Loading...
HomeMy WebLinkAbout20171306 Ver 2_CAMA App Package_20191217Carpenter, Kristi From: Ward, Garcy Sent: Tuesday, December 17, 2019 2:03 PM To: Carpenter,Kristi Subject: FW: Major CAMA Application Palmetto Peartree Drainage Canal Maintenance Attachments: CAMA App Package.pdf Kristi Lynn, This is the CAMA application for the project I was telling you about. The Corps will process it as a GP 291 so we won't be getting an ePCN. We can file it as 20171306 v.2. Thanks and let me know if you have any questions. Garcy Ward Environmental Specialist NC Divison of Water Resources (252)948-3917 From: Brittingham, Cathy Sent: Friday, October 25, 2019 4:02 PM To: Ward, Garcy <garcy.ward@ncdenr.gov> Cc: Daisey, Greg <Greg.Daisey@ncdenr.gov>; Kyle Barnes <Kyle.W.Barnes@usace.army.mil> Subject: FW: Major CAMA Application Palmetto Peartree Drainage Canal Maintenance Hi Garcy, Did you also receive a copy of the CAMA permit application from NCDOT? Thanks, Cathy Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathv.brittiniaham(&,ncdenr. iaov Mailing Address: c/o DWR Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building 12' Floor, Room 1204C Raleigh, NC 27604 Please visit https://deg.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Trowell, Steve J Sent: Monday, October 07, 2019 9:05 AM To: Daisey, Greg <Greg.Daisey@ncdenr.gov> Cc: Williams, Paul C <pcwilliams2@ncdot.gov>; Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>; Brittingham, Cathy <cathy.brittingham@ncdenr.gov> Subject: Major CAMA Application Palmetto Peartree Drainage Canal Maintenance Greg Attached is the Major CAMA/Dredge and Fill permit application package for the proposed maintenance excavation of a man made drainage canal located adjacent SR 1225, Pledger Harbor Road, at it's confluence with the Albemarle Sound east of Columbia in Tyrrell County, North Carolina. I have a verbal agreement from Kyle to use the Programmatic Regional General Permit 291 to process this on the Federal side. I copied Kyle as a reminder to him and Cathy to notify her. I am dropping off a hard copy of the application package this morning in Elizabeth City. If you have any questions or need more information please let me know. Steve J. Trowel Division Environmental Specialist Division One NC Department of Transportation (252) 482-1876 office (252) 402-4015 mobile (252) 482-8722 fax sitrowell0mcdot.aov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY October 7, 2019 Greg Daisy NC Division of Coastal Management 401 S. Griffin St., Ste. 300 Elizabeth City, NC 27909 Subject: Submittal of a Major CAMA/Dredge and Fill permit application package for maintenance excavation of a man made drainage canal Tyrrell County. Dear Mr. Daisey, The North Carolina Department of Transportation (NCDOT) is requesting a Major CAMA/Dredge and Fill permit for maintenance excavation of a man made drainage canal at it's confluence with the Albemarle Sound located at the terminus of SR 1225 Pledger Harbor Road east of Columbia in the Community of Goat Neck, Tyrrell County, North Carolina. This proposed maintenance activity has been identified as a potential for drainage improvement in the Goat Neck community. The canal opening and adjacent. Albemarle Sound shoreline is exposed to northly winds that result in seasonal shoaling of the canal opening by wave action. This maintenance activity has been authorized once in 2017 by CAMA/Dredge and Fill General permit no. 68746-B issued on 6 December 2017. Rather than continuing to authorize future maintenance of this project with general permits, the NCDOT is seeking authorization to maintain this area of the Palmetto Peartree Drainage Canal through the Major CAMA/Dredge and Fill process. The maintenance activities would be conducted using a tracked excavator and dump truck working from uplands at the sound shoreline and along the road shoulder of SR 1225. The area that typically requires maintenance is 175' long x 20' wide to an average depth of minus 1.8' below the normal water level (NWL). Maintaining the canal opening to the aforementioned dimensions typically results in ±58 cubic yards of material. Spoil material will be placed directly into a closed body dump truck and hauled offsite to a local upland stockpile site owned by NCDOT. Included with this letter are the location map, permit drawings, MP-1 and MP-2 forms and the signed adjacent landowner notification statement. If you have questions, please contact Steve Trowell at sjtrowell@ncdot.gov or (252) 482-1876. The permit fee can be charged to WBS # 1.208911. Sincerely, Jerry Jennings, P.E. Div 'o n ngi eer !;;p eve TroweIl Division One Environmental Specialist I1 Mailing Address: Telephone: (252) 482-1850 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (252) 482-8722 113 AIRPORT DRIVE, SUITE 100 DIVISION ONE Customer Service: 1-877-368-4968 EDENTON, NC 27932 113 AIRPORT DRIVE, SUITE 100 EDENTON, NC 27932 Website.