Loading...
HomeMy WebLinkAbout20180791 Ver 1_U-5846 Original Riparian Buffer Impacts Summary_20191217RIPARAIN BUFFER IMPACTS SUMMARY IMPACT BUFFER REPLACEMENT SITE NO. STRUCTURE SIZE ! TYPE STATION (FROM/TO) TYPE PERMENANT TEMPORARY ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft) ZONE 2 (ftz) TOTAL (ftZ) ZONE 1 (ft) ZONE 2 (ft) TOTAL (ft) ZONE 1 (ft) ZONE 2 (ft) 1 Concrete Sidewalk -Y- 12+10/12+69 LT X 381.4 196.6 577.9 Roundabout Construction -Y- 12+20/12+84 LT X 1213.9 375.1 1589.1 2 Utility Construction -Y- 12+08/13+92 RT X 4938.7 516.0 5454.8 3 Concrete Sidewalk -Y- 10+80111+50 RT X 310.5 201.6 512.1 Roundabout Construction -Y- 10+00/11+43 RT X 3276.2 699.2 3975.4 4 Concrete Sidewalk -Y- 10+00/11+22 LT X 439.4 173.6 613.0 Roundabout Construction -Y- 10+80/11+32 LT X 1785.5 1912.7 3698.2 TOTAL": 1131 572 1 1703 11214 3503 14717 0 0 'Rounded totals are sum of actual impacts N.C. DEPT. OF TRANSPORTATION NOTES: DIVISION OF HIGHWAYS ORANGE COUNTY PROJECT: U-5846 DATE 05/23/2018 SHEET 6 OF 7