO.8/17/99NCDOT_pdf_color_eng_50.pltDWAGNERUSER:FILE:NCDOT\NCDOT_Western_Div_On-Call_M_\NCDOT-B-4977_Wilkes_Co.\6.0_CAD_BIM\6.2_WIP\B-4977\Erosion Control\B-4977_EC_CS.dgnDATE:11/22/2019PENTABLE:TIME:8:07:48 AMNCDOT_CS.tbl1:12.4432SCALE:PLOT DRIVER: SHEET NO.PROJECT REFERENCE NO.
28' X 9' BOTTOMLESS CULVERT CONSTRUCTION SEQUENCE
B-4977
REPLACES WILKES COUNTY BRIDGE NO. 75
EC-4A/CONST. 4
NAD 83NOT TO SCALE
6. REMOVE IMPERVIOUS DIKES AND ANY REMAINING PUMPS AND SPECIAL STILLING BASIN(S).
5. COMPLETE CHANNEL IMPROVEMENTS.
4. INSTALL BOTTOMLESS CULVERT.
3. REMOVE EXISTING BRIDGE.
2. PROVIDE PUMPS AND SPECIAL STILLING BASINS FOR DEWATERING THE WORK ZONE.
STREAM BANKS TO ISOLATE WORK AREA.
1. INSTALL IMPERVIOUS DIKES AROUND WORK AREA ALONG THE LEFT AND RIGHT
P
P
DIKE
IMPERVIOUS
BASIN
STILLING
SPECIAL
BASIN
STILLING
SPECIAL
DIKE
IMPERVIOUS
117511751175
11751180118011801180
1180118011851185 11851
1
8
5 11851185
0.05 AC
DA=
PIPE DEFORMED
INLET COLLAPSED;
UNSTABLE;
2'
INV=1177.00
INV=1174.00
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
JERRY RAY JONES
VIRGINIA M. JONES
VAR. GR
2SB
WINV=1178.71'
24"
HDPE
24" HDPE
IN
V=1174.53'SEAT=1
1
8
3.
6
2'
S
E
A
T
=1183.62'
1SB
W24
" HDPE
WD WALL
VAR. HT
E
XIS
TI
N
G
R/W30
"RCP
F
F
F
C
C
F
F
F
F
F
3
09
0807060504030201
00
01 0203
0405060708
09
-
DR1-
-L- PC Sta. 14+21.06
-DR1- PCC Sta. 11+29.07
-DR1- PRC Sta. 11+61.26
-L- POC Sta. 15+16.84
-DR2- POT Sta. 11+05.40=
-DR1- POT Sta. 12+41.45=
-DR1- PT Sta. 12+30.31
-DR1- POC STA. 11+20.00
BEGIN CONSTRUCTION
EX.EX.
GREU TL-2, +20
,+95
CAT-1
+82
AT-1,
+90
AT-1,
75 SY GEO-TEXTILE
EST. 55 TONS
CLASS 'II' RIP RAP
REMOVE
REMOVE
REMOVE
HW
RETAIN
SEE DETAIL 'B'
TOE PROTECTION
SEE DETAIL 'A'
EMBEDDED EST. 49 TONS
W/CLASS 'B' RIP RAP
STANDARD BASE DITCH
0404
040554"
PROJECT REFERENCE NO.8/17/99NCDOT_pdf_color_eng_50.pltDWAGNERUSER:FILE:NCDOT\NCDOT_Western_Div_On-Call_M_\NCDOT-B-4977_Wilkes_Co.\6.0_CAD_BIM\6.2_WIP\B-4977\Erosion Control\B-4977_EC_CS.dgnDATE:12/3/2019PENTABLE:TIME:4:00:26 PMNCDOT_CS.tbl1:12.4432SCALE:PLOT DRIVER: SHEET NO.PROJECT REFERENCE NO.
B-4977
REPLACES WILKES COUNTY BRIDGE NO. 75
NOT TO SCALE
NAD 83EC-4B/CONST. 4
54" PIPE CONSTRUCTION SEQUENCE
8. COMPLETE ROADWAY WORK.
7. REMOVE ANY REMAINING PUMP(S) AND SPECIAL STILLING BASIN(S).
DIVERT FLOW INTO NEWLY INSTALLED 54" PIPE.
