HomeMy WebLinkAbout20180791 Ver 1_U-5846 Original Riparian Buffer Impacts Summary_20191217RIPARAIN BUFFER IMPACTS SUMMARY
IMPACT
BUFFER
REPLACEMENT
SITE NO.
STRUCTURE SIZE !
TYPE
STATION
(FROM/TO)
TYPE
PERMENANT
TEMPORARY
ROAD
CROSSING
BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft)
ZONE 2
(ftz)
TOTAL
(ftZ)
ZONE 1
(ft)
ZONE 2
(ft)
TOTAL
(ft)
ZONE 1
(ft)
ZONE 2
(ft)
1
Concrete Sidewalk
-Y- 12+10/12+69 LT
X
381.4
196.6
577.9
Roundabout Construction
-Y- 12+20/12+84 LT
X
1213.9
375.1
1589.1
2
Utility Construction
-Y- 12+08/13+92 RT
X
4938.7
516.0
5454.8
3
Concrete Sidewalk
-Y- 10+80111+50 RT
X
310.5
201.6
512.1
Roundabout Construction
-Y- 10+00/11+43 RT
X
3276.2
699.2
3975.4
4
Concrete Sidewalk
-Y- 10+00/11+22 LT
X
439.4
173.6
613.0
Roundabout Construction
-Y- 10+80/11+32 LT
X
1785.5
1912.7
3698.2
TOTAL":
1131
572 1
1703
11214
3503
14717
0
0
'Rounded totals are sum of actual impacts
N.C. DEPT. OF TRANSPORTATION
NOTES: DIVISION OF HIGHWAYS
ORANGE COUNTY
PROJECT: U-5846
DATE 05/23/2018
SHEET 6 OF 7