Loading...
HomeMy WebLinkAboutSW4070701_Supplement-EZ Form_20191030SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Echota IV The Summit at Echota 2 Project Area ac 46.73 3 _ Coastal Wetland Area (ac) 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? Low 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 280' and greater 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 _ Bioretention Cell 0 13 _ _ Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) _ 0 18 _ Green Roof 0 19 _ Level Spreader -Filter Strip (IS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormF(Iter _ 0 24 Silva Cell _ Y 0 25 BayflIter 0 26 Filterra 0 i FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J. Meliski, PE 28 Organization: McGill Associates 29 Street address: 55 Broad Street 30 City, State, Zip: Asheville, NC 28801 31 Phone numbers : 828-252-0575 32 Email; J.meliski@mcgillassociates.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowiedge and belief, true, accurate, and complete: and that the engineering plans, specifications. operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer •4`°r��1 (i�'Rp yqy CNNpII, Mr SEAL _ 029887 t • y�FNNip11M11\�` • a+„�« Signature of Designer Date DRAINAGE AREAS' 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? Yes FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 4 Type of SCM N/A 5 Total BUA in project (sq ft 333087 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft N/A 7permitting) New BUA outside of subdivided lots (subject to s N/A 8 Offsite - total area (sq ft N/A 9 Offsite BUA (sq ft N/A 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 137268 sf Sidewalk (sq ft 14427 sf Roof (sq ft 129488 sf - Roadway s ft 51904 sf - Future (sq ft sf - Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft N/A 12 New infiltrating permeable pavement outside of subdivided lots (sq ft N/A 13 Exisitng BUA that will remain (not subject to ermitting) (sq ft N/A 14 Existing BUA that is already permitted (sq ft 1454933 sf 15 Existing BUA that will be removed (sq ft sf 16 Percent BUA 12% 17 Design storm inches in 18 Design volume of SCM cu ft N/A 19 Calculation method for design volume N/A ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): Echota IV BUA will be on the ridge. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3 sf 5 Maximum velocity in the vegetated conveyances during the 10-year storm? a s r, 3 (o Gj S 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 13% 8 Bottom width of curb outlet swale(s) (feet) 3 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 3:1 10 Minimum length of curb outlet swale(s) (feet) 5 ft 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: Swale # Drainage Area ac BUA (ac) Pervious area ac C Q (cfs) Slope (%) V,,,°w (fps) V,�°,i (fps) Flow depth (ft) 1 0, 0 . QL5 Q,aL4 2 C - 5;CJ 61 Ll 5 , ( 8 3.95 `i. 3 .2O o . Cr `i (o 4 0,10 O (C) 8 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21