Loading...
HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 19465 Morman, Alaina From: laserfiche@ncdenr.gov Sent: Monday, December 16, 2019 8:24 AM To: michael.s.randall@dominionenergy.com Cc: Garcia, Lauren V; aaron.schwartz@dominionenergy.com; ehartwick@smeinc.com Subject: Construction Stormwater NOI Not Accepted This email is to notify you that your application for T-030 Extension was not accepted for the following reason: Part A15a/15b) The receiving body of water for the site address is "Buffalo Creek(Perry Pond, Robertsons Pond)", index number: 27-57-16-(1). Please provide all receiving waterbodies for the entire 399.50 acres in Parts A15c/I5d,etc. Double check the the post-construction impervious area will be 0 acres. Please resubmit a NEW eNOI with the above corrections made. A copy of the original submittal can be provided upon request. Contact Lauren Garcia at lauren.garcia@ncdenr.gov with questions. Please contact The Stormwater Program Administrative Assistant for more information at (919) 707- 3640. Please reference NOI application no. 19465 and Project ID NCC-WAKE-2020-T-030 Extension. This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. i