Loading...
HomeMy WebLinkAbout20140189 Ver 1_SAW-2015-00360 Year 4 Monitoring Report_20191031Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Thursday, October 31, 2019 11:48 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Bowers, Todd; Wells, Emily N Subject: [External] SAW-2015-00360 / EBX-Neuse I, LLC / Neu -Con UMBI / Arrington Bridge III Year 4 Monitoring Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Good morning, The below referenced Year 4 Monitoring Report review has been requested by Restoration Systems, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to Restoration Systems, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this Year 4 Monitoring Report credit release. Sponsor: EBX-Neuse I, LLC Name: Neu -Con UMBI / Arrington Bridge III USACE ID: SAW-2015-00360 River Basin: Neuse H UC: 03020201 County: Wayne CREDIT RELEASE: 5-percent of the total restoration and enhancement wetland credits: 1.63 wetland mitigation units. 15-Day Comment Start Date: October 31, 2019 15-Day Comment Deadline: November 14, 2019 45-Day Credit Release Approval Deadline: November 14, 2019 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete. Link to Arrington Bridge III Year 4 Monitoring Report can be found on RIBITs, under the Year 4 Monitoring Report: https://rib its. usace. a rmy. m i I/ri bits_apex/f? p=107:278:7926051663751:: N O: R P, 278: P278_BAN K_I D:3485 Please select the arrow beside Year 4 Monitoring Report to view and/or download the uploaded documents. Thank you, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil