Loading...
HomeMy WebLinkAboutSW6191002_Revised Hydrology Report_12/17/2019Hydrology study For Ft. Bragg Pope Field, North Carolina Prepared for: USACE Malvesti Street Pope Field, NC 28308 Prepared by. - Gerald Oberholtzer LOWE ENGINEERS December 10, 2019 Contents I. Executive Summary..............................................................................1 II. Hydrology.............................................................................................1 A. Objectives................................................................................................................... 1 B. Model Development................................................................................................... 1 III. Existing Conditions Hydrologic Analysis (Pre -Development) ................. 3 IV. Proposed Conditions Hydrologic Analysis (Post -Development) ............. 5 V. Conclusion..........................................................................................10 Tables Table 1: Rainfall Recurrence Intervals............................................................................2 Table 2: Study Point #1 Pre -Development Peak Flows....................................................3 Table 3: Study Point #2 Pre -Development Peak Flows....................................................3 Table 4: Study Point #3 Pre -Development Peak Flows....................................................4 Table 5: Study Point #4 Pre -Development Peak Flows....................................................4 Table 6: Overall Site Pre -Development Peak Flows........................................................4 Table 7: Study Point #1 Post -Development Peak Flows..................................................5 Table 8: Study Point #2 Post -Development Peak Flows..................................................6 Table 9: Study Point #3 Post -Development Peak Flows..................................................6 Table 10: Study Point #4 Post -Development Peak Flows................................................6 Table 11: Overall Site Post -Development Peak Flows.....................................................7 Table 12: Study Point #1 Pre -Development and Post -Development Comparison ............7 Table 13: Study Point #2 Pre -Development and Post -Development Comparison ............8 Table 14: Study Point #3 Pre -Development and Post -Development Comparison ............8 Table 15: Overall Site Pre -Development and Post -Development Comparison.................9 Exhibits Exhibit 1: Vicinity Map................................................................................................12 Exhibit2: Soils Map.....................................................................................................13 Appendices Appendix 1: Valdosta NOAA Precipitation Data...........................................................15 Appendix 2: NC Long -Term BRC Performance Tool Output & Drainage Basin Maps ......16 Appendix 3: Army LID Planning Tool Reports...............................................................19 Appendix 4: Calculations/Hydraflow Results...............................................................20 I. Executive Summary Lowe Engineers has prepared this hydrological study on behalf of the United States Army Corps of Engineers for the proposed development of the SOF Operations Support Facility. The facility includes the construction of a 17,000 SF building, pavement, and approximately 100 parking spaces. The Ft. Bragg SOF project proposes to develop ±2.59 acres of property located at Malvesti Street, Pope Field, North Carolina in Cumberland County. The project location is depicted on the Vicinity Map, Exhibit 1. II. Hydrology A. Objectives This hydrology study evaluates the existing (pre -development) and proposed (post -development) hydrologic conditions of the site to determine the requirements for stormwater quality, detention, and extreme flood protection. This study was developed using the federal and state laws which govern the National Pollutant Discharge Elimination System (NPDES), as part of the CFR 40 Clean Water Act, and mandates local authorities to review, permit, and enforce all point discharges into waters of the United States, such as land disturbing activities in excess of 1-acre. EISA section 438 compliance was also ensured via the Army LID Planning and Cost Tool, which can be reviewed in Appendix 3. B. Model Development Hydraflow Hydrographs version 12, which is an extension of AutoCAD Civil 3D 2018, was used to model the existing and proposed drainage, bioretention pond, and detention pond. The model uses the Soil Conservation Service (SCS) TR-20 hydrology method and the watershed lag method for calculating time of concentration (Tc). The following information is necessary to utilize the SCS method: 1. Determination of curve numbers in the drainage areas which is representative of the land uses and their hydrologic soil types. 2. Calculations of the times of concentration (longest) to their respective study points. 3. Type II rainfall distribution hydrographs, which are used to determine the total and excess rainfall amounts. The model uses a standard time series plot generated for an SCS Type II 24-hour rainfall distribution event for the 1-, 2-, 5-, 10-, 25-, 50-, and 100-year rainfall depths specific to that geographic location. Rainfall depths for this project were obtained from the NOAA Atlas website using Station Experiment, Site ID 31-6891. The design precipitation depths are listed below in Table 1. Additionally, the primary storm pipe network was designed via the Rational Method (using the 25-yr 5-min rainfall intensity of 8.78 in/hr) and Hydraflow Storm Sewers version 12. The profile and calculations can be reviewed in Appendix 4. Table 1: Rainfall Recurrence Intervals Rainfall Recurrence Depth (inches) Inches) 1-year 3.07 2-year 3.71 5-year 4.68 10-year 5.44 25-year 6.50 50-year 7.34 100-year 8.21 To accurately determine total discharge volumes and rates, the pre -developed and post - developed sites were divided into sub -basins with varying curve numbers and times of concentration. Per the USGS Soils Map (Exhibit 2), curve numbers for Hydrologic Soils Group (HSG) "B" were utilized. To show the retention of the 951" percentile rain event, an EISA section 438 requirement, the Army LID Planning Tool was used. See Appendix 3 for the Army LID Planning Tool report. Areas of relatively concentrated flows were assigned hydrological study point numbers, of which there are 4. Study point #1 is the general pre -developed discharge area for "PRE -BASIN #1" and the post -developed discharge area for the detention pond (which includes "POST -BASIN #1" and "POST -BASIN #2) and "POST -BASIN BYPASS #1". Study point #2 is a more generalized area of discharge for "PRE -BASIN #2" and "POST -BASIN BYPASS #2". Study point #3 is an existing catch basin ("PRE -BASIN OFFSITE" & "PRE -BASIN BYPASS") to be converted to a drain inlet and drained into from "POST -BASIN BYPASS #3 & POST -BASIN OFFSITE". Study Point #4 is a small area which is to remain unchanged, regarding impervious area, from its pre -developed to post -developed condition. To review the sub -basin maps as well as all pre -basin and post -basin routing, see drainage basin maps in Appendix 2 and routing models in the Hydraflow report in Appendix 4, respectively. To model the bioretention pond volume and its associated outlet control structure, the hydrograph for "POST -BASIN #1" was routed into the bioretention pond. The bioretention pond and "POST -BASIN #2" (the area which will drain to the detention pond) were routed into the detention pond. To ensure 10-yr event outlet velocities adhere to NPDES standards, the 10-yr flow rate from the detention pond was entered into Hydraflow Express. More information, as well as a cross -sectional view of the pipe, regarding the 10-yr flow rate obtained from Hydraflow analysis can be reviewed in Appendix 4. 2 III. Existing Conditions Hydrologic Analysis (Pre -Development) The project site consists of a medium dense wooded forest land with ascetically fair draining soils in good condition (Hydrologic Soil Group B). The topography slopes mildly to moderately across the site from East to West. The site is located within the Cape Fear River Basin and drains southwestwardly to Tank Creek which connects to Little River approximately 3.5 miles downstream. No portion of Tank Creek or Little River are classified as 303(d) impaired waterbodies. All upstream runoff, except that which is labeled as "OFFSITE", is diverted by an existing curb and gutter and therefore is not included in calculations. Pre -development peak flowrates and hydraulic volumes were calculated, and their results are depicted in the tables below. Table 2 shows the flowrates and hydraulic volumes for "Study Pt. #1". Table 3 shows the flowrates and hydraulic volumes for "Study Pt. #2". Table 4 shows the flowrates and hydraulic volumes for "Study Pt. #3", which includes the limited amount of offsite runoff. Table 5 flowrates and hydraulic volumes for "Study Pt. #4". Table 6 shows the overall site flowrates and hydraulic volumes for each pre -developed stormwater event. Table 2: Study Point #1 Pre -Development Peak Flows (Pre -Basin #1) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 0.715 1,848 2 1.219 2,929 5 2.088 4,835 10 2.832 6,497 25 3.931 8,998 50 4.846 11,096 100 5.838 13,354 Table 3: Study Point #2 Pre -Development Peak Flows (Pre -Basin #2) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 1.54 3,664 2 2.37 5,487 5 3.751 8,588 10 4.902 11,226 25 6.611 15,124 50 8.011 18,347 100 9.485 21,781 Table 4: Study Point #3 Pre -Development Peak Flows (Pre -Basin #s 3 & 4+ Pre -Basin Offsite) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 1.204 2,923 2 1.595 3,815 5 2.222 5,252 10 2.731 6,431 25 3.460 8,132 50 