6. REMOVE IMPERVIOUS DIKES AT INLET AND OUTLET OF NEWLY INSTALLED 54" PIPE AND
5. COMPLETE CHANNEL IMPROVEMENTS.
4. INSTALL 54" PIPE AND REMOVE/FILL EXISTING 30" RCP AND 2-24" HDPEs.
3. ISTALL PUMP-AROUND OPERATION AS SHOWN.
2. PROVIDE PUMP AND SPECIAL STILLING BASIN FOR DEWATERING THE WORK ZONE.
1. INSTALL IMPERVIOUS DIKES AT INLET AND OUTLET OF PROPOSED 54" PIPE TO ISOLATE WORK AREA.
P
P
DIKE
IMPERVIOUS
BASIN
STILLING
SPECIAL
DIKE
IMPERVIOUS
1175
117511801180
11801180
118011801185
1185
118511851
1
8
5
1190119011951195120012001205120512101210121512201225
HHMARGIE W. WYATT
WALTER LEE WYATT
JERRY RAY JONES
VIRGINIA M. JONES
HELEN T. CHURCH
HOHN G. CHURCH
4SBW
GATE
MTL
4S
B
W4SB
W
1SBW
1S
B
W18" CMP INV=1181.68'INV=1179.70'VAR. GR
VAR. GR
18" HDPE
VAR. GR
2SB
W2SBW
INV=1189.58'
INV=1178.71'WOODS
18' BST
VAR. BST
FISH D A M C R EEK R D . SR 1315
CONGO RD. SR 1313
CONGO RD. SR 131319' BST
19' B ST
(TYP.)
CONC WW
BRIDGE#75
TO WILKESBORO
TO MILLERS CREEK
TO HWY 421
WOODS
10" STL 10" STL
10" STL
1
8
" CMP
INV=1191.97'
24" HDPE
24" HDPE
18" CMP
I
NV=1188.11'
IN
V=1174.53'
WD RAIL
WD RAIL
12" HDPESEAT=1183.61'SEAT=1183.58'SEAT=1
1
8
3.
6
2'
S
E
A
T
=1183.62'
SIGN
1SB
W30
"RCP
24
" HDPE
DI
15" HDPE
EXISTING R/W
EXISTING R/W
F
I
S
H DAM CREEKEXISTING R/WE
XIS
TI
N
G
R/WEXISTING R/W
OPAL L. HAMBY
BOBBY HAMBY
(TRUSTEE)
BETTY S. ELLER
NAOLA N. SMITHEY
GUY ANTHONY SMITHEY, SR.
WOODS
WOODS
CHARLES E. CHURCH
WD WALL
VAR. HT50.00'50.00'
50
.0
0'
EXISTING R/W
60.00'
10" STL
W/BST OVERLAY
WD DECK
WOODS DWIGHT EDWARD CHURCH
DB 655 PG 159
DB 835 PG 9
E
XIS
TI
N
G
R/WGATESWD & MTLREVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.NAD 83/ NSRS 2007HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
F
F
F
F
F
C
C
F
F
F
F
F
F
F
F
C
C
C
C
F
F
F
F
F
F
F
F
4
5
3
1
2
EX. R/W
-L- +54.00
55.00' LT
-L- +15.00
09
0807060504030201
00
01
02
02 0203
0405060708
09
02
01
00
0 1
0 2
EX.EX.03
02
02
01
000101
02
03020
1
00
E
X.E
X.020203EX.EX.020202010001021510
-L- PC Sta. 12+50.39
-L- PC Sta. 14+21.06
-L- PT Sta. 13+77.92
-DR1- POT Sta. 10+00.00
-DR1- PC Sta. 10+63.37
-DR1- PCC Sta. 11+29.07
-DR1- PRC Sta. 11+61.26
-L- PRC Sta. 16+63.96
-L- PCC Sta. 18+82.39
-Y- PC Sta. 10+00.00
-Y- PT Sta. 11+63.55
-Y- PC Sta. 11+13.94
-Y- PT Sta. 10+82.84
-DR2- POT Sta. 10+00.00
-DR2- PC Sta. 10+60.62
-DR2- PT Sta. 10+89.61
-DR1- PT Sta. 12+30.31
-L- PRC Sta. 16+00.08
EX.EX.
GREU TL-2, +20
,+95
CAT-1
+82
AT-1,
+90
AT-1,
+65
AT-1,GREU TL-2, +5575 SY GEO-TEXTILE
EST. 55 TONS
CLASS 'II' RIP RAP
HW
28' SPAN X 9' RISE
BOTTOMLESS CULVERT
0401 18"RETAI
NRETAIN
RETAIN
RETAIN
18" RCP-III
SEE DETAIL 'B'
TOE PROTECTION
SEE DETAIL 'A'
EMBEDDED EST. 49 TONS
W/CLASS 'B' RIP RAP
STANDARD BASE DITCH
0402
0403
0404
0405
80 SY GEO-TEXTILE
EST. 60 TONS
CLASS 'II' RIP RAP
TB DI
GRADE TO DRAIN
54"
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
CLEAN WATER DIVERSION
OFFSITE CLEAN WATER
1' MIN.
1:2
SOIL STABILIZATION GEOTEXTILE
STABILIZE EXCAVATED MATERIAL
1' MIN.
(Not to Scale)
Sta. 15+30 to 17+00 -L- RT
Sta. 15+25 to 16+25 -L- LT
Sta. 11+30 to 12+30 -DR1- LT
on Slope as Work Allows.
Place Matting for Erosion Control
B
B
12/3/2019...\B-4977_HYD_EC_PSH.dgn3:56:58 PM8/17/99B-4977 EC-5/CONST. 4
-
DR1-
-L-
-L- POC Sta. 15+16.84
-DR2- POT Sta. 11+05.40=
-DR1- POT Sta. 12+41.45=
-L- POC Sta. 16+23.99
-Y- POT Sta. 12+25.67 =
-L- POT STA. 13+80.00
BEGIN TIP PROJECT B-4977
-Y- POC STA. 11+00.00
BEGIN CONSTRUCTION
-L- POC STA. 17+80.00
END TIP PROJECT B-4977
-
D
R
2--Y--DR1- POC STA. 11+20.00
BEGIN CONSTRUCTION
-DR2- POT STA. 10+50.00
BEGIN CONSTRUCTION
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
HEALING IN DIBBLE PLANTING METHOD
firming soil at top.
5. Push handle forward
PLANTING NOTES:
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
protected area.
1. Locate a healing-in site in a shady, well
the root collar is at ground level.
against the sloping end so that
4. Place a single layer of plants
as necessary and water thoroughly.
6. Repeat layers of plants and sawdust
correct depth.
and place seedling at
2. Remove planting bar
USING THE KBC PLANTING BAR
SEEDLING / LINER BAREROOT PLANTING DETAIL
PLANTING DETAILS
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
toward planter.
as shown and pull handle
1. Insert planting bar
root systems from drying.
container to prevent the
canvas bag or similar
shall be kept in a moist
During planting, seedlings
PLANTING BAG
soil at bottom.
toward planter, firming
4. Pull handle of bar
thoroughly.
hole open. Water
6. Leave compaction
RF-1
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
30% BETULA NIGRA
30% PLATANUS OCCIDENTALIS
40% LIRIODENDRON TULIPIFERA
B-4977
12 inches deep and provide drainage.
2. Excavate a flat bottom trench
a sloping angle.
sawdust over the roots maintaining
5. Place a 2 inch layer of well rotted
at one end of the trench.
well rotted sawdust at a sloping angle
rotted sawdust. Place a 2 inch layer of
3. Backfill the trench with 2 inches well
2 inch
from seedling.
2 inches toward planter
3. Insert planting bar
1 inch thick at center.
4 inches wide and
be 12 inches long,
cross section, and shall
blade with a triangular
Planting bar shall have a
KBC PLANTING BAR
root collar.
10 inches below the
no roots extend more than
pruned, if necessary, so that
All seedlings shall be root
ROOT PRUNING
REFORESTATION
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
REFORESTATION
REFORESTATION DETAIL SHEET
RIVER BIRCH
AMERICAN SYCAMORE
TULIP POPLAR