Loading...
HomeMy WebLinkAbout19990243 Ver 1_COMPLETE FILE_19990317State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES March 31, 1999 Cabarrus County DWQ Project # 990243 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS, WRP Ald; Inc. Att: David Niekamp 8301 University Executive Par'Dave Suite 110 Raleigh N.C. 28262 Dear Mr. Neikamp You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 475 linear feet of waters for the purpose of constructing a food store at Ald; Inc. site Cabamts County, as you described in your application dated 10 March, 1999. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3108.This certification allows you to use Nationwide Permit Number 26 when the Corps of Engineers issues it. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. An additional condition is that a final, written stormwater plan including a wet detention basin must be approved by DWQ before wetland (or stream) impacts occur. Also, before any building is occupied at the subject site the stormwater treatment facilities shall be constructed and operational and the stormwater management plan be implemented. We understand that you have chosen to contribute to the Wetland Restoration Program in order to compensate for these impacts to wetlands and/or streams. In accordance with 15A NCAC 2R.0402, this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2H.0506(h). According to 15A NCAC 2H .0506(h), feet of restoration will be required. Until the Wetland Restoration Program receives and clears your check (made payable to: DEHNR - Wetland Restoration Program), wetland or stream fill shall not occur. Mr. Ron Ferrell should be contacted at 919-733-5083 ext. 358 if you have any questions concerning the Wetland Restoration Program. You have one month from the date of this Certification to make this payment. For accounting purposes, this Certification authorizes the fill of 475 feet of streams, in 030711 river and subbasin and 475 feet of riparian restoration are required. Please be aware that the Wetland Restoration Program (WRP) rules require rounding of acreage amounts to one-quarter acre increments (15A 2R .0503(b)). If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Division of Water Quality • Environmental Sciences Branch Non-Discharge Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office Mooresville DWQ Regional Office Mr. John Dorney Central Files Ron Ferrell; Wetland Restoration Program Todd St. John Pe?Sic l S tevens f 990243.1tr NORTH CAROLINA-DIVISON OF WATER QUALITY 401 WATER QUALITY CERTIFICATION SUMMARY OF PERMITTED IMPACTS AND MITIGATION REQUIREMENTS In accordance with 15A NCAC 2 H .0500, Aldi; Inc. has permission as outline below for the purpose(s) of proposed food store. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached cetification transmitttal letter. THIS CERTIFICATION IS NOT VLID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENT WETLAND RESTORATION PROGRAM LOCATION: Wolf Meadow Branch COUNTY: Cabarrus BASIN/SUBBASIN: 030711 As required by 15A NCAC 2H .0506, and the conditions of this certification, you are required to compensate for the above impacts through the restoration, creation, enhancement or preservation of wetlands and surface waters as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the wetland Restoration Programs must be rounded to one-quarter acre increments according to 15 2r.0503(b) acres of Class WL wetlands acres of riparian wetland acres of non-riparian wetlands acres of Class SWL wetlands 475 linear feet of stream channel - (other) One of the options you have available to satisfy the compensatory mitigation requirements is through the payment of a fee to the Wetlands Restoration Fund per NCAC 2R .0503. If you choose this option, please sign this form and mail it to the Wetlands Restoration Fund at the address listed below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLESES NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVED NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE WETLANDS RESTORATION PROGRAM. Signature Date WETLANDS RESTORATION PROGRAM DIVISON OF WATER QUALITY P.O. BOX 29535 RALEIGH, N.C. 27626-0535 (919) 733-0535 ext. 358 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director Mr. David Niekamp Aldi, Inc. 8301 University Executive Park Drive Suite 110 Charlotte, NC 28202 Dear Mr. Gavin: A4?j? NCDENR DIVISION OF WATER QUALITY June 4, 1999 Subject: Stormwater Ponds Aldi, Inc. Cabarrus County, NC DWQ# 990243 This Office is in receipt of the plans dated May 18, 1999 for the stormwater management pond at the subject facility prepared on your behalf by Freeland and Kauffman, Inc. and submitted to the Division on Staff from the Wetlands Unit reviewed the lan_1 and found them acceptable Also, please find the attached c eck rom ree an an Kauffman that is eing returne to you as no fee was necessary to review the stormwater management plan. If you have axe questions regarding this matter, please contact Mr. Todd St. John at (919) 733-1786. ff Sincerely, n John R. Domey t? Wetlands Unit Supervisor cc: Mr. Todd St. John, Wetlands Unit ?- t Mooresville Regional Office } (Oad w '/C*t" tlf? 9 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1896 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper NCDENR DIVISION OF WATER QUALITY May 26, 1999 Memorandum To: John Dorney From: Todd St. John Subject: Aldi Cabarrus County DWQ# 990243 Please find the attached plans for the Aldi wet detention basin. As we discussed the basin has 2:1 side slopes (that will be stabilized with staked sod); however, the surface area is twice the required size. As such I recommend the plans be approved. Re: Aldi Subject: Re: Aldi Date: Tue, 25 May 1999 13:59:45 -0700 From: "John Dorney" <john_dorney@h2o.enr.state.nc.us> Internal To: "Todd St. John" <todd_st.john@h2o.enr.state.nc.us> make it so number one (or number whatever!) "Todd St. John" wrote: > In reference to the Aldi Food Store project in Cabarrus County: > They have proposed what appears to be an adequate stormwater wet > detention pond except for it has 2:1 sisde slopes. However, the pond > will have double the reqired surface area. I assume it was designed this > way due to detention requirements by Concord or Cabarrus County. Soils > in the area tend to be more stable because of high clay content so 2:1 > slopes may be acceptable in this case. Also, the design includes a > littoral shelf just below the pond surface with 4:1 slopes which should > make the pond safer than it would be with just 2:1 slopes. I think we > should allow the 2:1 slopes considering the fact that the surface area > is approximately twice as large as required. Do you agree? 4CO 1 of 1 5/26/99 F ) Project No. DWQ 990243 Project Name: Aldi SUBMITTED DESIGN: REQUIRED DESIGN: elevations status Bottom of Basin (ft) 6665 Permanent Pool (ft) 669.5 3 ft. depth ok Temporary Pool (ft) 670.55 1.05 ft. depth ok areas Permanent Pool SA (sq ft) 6094 3087 sq. ft. ok Drainage Area (ac) 2.556 Impervious Area (ac) 1.806 70.7 % - volumes Permanent Pool (cu ft) 6600 Temporary Pool (cu ft) 6894 6364 cu. ft. ok Forebay (cu ft) 1350 20.5 % ok other parameters SA/DA 2.79 2.77 - eq diameter Orifice Diameter (in) 2 0.08 cfs drawdown - 3.535534 Design Rainfall (in) 1 1.0 day drawdown check drawdown area 9.8175 Linear Interpolation of Correct SAIDA *** 3 ft. Permanent Pool Depth % impervious SA/DA from Table Next Lowest 70 2.75 Project Impervious 70.7 2.77 Next Highest 80 3.1 NOTES* *This spreadsheet is designed to perform a quick preliminary check of design requirements and should not be considered a complete evaluation of any project. Use 'tab' instead of 'enter' to automatically advance to the next data entry window. **This spreadsheet is designed to roughly calculate the draw-down time using the average temporary pool depth and the orifice equation to estimate the change in driving head over time. ***Calculation of the required design parameters requires the SA/DA be computed in the linear interpolation table provided. If the project % impervious is an even value that can be found directly in the table then enter this as either the next higher or lower value and complete the table. State of North Carolina ent of Environment and Natural Resources Division of Water Quality AGEMENT PERMIT APPLICATION FORM may be photocopied for use as an original I. 1. AppliclK ria?ftecify the name of the corporation, individual, etc. who owns the project): ` Aldi, Inc. 2. Print Owner Signing Official's name and titl (the person who is legally responsible for the facility and its compliance): Jeffrey J. Newton - Authorized Agent For Aldi, Inc. 3. Mailing Address for person listed in item 2 above: 8301 University Exec. Park Drive Suite 110 Charlotte State NC Zip. 28202 Telephone Number: ( 7 0 4 548-1804 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Aldi Food Store 5. Location of Facility (street address): 961 Concord Parkway South City. Concord Cry Cabarrus 6. Directions to facility (from nearest major intersection): Travel north on U.S. 29 Site is approximately 850' north cell Commercial Park Drive on the east side of rl _ .q ?a 7. Latitude: 35023' Longitude 8 0° 3 7' of facility 8. Contact person who can answer questions about the facility: Name Jeffrey J. Newton Telephone Number. ( 864 233-5497 II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the exsjaa Pmt raimber and its issue date (if lmown) Form SWU-101 April 1998 Page I of 4 ,r.. ••r-. Y _- ?yt,c vt Yiu)ct i k4a=%;ac vine): Low Density High Density Redevelop X General Permit Other 4. Additional Project Requirements (check applicable blanks): LAMA Major Sedimentation/Erosion Control x_404 -Permit # 1 9 9 9 3 0 5 7 2 III. PROJECT INFORMATION -, 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . A wet detention basin will be installed that meets the design guide- Lines outlined in the North Carolina-Best Management Practices This facility should provide at least 85% removal of total suspended solids. 2. Stormwater runoff from this project drains to the River basin. 3. Total Project Area2. 