• www.ncdotgov Dom MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) N.C. Department Of Transportation Palmetto Peartree Drainage Canal Maintenance Applicant 1: First Name MI Last Name Steve J. Trowell If additional applicants, please attach an additional page(s) with names listed Mailing Address 113 Airport Road ZIP 27932 Street Address (if different from above) Email sjtrowell@ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name Agent/ Contractor 2: First Name Mailing Address ZIP FAX No. Street Address (if different from above) Email PO Box City State Edenton NC Phone No FAX No. 252 - 482 - 1876 ext. 252 - 482 - 8722 City State ZIP MI Last Name MI Last Name PO Box Phone No. 1 Contractor # City City State Phone No. 2 ext. - - ext. State ZiP <Form continues on back> 252-608-2808 ,. 'i- 6-4 AST .. Www.ncc*asta6mana ement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit K3.Project Location County (can be multiple) Street Address I State Rd. # Tyrrell Terminus of SR 1225 at the Albemarle Sound Shoreline SR 1225 Subdivision Name City State Zip N/A ____[Columbia NC 27925 - Phone No. Lot No.(s) (if many, attach addilional page with list) N/A - ext. N/A a. In which NC river basin is the project located? Pasquotank c. Is the water body identified in (b) above, natural or manmade? ❑Natural ®Manmade ❑Unknown e. Is proposed work within city limits or planning jurisdiction? ❑Yes ®No 4. Site Description a. Total length of shoreline on the tract (ft.) 60' c. Size of individual lot(s) N/A, (If many lot sizes, please attach additional page with a list) b. Name of body of water nearest to proposed project Man made drainage canal d. Name the closest major water body to the proposed project site. Albemarle Sound f. If applicable, list the planning jurisdiction or city limit the proposed work falls within. N/A b. Size of entire tract (sq.ft.) 6,000 d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 2' ❑NHW or ®NWL e. Vegetation on tract Common Reed - Phragmites australis along road shoulder in project area f. Man-made features and uses now on tract Drainage canal, SR 1225 Pledger Harbor Road g. identify and describe the existing land uses ad'lacent to the proposed project site. North Carolina Wildlife Resource Commission Gameland h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No K. Has a protessional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [_]NA National Register listed or eligible property? <Form continues on next page> S m808-2808 .. -888-4 COAST ., ww. .nccoastaInnana8e sent. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conduct (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5. Actfie les and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Purpose of project is to excavate sand accumulation at the confluence of the drainage canal and Albemarle Sound to improve gravity flow and drainage to the Goat Neck community. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. An excavator with adequate reach (30') will be used to excavate accumulated sand from the canal mouth and place it directlt into a closed body dump truck to be trucked to an upland stock pile owned and maintained by NCDOT. The excavator and dump truck will operate on uplands adjacent canal. d. List all development activities you propose Undertake maintenance excavation of accumulated sand in a man made canal. e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What is the approximate total disturbed land area resulting from the proposed project? 1,332 ft2 g. Will the proposed project encroach on any public easement, public accessway or other area that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff i. Will wastewater or stormwater be discharged into a wetland? If yes, will this discharged water be of the same salinity as the receiving water? j. Is there any mitigation proposed? If yes, attach a mitigation proposal. <Form continues on back> ®Sq.Ft or []Acres ❑Yes ®No ❑NA ❑Yes ®No ❑NA []Yes ❑No ®NA ❑Yes ®No ❑NA Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In add+tton to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the I proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name State of North Carolina Property Office Phone No. Address 1321 Mail Service Center, Raleigh, NC Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Dredge and Fill General permit no. 68746-B issued USACOE SAW-2017-02159 12/6/2017 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that th in rmatio77n provided in this application is truthful to the best of my knowledge - Date Date ��� ' (� ,61,3 Print Name _Steve Trowell Signature��� Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information S -8 - 8 .. 