4.051 9,514 100 4.677 10,970 Table 5: Study Point #4 Pre -Development Peak Flows (Pre -Basin #5) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 0.112 231 2 0.174 349 5 0.276 552 10 0.361 725 25 0.486 982 50 0.591 1,195 100 0.701 1,423 Table 6: Overall Site Pre -Development Peak Flows Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 3.571 8,666 2 5.358 12,580 5 8.337 19,227 10 10.826 24,879 25 14.488 33,236 50 17.499 40,152 100 20.701 47,528 IV. Proposed Conditions Hydrologic Analysis (Post -Development) The proposed site consists of a 17,000 SF building, pavement, and approximately 100 parking spaces. The addition of these materials will result in the percentage of post -developed impervious area being greater than that of the impervious area in pre -developed conditions. Impervious area percentages for individual sub -basins can be reviewed in Appendix 2. Differing site conditions between the pre -developed and post -developed site will result in increased impervious area. As a result of the increased impervious area, soil infiltration rates will be reduced. Because the developed site will be infiltrating at a lower rate, stormwater runoff will increase. Increased runoff generated by the building roof will be diverted away from "Study Pt. #2" and drain to a bioretention pond which will discharge to a detention pond. The detention pond outflow, where all treated stormwater will be routed, is "Study Pt. #1". Table 7 shows the flowrates and hydraulic volumes for "Study Pt. #1". Table 8 shows the flowrates and hydraulic volumes for "Study Pt. #2", which is where stormwater cannot be collected due to topographical constraints. Table 9 shows the flowrates and hydraulic volumes for "Study Pt. #3", which includes the limited amount of offsite runoff. Table 10 shows the flowrates and hydraulic volumes for "Study Pt. #4", which are expected to remain the same as no impervious area is to be added or removed. Table 11 shows the overall site flowrates and hydraulic volumes for each post - developed stormwater event. The pre -developed and post -developed comparisons of peak flowrates and hydraulic volumes for each study point and rain event were also calculated. Table 12 shows the peak flowrate and hydraulic volume percentage changes for "Study Pt. #1". Table 13 shows the peak flowrate and hydraulic volume percentage changes for "Study Pt. #2". Table 14 shows the peak flowrate and hydraulic volume percentage changes for "Study Pt. #3". Table 15 shows that the overall site peak flowrate and hydraulic volume percentage changes are within the limits set by the NCDEQ Stormwater Design Manual. The pre -developed and post -developed conditions for "Study Pt. #4" are to remain the same, so there is no peak discharge rate or volumetric change. Table 7: Study Point #1 Post -Development Peak Flows (Post -Basin #s 1 & 2 + Post -Basin Bypass #1) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 0.178 659 2 0.339 1,135 5 0.687 4,940 10 0.964 8,692 25 1.405 14,238 50 1.851 18,829 100 3.124 23,747 Table 8: Study Point #2 Post -Development Peak Flows (Post -Basin Bypass #2) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 1.747 4,028 2 2.265 5,271 5 3.054 7,209 10 3.672 8,756 25 4.53 10,941 50 5.207 12,688 100 5.905 14,507 Table 9: Study Point #3 Post -Development Peak Flows (Post -Basin Bypass #s 3 & 4 + Post -Basin Offsite) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 1.066 2,712 2 1.317 3,361 5 1.707 4,361 10 2.016 5,159 25 2.453 6,285 50 2.803 7,186 100 3.167 8,126 Table 10: Study Point #4 Post -Development Peak Flows (Post -Basin Bypass #5) Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (W) 1 0.112 231 2 0.174 349 5 0.276 552 10 0.361 725 25 0.486 982 50 0.591 1,195 100 0.701 1,423 Table 11: Overall Site Post -Development Peak Flows Frequency (yr) Peak Discharge (cfs) Hydraulic Volume (ft3) 1 3.103 7,630 2 4.095 10,116 5 5.724 17,062 10 7.013 23,332 25 8.874 32,446 50 10.452 39,898 100 12.897 47,803 Table 12: Study Pt. #1 Pre -Development & Post -Development Comparison Frequency (yr) Pre -Development Peak Discharge (cfs) Pre -Development Hydraulic Volume (ft3) post -Development Peak Discharge (cfs) Post -Development 3 Hydraulic Volume (ft) 1 0.715 1,848 0.178 659 2 1.219 2,929 0.339 1,135 5 2.088 4,835 0.687 4,940 10 2.832 6,497 0.964 8,692 25 3.931 8,998 1.405 14,238 50 4.846 11,096 1.851 18,829 100 5.838 13,354 3.124 23,747 Frequency (yr) Post -Development Discharge Rate Change (%) Post -Development Hydraulic Volume Change (%) 1 -75.10% -64.34% 2 -72.19% -61.25% 5 -67.10% 2.17% 10 -65.96% 33.78% 25 -64.26% 58.24% 50 -61.80% 69.69% 100 -46.49% 77.83% Table 13: Study Pt. #2 Pre -Development & Post -Development Comparison Frequency (yr) Pre -Development Peak Discharge (cfs) Pre -Development Hydraulic Volume (ft3) Post -Development Peak Discharge (cfs) Post-Development3 Hydraulic Volume (ft) 1 1.54 3,664 1.747 4,028 2 2.37 5,487 2.265 5,271 5 3.751 8,588 3.054 7,209 10 4.902 11,226 3.672 8,756 25 6.611 15,124 4.53 10,941 50 8.011 18,347 5.207 12,688 100 9.485 21,781 5.905 14,507 Frequency (yr) Post -Development Discharge Rate Change (%) Post -Development Hydraulic Volume Change (%) 1 13.44% 9.93% 2 -4.43% -3.94% 5 -18.58% -16.06% 10 -25.09% -22.00% 25 -31.48% -27.66% 50 -35.00% -30.84% 100 -37.74% -33.40% Table 14: Study Pt. #3 Pre -Development & Post -Development Comparison Frequency (yr) Pre -Development Peak Discharge (cfs) Pre -Development Hydraulic Volume (ft3) post -Development Peak Discharge (cfs) Post -Development 3 Hydraulic Volume (ft ) 1 1.204 2,923 1.066 2,712 2 1.595 3,815 1.317 3,361 5 2.222 5,252 1.707 4,361 10 2.731 6,431 2.016 5,159 25 3.460 8,132 2.453 6,285 50 4.051 9,514 2.803 7,186 100 4.677 10,970 3.167 8,126 Frequency (yr) Post -Development Discharge Rate Change (%) Post -Development Hydraulic Volume Change (%) 1 -11.46°% -7 22°% 2 -17.43% -11.90% 5 -23.18% -16.96% 10 -26.18% -19.78% 25 -29.10% -22.71% 50 -30.81% -24.47% 100 -32.29% -25.93% Table 15: Overall Site Pre -Development & Post -Development Comparison Frequency (yr) Pre -Development Peak Discharge (cfs) Pre -Development Hydraulic Volume (ft3) post -Development Peak Discharge (cfs) Post -Development 3 Hydraulic Volume (ft) 1 3.571 8,666 3.103 7,630 2 5.358 12,580 4.095 10,116 5 8.337 19,227 5.665 14,179 10 10.826 24,879 6.978 19,271 25 14.488 33,236 8.806 27,153 50 17.499 40,152 10.313 33,675 100 20.701 47,528 12.077 40,629 Frequency (yr) Post -Development Discharge Rate Change (%) Post -Development Hydraulic Volume Change (%) 1 -13.11% -11.95% 2 -23.57% -19.59% 5 -32.05% -26.25% 10 -35.54% -22.54% 25 -39.22% -18.30% 50 -41.07% -16.13% 100 -41.66% -14.52% V. Conclusion The proposed site plan's increase in impervious area will result in varying pre -developed and post -developed flowrate and hydraulic volume changes. Overall site post -developed conditions will reduce hydraulic volumes for all rain events, therefore runoff from all storms will fall within the NC Stormwater Rule 15A NCAC 02H .1002 (44) "Runoff volume match" definition which states that "annual runoff volume after development shall not be more than ten percent higher than the annual runoff volume before development." Study Point #1 results show that pre -developed and post -developed flowrate and hydraulic volume percentage changes vary amongst rain events, with more common rain events resulting in decreased volumes and less common events causing a runoff volume increase. These variations are due to the bioretention pond retaining a greater percentage of runoff for common rain events when compared to volume retained for atypical rain events. The notable variation is also due to the post -developed "Study Point #1" being the primary discharge location for most of the post -developed site, so higher hydraulic volumes at this point are to be expected. Study Point #2 also shows substantial variation amongst pre - developed and post -developed flowrates and hydraulic volumes for each rain event, but with an increase in flowrates and hydraulic volumes with more common rain events and a decrease in flowrates and hydraulic volumes with less common rain events. The change is due to the considerable reduction in area that will be draining to Study Point #2 in its post -developed condition. Study Point #3 shows consistent reductions in flowrates and hydraulic volumes for all rain events. These are due to the slight area reduction that will be draining to that point. Study Point #4 experiences no change in discharge rates or volumes as the area draining to this point is to be returned to its pre -developed condition following construction completion. The increased post -developed runoff will be controlled by routing the applicable post -developed area to a bioretention pond for stormwater quality which will then be directed to a detention pond for discharge flowrate and velocity control. Due to topographical constraints, portions of the post -developed site (those which drain to Study Point #s 2, 3, and 4) runoff will not be collected. To meet NCDEQ and NPDES requirements, the post -developed site stormwater control measures were designed to ensure that overall site flowrates and hydraulic volumes for all rain events are within the parameters set by said requirements. To meet EISA section 438 retention volume requirements as well as ensure bioretention performance and longevity, analysis was conducted via the Army LID Planning Tool and Hydraflow Hydrographs. Results from the analyses show required retention volume at 4,198 ft3 which will be exceeded by the bioretention pond with a retention volume of approximately 5,856 ft3. 