9 5 -8 acres 4. Project Built Upon Area: 61 % 5. How many drainage basins does the project have?. 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. ;a$asli?Qi g o Receiving Stream Name v a IEaiEi Unnamed "Fias Receiving Stream Class Drainage Basin Area 2 : 5 5 6 '-Ac. Existing lm emous* Area 0.00 Ac. Proposed Imvervious*Area 1 . 8 0 6 Ac. % Lmvervious* Area (total) 71% ... .:mow::.., On-site Buildings .. 0.348 Ac. ......... w On-site Streets 0.00 Ac. On-site Parkin 1 .366 Ac. On-site Sidewalks 0.092 Ac. Other on-site 0. 00 Ac. Off-site 0. 00 Ac. Total: S= 1 .8 0 6 Ac. --t- -w "i Q" &a ucfutcu us = ouIli u-pun area 171cluaing, our nor 11MItea to, ouvaings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area listed above derived? N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SWU-101 April 1998 Page 2 of 4 1j)- ) vul J17'1LCLLULC Delow, you cerary UME me recoraea aeert restncuonS and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will nut with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section r Deli atedagentOnd dual orfirm); Freeland and Kauffman, Inc. Mailing A 209 West Stone Avenue Greenville Staff SC Mp: 29609 Phone: ( 864 ) 233-5497 Fax ( 864 ) 233-8915 VI. STJBN=AL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal 1. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP (see Attachment A) • Permit application processing fee (see Attachment A) • Two copies of plans and specifications including: • Detailed narrative description of stormwater treatment/ management • Two copies of plans and specifications, including: Ole - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations -.Details of roads, parking, cul-de-sacs, sidewalks, and curb and"o tter - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage basins delineated - Vegetated buffers (where required) VII. APPLICANTS CERTIFICATION I, (print or type name of person listed in General lnfnrniatian, item 2) Jeffrey J. Newton for A 1 d i ,Inc . certify that the information included on this permit application form is correct, that the project will be constructed in confo ce with the approved plans, that the deed restrictions in accordance with Attachment A of this form will b corded with all re ed permit conditions, and that to the best of my knowledge the proposed project co p ** ept* ients_a-16X NCAC 2H .1000. Date 5-14-99 Form SWU-101 April 1998 Page 3 of 4 A l-IAC:HMENl A Y: Deed Restriction Language The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of lots or outparcels: 1. No more than square feet of any lot, including that portion of the right-of-way between the edge of pavement and the front lot line, shall be covered 'by impervious structures including asphalt, gravel, concrete, brick, stone, slate or similar material but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. 2. No one may fill in, pipe, or alter any roadside Swale except as necessary to provide a minimum driveway crossing. NOTE: If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size and the allowable built-upon area for each lot. For commercial projects that have outparcels or future development the following statements must also be recorded: 3. The connection from the outparcel or future area into the stormwater system must be made into the forebay such that short-circuiting of the system does not occur. 4. All built-upon area from the outparcei or future development must be directed into the permitted stormwater control system. 5. Built-upon area in excess of the permitted amount will require a permit modification prior to construction For curb outlet systems, the following statement in addition to items 1 and 2 above must be recorded: 6. No one may pipe, fill in or alter any designated 100 foot long grassed Swale used to meet the requirements of NCAC 2H .1008(g). 2 SupplementFormm The applicable supplement form(s) listed below must be submitted for each BMP specified for this project: Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement. Form SWU-105 Curb Outlet System Supplement Form SWU 106 Off-Site System Supplement Form SWU 107 Underground hiMtration Trench Supplement Form SWU-108 Neuse River Basin Nutrient Management Strategy Supplement 3. Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit Low Density High Density Other Director's Certification General Permit New, Modification, or Late Renewal $225 $385 5235 $350 $50 Timely Renewal Without Modification n/a $25 n/a n/a n/a Form SWU-101 April 1998 Pale 4 of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT Thu form may be photocopied for use as an original DW Stormwater Management Plan Review: A complete stormwater management p an su mittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement I. PROJECT INFORMATION (please complete the following information): Project Name : Aldi Food Store Contact Person: Jeffrey J. Newton Phone Number: ( 864) 233-5497 For projects with multiple basins, specify which basin this worksheet applies to: Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume_ Forebay Volume SA/DA1 used Diameter of Orifice Design TSS Removal 666.50 669.50 670.55 6,094 2.556 1.806 6,600 '61894 1,350 2'`: 79 85 ft (average elevation of the floor of the basin) ft. (elevation of the orifice) _ ft. (elevation of the discharge structure overflow) _ sq. ft. - (water surface area at the orifice elevation) ac. (on-site and off-site drainage to the basin) ac. (on-site and off-site drainage to the basin) cu. ft. (combined volume of main basin and forebay) cu. ft. (volume detained above the permanent pool) cu. ft. (surface area to drainage area ratio in. % (85% TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 Rev 1/August 1998 Page 1 of 3 * The temporary pool controls runoff from the 1 inch storm event. * The basin length to width ratio is greater than 3:1-: The basin side slopes above the permanent pool are no steeper than 3:1. 1. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. f. An emergency drain is provided to empty the basin. g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). h. The temporary pool draws down in 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool. 1. A 304oot vegetative filter is provided at the outlet2 (include erosive flow calculations) m. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. o. A vegetation management/mowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the O&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean-out benchmarks are specified in the O&M plan (elevation or depth). s. A legally responsible party is designated in the O&M plan3 (include name and title). t. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. Footnotes: 1 When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. = The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. 3 The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. M. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, forebay, non-integrated pretreatment systems (pretreatment other than forebays), and the vegetated filter if one is provided. This system (check one) ? does 2 does not incorporate a vegetated filter. This system (check one) ? does 2 does not incorporate non-integrated pretreatment. Maintenance activities shall be performs as follows: After every significant runoff producing rainfall event and at least monthly: Form SWU-102 Rev 1/August 1998 Page 2 of3 .a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. _ b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 3.0 0 ' The sediment removal benchmark epth is: 2.25' 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project, responsible party, or address. Print name: Jeffrey J. Newton Address: 8301 University Exec. Park Drive Suite 110 Phone-.. (704), 704) 548-1 804 Title: Au iz t for Aldi, Inc. Signature: Date: 5 _ 14 _ I, Phillip L. Stollar aNotary Public for the State of South Carolina County of Greenville do hereby certify that Jeffrey J. Newton personally appeared before me this 14 day of _ May 1999 , and acknowledge the due execution of the forgoing infiltration system maintenance requirements. Witness my hand and official seal, My commission expires February 2 2006 SEAL Form SWU-102 Rev 1/August 1998 Pane 3 of 3 April 1, 1999 To Whom It May Concern: 4400 S. Charleston Pike P.O. Box 2997 Springfield, OH 45501-2997 Tel: 937/323-5500 FAX: 937/323-0023 Please allow this letter to serve as a Notice of Authorization that Jeffrey J. Newton, P.E. is authorized to sign, on behalf of Aldi Inc., all permits, applications, or other required documents necessary for site development. Thank you. S7ne y, Daniel Jtent Vice PrAldi Inc. - Springfield Division DJG/tlk a STORM DRAIN CALCULATIONS a ALDI FOOD STORE U.S.# 29 CONCORD, NORTH CAROLINA rGAdy T ?Ad ? as s?ogl? ,?. g ;° C ,0 1 Freeland and Kauffman, Inc. 209 West Stone Avenue Greenville, South Carolina 29609 (864) 233-5497 (864) 233-8915 fax wsom.r. •...o?? ? - La ? s?xv ?'¦> solP~'PPra?s SJNOlYF.M? ?FJIB MI's 3R s d 's rnaa rao aW .11 4 "? ?N I IQ? ° V..m ., a1P.W.iP E:l dw WOS A- od PD-oo 96 w° ON wvw ixw;4 PIS v? ?N ?I it 9 1 - P I , _ ?- ms's. 16 ` I 05 ` I 99 1} t r r , + ? \ 4 `? ? i H I+ ,111 s?A ? l i ? J ? O d5G3? ? ? I ? y , o I U .? I'?q }ICS ?' ? IR9 ? W II !, ' j o Re OIn 3 as a. 3 L 2 rn rn 0 eY) LO 0 v a? .c J 0 d. Z ch LL -o N O U O U N LL E -6 O U C 1 O U ai ir- U N O a. m a C. W 4) L 4) 3 m co E L O -+ CD O L T? i 0 d c J O 47 O N c? C O M N c+? 17 O _ '7 W 41 U? (Ci O N - w C . Z 00 ? to ? to ? to 0 c D O 0 0 Y O O O In LO N O O '7 V ? O r r 0) M Cl) M M Z? V O O O O ? > O O C O iii m C m CL L L L O ??? U U U U m T ? o v ? a J (A L:. 00 00 00 U H O 00 1-- > __ e rl? C W „' (D co ? P C O o U? uO7 J w" O C C O O C N 0 0 U? C W ... O O co n t 0 f 0 C 0 Ol C m ?' = O - O O d O O LL w L 16 uS - U c 0 c D U " Oo CD 89 LO (-R m O U m ? o c c c L] 3 Li cm e m o 1`rn 4r O 1Lo c o C Y .., o c o c m w m ... o O O D my r rn of E R c^ O O C6 O ui O N r r 7? 8 ?. O U N J Z r. N M er d Hydraflow Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (S) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) No. 1 1-2 9.44 18 c 22.0 669.00 669.11 0.500 672.17* 672.35* 0.44 End 2 2-3 9.67 18 c 108.0 669.21 669.75 0.500 672.79* 673.71* 0.23- 1 3 3-4 6.03 18 c 125.0 669.85 670.48 0.504 673.94* 674.35* 0.23 2 4 4-5 2.85 15 c 117.0 670.58 671.17 0.504 674.58* 674.81 * 0.08 3 Project File: Concord-1a.stm I-D-F File: Concord.IDF Total No. Lines: 4 Run Date: 05-13-1999 NOTES: c = circular, e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. m m m IL 0 f L 4) 3 as v? E L 0 r14W v? 3 0 L 2 D i m e J N M v O O) O N M 4 0) M ' m ? m to c 6 N W p c 6 ^ L ^ O E n co co co cc O' co 0 0 0 0 O C Q O O M I,.! C m 0 co Lo 0 c 0 00 to co n' rn It co v .- n rn O m G ? I N . n n w co co co co J lt7 r In r = a. v M n M ao. N cn Z to w to m C C O N c00 Lq O m O (M (M 0) a w cOD c00 co o co co E ? O m .- LO ao n C e a n d .- m o w co co ~ o c co c o CD C) CD CD 0 e 0 W ?- o 0 o c IL co 00 00 to n m M Vn' C Coq n 04 O U') to Cl) C14 c O CL= CN' Cl) V VO' ? > V w V ? n ? v m a? L v o w 7 c0 O co cl) F- r- of of cfl ?i li D 3 ' c .mom s c n c rn c P + cn ? ? ? m m c c I r c c ? rn O i o ? O CO N_ O m t cfl cD ? ? O U. C O O O O ? II O Q a a LO (M CL K H V: E m ` a o tq ? C _ c o o d o o = v CD Ln 0 o ?? o 0 0 0 ?- m .. ? m cno co v + Q , o 0 0 m ca c V O cOD ? r N O O O O V = C! O O O C II ? J N U . m c C m O lL C F J W N co m W ce uj N m = a O Z m co a It JCL W A W 3 _o m L 2 0 0 0 0 M=Z a N ? 00 N 0) i E "' p O G O N to N c w r cn L LO 0 . . O O .- M n N O N O -p . M O O O O CU N O m x 0 Cl) 0 0 c 0 (? ? c o c o c o _ 31 o0 0 0 0 La 4) c (M c o U 3 ? ? 7? O O O O c C ? r r 12 (n to w cm m (M m C } !n fA !n (Q C O 4) ?. O N N N 4) L II 'p C CV CV N - O i° a m J o O n N n N n N pl O cM cM (M F- 7 m ta ' m cr O co cn0 co p cc .w. C Ch m ci CR O m J ??' O O O O Q = O O C O M .Q t.. 3 V ? = O O O O ? + tU ? C C C C E n w a> i w m m ? c CL = s m ? C7 C7 C9 N CD d? V O O O O O O O O LL_ II d 0 O O co O M O 72 N C t tl C 4 th N C tb C a 0 o O Q 0, o ci v ? 0 0 0 0 - jy M _ LL. C 11 _Q U) d V O O M LO O L II O d' M N w N C.a O coo OR OR rn O C C C O w s O N N C N N v O n n n ? C m m ? .N c E O O O O Q ... O tp to to Q tOp O COO ? ? D v O C C C E w C r II La o ? m c U Z J N N co d' to m C r N M 4 w c o 'o O J Z r N M et CL Z T C t a U) c O E V W ¦ J ??L^^ 'V L 2 3 Lft T^ i V tom 'Ir N c ' ? O N O O O O 0 Y ? O O to N O ? t) r C r r O) r to CO ? to N O N O) r r c O V; Y w - w 0 0 0 0 us o m av,o co o cl ° m p 0 0 0 o c w Co 0 n g o co U) a' o `-' O O O O J> 0) 1- co C w 0 - N co ?t <t n c o c 0 co N m .-.. > 1- 00 O d' L `? C C C C N C ? a v ? m m to to m N E co v r m 0 t ? O to in to to to ? r r J con n fc) CO x ® ^ N. 9 9 CO co w co C > = ro. v d c to (D ° n - co O 0 c0 E J $ o N co Lo r y c 0 L _ ?- O N- M N a a0 cl r O O O O U- ca U Q J > .-. t0 N ' m U U w m ... N n M d 7 w c 0 co co O U - 1- 00 co m E a1 s" C' 7 O !L y o o c o w ? E ?? > v cn n V' e. cn M o w fl' ? to LO cV m (O c n n N O 3 Q r r N- r r z + O t - Q to tto LO N v Q r r r r n -? > n r n (D 04 04 Cl) d' co co to w c 0 > O N COO l E f0 r m coo w co y ca y - co cc o w v Cd ? v m Cl) aoo 01 O! cG cV O U •«? ? N v m C ? co CD CO to T r r r _ m O N w O J r N (n R fl- z a 3 O L T^ i a? rn rn T c? T LO 0 ¦ a? 0 Z M LL O` U c O N U ui LL O ca T N 0 U C O U ui w U m O d m 0I l0 a ?C. W J ?A + W c 3 O m L T? i m ? >. cc M =Z O N O a a" C C C cv ? o a r? LL r- s ? 0 0 o co 0 m? 0 0 0 0 ? a" c o 0 o ci a m 0 O 0 Cl) o 0 ? c C 0 0 0 3 0 O O• O O O L p? O O O O U 7 O O O N i O O O c Oo O O O O O II 3 O o O 0 O 0 O o E o m o c o _ m CL d J? O O O O . o .. E C R C O O N ~ 10 m a O O O ? O C w Gf J V O O O O O O O O O C O O O O ? C7 ? C O O O O t N 2? C O C O ? V ..0+ N CL = x 5 ?w x N O Cl O V O O O O n C C GO O LL II _T ' R O O co 0 y ! C V (q U O G O fV C C ? a ° ° ° ° O U CY v o o o o ;6 v c o c c LL ci tL C 11 Q y? O O co 11 q C 0 N C rn N U o° Oo rn rn N rn 0 0 0 0 !0 ? L L O O O O C. v O O N N ? C O I? I? C ? m E O O O O </J C £ C C LO to c0 Q v q O ccl O C C C O (o V O 0 N w -_ ? U m Z J N N o O U N m C N N N N U ui c N W F, O O J Z r N M V n, Z m m CL It ^O NW r_ L 3 a? E L O I" cn 3 _C L c. m c J N N O 2 N 4- N N N N N N N M r O mu a 0 0 ' 00 c 0 V N o to w 002, O f- O 00 O O O O V C G .- .? m 2... c+) r M M M r Z. v O O O O ?' > C O C O t/1 m C m C Q a.. L O J?` U U U U Q v . ? c Z C N ? (0 m m ° co >> q (D q CD 0 = W r- n c o m c 2 t° to °o °o - J W O C ? ? ? C c0 cD O O > 9 to O! O) C W co w w 0 N m C E E'E O O O O U- 0 C O LO to - 0 G ° ° rn ? O m o ? o o o c o 0 U ;? ? O .2 LL. tm m .-. O O M ' C ° O O O O G o d :? ° ° ° ° , ? O o O o Y o c o 0 m m? Im m cn M co co a r . m m... C C O O O o cj N -j N m L6 LO 20 O C w m Q C Z C W r N N U 01 lL J Z ? N c? d' d Hydrafiow Summary Report Page 1 Line Line 1D Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (Cfs) (in) (ft) (ft) (ft) l%) (ft) (ft) (ft) No. 1 21-22 2.84 15 c 20.0 669.26 669.36 0.500 672.17* 672.21* 0.06 End 2 22-23 2.90 15 c 97.0 669.46 669.95 0.505 672.27" 672.47" 0.07 1 3 22-roof 2.28 10 c 5.0 669.95 670.00 1.000 672.54* 672.60* 0.27 2 4 i i I 'I i 22-23 0.66 12 c 53.0 670.05 670.58 1.000 672.54* 672.56* 0.01 2 Project File: Concord-21.stm I-D-F File: Concord.IDF Total No. Lines: 4 Run Date: 05-13-1999 NOTES: c = circular, e = elliptical; b = box; Return period = 10 Yrs.; ' Indicates surcharge condition. m m ro CL O ¦? 75 f L- 3 as E L t0 14W co 3 _o L T? i 0 m e o J N N N O N N N N N N N N O CA m ? M = ? tt) t W n o ? n ° E. o o m o m i>r ro 0 0 ? e C M `n O O IT o o O (7 cno 0 0 C r N ? ? m I- ti n ti W cD O c0 O J S C N IR Lq v CV N N N tn0 co c^o (to m C O N O m r D ^ O O O 'n W O C O C C O C O ? O p > co in M O O to C 6 CD m a O 16 0 O c0 O C. O O O p a t0. ifI O O Q r' ?- r O CD a m to t0 O N n ? M M ? 0?0 r Cp CV N c c; p O O 0 in LO C.? `? V 7 v CV CM N 9 3 ?, p O w o co m (A N o 3 I? .p. CV N CV G IL 0 A L O N M M R' C n ^ 0 C c O U _ ti O M O O 4) U) L tri L . In F U- O_ E = ? ? O O O O n o O O - II ' t L O O N O % 0 H M E m C O G O j m ch Co (D °o 5 , c o 0 o c 0 c ® U °o o ? rn < ? ? ? c c o o ro v p LO to a M t Q ? - c O o c E y ° v !A r ? R . C . Cl O (OM N 'O . C O O O O d' C II ro O U J N 0) Ld tM m N p 0 ? lL C w f"' J W N N W O ? N ? ? Z J ? N M d' m R CL N 0 CL E V J rLM V L 2 3 _C L T^ i L cD 1.- r -- r- R O O N O . ji 2 O O O O j LO LO cm C) o 1-- 00 C) 0 O U O O ? r O Im (a ` 0) co O co O) C6 = 0 O O Y W- 0 0 6 o uj o R Z U R ,- a U) M N N h O It O Q Q O C ? O w M M N N ^ co ? O C O ? O C r C J > N ? a~o W m N N N N cnD 1- to 1- w cc`O m Cc ® ao O" O) O n N O > L `'? O C C O m C M M O O m fV .. N 'T C a ..Li E CL R V) N CIO to O 0) P a a .= N o o m 0 w H _ N N CO) O 0 D J N cOD CO = y N N N N co co cc c(D > m rn o o co - a7 cD CO O a) E ? R + o 0 O 0 N J N CD L6 co R t w M N aD d CL cA a ? N O O 'C r. C C r C LL ca U ? J > N to w Cl) a?0 tU U of F U m ti n O c O cD co O O U - ai m" O N t v O C C O O O LL 7 V- y R M M ?- a aD o - m m CV cV d' C 'O R w C _ R Q N N L r 0 O 3 V .- o o Z ? O s - R N N co a D r- C J > r N _ 4) cV r- N co N co CV o c0 co c o c o co c 0 > > ® N i i N i O E m iO m C 47 "" D 0 D (D O C O ? a) - co cc N w ? co cq U 3 N N cV O p U «? ? N C 4) C O O O - N lL r r a r _ U m LU ? e 2 O J N M V CL Z I t a c 0 U w C 00 CL fC O m m ? a Vl N m C N ? O 47 N (D U m C C (0 ?a ? C 0 O tp O N lU A 0 N C m CD m ca a Qw m roc a 'E U' cS m m 2 E? 4) ? L 0 3=m A? c N y W a L ? m V o N _° O O O Co _ U L 7 O 'C C U m m c d 'N U 3 o N n. j N CL- O E N U ? ? 0'2 c v U W .W f?`0 y O ? f0 C i S C v 3 m O 4? O L C. T/7 C U m C c m m O 0 F0 M 0 U N C y 3 0 N 0 c O cis N a? m H V t0 CO n U U U U N 7 W U O m L U O U rn 0 U U m L w 'U O J 0 S O U U m m m c N N U m c E CL 0 w O C 0 N m m H r 0 U O to w U C N E N a 7 N w lO 0 N O m l6 c 0 U a? y O U O U O) N 7 'U O m m s 'U O co U co U 0 U v co L •U O t O) V C O U N N O N 0 0 n 0 c O V w E m .5 N O. r C t0 E N y 3 O N O m m m N H N 0 0 V C O O t N is N 3 0 0 W E m N 0. J C7 v N lC 7 W Y N .U N 0 N O c O U C H M N 0 0 N 0 U E E y N a N N O U Z U FREELAND and KAUFFMAN, INC. ENGINEERS - LANDSCAPE ARcHmEc7,5 209 West Stone Avenue JobOreenville, South Carolina 29609 JO JOO No. Date 4 Telephone 864-233-5497 Computed By CL7� Fax 864-233-8915 Checked By Date REFERENCE .. ..... .......... T on Far : Calculate: .... . ....... ................... .......... ... . .......... ......... . . ..... .. . . ............ .... . . ... . ...... ... ....... ............... ... ........ .. . ................ . ....... ... ........... ... .... . . . ...... . . . ......... .. . ............................ ....... . .... . ... --4 . ... . ..... ........ it ..... ....... .. . . ............ . . ..... . ..... .............. . ......... .............. .... . .... .. ........ ........ 'A . ............. .4 .......... ......... . i ........... . ....... . .............. . ...... .. .... ...... .... . ...... ...... . .. .... . ...... ........ .. . . ........ ......... .... . ... . ..... ... ....... ..... I . ...... . .. ........... ........... ......... ... . . ....... ..... t!� 'e� tzr . ... ... . ..... . . .... �w -i 14�—7!t� ... ... . ... .. ....... ... . ........... ......... . ..... . [71-A-1-71 SY I..."...., .. .... . ........ .. - ....... ... .... ... ... ....... ...... . ... ............. .......... ..... . .......... . . . ....... .............. ............. ... . ........... ......................... ....... .... . ....... . . . .... ....... .... . ........ ........... ... ... ........... . . ..... ...... . . ...... ..... . . . .... ... . ....... i2 ... .......... ..... . ..... .... ... . ..... ... ..... . "r .7 9". - zl J .......... . . ...... ...... ... ............. . ... . ............ .. . ......... . ............ . ...... .. ........... .......... .......... . ....... ....... .... ............. - ........... ...... ... . ....... ... .... ........ .... .. . ....... .. . . . ... ......... ............. . .... ..... ------- .. . .... . ................ 4 IL - 4' .............. . . Q— ..... .............. . .. ... . .... ... .......... ........... . jjjj.... . ..... . ........ . .. ....... .. ..... .... . . ........ ....... ...... .... .. ... ...... . . . ....... ..... . ..... . .... .... ...... . .... .................... ........... ...... ... ... ... ........... .... . . . ..... . ..... - ..... ...... ................. .... ............ . . ... .. ... ... ...... ..... .... . ......... ...... ..... . . . .......... . .. ........... -.4 .........y. ........... ........ ... ............. d ... ... . ..... ...... . .. . ........... Existing 60" CMP Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\concord.fm2 Worksheet Creek Re-Route Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.024 Channel Slope 0.021739 ft(ft Diameter 60.00 in Results Depth 5.00 ft Discharge 207.99 cfs Flow Area 19.63 ft2 Wetted Perimeter 15.71 ft Top Width 0.00 ft Critical Depth 4.11 ft Percent Full 100.00 Critical Slope 0.021640 fttft Velocity 10.59 ftts Velocity Head 1.74 ft Specific Energy FULL ft Froude Number FULL Ma)amum Discharge 223.74 cfs Full Flow Capacity 207.99 cfs Full Flow Slope 0.021739 fttft 04/05/99 FlowMaster v5.15 04:35:01 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Downstream of Pond Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\concord.fm2 Worksheet Creek Re-Route Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Diameter Input Data Mannings Coefficient 0.013 Channel Slope 0.006500 ft/ft Discharge - 208.00 cfs Results Depth 59.8 in Diameter 59.79 in Flow Area 19.50 ft2 Wetted Perimeter 15.65 ft Top Width 0.00 ft Critical Depth 4.11 ft Percent Full 100.00 Critical Slope 0.006426 ft/ft Velocity 10.67 ft/s Velocity Head 1.77 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 223.75 cis Full Flow Capacity 208.00 cfs Full Flow Slope 0.006500 fttft 04/05/99 FlowMaster v5.15 05:04:07 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Pond Outlet Pipe Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\concord.fm2 Worksheet Creek Re-Route Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.010 Channel Slope 0.020000 ft/ft Diameter 24.00 in Discharge 21.00 cfs Results Depth 12.1 in Flow Area 1.58 ft2 Wetted Perimeter 3.15 ft Top Width 2.00 ft Critical Depth 1.64 ft Percent Full 50.29 Critical Slope 0.005085 ft/ft Velocity 13.27 ft /s Velocity Head 2.74 ft Specific Energy 3.74 ft Froude Number 2.63 Maximum Discharge 44.74 cfs Full Flow Capacity 41.59 cfs Full Flow Slope 0.005099 ft/ft Flow is supercritical. 04/05/99 FlowMaster v5.15 07:28:26 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 1 r Upstream of pond Worksheet for Circular Channel Project Description Project File d:Xhaestad\fmw\concord.fm2 Worksheet Creek Re-Route Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.010 Channel Slope 0.010000 ft/ft Diameter 48.00 in Discharge 198.00 cfs Results Depth 42.7 in Flow Area 11.81 if Wetted Perimeter 9.86 ft Top Width 2.50 ft Critical Depth 3.84 ft Percent Full 88.98 Critical Slope 0.009797 ft/ft Velocity 16.76 ft/s Velocity Head 4.37 ft Specific Energy 7.93 ft Froude Number 1.36 Mabmum Discharge 200.86 cfs Full Flow Capacity 186.73 cfs Full Flow Slope 0.011244 ft/ft Flow is supercritical. 04/05/99 FlowMaster v5.15 07:26:55 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 • I I' FREELAND and KAUFFMAN, INC. ENGINEERS • LANDSCAPE ARCHITECTS 209 West Stone Avenue Greenville, South Carolina 29609 Telephone 864233-5497 Fax 864-233-8915 mac,` ?° `„? a Job Job No. Date Computed By» Checked By Date REFEIZENGE Calculation Far w? ?^?? ?, _ _ ! _ Diseipiirde: AA2 ... .._.... ...... - -- 3 ._'_ ..... . .... . g.. OZ. -TA `rte. i j ............?....___. ...... ...... ._.... .._ 1 } _... ...... _..... .a. , ._ ._,.. .. '..._. .., a, m._ t ?EJ. 3. t .. ....y6 FF 0 / ..... E __ . VI '4 i i . ........ .......... ........ ._ ... .............}................ ...... ¢_..._ ...... t .... ._;....._ .. .. . E , . _.......:.._._. _€ .............. i t : I i ? ._. _ .a .. :. ... i.... ,. i 1 ' S t ...... ......... .. _`.. .._.; E 3 t 1 t t • r .1992 3.18 i O ;aa4 °azLS derdLN 09p o 0 o' 4 C - z 3 ^ ... _ .. _. . 8 ' LL- w ? . ..t LL, r. 4. W tQ D a( n ?A Z C a Al rn ~v `° a b - o2: r-?_., ° r pro LL. - , , yes z z C 1 Gd 00 ~ r W C e7' ' 4 0 0 ? ? ?ly ? v z L'i W H J C 3 O M 11 ° G O O C = i Z 41 41 O N W cc 41 G. N O 7 •'- •r O CL. O 0 0 N U d M• 4- O N S U 0 0 N LO M G N • ro c m U II 07 ° P: ro 1 C Source: USDA-SCS Plate 3.18-4 111- 165 0 0 0 STORMWATER MANAGEMENT REPORT ALDI FOOD STORE 961 CONCORD PARKWAY SOUTH CONCORD, NORTH CAROLINA ?4?rNor•rrrrrr N I;ARp '•. ?i+ ???.•• ESS/ ..9 { S AL 10565 s • Freeland and Kauffman, Inc. 209 West Stone Avenue Greenville, South Carolina 29609 (864) 233-5497 (864) 233-8915 fax LI Introduction 1 Methods and Procedures 1 Analysis 2 Design Summary 2 A. Discharge Summary 2 B. Facility Discharge Summary 3 C. Facility Summary 3 Conclusions 3 Appendices 4 A. USGS Map 5 B. Soils Map 6 C. Pre-Development Drainage Area Map 7 D. Pre-Development TR-55 Computations 8 E. Post-Development Drainage Area Map 11 F. Post-Development TR-55 Computations 12 G. Hydrograph Summary (2-year) 16 H. Pre-Development Discharge Hydrographs (2-year) 17 K. Resevior Report (2-year) 19 L. Post-Development Discharge Hydrographs (2-year) 22 M. Hydrograph Summary (10-year) 28 N. Pre-Development Discharge Hydrograph (10-year) 29 0. Resevior Report (10-year) 31 P. Post-Development Discharge Hydrographs (10-year) 34 Q. Hydrograph Summary (100-year) 40 R. Pre-Development Discharge Hydrograph (100-year) 41 S. Resevior Report (100-year) 43 T. Post-Development Discharge Hydrographs (100-year) 46 r Tables Discharge Summary 2 Facility Discharge Summary 3 Facility Summary 3 0 Figures USGS Map 5 Soils Map 6 Pre-Development Drainage Area Map 7 Post-Development Drainage Area Map 11 Stage / Storage Curve (2-year) 20 Stage / Discharge Curve (2-year) 21 Stage / Storage Curve (10-year) 32 Stage / Discharge Curve (10-year) 33 Stage / Storage Curve (100-year) 44 Stage / Discharge Curve (100-year) 45 r 0 Introduction The subject property consists of a 2.958-acre parcel of land, which is to be developed into a retail food store. The majority of the proposed development area is currently a wooded parcel with a drainage way bisecting the property. The drainage way is fed by approximately 43 acre watershed. A small area of gravel, which lies in the northwestern portion of the site, was ignored for the purposes of pre-development runoff calculations. All areas that were not wooded were considered to be grass covered. The development (the Aldi Food Store) will introduce impervious area of approximately 1.87 acres, while disturbing approximately 3.0 acres. The site currently drains in two directions. The majority of the site drains to the existing drainage 1 way, which discharges to the southwest of the property into an existing 60" corrugated metal pipe and ultimately to Wolf Meadow Branch. The remainder of the site drains onto the adjacent parking lot for Concord Nissan. The development of the subject property will include the re-routing of the existing drainage way through a storm drain system. The majority of the offsite drainage will be collected in the northeastern portion of the site in the above mentioned storm drain system or will be diverted by a permanent berm on the south side of the site. Therefore, the majority of the offsite drainage has been neglected for use in pre-development and post-development portions of this analysis in order to study the increase in stormwater runoff and pond performance locally. The development will include the construction of a stormwater management facility in the southern portion of the site. The stormwater management facility is designed to provide water quality benefits and to manage the increase in stormwater runoff as a result of the ultimate development. Water quality has been provided through the use of a permanent pool of water, the use of a forebay for initial settling, vegetation and the release of the first 1 " of rain over a 2 to 5 day period. The facility has been designed in accordance with the North Carolina "Stormwater Best Management Practices" for the removal of at least 85% of the total suspended solids. Stormwater quantity has been managed in such a way that the 2-year and 10-year pre-development discharge rates will not be exceeded during the 2-year and 10-year post-development storm events respectively. Additionally, the facility has been designed to safely release the 100-year post-development storm discharge through the outlet pipe. All pond design has been performed in conformance with state and local guidelines. Methods and Procedures "Urban Hydrology for Small Watersheds" (TR-55) was used in determining runoff curve numbers (RCN's) and times of concentration (TA's). The resulting RCN's and Tc's were then entered into Intelisolve's software package entitled "Hydraflow - Hydrographs," which was used to determine peak discharge rates, elevation vs. storage and elevation vs. discharge relationships, and routed storm volumes and discharge rates. The hydrographs generated by this program are based on the Unit Hydrograph method, and the routings are based on the Storage Indication method. Due to P Page 1 the fact that the discharge from the pond is being directed into a closed system, the effect of tailwater was taken into consideration for each design storm. The 2-year tailwater was assumed to be at the center of the downstream pipe, the 10-year tailwater was assumed to be at the crown of the downstream pipe, and the 100-year tailwater was assumed to be at the rim of the downstream manhole. For the purposes of this study, fluctuations of less than 1 cfs were considered negligible due to the empirical nature of the calculation method. Analysis The site is mapped as a combinaflon of Chewacla Sandy Loam, Mecklenburg Loam which are classified as a type "C" soil by TR-55, and Iredell Loam which is classified as a type "D" soil. The 1 post-development condition was based on proposed ground cover conditions and proposed flow paths for the areas which discharge into the proposed facility and the areas which bypass the facility. The points of interest for the purposes of this analysis are indicated on the drainage area map. The pre-development hydrograph summaries at each point of interest are shown below. The post- development composite hydrographs may not exceed the peak discharges during their respective storm events. Discharge from the pond is controlled through a riser structure. The riser structure is equipped with a 2" diameter PVC inverted siphon orifice and a 13" low flow orifice set at different elevations which will provide control of peak discharge during the 2-year and 10-year design storm events. The 100-year peak discharge is will be released from the pond through the riser structure. Design Summary 10 Total Discharge Summary Nissan Storm Frequency Pre-Development Post-Development 2-year 3.79 cfs 4.20 cfs 10-year 6.05 cfs 6.55 cfs 100-year 9.35 cfs 9.95 cfs Creek Storm Frequency Pre-Development Post-Development 2-year 4.27 cfs 4.22 cfs 10-year 8.29 cfs 8.25 cfs 100-year 14.74 cfs 23.51 cfs 0 Page 2 Facility Discharge Summary 0 Storm Frequency Inflow Outflow Water Surface Elevation 2-year 12.06 cfs . 