4-888-4RCOAS T .. ncr-oastal mement. o ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to SR 1225 Pledges Harbor Road 's (Name of Property Owner) property located at the terminus of SR 1225 Pledger Harbor Road adjacent the Albemarle Sound (Address, Lot, Block, Road, etc.) onman made canal that drains to Albemarle Souga Tyrrell County near Columbia N.C. (Waterbody) (City/Town and/or County) The 11 app' ant has described to me, as shown below, the development proposed at the above locatio . I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) Undertake maintenance excavation in the man made drainage canal adjacent #Ri%�9atit's ?confluence with the Albemarle Sound. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. ation) (Adjacent Property Signature Sf�nat► Steve Trowell agent for NC Dept. of Transportation ILI Print or Type Name Print or 113 Airport Drive Suite 100 1 Mailing Address Edenton, North Carolina 27932 City/State/Zip (252) 482-1876 Telephone Number 21 August 2019 Date Information) ' Ao?'WRe Mailing Ad r, s AJ4?'T City tate p �►b Te ph 1,� e umber Dar (Revised 611812012) Canal Maintenance Excavation SR 1225 Pledger Harbor Road Tyrrell County Quad Name Fort Landing 1 B EA R L E Canal Maintenance Excavation 35.990158' -76.06945' y Lewis Point ~ .................I. ................................. . c CL 25 Ln t,?tigator ;Goat Necti - F- Chapel .' 4 •.c Mt Maria °�PRh Pea►tree Lewis Point led er- a 14 -"d pa r � oP f ' -« Neck��. •V" - 1 1 _ NCDOT GIS Upit, NCDOT GlS 'Onit_North-Carolina Genter--for_` Geographic Information and Analysis, North Carolina Center for Geographic Information and Analysis ,_Copyright:0 2013 _ — National Geographic'Society,-i-cubed _ 0 0.5 1 2 Miles I I I I I I I I Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Channel Rock ---F—(excluding Other (NLW or Canal Boat Basin Boat Ramp Rock Groin Breakwater shoreline NWL _ - stabilization) Length 20' 55' Width 20' 20' Avg. Existing 1' Depth 0.6' NA NA Final Project 1 $, Depth I 1.81 I � NA NA I. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 35.6 below NWL and 12.8 above for 58.4 total c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked. provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas: N/A 2. MISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. Local NCDOT upland stockpile site C. (i) Do you claim title to disposal area? ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner ❑This section not applicable b. Type of material to be excavated. Sand d. High -ground excavation in cubic yards. N/A ❑This section not applicable l b. Dimensions of disposal area. 50' x 50' d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA (ii) If yes, where? Local NCDOT upland stockpile site e. (i) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? 5 -B S-2S0B .. 1- B -4RCOA `A' ma www.ne coastaIm&1magement.net. revised. 1 1 6/0 Form DCM MP-2 (Exr-avation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: , c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g- Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes []No ❑NA If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill 15. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Excavated sand will be placed directly into a closed body dump truck C. (i) Will navigational aids be required as a result of the project? ❑Yes ONo ❑NA (ii) If yes, explain what type and how they will be implemented. Date Palmetto Peartree Preserve Drainage Canal Maintenance ®This section not applicable b. Length: Width: d Maximum distance waterward of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. ®This section not applicable b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 1 b. What type of construction equipment will be used (e.g.,dragline, backhoe, or hydraulic dredge)? Tracked excavator, dump truck d (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Steve Trowell, Environmental Specialist II, NCDOT Applicant Name 2 - oB- 08 .. 1,. - RC ST .. Mn0W.. C. Coastalmana ement.net revised. 12/26,106 For71Vff 97-;*Z:2; III, Page 3 of 3) Applicant Signature 252-808-2806 �' 1-888-4RCOAST nccoastaiman ment.net . ..... . . .. . ........ revised. 12/26/06 PALMETTO PEARTREE PRESERVE DRAINAGE CANAL MAINTENANCE STATE OF NORTH CAROLINA 1321 MAIL SERVICE CENTER RALIEGH, NC 27699 DB 244 PG 731 75' PALMETTO PEARTREE PRESERVE NWL CANAL 20' EXISTING RIP RAP (TO BE REFURBISHED) =1.8 ALBEMARLE SOUND AREA TO BE EXCAVATED / "'EXISTING RIP RAP (TO BE REFURBISHED)\ SR 1225 (PLEDGER HARBOR RD) BEACH ASPHALT 1^ \^0.5 NORMAL WATER LEVEL STATE OF NORTH CAROLINA I32I MAIL SERVICE CENTER RALIEGH, NC 27699 DB 244 PG 731 NOTE. CANAL SURFACE WATER ELEVATION 0.3 FT BELOW NWL OF ALBEMARLE SOUND 8/22/2019 ELEVATION VIEW 1 1 1 ....SCALE N 35.990188° W 76.069588° INC DEPARTMENT OF TRANSPORTATION COUNTY: TYRRELL NWL _ OUAD: FORT LANDING BASIN: PASOUOTANK PROJECT: CANAL MAINTENANCE WBS ELEMENT: 1.208911 TOTAL VOLUME EXCAVATED = 58.4 YDS DRAWN BY: B.K. BROWN EXCAVATION BELOW WATER LINE = 35.6 YDS EXCAVATE TO ELEVATION DATE: 08/23/2019 OPEN WATER IMPACT = 1332.2 SQ FT 1.5' 2.6' 1.8' OF 1.8' FT. BELOW NWL