10 Exhibits Exhibit 1 Vicinity Map Exhibit 2 Soils Map 11 Exhibit 1 Vicinity Map 12 -X-. Exhibit 2 sa Ma—GurrJwuria Carty, Win Ca�A,m } ftsa11: 14'"rOwraa'ia tidi3wrzt•rW9,ut. o a r •- hn 0 LO FA 1IA 1pJ �pf*9�"'AYL Mew �rcrlmla Ev�Ks:P.ME�kI!1'M�9{ 15p-i�. lfatural i2esources Weh SoA Survey :i fi241B Conservation Service National Cooperative Sod Surrey gape 1 &3 Map Unit syfnw Map unk Name Acres in AO! Percent of AOt Ea6 Blaney Iwmy sand, 2 to 8 percent slopes 10.1 5."e Ede Blaney -Urban land complex, 2 10 8 percent slopes 9.4 5.31N. CaB Candor sand, 1 to 8 puce^z slopes 8.4 4.7'4 GdB Gaead Swrny sand 2 m S peroern slopes 22.8 18.5% 3T Johnston ban 14.2 S.07. UG Udorthents. loamy 10.0 6.2% WgB Wapram-Urban laved cmgp ex 0 to 6 pecent slopes 91.6 51.E'.•. Totals for Area of Interest f 77A f 00.0% 13 Appendices Appendix 1: Pope Army Airfield NOAA Precipitation Data Appendix 2: NC Long -Term BRC Performance Tool Output & Drainage Basin Maps Appendix 3: Army LID Planning Tool Reports Appendix 4: Calculations/Hydraflow Results 14 Appendix 1 Pope Army Airfield NOAA Precipitation Data NOAA Atlas 14, Volume 2, Version 3 POPE AFQ Station ID: 31.M4 Location name: Pope Army Air &M, North Carolina, USA' Latitude: 35.173T, Longitude--79_D009' f ow Elevation- Elevation (station metadata): 218 tt- ' We e: El:R-Maps '• :curve- V3G3 POINT PRECHITATION FREQUENCY ESTRATES G AA. YCf'•JrY.- P. MaMm. S. L,n• 7- Parirbok. M-YeM &M r. RI Cj YOAA, Na4on1i 'h'eathm 3trrY-t. 3:Irtl 3a". raary ar I tabular : PF gra hp ical I Maps & aeri xs PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals tin inches)' Duration Average recurrence interval [years} ' -_u 1 2 5 10 N 50 100 1 2DO 5M 1000 ran 0-411 �. 0-512 0-596 0.659 0-732 0-7$3 0-832 0-875 0-928 ' 0.968 {}.39K.487y jMA41-0.574i fDS37-0.669i.;0.593-0.735: C.65-t-0.CI7i IG7.^.+]•C-873'.j;a.%3'tr0.9255 f0-774-C,973 fD413-j,0j 0."3•1.09 10�nin r� 0.694 0,819 0355 1.05 C17 1-25 1.32 1M 1A7 1M 'CAN-D.77E"M738-0.919 O.BGD-1.07•. ;0U6-1.1 IM4-1.30 1.11-t.39 1.t7-1.4 1.23-1.541 1.29-].b3 1.33-].69 1-1-in0-867 1.D3 1.21 1.33 1AA 1.59 1.67 1.75 1A15 " 1.91 0-780-0-972' •D.927.1-161 1.09.1-35; -.20-7-49 1.32-1.55' 1A1-1.76 1-46.1.85i 1.55-1-95 1.62.2-05 :- 1,67-2-12 30-nir1 119 1A2 1.72 113 2.19 2,38 2.56 2,13 2.94 3-10 1-p7-1.33 2$1-fi0 t-551-92; -2.1 1962u 2t32b5 27-7,SSi 2-41-3-03 (2-W3271: 70.3-da 1A8 1.79 2.20 2.51 292 S. 153 3 22 " 4M 60�rrin •1 �'-• E^ 51-2-GOl-O� 1.96-2.s": _ �''�2-81 ,61�.26 288-3.39 .13-3.97 i3.38-i.25 43,70-4.68 .' 319dd.02 5. SJO 2 1-74 2t 2-63 1 '7.55•t.5T• 88.236' '2.3d•2.9?: ._ 70-362' f3.15�.O3Y ,: 3.51.6SD 3.as-d.96 a.19fiA3] d,63-6.06 14,96-6.51 3 1-85 223 2-90 326 3-87 4-37 4-88 SAI 6-14 6-73 :.7.2-53j; 15D-3-18; :.;43-68� 3.43-d.37i :: i3-8,24941 f4.26vr•.50 4.6"LIO 5,25-691 5.70-7,56 6 220 E6 3-35 190 465 5.21 I 5-90 6-% 719 i22 _.51.4-32; l4..15-5.i5j t [4-58.5b2J 520.6-51 5-73.7-22 12�1r 2 314 3.97 4A5 5M 6.36 7.18 &04 926 103 _L4;2t ,16i ,I f5-6"_W 1- 788 6-H-8_91 (7-93-M2)' 8-67.11-2 24�1r 3.DT 3.T7 4.68 S:4 C.50 I l.21 9.11 10. t 41.3 f2.95-3.3&"-4-001 4.3 &,04 -06d-8 COD-7.00- ! 6.76 T.90 .54-e.83 a.3[ 9-79 (9,42-11,1)f`f 10.3-112 2�� 3.56 430 5.3E 6.24 '5.8G-669'. 7A2 8M 9.32 10.3 111 12-8 l3.32.3.831 11 CII.4-61} 5.02.6,76 6.a7-7.% 7.72-9.96 8.sa-1D.9 8,15-tt.7 70.7.12.6 : 51.6-13. 7;�7 3_y 3-T9 4.55 5-67 6-55 7.7r 833 9.73 10.8 122 13-3 . (3-53-d.04'1 _ ta1^.5s-37; '52M.0fi� E.tO-7G01 721-8,30 8.08-2.33 8-98•10.d 9.m%i1.5 11.1-13-fl .' 12.1.14-2 4-day 4.*D 4,80 5.95 6.86 B-11 9A2 10.1 111 12.7 138 �3.74.4,26 4SGd.12 5.56-6.341 i6.41.7.30'. 17.5".547 SAS-9.70 .37.10.6) 10.3-11. 11.6-]3.5 02,6.14, 7-day 4.63 SM 6.77 7.75 9,10 10.2 11.3 12A 14.0 152 4-32-4-95 5.15.522 6.3D-725'j f722-8-30� fBA4-9,74 9.4240.9 1.0412.1 11.4-t3.3 12,8.15,M +13.S-163 16 day 5.29 L" 7.519 &61 9- t 11.1 IV '11-3.12.9 13.3 1" 15.9 4-975-62 "Z6- 9 7.t24067 6-07.9-14 -33.10-5 10-31If_7 12-3.14-1 13.5.75.71:: 14-7-17_D 20-day T 11 8A1 9.57 112 12-1 142 15.5 1i.$ 18-6 , 20.0 �6-67.7-58 a9-0-97 9.34-10,61 1p511.9 12-0- 3.7 73-2-15.1 14,4-ta 155-17-9 17.1-t9-9 I&A-21d 8.r15 1 A 1. 1 G19.3 21.1 ZLS 3D�y 8.3d-gA2 .82.1T.1 f14.12.9i r12.7.14.d 14.3-16.3 15.6-17.71 16.519 16020E 19.b22.6 •i a 241 dy 1.12 13-1 15-1 16 2- 22A 24A . iIZ4-13,s 17719.E .o-22 123 :xrio45 -262! .2.27.< 60�ay 14A 15-7 17.8 19-5 21-6 23.2 24-7 262 28.1 29.E 12-7-142, ,i 04,9.161_ '16.9.18-8! i18a-20y' !2D-d- .8i 21-9-7A.4i 3.3.25-7 24.E-27-71 2fid-29.8 '' -7.37d Precklrailon teguency [OFj esernates n Ma tale are taw or. +regtrercy anayst6 of part a; airaron Genes [POS�- triners'n parequ*us a e PF e&.rr sues at Wirer and upper dowr3s y the 90% e3rradlrce •'1ter:al. Ti* proo"ity that p'emimrl'reTiercy es:rr aces [Ydr gt,en duration and anlerxp rec%,rvice rleNa[: x,lf oe greater sla'1 Me upper- ooura {or less mar. ',lie iDww Doa10} 4 6%. EstlmaLS at upper Murds are ]t Cl Meb agatrsl proWl)4 n'axHrwm predprahorl PVP: e6tr'1ate6 ar10 may be hVW Klan pire-rlfy Vald PMP VA*6- lease m0tr so NOAA A^as 14 Wa ment °3r mote in trmamr- 15 Appendix 2 NC Long -Term BRC Performance Tool Output & Drainage Basin Maps North Carolina Long -Term Bioretention Hydrologic Performance Tool IF51 G rY I NPLT P AgArOETER5 r�rlan LT — Overflow Wiltration — Drainage : �Dgq SPi Group •A+S.i prpq 5 t In rws t t ...-e 4lba$e Ra110 150% reldtlrr is WO voVu••- gr C-41 n! z we 9% 3% n•ri G, i.��r A—W_1. 175% d[[n. W Satrtr 10% wATER GVAU7Vp1ARAMFwATHM 27% amok Ar$ 1N Cant. 1.A3 flrani�e Mp IN CZ c 0.9 rr g/r Eu1WR"TP Cax. 0.19 mpjL .. O,ui­gr Avg iP C-, 0.14 l DE51GN OLrTFUT PARAMETERS •.1�r. n.wn SPEgradr KIM 0.1�0 ' J1.r NTpR010Gr TARO IryTr] pa "M 7K a! Tood LI g5 f% ote &M 10 7% EA1YfrdODn 1lF 6i16 orruge ton r7z VOLUME REDUCTION ipq TREATS9VAOSAUNOFF? Yfs 61'% WATER CAM"" 'F td Uhl- W1 P—M I Pflumt A4 Tom1 N 117.9 Rvduc ., Efflypnr Avg TOtu N 7 1 g3V. InRu A>E TM.1 P 7 1 FfFk—t An TMW P 0A ]+ a* Average Surtau• �L t ojb Ponding Depth ►r ■ �e ❑epth to I �� (root zone) IWS (meoila+gravel} 1 r so 16 . �' 3.ro�ntm3 r rai i e�.xne31 wo�ar ►■ol--v dYW 3'JMJIYtlO LKLVdOl3h3G-3Nd 0 of Lad •w vcwi ia6id�.i+rrt>•sn 'mAg u■N � �. � �= k?a�y �J z� Q 1 o d o � x L.; 7 < < y ■ w¢¢7 ■ zcynN I¢fCJ�� �r 1 aarc4�• _ Vt p ►r - J i ■ wS:: 000�a Z z LU _ ZL,3 W f V t a, i W z m �■� I I 4 .-ro �. ¢ 7 LU ll �■i t d QO]d U ❑ L LU cr 1 5 ------------ 00000/, l ... jm n v 7 � W CJ s4 ni e) rJOO CO C C y W O con L 41 7 V 10 I 7 C] n o 4 n w a 0 0 0❑ G 7 �¢ c� S U' try A s3 CA '4 0 •? a 4 N V1 in I I 1 I 1 I I1 •--- - 8" - _ �g Al �1 _ 1E� .;1 LU N LU LU ❑ Q r 17 �,w r,wa M¢aeamws' _ ° J u eM �aa �3oiw36vw3rVJCKNV dVYl 3`JLHMtl01H]I�dOl3M130150d N Li �aq Ll .. u 53 E r I17 f r J �icsci R Q 6' cv CA o T f ' Q u�`� • F C. Lug t ramp ► I a m<C314 1 rrwa� aQ t a a r , rod arn' ` y j z r i » z aama�In ¢�� } LJ ml actor- r • ` } ¢<,` ....r E ao¢7 �°L41 -'k,In 1/1 L,.I Q 7 .. ■. LY Y: I _Ln�.- ��U z3 1 m Ua z� Q n�-•�•� 07C O �J 0 sn w 4 7 riQma�� SIN uE� �¢¢a ¢nr��' a V1 LU O[Y�ly z I ❑ Q07RCJ 0 00 0 m d co N O W L n C 0 n 8 o p O O G ZLII� L. I Z. 0 W p1 u-, d 0 0 z C'J z.n Cl ClC o z 2-M, "1"�ar� T 18 Appendix 3 Army LID Planning; and Cost Tool Report PROJECT INFO SITE INFO) AND EISA VOLUME Date REQ UA REIiENT Anne Command [IMCoM J Project limit of disturbance (ac) 2.59 Army [nstallatinn 95% rainfall depth fin) 1.8 tort Bragg Project name ISOF UPI:RA'f1UNS FAC11,11 Sod tape Sandy-Lwm Project descriptionHydrologic Soil Group (HST;) New building and associated parking Pre project curse. number {CNj G7 Post project cone number (t"N) 83 Uscr Name 1� JWI off noff volume (ef) 1088 run M,wer Planner LUWE ENGINE PoA-project runoff volume (cf) 5285 EISA Section 438 retention volume 4198 requirement (cf) LID PLANNING SUMMARY Structural BMP surface area Runoff volume Non-structural BLIP Surface (sf) retained (co area (ac) I3iaretentian 6960 SbSi Veg. Inter Strip (Slope >2%, Short Grass): 0.00 Swale: 2948 205 Veg- Filter Strip (Slope �2%,'fall Gras); 0,q0 Permeable Pavement: 0 0 Veg. Filter Strip (Slope <2%, Short Grass); 0100 Rainwater Harvesting: 0 Veg- Filter Strip (Slope �2"/, Tail Grass) 0. Green Roof: 0 1 0� Reforestation (Trees - Short Grass); 0,00 Infiltration Practice: 0 0 Reforestation (Trees - Shrubs and'fall Grass)r 0.f1D Total retention volume provided by BMPs (cf): 5856 Project complies with EISA Section 438. LID COST SUMMARY 19 Appendix 4 Calculations/Hydraflow Results Underdrain Calculations D=1 �*n S o. where: D = Diameter of single pipe {inchesy n = Roughness factor (recommended to be 0.011) 5 = Internal slope (recommended to be 0.5%) ❑ = Underdrain design flaw [cfs] Q = Media Surf ace Area (f t2) * Media Inf filtration Rate (f t1s) * Sa f ety Factor in f t 1 hr = 0.00002315 s ft ft3 Q = 6,435 f t2 * 0.00002315 — * 10 = 1.49 — s s 3 (1.49 fs )*0.011 D = 16 = 3.90 inches 0 50 5 Table 1: Number of 4" Pipes Required in the Underdrain ff D is Less Than of 4" Pipes 5.13 2 6.96 3 6.66 4 7.22 5 7.75 6 $.20 7 20 Runoff Volume Match Calculations R„ = 0.05 + 0.9 * 1A Where: R., - Runoff coefficient (unitless) I.:.. _ Impervious fraction (unitiess) DV = 3630*Ra*Rv*A Where- DV = Design volume (cu ft) R:, _ Design storm depth (in) A = Drainage area (ac) Impervious Area IA Drainage Area Pre — Development: IA = 0.08 Ac. = 0.03 2.59 Ac. Pre — Development: R„ = 0.05 + 0.9 * .03 = .08 Post — Development: IA = 1.16 Ac. = 0.45 2.59 Ac. Post — Development: R„ = 0.05 + 0.9 * .45 = .46 Post — Developmetnt D„ = 3,630 * 1 * (. 