2.54 cfs 671.44 10-year 18.00 cfs 5.53 cfs 672.17 100-year 26.59 cfs 19.78 cfs 672.60 Facility Summary Outlet Pipe Inverted Siphon Orifice (1 " Rain) Low Flow Orifice (10-year) Riser Size Spillway Length Emergency Drain Riser Crest Conclusions 24" RCP 2" Diameter PVC @ Elev. 669.50 13" Diameter @ Elev. 670.60 4'x2'-8" (Interior) Concrete Box NCDOT 840.04 W/ 4 12" High Openings 13.33' 4" PVC W/ OS&Y Valve 672.10 The proposed development of the site will include the re-routing of the existing drainage way. The majority of the approximate 43-acre watershed will be diverted through this storm drain system. Therefore, the majority of the offsite drainage has been neglected for use in pre-development and post-development portions of this analysis in order to study the increase in stormwater runoff and pond performance locally. The proposed stormwater management facility meets or exceeds the requirements for management of discharge quantity, protection of downstream property, and safety as required local and state regulations. The facility has been designed and is to be constructed in conformance with Nationally accepted guidelines. Additionally, the wet detention pond meets the design criteria of the North Carolina "Stormwater Best Management Practices" providing at least 85% removal efficiency of total suspended solids prior to downstream discharge. 0 Page 3 Appendices USGS Map Soils Map Pre-Development Drainage Area Map Pre-Development TR-55 Computations Post-Development Drainage Area Map Post-Development TR-55 Computations 2-Year Hydrograph Summary 2-Year Pre-Development Discharge Hydrographs 2-Year Reservoir Report 2-Year Post-Development Hydrograph Summary 10-Year Hydrograph Summary 10-Year Pre-Development Discharge Hydrographs 10-Year Reservoir Report 10-Year Post-Development Hydrograph Summary 100-Year Hydrograph Summary 100-Year Pre-Development Discharge Hydrographs 100-Year Reservoir Report 100-Year Post-Development Hydrograph Summary 0 Page 4 �ul 0 0 0 AdA idA -+ ....,1 # ? ? re u 6i?* IP +? . This soil survey map was compiled by the U. S. Department of Agriculture, Solt Conservation Service, and cooperating agencies. Base maps ate orthophotographs prepared by the U. S. Depart- ment of Interior, Geological Survey from 1976 aerial photography. Coordinate grid ticks and land division corners, if shown, are approximately positioned. 5000 4000 3000 2000 M g'. 0 ?. a®eiar n u+?vnx?a'? o a as fs?Lrnav wdo a. +v?«Mia tirauyr?s e3ra -m - )NI 'ICI V 6Z ma sn RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Pre-Development Subarea : US 2 9 •- N ::_tA,,; Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - - .374(74) .086(80) Impervious Areas i Paved parking lots, roofs, driveways .499(98) - Total Area (by Hydrologic Soil Group) .873 .086 ------------------------------------------------------------------------------- SUBAREA: US 29 TOTAL DRAINAGE AREA: .959 Acres WEIGHTED CURVE NUMBER: 87 ------------------------------------------------------------------------------- 1 I RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Pre-Development Subarea : Pipe-60"C;,#,? ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - Impervious Areas Paved parking lots, roofs, driveways - - .581(74) .399(80) - .333(98) - OTHER AGRICULTURAL LANDS Woods good - - 2.01(70) .296(77) Total Area (by Hydrologic Soil Group) 2.92 .695 ------------------------------------------------------------------------------- SUBAREA: Pipe TOTAL DRAINAGE AREA: 3.619 Acres WEIGHTED CURVE NUMBER: 75 ------------------------------------------------------------------------------- b P TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Pre-Development Subarea #1 - US 29 Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code ------- (sq/ft) -------- (ft) (ft/sec) ---------------- (hr) ------ ------------------ Sheet 3.5 ----------- 190 ---------- .032 --- a 0.027 Sheet 40 .05 a 0.052 Shallow Concent'd 180 .027 u 0.019 Time of Concentration = 0.10* r ------------------ ----------- - Subarea #2 - Pipe -------- ---------------- ------ Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code ------ (sq/ft) --------- (ft) (ft/sec) ---------------- (hr) ------ ------------------ Sheet 3.5 ----------- 30 ---------- .09 --- a 0.033 Sheet 270 .09 h 0.415 Shallow Concent'd 60 .055 u 0.004 Open Channel 100 3 0.009 Time of Concentration = 0.46* --- Sheet Flow Surface Codes -- - A Smooth Surface F Grass, Dense --- Shallow Concentrate d --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by TABULAR method a 0 raeaq aw ssaas>BOae ?e°?srMa.r sus°O-w ..m °stlO ?'?= sltivlY?m ?33ri? ?M'? ? ? ? 4 • ' '°"' '?'" `?D N1°1p"'rr I SL?3LH721VNd0 aN+ mn ? 3m u p 9W'[FL-fYY ?l - ' _ sn U ..e au wm4= M:q P avv Rg?w 'PW 9i ' $ ° I e y I 1111 I II :\?• II ° °R Ox I ? ?, ? S }tl c ?1 I 11111 ?y I° a ?? ?` - T F `\ \ ° ` ° `` `\ s?. m y?tlnn?R ?Y 8i1H S ` Ys• - a -0Q dtl; i q ------- Iw . +` 1 \ I n i a I tl Z 71 98 ` \ 1 ? it I I• ? z Wq Y CD _ ? ? , ? 11 ? 1 g?4 I ??4 \ \ i ,R 1 it \ - 11 r r 3$5 a ? 1b1? '? 1 ?; ?? r? eE€y I s Oa e$w y g ? ? 1 I tl NI{I???UI?`?j ° {? II 111 f?ppj I $q`? UQAm IS a 000 Z o W Qa? 13 :D yy ?o?y?? Z y i r s s n lei Q ziy g>s 16° 44 U) Q??¢9U' ? ?°~? OaC 3 ?a 3 6 3 3 3 0 U) ?FQ??? ?_? tl s n a A A 11.1 X56 6 Ill RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Post-Development Subarea : US29 --61Ja4--,,k.%; ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - - .353(74) .053(80) Impervious Areas Paved parking lots, roofs, driveways - - .590(98) - Total Area (by Hydrologic Soil Group) .943 .053 ------------------------------------------------------------------------------- SUBAREA: US29 TOTAL DRAINAGE AREA: .996 Acres WEIGHTED CURVE NUMBER: 89 ------------------------------------------------------------------------------- 0 RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Post-Development Subarea : Pond ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - - .576(74) .013(80) Impervious Areas Paved parking lots, roofs, driveways - - 1.97(98) - Total Area (by Hydrologic Soil Group) 2.54 .013 ------------------------------------------------------------------------------- SUBAREA: Pond TOTAL DRAINAGE AREA: 2.559 Acres WEIGHTED CURVE NUMBER: 93 ------------------------------------------------------------------------------- b 0 RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : Aldi - Concord User: CLD Date: 04-02-99 County : Cabarrus State: NC Checked: Date: Subtitle: Post-Development Subarea : Bypass ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - - .327(74) .409(80) Impervious Areas r Paved parking lots, roofs, driveways - - .262(98) - Total Area (by Hydrologic Soil Group) .589 .409 ------------------------------------------------------------------------------- SUBAREA: Bypass TOTAL DRAINAGE AREA: .998 Acres WEIGHTED CURVE NUMBER: 83 ------------------------------------------------------------------------------- b D I TIME OF CONCENTRATION AND TRAVEL TIME Project : Aldi - Concord User: CLD County : Cabarrus State: NC Checked: Subtitle: Post-Development Subarea #1 - US29 Version 2.00 Date: 04-02-99 Date: Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code --- (sq/ft) (ft) (ft/sec) (hr) --------------------------------- ------- Sheet ------------- 3.5 -------- 150 -------- .05 ------- a 0.019 Sheet 20 .06 a 0.028 Shallow Concent'd 130 .026 u 0.014 Shallow Concent'd 60 .026 p 0.005 Time of Concentration = 0.07* r Subarea #2 - Pond Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.5 220 .4 a 0.011 Open Channel 520 3 0.048 Time of Concentration = 0.06* Subarea #3 - Bypass Flow Type 2 year Length Slope Surface n Area Wp velocity Time ----- rain (ft) - - (ft/ft) code ---------- (sq/ft) (ft) (ft/sec) ------------------------ (hr) ------ Sheet - --------------------- 3.5 100 ---------- .05 a 0.013 Sheet 70 .15 a 0.052 Open Channel 570 3 0.053 Time of Concentration = 0.12* --- Sheet Flow Surface Codes -- - A Smooth Surface F Grass, Dense --- Shallow Concentrate d --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by TABULAR method 0 D C Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 4.3 1 731 16,853 2 - Pre-601n. CMP 3 SCS Runoff 12.1 1 717 26,169 2 - Pond 4 Reservoir 2.5 1 726 18,655 2 3 671.44 13,624 Pond 5 SCS Runoff 1.7 1 730 6,643 2 - - Bypass 7 Combine 4.2 1 728 25,298 2 4+5 - - Post-601n. CMP 9 SCS Runoff 3.8 1 717 7,824 2 - - Pre-Nissan 10 SCS Runoff 4.2 1 717 8,778 2 - - Post-Nissan Proj. file: A-Concord-3.GPW OF file: Storm.lDF Run date: 05-18-1999 0 1 r P Hydrograph Plot English Hyd. No. 1 Pre-60in. CMP Hydrograph type = SCS Runoff Peak discharge = 4.27 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.62 ac Curve number = 75 Basin Slope = 7.2% Hydraulic length = 460 ft Tc method = USER Time of conc. (Tc) = 27.6 min Total precip. = 3.50 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Total Volume = 16,853 cuft 1 - SCS Runoff - 2 Yr - Qp = 4.27 cfs 5- 4- t 3 Hyd. 1 Ot 2 1 0 5 10 15 20 25 Time (hrs) D 0 Reservoir Report Page 1 Reservoir No. 4 - Wet Pond Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft Contour area Incr. Storage Total storage sqft cult cuft 0.00 669.50 0.50 670.00 1.50 671.00 2.50 672.00 3.50 673.00 4.10 673.60 1 6,094 0 0 6,388 3,121 3,121 7,534 6,961 10,082 8,710 8,122 18,204 9,917 9,314 27,518 10,657 6,172 33,690 Culvert / Orifice Structures [A] [el [C] [D] Rise in = 24.0 2.0 13.0 0.0 Span in = 24.0 2.0 13.0 0.0 No. Barrels = 1 1 1 0 Invert El. ft = 667.00 669.50 670.60 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 2.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = - Yes No No English Weir Structures [A] [B] Crest Len ft = 13.3 0.0 Crest El. ft = 672.10 0.00 Weir Coeff. = 3.00 0.00 Eqn. Exp. = 1.50 0.00 Multi-Stage = Yes No [C] 0.0 0.00 0.00 0.00 No Aa 0.0 0.00 0.00 0.00 No Tailwater Elevation = 665.00 ft Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 0.00 0 669.50 18.52 0.50 3,121 670.00 21.39 1.50 10,082 671.00 26.20 2.50 18,204 672.00 30.25 3.50 27,518 673.00 33.82 4.10 33,690 673.60 35.79 Note: All outflows have been analyzed under inlet and outlet control. CIv B CIv C CIv D Wr A Wr B Wr C Wr D Discharge cfs cfs afs as cfs as cfs cfs 0.00 0.00 - 0.00 - - - 0.00 0.07 0.00 -- 0.00 - - - 0.07 0.13 0.70 - 0.00 - - - 0.83 0.16 4.11 --- 0.00 -- - - 4.27 0.12 6.05 - 34.15 - - - 39.87 0.00 6.96 - 73.47 - - - 42.75 0 b 0 0 Wet Pond 5 / Total 4 Culy A 3 Culv B / Culy C 2 Culv D Weir A Weir B / Weir C 0 0 10 20 30 40 50 / Weir D Discharge (cfs) Hydrograph Plot English 1 1 Hyd. No. 3 Pond Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff 2 yrs = 2.56 ac 3.8% = USER = 3.50 in = 24 hrs Peak discharge = 12.06 cfs Time interval = 1 min Curve number = 93 Hydraulic length = 740 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Total Volume = 26,169 cuft 3 - SCS Runoff - 2 Yr - Qp = 12.06 cfs 15 10- Hyd. 3 C 5- 01 0 5 10 15 20 Time (hrs) Hydrograph Plot English r Hyd. No. 4 Pond Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 3 Max. Elevation = 671.44 ft Peak discharge Time interval Reservoir name Max. Storage = 2.54 cfs = 1 min = Wet Pond = 13,624 cuft Storage Indlcadon method used. Total Volume = 18,655 cult 4 - Reservoir - 2 Yr - Qp = 2.54 cfs 1 / Hyd. 3 1 N V cY / Hyd.4 1 Time (hrs) 0 5 10 15 20 25 D Hydrograph Plot English I Hyd. No. 4 Pond Hydrograph type = Reservoir Storm frequency 2 yrs Inflow hyd. No. = 3 Max. Elevation = 671.44 ft Peak discharge Time interval Reservoir name Max. Storage = 2.54 cfs = 1 min = Wet Pond = 13,624 cuft Storage Indication method used. Total Volume = 18,655 cuft 4 - Reservoir - 2 Yr - Max. El. = 671.44 ft 672. 1 671 671 as w 670 670 669 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English r 0 Hyd. No. 5 Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 1.00 ac Basin Slope = 3.8% Tc method = USER Total precip. = 3.50 in Storm duration = 24 hrs Peak discharge = 1.74 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 740 ft Time of conc. (Tc) = 27.6 min Distribution = Type II Shape factor = 484 Total Volume = 6,643 cuft 5 -SCS Runoff -2Yr-Qp= 1.74 cfs 2.0- 1.5- 1.0- / Hyd. 5 0.5- 0.0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English Hyd. No. 7 Post-60in. CMP Hydrograph type = Combine Storm frequency = 2 yrs 1 st inflow hyd. No. = 4 Peak discharge = 4.22 cfs Time interval = 1 min 2nd inflow hyd. No.= 5 Total Volume = 25,298 cult D 7 - Combine - 2 Yr - Qp = 4.22 cfs 5 4 Hyd.4 rn 3 CY / 2 Hyd. 5 1- 01 / Hyd. 7 0 5 10 15 20 25 Time (hrs) r Hydrograph Plot English Hyd. No. 9 Pre-Nissan Hydrograph type = SCS Runoff Peak discharge = 3.79 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.96 ac Curve number = 87 Basin Slope = 3.2% Hydraulic length = 410 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 3.50.in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Total Volume = 7,824 cuft 9-SCS Runoff -2Yr-Qp=3.79 cfs 4 3- 2- CY Hyd. 9 1 0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English 1 Hyd. No. 10 Post-Nissan Hydrograph type Stone frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 2 yrs = 1.00 ac = 3.8% = USER = 3.50 in = 24 hrs Peak discharge = 4.20 cfs Time interval = 1 min Curve number = 89 Hydraulic length = 360 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Total Volume = 8,778 cult 10 - SCS Runoff - 2 Yr Qp = 4.20 cfs 5 4 rn 3 Hyd. 10 2- 1 01 1 0 5 1,0 15 20 25 Time (hrs) Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 8.3 1 730 31,737 10 - - - Pre-60in. CMP 3 SCS Runoff 18.0 1 717 40,170 10 - Pond 4 Reservoir 5.5 1 724 32,209 10 3 672.17 19,773 Pond 5 SCS Runoff 3.0 1 730 11,352 10 - Bypass 7 Combine 8.2 1 725 43,562 10 4+5 - - Post-601n. CMP 9 SCS Runoff 6.0 1 717 12,791 10 - - Pre-Nissan 10 SCS Runoff 6.5 1 717 14,047 10 - Post-Nissan Proj. file: A-Concord-IGPW OF file: Storm.IDF Run date: 05-18-1999 10 Hydrograph Plot English L P Hyd. No. 1 Pre-60in. CMP Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 3.62 ac = 7.2% = USER = 5.00 in = 24 hrs Peak discharge = 8.29 cfs Time interval = 1 min Curve number = 75 Hydraulic length = 460 ft Time of conc. (Tc) = 27.6 min Distribution = Type II Shape factor = 484 Total Volume = 31,737 cuft 1 - SCS Runoff -10 Yr - Qp = 8.29 cfs 10 8 rn 6 Hyd. 1 CJ 4 2 0 0 5 10 15 20 25 Time (hrs) 0 Reservoir Report Page 1 English Reservoir No. 4 - Wet Pond Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft Contour area Incr. Storage Total storage sgft cuft cult 0.00 669.50 0.50 670.00 1.50 671.00 2.50 672.00 3.50 673.00 4.10 673.60 0 6,094 0 0 6,388 3,121 3,121 7,534 6,961 10,082 8,710 8,122 18,204 9,917 9,314 27,518 10,657 6,172 33,690 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 24.0 2.0 13.0 0.0 Span in = 24.0 2.0 13.0 0.0 No. Barrels = 1 1 1 0 Invert El. ft = 667.00 669.50 670.60 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 2.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Cirif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = - Yes No No Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cult ft cfs 0.00 0 669.50 18.52 0.50 3,121 670.00 21.39 1.50 10,082 671.00 26.20 2.50 18,204 672.00 30.25 3.50 27,518 673.00 33.82 4.10 33,690 673.60 35.79 Weir Structures [A] [B] [C] [D] Crest Len ft = 13.3 0.0 0.0 0.0 Crest El. ft = 672.10 0.00 0.00 0.00 Weir Coeff. = 3.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Multi-Stage = Yes No No No Taiiwater Elevation = 665.00 ft Note: All outflows have been analyzed under inlet and outlet control. Clv B Civ C Clv D Wr A Wr B Wr C Wr D Discharge cfs cfs afs cfs cfs cfs cfs cfs 0.00 0.00 - 0.00 --- - - 0.00 0.07 0.00 - 0.00 -- - - 0.07 0.13 0.70 - 0.00 - - - 0.83 0.16 4.11 -- 0.00 - - - 4.27 0.12 6.05 - 34.15 - - - 39.87 0.00 6.96 - 73.47 --- - - 42.75 b D Wet Pond 5- 4- 3- - a? -ca 2 1 0 0 10000 20000 30000 40000 Storage (cult) 0 0 1 Wet Pond 5 / Total 4 Culy A 3 Culv B / Culy C 2 U) / Culv D Weir A 1 / Weir B / Weir C 0 0 10 iO 30 40 50 Weir D Discharge (cfs) Hydrograph Plot English 1 1 Hyd. No. 3 Pond Hydrograph type Storm frequency Drainage area. Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 2.56 ac = 3.8% = USER = 5.00 in = 24 hrs Peak discharge = 18.00 cfs Time interval = 1 min Curve number = 93 Hydraulic length = 740 ft Time of conc. (Tc) = 6 min Distribution Type II Shape factor = 484 Total Volume = 40,170 cuft 3 - SCS Runoff -10 Yr - Qp = 18.00 cfs 20- 15 Hyd.3 CY 10 5 0 0 5 10 15 20 Time (hrs) Hydrograph. Plot English 1 Hyd. No. 4 Pond Hydrograph type Storm frequency Inflow hyd. No. Max. Elevation = Reservoir = 10 yrs = 3 = 672.17 ft Peak discharge Time interval Reservoir name Max. Storage = 5.53 cfs = 1 min = Wet Pond = 19,773 cult Storage Indiaatlon method used. Total Volume = 32,209 cult 4 - Reservoir -10 Yr - Qp = 5.53 cfs 20- 15- / Hyd. 3 CY 10 5 ® Hyd.4 0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English r Hyd. No. 4 Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 3 Max. Elevation = 672.17 ft Peak discharge Time interval Reservoir name Max. Storage = 5.53 cfs = 1 min = Wet Pond = 19,773 cuff Storage Indication method.used. Total Volume = 32,209 cuft 4 - Reservoir -10 Yr - Max. E1. = 672.17 ft 673 1 672 671 as w 670 670 669 Time (hrs) 0 5 10 15 20 25 Hydrograph Plot English 1 Hyd. No. 5 Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 1.00 ac Basin Slope = 3.8% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Peak discharge = 2.98 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 740 ft Time of conc. (Tc) = 27.6 min Distribution = Type II Shape factor = 484 Total Volume = 11,352 cuft 5-SCS Runoff-10Yr-Qp=2.98 cfs 3.0- 2.5- 2.0- 1.5- Hyd. 5 1.0- 0.5- 0.01 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English Hyd. No. 7 Post-60in. CMP Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No.= 4 Peak discharge = 8.25 cfs Time interval = 1 min 2nd inflow hyd. No. 5 Total Volume = 43,562 cuft 1 1 7-Combine -10Yr-Qp=8.25 cfs 10- 8- Hyd. 4 rn 6 Cl / 4 Hyd. 5 2 0 / Hyd. 7 0 5 10 15 20 25 Time (hrs) Hydrograph Plot r 0 English Hyd. No. 9 Pre-Nissan Hydrograph type = SCS Runoff Peak discharge = 6.05 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.96 ac Curve number = 87 Basin Slope = 3.2% Hydraulic length = 410 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.00 in Distribution = Type it Storm duration = 24 hrs Shape factor = 484 Total Volume = 12,791 cuft 9-SCS Runoff-10Yr-Qp=6.05 cfs 8 6 0 ,?+? Hyd. 9 C1 4 2 0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot r 1 English Hyd. No. 10 Post-Nissan Hydrograph type = SCS Runoff Peak discharge = 6.55 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.00 ac Curve number = 89 Basin Slope = 3.8% Hydraulic length = 360 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Total Volume = 14,047 cult 10 - SCS Runoff -10 Yr - Qp = 6.55 cfs 8 6 Hyd. 10 CY 4 2 0 0 5 10 15 20 Time (hrs) Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 14.7 1 730 56,096 100 - - Pre-601n. CMP 3 SCS Runoff 26.6 1 717 60,952 100 - - - Pond 4 Reservoir 19.8 1 721 52,656 100 3 672.60 23,814 Pond 5 SCS Runoff 4.8 1 730 18,666 100 - Bypass 7 Combine 23.5 1 721 71,322 100 4+5 Post-601n: CMP 9 SCS Runoff 9.3 1 717 20,342 100 - - - Pre-Nissan 10 SCS Runoff 10.0 1 717 21,987 100 - - - Post-Nissan Proj. file: A-Concord-IGPW OF file: Storm.IDF Run date: 05-18-1999 Hydrograph Plot English 0 III, Hyd. No. 1 Pre-60in. CMP Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 3.62 ac Basin Slope = 7.2% Tc method = USER Total precip. = 7.20 in Storm duration = 24 hrs Peak discharge = 14.74 cfs Time interval = 1 min Curve number = 75 Hydraulic length = 460 ft Time of conc. (Tc) = 27.6 min Distribution = Type II Shape factor = 484 Total Volume = 56,096 cuft 0 III Reservoir Report Page 1 English Reservoir No. 4 - Wet Pond Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft Contour area Incr. Storage Total storage sgft cuft cuft 0.00 669.50 0.50 670.00 1.50 671.00 2.50 672.00 3.50 673.00 4.10 673.60 D 6,094 0 0 6,388 3,121 3,121 7,534 6,961 10,082 8,710 8,122 18,204 9,917 9,314 27,518 10,657 6,172 33,690 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 24.0 2.0 13.0 0.0 Span in = 24.0 2.0 13.0 0.0 No. Barrels = 1 1 1 0 Invert El. ft = 667.00 669.50 670.60 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 2.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = -- Yes No No Weir Structures [A] [13] [C] [D] Crest Len ft = 13.3 0.0 0.0 0.0 Crest El. ft = 672.10 0.00 0.00 0.00 Weir Coeff. = 3.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Multi-Stage = Yes No No No Taiiwater Elevation = 665.00 ft Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft afs 0.00 0 669.50 18.52 0.50 3,121 670.00 21.39 1.50 10,082 671.00 26.20 2.50 18,204 672.00 30.25 3.50 27,518 673.00 33.82 4.10 33,690 673.60 35.79 Note: Al outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cfs cfs cfs cfs cfs cfs afs cis 0.00 0.00 - 0.00 - - - 0.00 0.07 0.00 - 0.00 - - - 0.07 0.13 0.70 - 0.00 - - - 0.83 0.16 4.11 - 0.00 - - - 4.27 0.12 6.05 34.15 - - - 39.87 0.00 6.96 - 73.47 - - - 42.75 Wet Pond 5 4 3 2 U 1 0 0 10000 20000 30000 40000 Storage (cuft) 0 r r Wet Pond 5 / Total 4 Culv A 3 Culy B / Culy C Cn 2 / Culv D Weir A 1 / Weir B / Weir C 0 0 10 20 30 40 Weir D Discharge (cfs) b 0 Hydrograph Plot English r b Hyd. No. 3 Pond Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff Peak discharge = 26.59 cfs = 100 yrs Time interval = 1 min = 2.56 ac Curve number = 93 = 3.8% Hydraulic length = 740 ft = USER Time of conc. (Tc) = 6 min = 7.20 in Distribution = Type II = 24 hrs Shape factor = 484 Total Volume = 60,952 cuft 3 - SCS Runoff -100 Yr - Qp = 26.59 cfs 30- 25- 20- 15- . Hyd. 3 10- 5- 01 0 5 1,0 15 20 Time (hrs) 0 It Hydrograph Plot English 0 Hyd. No. 4 Pond Hydrograph type Storm frequency Inflow hyd. No. Max. Elevation Storage Indication method used. = Reservoir = 100 yrs = 3 = 672.60 ft Peak discharge Time interval Reservoir name Max. Storage = 19.78 cfs = 1 min = Wet Pond = 23,814 cuft Total Volume = 52,656 cuft 4 - Reservoir -100 Yr - Qp = 19.78 cfs 30 25 / Hyd. 3 20 y 1 CY 10- 5- / Hyd.4 0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English r, Hyd. No. 4 Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 3 Max. Elevation = 672.60 ft Peak discharge Time interval Reservoir name Max. Storage = 19.78 cfs = 1 min = Wet Pond = 23,814 tuft Storage Indication method used. Total Volume = 52,656 cuft 4 - Reservoir -100 Yr - Max. El. = 672.60 ft 673 L 672 /\ 671 m w 670 670 669 0 0 5 10 15 20 25 Time (hrs) 0 Hydrograph Plot English r Hyd. No. 5 Bypass Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 1.00 ac = 3.8% = USER = 7.20 in = 24 hrs Peak discharge = 4.83 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 740 ft Time of conc. (Tc) = 27.6 min Distribution = Type II Shape factor = 484 Total Volume = 18,666 cult 5-SCS Runoff -100Yr-Qp=4.83 cfs 4 rn 3 Hyd. 5 CY 2 1 0 0 5 10 15 20 25 Time (hrs) Hydrograph Plot English Hyd. No. 7 Post-60in. CMP Hydrograph type = Combine Storm frequency = 100 yrs 1st inflow hyd. No. = 4 Peak discharge = 23.51 cfs Time interval = 1 min 2nd inflow hyd. No. 5 Total Volume = 71,322 cuft 0 7 - Combine -100 Yr - Qp = 23.51 cfs 25- 20- Hyd.4 15- 10- / Hyd.5 5 0 ,! Hyd.7 0 5 10 15 20 25 Time (hrs) 0 Hydrograph Plot English 1 LI Hyd. No. 9 Pre-Nissan Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 0.96 ac = 3.2% = USER = 7.20 in = 24 hrs Peak discharge = 9.35 cfs Time interval = 1 min Curve number = 87 Hydraulic length = 410 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Total Volume = 20,342 cuft 9 - SCS Runoff - -100 Yr - Op = 9.35 cfs 10 8 N 6 Hyd.9 Cat 4 2 0 0 5 10 15 20 Time (hrs) 0 Hydrograph Plot English 10 Hyd. No. 10 Post-Nissan Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 1.00 ac = 3.8% = USER = 7.20 in = 24 hrs Peak discharge = 9.95 cfs Time interval = 1 min Curve number = 89 Hydraulic length = 360 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Total Volume = 21,987 cuft 10 - SCS Runoff -100 Yr - Qp = 9.95 cfs 10 8 6 Hyd. 10 CY 4 2- 0 0 5 10 15 20 Time (hrs) b FREELAND and KAUFFMAN, INC. ENGINEERS - LAND5cAPEA Rmrmc75 209 West Stone Avenue q Greenville. South Carolina 29609 Job Job NO. ®2 Date Telephone 864233-5497 Computed 13Y CLFax664233-8915 Checked By Date REFERENT E Caiculati®n Far 1?'S' A €?C'? ? •°u e F € # I DiSCiplf I < i j ? "?„•?v? ' ,gip.' ? ^? .. _____y _ ? _... __ ? ??__,_ # _ € < _ ..-t ' f€ )Y !9 c : * i ` f }A ? i 1 F : ? _?qe µf V E _ x i -£ , > < t s < x Y. = s I F i £ F g ...f.. i £ x f < i s - n uyt Cq . i # x e 1 'sry./ay i r Fo x 3 _ i s • ?-S € 3 = i i 3 < < € # x < = 8? Z. 17 91 1 < < < , # < i x .- £ s x r ( it € i 6:1 ARICA # x , < i x ? x x x 3 , s x x s < ? t ? '; ? j 2 _I..- i < < ; x .- r : , V . x t x s < ` s f # i # 66 j f [ € , : } # --- - - ------- --- - ---- ------ < € A i•, i _.._..._._............_ _.o x , # f i £ i x ......._.. __..._y__._._.__._ ............:................__.___.s____._,._..__.._.L_...._._._._.___.._.....a____.. C < < £ < i £ i } {? j I i i , i Y i < i . I ' S < i z i . j # t < ?` FREELAND and KAUFFMAN, INC. ENGINEERS • LANDSCAPE ARCHITECTS 209 West Stone Avenue GmerMlle, South Carolina 29609 J017 L. t JOIE NO. tZ'? Date t i Telephone 864233-5497 Computed 13Y Fax864233-8915 Checked By Date REFERENCE Calculation Far = -r- ? lsk= K=14 £ E ? ? f I f ? ; _ £ ` £ 3 ? < > ? 3 , : : i ! a 7 e . Y ), ....._.... __..?....... _.......,,._..,-.._ _..........f.--_._ b._....... _ . 4101 i. -To £ w _ - - t ....-..... _.... • , 4 £ z Q =1 > a 4 - , , i ! , u ppp f IE 77 F [ i ? 3 a : a a i £ _.___..............-"_--.......5..._....__.a____..._.....__..<.....„._._...a........_-_€......._..._..._-., ...... .. ??' ..... f a I • j I 3 . 3 t a t ; ; ? t 3 i i -a--- _ , ! f w f a Jr, 41 i < i < f}j S F f 3 3 a • 3 i f ?. , a s f ^ i _._,. FREELAND and KAUFFMAN, INC. ENGINEERS • L 4NDscAPEARCHrrEL'TS 209 West Stone Avenue 90,061 Date ? da Greenville, South Carolina 29609 Job -AL b Job No. Telephone 864233-5497 Com Uteri B CL Fax 864233-8915 y - Checked By Date r..._-. _1...._.__ ___ . _ _.. REFERENQE Calculatl®n For. \j iz-r '? a t om; e +t ?, A?,,• ! Dis of _ -€ £ € i ? x € i € x : t s..,..,......-' c rte. .... ..... ....w. _, .<..... _... _.., ... ., _.... x J --4 7SA < < , < , € < f - i 3 s F f IV 07 ?,4CJ3 - ._. ._._...__....___._ ._._.__ -._...,.._.._..__.. aj £ , i_.._, g_._.__._...._.,.,..£___... .__. I.. _ . x I < _.._.._ .... _.._..M. ,_ _. .., _ - ..V??..- d7?Llf lk - , e i i f = I < i < £ t i I { < _..._.._;_ ?.... _..... _ l _ .. ___r..._ .._ -.... ..... , _..._....... ................ .-.... ....... . ...... ___....._ _ .;...._ < I v .....,. - -- _---._•---.:_....__...,..?..,_.__.... . .. ....... ....__.... _........:. _..._...... _.g.. -- ._ .. _.. -?- -- ---. _.?ax?• ?%?F-s Lys < x € < < 1 f E i 3 fd :. r: = .... : z __..,.._....__»........-_ -._.... ...._ ................. _........._.... ...... ..__...... ( Z l? ?? w.. t i i I 1 ; 1 € > , € ..._ ............ ; ; ._..._. . .. _.. ..o-.- - ._r.._._._.._ ._ . - t.. _...._ -._.... ?i ...... ....... ...... L ...... _------ _. ....._.. - _._..............-- £ I I i i I 1 < € < I < < i t f i 1 x f € € i 1 € £ t i t i i , i i ' i A < y € Y s s l € , : i i i t . £ -6 i s I £ 3 i ? A she ...... i of FREELAND and KAUFFMAN, INC. ENGINEERS • LANDSCAPE ARCHITECTS 209 West Stone Avenue Greenville, South Carolina 29609 Telephone 864-233-5497 Fax 864233-8915 ..-.....,....,� .. ............ ... .. � 3.. f i € € £ � E i .......-........#......,. b, . i.. .,.. F . £ i qiq _._.. __........�.... ...... .. ..g, ...._... a.........:. .:. _......... ... .,.... ...... . ...... } £ € i i t} ... .... .... ». _ ..... -..... _' . ;...,. ........... ... o ,............ �.. ....,..., ... .... .. _... € _... ..... ......... ... . ... .... €... .... I .... .g .. ... .__, .. € i x � f ......._.. . _..:........... i _ € + _ _ ... _..... . ..._ , x , i € .... ..... '........ .... .. .. ..... .. .... .... x..._.... .... .... ........... 5........... ..... .. £ . 7..... ......... .. .. __.. } ............ t.... ..... € t € ..-.....,....,� .. ............ ... .. � 3.. f i € € £ � E i .......-........#......,. b, . i.. .,.. F . £ Table 16 ANTI -SEEP COLLAR DESIGN 200 ISO N 100 c v J D L 3 On 56 4Z` 591 C-10-22 _N L O U CL 9 c Q 0 1994 fbw path. MEMORANDUM TO: John Dorney Non=Discharge Branch Regional Contact: Samar Bou-ghazale WQ Supervisor: Rex Gleason Dater 2123,49 SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Aldi, Inc. Project Number 99 0243 Recvd From APP Received Date 3/15/99 Recvd By Region 3/19/99 Project Type Stream impact County Cabarrus County2 Region Mooresville Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. F26 Stream O Y O N F- - 13-17-6-7 F C ?- 30,711. ? ?- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y 0 N Did you request more info? Q Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? Q Y QQ N Is Mitigation required?p Y O N Recommendation: Q Issue O Issue/fond O Deny Provided by Region: Latitude (ddmmss) 35-23-50 Longitude (ddmmss) 80-37-45 Comments: The above lydect was inspected on December 18, 1998 by Samar Bou-Ghazale of this Office. Crayfish were noted in the stream, therefore, mitigation is required for disturbing more than 150 feet of stream It is recommended that the 401 certification be issued provided that the proposed mit]gation is approved by the wetlands gip. cc: Regional Office Central Office Page Number 1 Z aaquinN abed aallj0 IL-JIua0 831110 leuO16ad :aa :(L abed wo.1l panuiluoo) sluawwoo 66/SZ/£ :alsa maw-eS :Ioeluoo 113U016911 £17Z0 66 aagwnN ;OafOad snijuquD Aluno0 *"I `IPIV aweN AIIIloed 612 Wade Avenue Suite 200 Raleigh, NC 27605 Telephone: 919.828.3433 Fax: 919.828.3518 EcoScience March 10, 1999 AX Mr. Steve Chapin U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 143 Asheville, North Carolina 28001-5006 Re: Aldi Inc., Concord Site, Permit Request Dear Steve: Aldi Inc. proposed development of a food store with associated amenities to be located adjacent to Highway US 29 in Concord, Cabarrus County, North Carolina (see attached Figure 1). The site is approximately 3 acres in size, positioned near the crest of a ridge dividing the drainages of Wolf Meadow Branch and Irish Buffalo Creek in the Yadkiri/Pee Dee River drainage basin. This site is in a highly urbanized section of town surrounded by a car dealership to the southwest, a self-storage lot the south, and bounded by US 29 to the north. EcoScience Corporation has been retained to assist with environmental planning for the project. The tract was investigated in July 1998 by our staff. A wetland delineation was conducted as part of field investigations. No jurisdictional wetlands were identified on the subject property. However, a small linear intermittent headwater tributary, approximately 550 feet in length, traverses the site. This bank-to- bank system is entrenched to bedrock approximately 6 feet below ground level. The width of the trench varies from 3 to 7 feet at the surface and 2 to 3 feet at the bottom. Water is supplied to this degraded system by two pipes carrying stormwater runoff from a series of large commercial developments and a 4-lane divided highway. This system is subject to jurisdictional consideration under Section 404 of the Clean Water Act (33 CFR 320 et seq). Information on this determination was forwarded to you on August 19, 1999, and we have received verbal confirmation accepting this determination. The position of this degraded system through the center of the property has limited avoidance and minimization opportunities. Approximately 475 linear feet of degraded stream channel will be impacted by development. However, the current system will be culverted, allow for continued -1- stormwater conveyance through this system. Stormwater treatment has been proposed on the subject property, including a 0.1 acre stormwater basin sized for a 10-year storm event and for treatment of runoff from an increase in impervious surfaces caused by development. Erosion control measures will include the use of diversion dikes, silt fencing, and inlet protection at storm drains (use of stone filters). We understand proposed impacts can be authorized under Nationwide Permit (NP) #26 (33 CFR 330 Appendix A). By copy of this letter, we are requesting NWP #26 review and concurrence from your office. In support of NWP #26 issuance, 401 Water Quality Certification is required from the N.C. Division of Water Quality (DWQ)., Mr. Samar Boughazale from the regional DWQ office, visited the Aldi Concord site on December 18, 1998. Mr. Boughazale sampled the site and found evidence of aquatic life in the stream. Mitigation is therefore required for project related impacts. Aldi Inc. proposes to acquire needed mitigation from the N.C. Wetland Restoration program for 475 linear feet of stream impact. By copy of this letter and completed Pre-Construction Notification (PCN) application package (7 copies provided), we are requesting review and concurrence from DWQ for Water Quality Certification. We understand that payment in the amount of $59,375.00 will be forwarded to NCWRP as a condition of 401 issuance. If I can provide additional information to assist in your review of this project, please feel free to call contact me at your convenience. We would appreciate your immediate attention to this matter. Sincerely, ECOSCIENCE CORPORATION A?e?x KA? Jerry McCrain, Ph.D, CEP President cc: Mr. John Dorney, DWQ Mr. Jeff Newton Mr. David Niekamp -2- c \+11t2?C%b!? d ? 11P 1 Ake ? e• : r?'•,• ?.-?1 , . _ :•\ pY/ %ii - - ? ?t $de - - Ala): ?•b/ T .?--;;,. .?• ??. ? 8 ? - '=? / _ ?.. -ben MM, P, ?i a;?`' ??? ?"'1 ? ?/•`. ' 650 ?.: . .•_-? ly 75 rr 10 1 /lo??t it v : ?? /? ?? I ?\ ?? BM ' .r - o - • %_ ? ? ? ? _• of , ? .. ,-:'' M g• - r ? ? 'jl?f ?' g1•? :LY > >? $31 / T` Site Location' n, r ..?` ''? - 1...a? _ - -'; =_ - Tc ' ?_ 1 v + ? ?4;/ . 650 \ , t - i ?? • '1 ?? w ??' J ??? P1. ? ?' i ;111 i ? '? \ •1` J ? "? ../ - `°- eso - - '• i l ?? % ?1 (. ?' - J \?\` J + • :r:;: I .- ifierfo f -M all A it ?. `'l? ? • I?/ 1 i s anon` •? \: All a EcoScience 19 Corporation 612 Wa Avenue. S.* 200 Raleigh, Norm Ca otma 27605 919 828 3433 fax: 919 828 3518 Dwn. by: MAF FIGURE Cka by: JRM Date: 3/12/99 Protect: 98-059 DEM ID: CORPS ACTION ID: NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): 26 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION OF THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 01 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COSTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADRESSES SHEET). PLEASE PRINT 1. OWNERS NAME: Aldi Inc Attn: Mr. David Niekamp 2. MAILING ADDRESS: 8301 University Executive Park Drive, Suite 110 SUBDIVISION NAME: NfA CITY: Raleigh STATE: NC ZIP CODE: 28262 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAINLING ADDRESS ABOVE): US Route 29 (Concord Parkway) between two functions with Commercial Drive loop road (see attached copy of USGS quad map) 3. TELEPHONE NUMBER (HOME): (704) 782-1852 WORK: (704) 548-1804 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: David Niekamp Director of Real Estate, 8301 University Executive Park Drive Suite 110, Charlotte NC 28262 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Cabarrus NEAREST TOWN OR CITY: Concord SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ECT.): The site is located on the south side of US 29, immediately east of a Nissan automobile dealership and immediately north of a self-storage lot. 6. IMPACTED OR NEAREST STREAM/RIVER: Wolf Meadow Branch (not directly impacted) RIVER BASIN: Yadkin/Pee Dee 7a. IS THE PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES NO X IF YES EXPLAIN: 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)? YES _ NO X 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES NO X IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES X NO IF YES, DESCRIBE ANTICIPATED WORK: Culverting of approximately 475 linear feet of stream Construction on more than 7 0 acre of a food mart and associated parking 9a. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 3.0 9b. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: N/A 10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: FLOODING: DRAINAGE: TOTAL ACRES TO BE IMPACTED: N/A 10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFOREAND AFTER RELOCATION): LENGTH BEFORE: 524 linear feet FT AFTER: 49 /inear feet FT WIDTH BEFORE (based on normal high water contours): 3 to 7 feet FT WIDTH AFTER: 3 to 7 feet placed in culvert and filled FT AVERAGE DEPTH BEFORE: 2 inches of water: entrenchment up to 6 feet in depth AFTER: culverted with fill placement to grade (2) STREAM CHANEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: X CHANNEL EXCAVATION: _ CONSTRUCTION OF A DAM/FLOODING: _ OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? An on-site 0. 1-acre storm water pond will be constructed in uplands to treat on-site runoff WHAT IS THE EXPECTED POND SURFACE AREA? 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS: 8 %2" X 11 " DRAWINGS ONLY): On-site construction of an approximately 15,150 sq ft Aldi food store and associated 116 space parking lot fronting US 29 (see attached plan view and cross- section). Upstream flow through the existing stream will be piped under the construction and outfall into the existing stream channel. On-site runoff will be treated in a 0. 1-acre storm water pond (sized for a 10-year storm event). Erosion control measures will include the use of.- diversion dikes, silt fences, inlet protection for storm drains (stone filter) stone construction of the entrance road crossing of the stream, and a temporary ditch/berm around the site perimeter during construction. EXCAVATION OTHER: 13. PURPOSE OF PROPOSED WORK: Provide the public with an Aldi food store convenient to the heavily-traveled US 29 facility. 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS): The existing stream courses diagonally through the small proiect site making avoidance impracticableTotal avoidance of the stream would reduce usable space within the site eliminating the economic feasibility of the proposed proiect Approximately 25 linear feet of stream will be avoided at both the upstream and downstream portions of the stream. 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: Not required, according to COE, March 1999. 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN 'THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: Not required, according to COE, March 1999 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES _ NO X (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES _ NO b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES _ NO _ IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO Ms. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING'ALL WETLANDS, STREAMS, LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21 ,26, 29, AND 38). . ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET OF THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e. WHAT IS LAND USE OF SURROUNDING PROPERTY? Road facility to the north Nissan dealership to the west self-stora4e lot to the west, and current development underway to the east. f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OF THE U.S. MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH 'SLKGENT'S S (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED (18g.)) DATE' 5 f•n..l, F,? 1?? 70 •? ? 7 ??.. I sl Ia 1: a1? ?rr Is I. ? ?Il r?fle `?'%j li ?V`?111 •i ?1il I , € p g l P 8 r ouro 29 t1 1 ara KAtfFM.W eyG FQEELAW CONCEPTUAL 4 s'^°?e. on sv ?.... e.+ ceew anew ? I J GRADING PLAN o.rn wn mar. °M °ay00 ?+e. p?... w $ ; 111 ALDI; INC. -""Ow'c.: rerrp ?w ovnaawirNSS, itl. • p , I Wz *lvlmCutrkm ' ? ?' .actttxSCAS j ?o i 1 a mow, uz??f ,i _??, un3eoLe i N a 4°a ? ?? n n l 9: ?, ? a t t R °i o I1 !,1 "IN a ? 0 ?" `1 ? ? I'1'' 13 I'd