46 — .08) * 2.59 = 3,573 f t3 21 Designed By: SKW Date: Checked By: HMA Date: Company: LOWE ENGINEERS Project Name: SOF OPERATIONS FACILITY Project No.: 18-0088 Site Location (City/Town) FT. BRAGG Culvert Id. A Total Drainage Area (acres) 0.21 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe_ If the tail►s•ater depth is less than half the outlet pipe diameter, it is classified minimum tail►vatet condition. If it is greater than half the pipe diameter. it is classified maxmt'iin condition. Pipes that outlet onto .vide fiat areas with no defined channel are assutned to have a turnimurn radwater condition'unless reliable flood sta_ze elevations, shot- otherwise Outlet pipe diameter, Do (in.) Tailwater depth (in.) MinimumlMaximum tailwater? Discharge (cfs) Velocity (Us) W.] 2 Min TW (Fig. 8.06a) 0.1 1 Step _'. Saved on the tailw-ater conditions deternuned in step 1. enter Figure 8.06a or Figure 8.06b. and determine ds¢ riprap size and minimum apron length (Ld- The d,., size is the rnedrarn stone size ui a well -graded riprap apron_ Step 3. Deternune apron width at the pipe outlet. the apron shape, and the apron width at the outlet end from the same figure used in Step Minimum TW Maximum TW Figure 8.06a Figt,re 8.06b Riprap d,s(,, (ft.) 0.5 Minimum apron length, La (ft) 4.5 Apron width at pipe outlet (ft.) 4.5 4.5 Apron shape Apron width at outlet end (ft.) 6 1.5 Step 4. Deternime the maximum stone diameter dfrku= 1.5xd., Minimum TW Maximum TW Max Stone Diameter, dmax (ft.) 0.75 0 Stele 5. Deteruune the apron thickness. Apron thickness = 1 5 x dr,-,, Minimum TW Maximum TW Apron Thickness(ft.) 1.125 0 22 Designed By: SKw Date: Checked By: HMA Date: Company: LOWE ENGINEERS Project Name: SOF OPERATIONS FACILITY Project No.: 18-0088 Site Location (City/Town) FT. BRAGG Culvert Id. B Total Drainage Area (acres) 1.33 Step 1. Detenine the tail-,vater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter. it is classified minimum. tallwater condition. If it is greater than half the pipe diameter. it is classified maxnnum condition. Pipes that outlet onto wide fiat areas with no defined channel are assumed to have a num ruin tailwater condition finless reliable flood stage elevations shoe- otherwise. Outlet pipe diameter, D, (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity ftJs) EV 4.2 Min TW (Fig. 8.06a) 0.98 3.12 Step 3. Based on the tailwater conditions determined in step 1. enter Figure 8.06a or Figure 8.06b, and determine dj¢ riprap size and minimum apron length (Ld. The dfy size is the median stone Size in a well -graded riprap apron - Step 3. Determine apron width at the pipe outlet. the apron shape. and the apron width at the outlet end from the same fimire used to Step -'- Minimum TW Maximum TW Figure 8.06a Fioure 8.06h Riprap d5o, (ft.) 0.5 Minimum apron length, L,, (ft.) 4.5 Apron width at pipe outlet (ft.) 4.5 4.5 Apron shape Apron width at outlet end (ft.) 6 1,5 Step 4. Determne the maxrnitim stone diameter. 1.5 x d. , Minimum TW Maximum TW Max Stone Diameter, dmax (ft.) 0.75 0 Step 5. Detenmue the apron thickness. Apron thickness = 1.5 x dr,'. Minimum TW Maximum TW Apron Thickness(ft.) 1.125 0 23 Designed By: SxW Date: Checked By: HMA Date: Company: LOWE ENGINEERS Project Name: SOF OPERATIONS FACILITY Project No.: 18-0088 Site Location (City/Town) FT, BRAGG Culvert Id. C Total Drainage Area (acres) 0.97 Step 1. Deteniune the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter_ it is classified i i-mi:ntim tailivater condition. If it is greater than half the pipe diameter. it is classified maximtun condition. Pipes that outlet onto wide flat areas With no defined chaniiel are assumed to have a nummum tailwater condition tireless reliable flood stage elevations shops- othenvise Outlet pipe diameter, Do (in.) Tailwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft./s) ��I 19 Max TW (Fig. 8.06b) 10.34 4.4 Step 2. Based on the taih%-ater conditions determined in step 1. enter Figure 8.06a or Figure 8.06b. and determine dso riprap size and mimmum apron length {L�. The d,, size is the median stone size in a well -graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step 1 Minimum TW Maximum TW Eiaure 8.06a Fiaure 8.06b Riprap d.., (ft.) 0.5 Minimum apron length, L„ (ft.) 9 Apron width at pipe outlet (ft.) 6 6 Apron shape Apron width at outlet end (ft.) 2 5.6 Step 4. Deternune the maxiuimu stone diameter. drrax = 1.5 x d5o Minimum TW Maximum TW Max Stone Diameter, dmax (ft.) 0 0.75 Step 5. Determine the apron thickness: Apron thickness = 1 5 x dM„ Minimum TW Maximum TW Apron Thickness(ft.) 0 1.125 24 Designed By: SKW Date: Checked By: HMA Date: Company: LOWE ENGINEERS Project Name: SOF OPERATIONS FACILITY Project No.: 18-0088 Site Location (CitylTown) FT. BRAGG Culvert Id. ❑ Total Drainage Area (acres) 0.13 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capactry of the pipe. If the tail%vater depth is less than half the outlet pipe diameter_ it is classified iniumium tailwater condition. If it is greater than half the pipe diameter. it is classified nu"uuin condition. Pipes that outlet onto wide Hat areas ►VIth no defined chatuiel are assumed to have a mmtnnun tailwater condition unless reliable flood stage elevations. shops- othe -A-rse Outlet pipe diameter, Do (in.) Taiiwater depth (in.) Minimum/Maximum tailwater? Discharge (cfs) Velocity (ft.ls) 2 Min TW (Fig. 8.06a) 1.1 1 Step 2. Based on the tailwater conditions deternuned in step 1. enter Figure 8.06a or Figure 8.06b. and determine d,0 riprap sue and minimum apron length (La. The d„ size is the inedian stone size in a well -graded nprap apron. Step 3_ Determine apron width at the pipe outlet. the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Fioure 8.06a Figure 8.06h Riprap d,;), (ft.) 0.5 Minimum apron length, La (ft.) 6 Apron width at pipe outlet (ft.) 6 6 Apron shape Apron width at outlet end (ft.) 8 2 Stele 4. Deteniune the maximum stone di�uneter d„%ax= 1.5xd., Minimum TW Maximum TW Max Stone Diameter, dmax (ft.) 0.75 0 Step 5. Deterunnnne the apron thickness. Apron thickness = 1.5 x dr,,. Minimum TW Maximum TW Apron Thickness(ft.) 1.125 0 25 a O 0 M V �Q V 0 Q O N 0 Q L 0 4- C 0 x W L r� v/ E L 0 c/ 3 0 c� L T� i 0) rn IL 0 m c J Q LO Q Q Q Q 0 0 U O o Q Q Q _ Q m _ U _ N W O N CO O 0 O O O M 00 co 00 0) O^ lq- co LO co co M O N N 0 C v N N N N O N N 00 N O� N O O CD O J 0 � U Y O O N M M M M N M M 7 O O O O O O O Z> V O O O O O O O N :° 0)CL S m U U U U U U U 0 s J U) c = O f0 V O) T E t N N N N N N 7 a E N S Z J (A '- �-' Q O O N V (O O O >> N O O O O N O C W v N N N N N N N N CL O) N O co O M O co O V M V Ih 1- 2" o 6 6 6 o r J U) O (O O (O M O V N O Ln O Ln O Ln > 0 N N O O O N C W v N N N N N N N d C O O O O O O O cF E (a 0 w C N O O O O O O O O O O O O O O +-' 7 0 "" O O O O O O O 0 a: u LL O7 L6 i i O O O O O O O oa� O O O O O O 3 O V r 00 N 0000 N Ycy V O O V M O O E (D 'C N i F C7 0 0 Z 0 C7 0') 0 LO N O N .-. N O M V M M LO (O LO M CD r CD C14 NC D (O a7 M 00 E0 O O LO >- P t ONO N O M O co V Q QV N 00 N[,-: Ln O O Z C a ^ a) N LO (O ON LO V Q J ry 0 L � 0 J Z W r N coV W W U N N O C N M V LO (.01- d J Z r 1 L rn 00 It o (O O N Lq N O O O O r N co M M C w N N N N a7 O C N_ N O a U U U U J N S cn O) (6 0 N N N N N ui '_. N N O O O O N a7 '� N N N N N N N r C w 7 7 U i C U U U U U U U U J o s cn s E Z N N � (n 'z. O O O O O O s o 0 0 o m o 0 v v v v c v LO L � s rn o 0 0 o (a o 0 fA J N O_ U U U U c U U Cl) O 0 0 O M M N O O O 00 00 .� M O co co co N N O N N N N C O 0) 0) 0) 0) rn m o o o o m C7 0 0 Z 0 Q 6' 0 0 N } 0 J Q L L% Q L L U U 0 Cl) 0 O O Q Q Q Q Z U 0 ai ii U N %o N M V Lo (D r d (A Z O A� W E CD _W AL+ W 3 CD cn E L O W ♦^ c / R> dc E£ o 0 0 0 0 0 0 O i gyp_. LO LO O LO LO LO LO > m c �p £ s rn � 0 N O N w J p� N > o 3 O LL N O N C C � l6 s U a s o� v °7 E u ^_ 0 N N w S xa� z > m c �p O LL N _ y a;w w la L L � V 0 LO O U L m ui 3 C RO^ c o o w' is S c S U (a 3 cam_ U w J c N c_ N m E c o H H £ N NCL O ^ H J(A� c o a LL s N S c S O N w J E N r 7 la � O C O � O s W J Q Z Q ry ry ° o Q Q Q Q Q p U J Q Q Q Q m U LL U N N O O O r N Cl) V (O J Z Hydraflow Table of Contents BIORET & DET POND - TYPE II.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE 1.................................................................................... 4 Hydrograph No. 2, SCS Runoff, PRE 2.................................................................................... 5 Hydrograph No. 3, SCS Runoff, POST 1................................................................................. 6 Hydrograph No. 4, Reservoir, BIORETENTION....................................................................... 7 Pond Report - BIORETENTION.......................................................................................... 8 Hydrograph No. 5, SCS Runoff, POST BYPASS 1.................................................................. 9 Hydrograph No. 6, SCS Runoff, PRE 4.................................................................................. 10 Hydrograph No. 7, SCS Runoff, PRE 5.................................................................................. 11 Hydrograph No. 8, SCS Runoff, POST BYPASS 2................................................................ 12 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................... 13 Hydrograph No. 10, SCS Runoff, POST 2............................................................................. 14 Hydrograph No. 11, Combine, POST TO POND.................................................................... 15 Hydrograph No. 12, Reservoir, DETENTION......................................................................... 16 Pond Report - DETENTION............................................................................................... 17 Hydrograph No. 13, SCS Runoff, PRE 3................................................................................ 19 Hydrograph No. 14, SCS Runoff, POST BYPASS 4.............................................................. 20 Hydrograph No. 15, SCS Runoff, POST OFFSITE................................................................ 21 Hydrograph No. 16, SCS Runoff, PRE OFFSITE.................................................................. 22 Hydrograph No. 17, SCS Runoff, POST BYPASS 5.............................................................. 23 Hydrograph No. 18, Combine, PRE TOTAL.......................................................................... 24 Hydrograph No. 19, Combine, POST SUBTOTAL................................................................ 25 Hydrograph No. 20, Combine, POST TOTAL........................................................................ 26 2 - Year SummaryReport ....................................................................................................................... 27 HydrographReports................................................................................................................. 28 Hydrograph No. 1, SCS Runoff, PRE 1.................................................................................. 28 Hydrograph No. 2, SCS Runoff, PRE 2.................................................................................. 29 Hydrograph No. 3, SCS Runoff, POST 1............................................................................... 30 Hydrograph No. 4, Reservoir, BIORETENTION..................................................................... 31 Hydrograph No. 5, SCS Runoff, POST BYPASS 1................................................................ 32 Hydrograph No. 6, SCS Runoff, PRE 4.................................................................................. 33 Hydrograph No. 7, SCS Runoff, PRE 5.................................................................................. 34 Hydrograph No. 8, SCS Runoff, POST BYPASS 2................................................................ 35 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................... 36 Hydrograph No. 10, SCS Runoff, POST 2............................................................................. 37 Hydrograph No. 11, Combine, POST TO POND.................................................................... 38 Hydrograph No. 12, Reservoir, DETENTION......................................................................... 39 Hydrograph No. 13, SCS Runoff, PRE 3................................................................................ 40 Hydrograph No. 14, SCS Runoff, POST BYPASS 4.............................................................. 41 Hydrograph No. 15, SCS Runoff, POST OFFSITE................................................................ 42 Contents continued... BIORET & DET POND - TYPE Il.gpw Hydrograph No. 16, SCS Runoff, PRE OFFSITE.................................................................. 43 Hydrograph No. 17, SCS Runoff, POST BYPASS 5.............................................................. 44 Hydrograph No. 18, Combine, PRE TOTAL.......................................................................... 45 Hydrograph No. 19, Combine, POST SUBTOTAL................................................................ 46 Hydrograph No. 20, Combine, POST TOTAL........................................................................ 47 5 - Year SummaryReport ....................................................................................................................... 48 HydrographReports................................................................................................................. 49 Hydrograph No. 1, SCS Runoff, PRE 1.................................................................................. 49 Hydrograph No. 2, SCS Runoff, PRE 2.................................................................................. 50 Hydrograph No. 3, SCS Runoff, POST 1............................................................................... 51 Hydrograph No. 4, Reservoir, BIORETENTION..................................................................... 52 Hydrograph No. 5, SCS Runoff, POST BYPASS 1................................................................ 53 Hydrograph No. 6, SCS Runoff, PRE 4.................................................................................. 54 Hydrograph No. 7, SCS Runoff, PRE 5.................................................................................. 55 Hydrograph No. 8, SCS Runoff, POST BYPASS 2................................................................ 56 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................... 57 Hydrograph No. 10, SCS Runoff, POST 2............................................................................. 58 Hydrograph No. 11, Combine, POST TO POND.................................................................... 59 Hydrograph No. 12, Reservoir, DETENTION......................................................................... 60 Hydrograph No. 13, SCS Runoff, PRE 3................................................................................ 61 Hydrograph No. 14, SCS Runoff, POST BYPASS 4.............................................................. 62 Hydrograph No. 15, SCS Runoff, POST OFFSITE................................................................ 63 Hydrograph No. 16, SCS Runoff, PRE OFFSITE.................................................................. 64 Hydrograph No. 17, SCS Runoff, POST BYPASS 5.............................................................. 65 Hydrograph No. 18, Combine, PRE TOTAL.......................................................................... 66 Hydrograph No. 19, Combine, POST SUBTOTAL................................................................ 67 Hydrograph No. 20, Combine, POST TOTAL........................................................................ 68 10 -Year SummaryReport ....................................................................................................................... 69 HydrographReports................................................................................................................. 70 Hydrograph No. 1, SCS Runoff, PRE 1.................................................................................. 70 Hydrograph No. 2, SCS Runoff, PRE 2.................................................................................. 71 Hydrograph No. 3, SCS Runoff, POST 1............................................................................... 72 Hydrograph No. 4, Reservoir, BIORETENTION..................................................................... 73 Hydrograph No. 5, SCS Runoff, POST BYPASS 1................................................................ 74 Hydrograph No. 6, SCS Runoff, PRE 4.................................................................................. 75 Hydrograph No. 7, SCS Runoff, PRE 5.................................................................................. 76 Hydrograph No. 8, SCS Runoff, POST BYPASS 2................................................................ 77 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................... 78 Hydrograph No. 10, SCS Runoff, POST 2............................................................................. 79 Hydrograph No. 11, Combine, POST TO POND.................................................................... 80 Hydrograph No. 12, Reservoir, DETENTION......................................................................... 81 Hydrograph No. 13, SCS Runoff, PRE 3................................................................................ 82 Hydrograph No. 14, SCS Runoff, POST BYPASS 4.............................................................. 83 Hydrograph No. 15, SCS Runoff, POST OFFSITE................................................................ 84 Hydrograph No. 16, SCS Runoff, PRE OFFSITE.................................................................. 85 Hydrograph No. 17, SCS Runoff, POST BYPASS 5.............................................................. 86 Contents continued... BIORET & DET POND - TYPE Il.gpw Hydrograph No. 18, Combine, PRE TOTAL.......................................................................... 87 Hydrograph No. 19, Combine, POST SUBTOTAL................................................................ 88 Hydrograph No. 20, Combine, POST TOTAL........................................................................ 89 25 - Year SummaryReport ....................................................................................................................... 90 HydrographReports................................................................................................................. 91 Hydrograph No. 1, SCS Runoff, PRE 1.................................................................................. 91 Hydrograph No. 2, SCS Runoff, PRE 2.................................................................................. 92 Hydrograph No. 3, SCS Runoff, POST 1............................................................................... 93 Hydrograph No. 4, Reservoir, BIORETENTION..................................................................... 94 Hydrograph No. 5, SCS Runoff, POST BYPASS 1................................................................ 95 Hydrograph No. 6, SCS Runoff, PRE 4.................................................................................. 96 Hydrograph No. 7, SCS Runoff, PRE 5.................................................................................. 97 Hydrograph No. 8, SCS Runoff, POST BYPASS 2................................................................ 98 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................... 99 Hydrograph No. 10, SCS Runoff, POST 2........................................................................... 100 Hydrograph No. 11, Combine, POST TO POND.................................................................. 101 Hydrograph No. 12, Reservoir, DETENTION....................................................................... 102 Hydrograph No. 13, SCS Runoff, PRE 3.............................................................................. 103 Hydrograph No. 14, SCS Runoff, POST BYPASS 4............................................................ 104 Hydrograph No. 15, SCS Runoff, POST OFFSITE.............................................................. 105 Hydrograph No. 16, SCS Runoff, PRE OFFSITE................................................................ 106 Hydrograph No. 17, SCS Runoff, POST BYPASS 5............................................................ 107 Hydrograph No. 18, Combine, PRE TOTAL........................................................................ 108 Hydrograph No. 19, Combine, POST SUBTOTAL.............................................................. 109 Hydrograph No. 20, Combine, POST TOTAL...................................................................... 110 50 - Year SummaryReport ..................................................................................................................... 111 HydrographReports............................................................................................................... 112 Hydrograph No. 1, SCS Runoff, PRE 1................................................................................ 112 Hydrograph No. 2, SCS Runoff, PRE 2................................................................................ 113 Hydrograph No. 3, SCS Runoff, POST 1............................................................................. 114 Hydrograph No. 4, Reservoir, BIORETENTION................................................................... 115 Hydrograph No. 5, SCS Runoff, POST BYPASS 1.............................................................. 116 Hydrograph No. 6, SCS Runoff, PRE 4................................................................................ 117 Hydrograph No. 7, SCS Runoff, PRE 5................................................................................ 118 Hydrograph No. 8, SCS Runoff, POST BYPASS 2.............................................................. 119 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................. 120 Hydrograph No. 10, SCS Runoff, POST 2........................................................................... 121 Hydrograph No. 11, Combine, POST TO POND.................................................................. 122 Hydrograph No. 12, Reservoir, DETENTION....................................................................... 123 Hydrograph No. 13, SCS Runoff, PRE 3.............................................................................. 124 Hydrograph No. 14, SCS Runoff, POST BYPASS 4............................................................ 125 Hydrograph No. 15, SCS Runoff, POST OFFSITE.............................................................. 126 Hydrograph No. 16, SCS Runoff, PRE OFFSITE................................................................ 127 Hydrograph No. 17, SCS Runoff, POST BYPASS 5............................................................ 128 Hydrograph No. 18, Combine, PRE TOTAL........................................................................ 129 Hydrograph No. 19, Combine, POST SUBTOTAL.............................................................. 130 Contents continued... BIORET & DET POND - TYPE Il.gpw Hydrograph No. 20, Combine, POST TOTAL...................................................................... 131 100 - Year SummaryReport ..................................................................................................................... 132 HydrographReports............................................................................................................... 133 Hydrograph No. 1, SCS Runoff, PRE 1................................................................................ 133 Hydrograph No. 2, SCS Runoff, PRE 2................................................................................ 134 Hydrograph No. 3, SCS Runoff, POST 1............................................................................. 135 Hydrograph No. 4, Reservoir, BIORETENTION................................................................... 136 Hydrograph No. 5, SCS Runoff, POST BYPASS 1.............................................................. 137 Hydrograph No. 6, SCS Runoff, PRE 4................................................................................ 138 Hydrograph No. 7, SCS Runoff, PRE 5................................................................................ 139 Hydrograph No. 8, SCS Runoff, POST BYPASS 2.............................................................. 140 Hydrograph No. 9, SCS Runoff, POST BYPASS a............................................................. 141 Hydrograph No. 10, SCS Runoff, POST 2........................................................................... 142 Hydrograph No. 11, Combine, POST TO POND.................................................................. 143 Hydrograph No. 12, Reservoir, DETENTION....................................................................... 144 Hydrograph No. 13, SCS Runoff, PRE 3.............................................................................. 145 Hydrograph No. 14, SCS Runoff, POST BYPASS 4............................................................ 146 Hydrograph No. 15, SCS Runoff, POST OFFSITE.............................................................. 147 Hydrograph No. 16, SCS Runoff, PRE OFFSITE................................................................ 148 Hydrograph No. 17, SCS Runoff, POST BYPASS 5............................................................ 149 Hydrograph No. 18, Combine, PRE TOTAL........................................................................ 150 Hydrograph No. 19, Combine, POST SUBTOTAL.............................................................. 151 Hydrograph No. 20, Combine, POST TOTAL...................................................................... 152 OFReport................................................................................................................ 153 Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 18 19 11 Leaend Hvd• Origin Description 1 SCS Runoff PRE 1 2 SCS Runoff PRE 2 2 3 SCS Runoff POST 1 4 Reservoir BIORETENTION 5 SCS Runoff POST BYPASS 1 6 SCS Runoff PRE 4 7 SCS Runoff PRE 5 8 SCS Runoff POST BYPASS 2 9 SCS Runoff POST BYPASS 3 10 SCS Runoff POST 2 11 Combine POST TO POND 12 Reservoir DETENTION 13 SCS Runoff PRE 3 20 14 SCS Runoff POST BYPASS 4 15 SCS Runoff POST OFFSITE 16 SCS Runoff PRE OFFSITE 17 SCS Runoff POST BYPASS 5 18 Combine PRE TOTAL 19 Combine POSTSUBTOTAL 20 Combine POST TOTAL Project: BIORET & DET POND - TYPE Il.gpw Tuesday, 12 / 10 / 2019 Hydrograph Return Period Regd �� Hydra w Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.715 1.219 ------- 2.088 2.832 3.931 4.846 5.838 PRE 1 2 SCS Runoff ------ 1.540 2.370 ------- 3.751 4.902 6.611 8.011 9.485 PRE 2 3 SCS Runoff ------ 1.535 2.219 ------- 3.340 4.260 5.577 6.636 7.742 POST 1 4 Reservoir 3 0.000 0.000 ------- 0.184 0.977 2.415 3.614 4.266 BIORETENTION 5 SCS Runoff ------ 0.173 0.329 ------- 0.605 0.844 1.204 1.504 1.824 POST BYPASS 1 6 SCS Runoff ------ 0.145 0.198 ------- 0.280 0.345 0.437 0.510 0.585 PRE 4 7 SCS Runoff ------ 0.112 0.174 ------- 0.276 0.361 0.486 0.591 0.701 PRE 5 8 SCS Runoff ------ 1.747 2.265 ------- 3.054 3.672 4.530 5.207 5.905 POST BYPASS 2 9 SCS Runoff ------ 0.112 0.174 ------- 0.276 0.361 0.486 0.591 0.701 POST BYPASS 3 10 SCS Runoff ------ 0.094 0.199 ------- 0.388 0.554 0.806 1.017 1.244 POST 2 11 Combine 4, 10 0.094 0.199 ------- 0.388 1.034 2.509 3.735 4.440 POST TO POND 12 Reservoir 11 0.004 0.007 ------- 0.052 0.100 0.140 0.163 0.884 DETENTION 13 SCS Runoff ------ 0.268 0.438 ------- 0.727 0.972 1.331 1.629 1.952 PRE 3 14 SCS Runoff ------ 0.248 0.301 ------- 0.381 0.444 0.531 0.600 0.672 POST BYPASS 4 15 SCS Runoff ------ 0.791 0.959 ------- 1.215 1.414 1.692 1.912 2.140 POST OFFSITE 16 SCS Runoff ------ 0.791 0.959 ------- 1.215 1.414 1.692 1.912 2.140 PRE OFFSITE 17 SCS Runoff ------ 0.027 0.057 ------- 0.111 0.158 0.230 0.291 0.355 POST BYPASS 5 18 Combine 1, 2, 6, 3.457 5.238 ------- 8.246 10.77 14.46 17.47 20.66 PRE TOTAL 7, 13, 16, 19 Combine 5, 8, 9, 3.087 4.072 ------- 5.624 6.874 8.648 10.07 11.56 POST SUBTOTAL 14, 15, 17, 20 Combine 12, 19 3.087 4.074 ------- 5.630 6.883 8.667 10.10 11.60 POST TOTAL Proj. file: BIORET & DET POND - TYPE Il.gpw Tuesday, 12 / 10 / 2019 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.715 2 720 1,848 ------ ------ ------ PRE 1 2 SCS Runoff 1.540 2 720 3,664 ------ ------ ------ PRE 2 3 SCS Runoff 1.535 2 728 5,503 ------ ------ ------ POST 1 4 Reservoir 0.000 2 1372 0 3 229.91 2,741 BIORETENTION 5 SCS Runoff 0.173 2 718 421 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.145 2 718 293 ------ ------ ------ PRE 4 7 SCS Runoff 0.112 2 718 231 ------ ------ ------ PRE 5 8 SCS Runoff 1.747 2 718 4,028 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.112 2 718 231 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 0.094 2 718 256 ------ ------ ------ POST 2 11 Combine 0.094 2 718 256 4, 10 ------ ------ POST TO POND 12 Reservoir 0.004 2 1044 226 11 220.04 120 DETENTION 13 SCS Runoff 0.268 2 718 570 ------ ------ ------ PRE 3 14 SCS Runoff 0.248 2 716 579 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 0.791 2 718 2,060 ------ ------ ------ POST OFFSITE 16 SCS Runoff 0.791 2 718 2,060 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.027 2 718 73 ------ ------ ------ POST BYPASS 5 18 Combine 3.457 2 720 8,665 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 3.087 2 718 7,392 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 3.087 2 718 7,618 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 1 Year Tuesday, 12 / 10 / 2019 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 0.715 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,848 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PRE 1 Hyd. No. 1 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.260 ac Curve number Basin Slope = 3.3 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 3.07 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE 2 Hyd. No. 2 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Tuesday, 12 / 10 / 2019 = 1.540 cfs = 720 min = 3,664 cuft = 71 = 305 ft = 8.80 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 0 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.330 ac Curve number Basin Slope = 1.0 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 3.07 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST 1 Hyd. No. 3 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 3 Tuesday, 12 / 10 / 2019 = 1.535 cfs = 728 min = 5,503 cuft = 77 = 544 ft = 21.30 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1372 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 229.91 ft Reservoir name = BIORETENTION Max. Storage = 2,741 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 2.00 1.00 BIORETENTION Hyd. No. 4 -- 1 Year 120 240 360 480 600 720 Hyd No. 4 Hyd No. 3 Q (cfs) 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Total storage used = 2,741 cult Pond Report $ Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Pond No. 1 - BIORETENTION Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 229.50 ft. Voids = 40.00% Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 229.50 6,500 0 0 0.50 230.00 6,994 3,372 3,372 1.00 230.50 7,506 3,624 6,996 1.50 231.00 8,036 3,884 10,881 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 Inactive Inactive Inactive Crest Len (ft) = 4.00 Inactive Inactive Inactive Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 230.33 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 226.50 0.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 11.43 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 1.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 229.50 0.00 --- --- --- 0.00 --- --- --- 0.000 --- 0.000 0.05 337 229.55 12.76 is --- --- --- 0.00 --- --- --- 0.016 --- 0.016 0.10 674 229.60 12.76 is --- --- --- 0.00 --- --- --- 0.032 --- 0.032 0.15 1,012 229.65 12.76 is --- --- --- 0.00 --- --- --- 0.049 --- 0.049 0.20 1,349 229.70 12.76 is --- --- --- 0.00 --- --- --- 0.065 --- 0.065 0.25 1,686 229.75 12.76 is --- --- --- 0.00 --- --- --- 0.081 --- 0.081 0.30 2,023 229.80 12.76 is --- --- --- 0.00 --- --- --- 0.097 --- 0.097 0.35 2,361 229.85 12.76 is --- --- --- 0.00 --- --- --- 0.113 --- 0.113 0.40 2,698 229.90 12.76 is --- --- --- 0.00 --- --- --- 0.130 --- 0.130 0.45 3,035 229.95 12.76 is --- --- --- 0.00 --- --- --- 0.146 --- 0.146 0.50 3,372 230.00 12.76 is --- --- --- 0.00 --- --- --- 0.162 --- 0.162 0.55 3,735 230.05 12.76 is --- --- --- 0.00 --- --- --- 0.163 --- 0.163 0.60 4,097 230.10 12.76 is --- --- --- 0.00 --- --- --- 0.164 --- 0.164 0.65 4,460 230.15 12.76 is --- --- --- 0.00 --- --- --- 0.165 --- 0.165 0.70 4,822 230.20 12.76 is --- --- --- 0.00 --- --- --- 0.167 --- 0.167 0.75 5,184 230.25 12.76 is --- --- --- 0.00 --- --- --- 0.168 --- 0.168 0.80 5,547 230.30 12.76 is --- --- --- 0.00 --- --- --- 0.169 --- 0.169 0.85 5,909 230.35 12.76 is --- --- --- 0.04 --- --- --- 0.170 --- 0.208 0.90 6,272 230.40 12.76 is --- --- --- 0.25 --- --- --- 0.171 --- 0.418 0.95 6,634 230.45 12.76 is --- --- --- 0.55 --- --- --- 0.173 --- 0.726 1.00 6,996 230.50 12.76 is --- --- --- 0.93 --- --- --- 0.174 --- 1.107 1.05 7,385 230.55 12.76 is --- --- --- 1.37 --- --- --- 0.175 --- 1.549 1.10 7,773 230.60 12.76 is --- --- --- 1.87 --- --- --- 0.176 --- 2.045 1.15 8,162 230.65 12.76 is --- --- --- 2.41 --- --- --- 0.177 --- 2.589 1.20 8,550 230.70 12.76 is --- --- --- 3.00 --- --- --- 0.179 --- 3.176 1.25 8,938 230.75 12.76 is --- --- --- 3.63 --- --- --- 0.180 --- 3.805 1.30 9,327 230.80 12.76 is --- --- --- 4.29 --- --- --- 0.181 --- 4.473 1.35 9,715 230.85 12.76 is --- --- --- 3.88 is --- --- --- 0.182 --- 4.060 1.40 10,104 230.90 12.76 is --- --- --- 4.06 is --- --- --- 0.184 --- 4.243 1.45 10,492 230.95 12.76 is --- --- --- 4.23 is --- --- --- 0.185 --- 4.418 1.50 10,881 231.00 12.76 is --- --- --- 4.40 is --- --- --- 0.186 --- 4.587 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 0.173 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 421 cuft Drainage area = 0.290 ac Curve number = 62 Basin Slope = 25.5 % Hydraulic length = 47 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 1 Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge = 0.145 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 293 cuft Drainage area = 0.060 ac Curve number = 82 Basin Slope = 1.8 % Hydraulic length = 112 ft Tc method = LAG Time of conc. (Tc) = 3.80 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 4 Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge = 0.112 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 231 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 4.0 % Hydraulic length = 82 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 5 Hyd. No. 7 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.590 ac Curve number Basin Slope = 2.4 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 3.07 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST BYPASS 2 Hyd. No. 8 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 8 Tuesday, 12 / 10 / 2019 = 1.747 cfs = 718 min = 4,028 cuft = 88 = 375 ft = 7.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge = 0.112 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 231 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 3 Hyd. No. 9 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge = 0.094 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 256 cuft Drainage area = 0.210 ac Curve number = 60 Basin Slope = 10.0 % Hydraulic length = 131 ft Tc method = LAG Time of conc. (Tc) = 3.40 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 POST 2 Hyd. No. 10 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 0.094 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 256 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 POST TO POND Hyd. No. 11 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 — Hyd No. 4 Hyd No. 10 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.004 cfs Storm frequency = 1 yrs Time to peak = 1044 min Time interval = 2 min Hyd. volume = 226 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 220.04 ft Reservoir name = DETENTION Max. Storage = 120 cuft Storage Indication method used. Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 DETENTION Hyd. No. 12 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 1111y: 0.01 0.00 2160 Time (min) Pond Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Pond No. 2 - DETENTION Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 220.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 220.00 1.00 221.00 2.00 222.00 3.00 223.00 4.00 224.00 Contour area (sqft) 2,442 3,086 3,803 4,575 5,406 Incr. Storage (cuft) 0 2,757 3,438 4,183 4,984 Total storage (cuft) 0 2,757 6,195 10,378 15,362 Tuesday, 12 / 10 / 2019 Culvert / Orifice Structures [A] Rise (in) = 18.00 Span (in) = 18.00 No. Barrels = 1 Invert El. (ft) = 219.50 Length (ft) = 48.00 Slope (%) = 4.18 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a [B] [C] [PrfRsr] 3.00 Inactive Inactive 1.00 2.00 0.00 1 1 0 220.00 222.00 0.00 0.50 0.50 0.00 0.50 0.50 n/a .013 .013 n/a 0.60 0.60 0.60 Yes No No Weir Structures [A] [B] Crest Len (ft) = 8.00 Inactive Crest El. (ft) = 222.92 222.75 Weir Coeff. = 3.33 3.33 Weir Type = 1 Rect Multi -Stage = Yes No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 [C] [D] Inactive Inactive 0.00 0.00 3.33 3.33 --- --- No No Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 220.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.10 276 220.10 1.27 is 0.01 is 0.00 --- 0.00 0.00 --- --- --- --- 0.009 0.20 551 220.20 1.27 is 0.03 is 0.00 --- 0.00 0.00 --- --- --- --- 0.025 0.30 827 220.30 1.27 is 0.04 is 0.00 --- 0.00 0.00 --- --- --- --- 0.042 0.40 1,103 220.40 1.27 is 0.05 is 0.00 --- 0.00 0.00 --- --- --- --- 0.053 0.50 1,379 220.50 1.27 is 0.06 is 0.00 --- 0.00 0.00 --- --- --- --- 0.061 0.60 1,654 220.60 1.27 is 0.07 is 0.00 --- 0.00 0.00 --- --- --- --- 0.069 0.70 1,930 220.70 1.27 is 0.08 is 0.00 --- 0.00 0.00 --- --- --- --- 0.076 0.80 2,206 220.80 1.27 is 0.08 is 0.00 --- 0.00 0.00 --- --- --- --- 0.082 0.90 2,482 220.90 1.27 is 0.09 is 0.00 --- 0.00 0.00 --- --- --- --- 0.088 1.00 2,757 221.00 1.27 is 0.09 is 0.00 --- 0.00 0.00 --- --- --- --- 0.094 1.10 3,101 221.10 1.27 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.099 1.20 3,445 221.20 1.27 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.104 1.30 3,789 221.30 1.27 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.109 1.40 4,133 221.40 1.27 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.113 1.50 4,476 221.50 1.27 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.118 1.60 4,820 221.60 1.27 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.122 1.70 5,164 221.70 1.27 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.126 1.80 5,508 221.80 1.27 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.130 1.90 5,852 221.90 1.27 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.134 2.00 6,195 222.00 1.27 is 0.14 is 0.00 --- 0.00 0.00 --- --- --- --- 0.137 2.10 6,614 222.10 1.27 is 0.14 is 0.00 --- 0.00 0.00 --- --- --- --- 0.141 2.20 7,032 222.20 1.27 is 0.14 is 0.00 --- 0.00 0.00 --- --- --- --- 0.144 2.30 7,450 222.30 1.27 is 0.15 is 0.00 --- 0.00 0.00 --- --- --- --- 0.148 2.40 7,868 222.40 1.27 is 0.15 is 0.00 --- 0.00 0.00 --- --- --- --- 0.151 2.50 8,287 222.50 1.27 is 0.15 is 0.00 --- 0.00 0.00 --- --- --- --- 0.155 2.60 8,705 222.60 1.27 is 0.16 is 0.00 --- 0.00 0.00 --- --- --- --- 0.158 2.70 9,123 222.70 1.27 is 0.16 is 0.00 --- 0.00 0.00 --- --- --- --- 0.161 2.80 9,541 222.80 1.27 is 0.16 is 0.00 --- 0.00 0.00 --- --- --- --- 0.164 2.90 9,960 222.90 1.27 is 0.17 is 0.00 --- 0.00 0.00 --- --- --- --- 0.167 3.00 10,378 223.00 1.27 is 0.17 is 0.00 --- 0.60 0.00 --- --- --- --- 0.773 3.10 10,876 223.10 2.23 is 0.17 is 0.00 --- 2.03 0.00 --- --- --- --- 2.206 3.20 11,375 223.20 4.11 is 0.17 is 0.00 --- 3.95 0.00 --- --- --- --- 4.113 3.30 11,873 223.30 6.43 is 0.16 is 0.00 --- 6.24 0.00 --- --- --- --- 6.399 3.40 12,372 223.40 9.00 is 0.14 is 0.00 --- 8.86 0.00 --- --- --- --- 9.003 3.50 12,870 223.50 11.88 is 0.11 is 0.00 --- 11.77 0.00 --- --- --- --- 11.88 3.60 13,369 223.60 14.32 is 0.07 is 0.00 --- 14.24 s 0.00 --- --- --- --- 14.32 3.70 13,867 223.70 14.99 is 0.06 is 0.00 --- 14.93 s 0.00 --- --- --- --- 14.99 Continues on next page... 18 DETENTION Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.80 14,365 223.80 15.45 is 3.90 14,864 223.90 15.82 is 4.00 15,362 224.00 16.14 is ...End Clv B Clv C PrfRsr Wr A Wr B Wr C MID Exfil User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.05 is 0.00 --- 15.40 s 0.00 --- --- --- --- 15.45 0.04 is 0.00 --- 15.78 s 0.00 --- --- --- --- 15.82 0.04 is 0.00 --- 16.10 s 0.00 --- --- --- --- 16.14 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge = 0.268 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 570 cuft Drainage area = 0.270 ac Curve number = 67 Basin Slope = 3.9 % Hydraulic length = 159 ft Tc method = LAG Time of conc. (Tc) = 5.30 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 3 Hyd. No. 13 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.248 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 579 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 Hyd No. 14 POST BYPASS 4 Hyd. No. 14 -- 1 Year Q (cfs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge = 0.791 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,060 cuft Drainage area = 0.200 ac Curve number = 98 Basin Slope = 0.9 % Hydraulic length = 345 ft Tc method = LAG Time of conc. (Tc) = 6.90 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST OFFSITE Hyd. No. 15 -- 1 Year Q (cfs) 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 15 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge = 0.791 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,060 cuft Drainage area = 0.200 ac Curve number = 98 Basin Slope = 0.9 % Hydraulic length = 345 ft Tc method = LAG Time of conc. (Tc) = 6.90 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) PRE OFFSITE Hyd. No. 16 -- 1 Year Q (cfs) 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 16 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.027 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 73 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 3.07 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 POST BYPASS 5 Hyd. No. 17 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 3.457 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 8,665 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac PRE TOTAL Q (cfs) Hyd. No. 18 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 3.087 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,392 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac POST SUBTOTAL Q (cfs) Hyd. No. 19 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 14 Hyd No. 15 Hyd No. 17 Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 3.087 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,618 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac POST TOTAL Q (cfs) Hyd. No. 20 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 12 Hyd No. 19 27 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.219 2 720 2,929 ------ ------ ------ PRE 1 2 SCS Runoff 2.370 2 720 5,487 ------ ------ ------ PRE 2 3 SCS Runoff 2.219 2 728 7,805 ------ ------ ------ POST 1 4 Reservoir 0.000 2 1544 0 3 230.10 4,117 BIORETENTION 5 SCS Runoff 0.329 2 718 707 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.198 2 716 400 ------ ------ ------ PRE 4 7 SCS Runoff 0.174 2 718 349 ------ ------ ------ PRE 5 8 SCS Runoff 2.265 2 718 5,271 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.174 2 718 349 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 0.199 2 718 446 ------ ------ ------ POST 2 11 Combine 0.199 2 718 446 4,10 ------ ------ POST TO POND 12 Reservoir 0.007 2 954 416 11 220.08 217 DETENTION 13 SCS Runoff 0.438 2 718 892 ------ ------ ------ PRE 3 14 SCS Runoff 0.301 2 716 710 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 0.959 2 718 2,523 ------ ------ ------ POST OFFSITE 16 SCS Runoff 0.959 2 718 2,523 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.057 2 718 128 ------ ------ ------ POST BYPASS 5 18 Combine 5.238 2 718 12,580 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 4.072 2 718 9,688 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 4.074 2 718 10,103 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 2 Year Tuesday, 12 / 10 / 2019 Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.880 ac Curve number Basin Slope = 5.8 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 3.71 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE 1 Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Tuesday, 12 / 10 / 2019 = 1.219 cfs = 720 min = 2,929 cuft = 66 = 294 ft = 7.30 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 2.370 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 5,487 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE 2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 2.219 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 7,805 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 1 Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1544 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.10 ft Reservoir name = BIORETENTION Max. Storage = 4,117 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 3.00 rM 1.00 BIORETENTION Hyd. No. 4 -- 2 Year Q (cfs) 3.00 2.00 1.00 0.00 1 --1-- --J-- I I f I I I I 1 --T 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 4 — Hyd No. 3 Total storage used = 4,117 cult 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 0.329 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 707 cuft Drainage area = 0.290 ac Curve number = 62 Basin Slope = 25.5 % Hydraulic length = 47 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 1 Hyd. No. 5 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 33 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.060 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 3.71 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.198 cfs = 716 min = 400 cuft = 82 = 112 ft = 3.80 min = Type II = 484 Q (cfs) PRE 4 Hyd. No. 6 -- 2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0 120 Hyd No. 240 360 480 600 720 840 960 1080 6 0.00 1200 1320 1440 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge = 0.174 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 349 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 4.0 % Hydraulic length = 82 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 5 Hyd. No. 7 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge = 2.265 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 5,271 cuft Drainage area = 0.590 ac Curve number = 88 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = LAG Time of conc. (Tc) = 7.10 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS 2 Q (cfs) Hyd. No. 8 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 8 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge = 0.174 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 349 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 3 Hyd. No. 9 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge = 0.199 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 446 cuft Drainage area = 0.210 ac Curve number = 60 Basin Slope = 10.0 % Hydraulic length = 131 ft Tc method = LAG Time of conc. (Tc) = 3.40 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST 2 Hyd. No. 10 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 0.199 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 446 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST TO POND Hyd. No. 11 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 — Hyd No. 4 Hyd No. 10 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.007 cfs Storm frequency = 2 yrs Time to peak = 954 min Time interval = 2 min Hyd. volume = 416 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 220.08 ft Reservoir name = DETENTION Max. Storage = 217 cuft Storage Indication method used. DETENTION 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge = 0.438 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 892 cuft Drainage area = 0.270 ac Curve number = 67 Basin Slope = 3.9 % Hydraulic length = 159 ft Tc method = LAG Time of conc. (Tc) = 5.30 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 3 Hyd. No. 13 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.301 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 710 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST BYPASS 4 Hyd. No. 14 -- 2 Year Q (cfs) MI WIIIIIIIIIIIIIII 0 120 240 Hyd No. 14 360 480 600 720 840 960 1080 1200 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge = 0.959 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,523 cuft Drainage area = 0.200 ac Curve number = 98 Basin Slope = 0.9 % Hydraulic length = 345 ft Tc method = LAG Time of conc. (Tc) = 6.90 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 15 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge = 0.959 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,523 cuft Drainage area = 0.200 ac Curve number = 98 Basin Slope = 0.9 % Hydraulic length = 345 ft Tc method = LAG Time of conc. (Tc) = 6.90 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 16 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.057 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 128 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 POST BYPASS 5 Hyd. No. 17 -- 2 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 5.238 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 12,580 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 46 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 4.072 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 9,688 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac POST SUBTOTAL Q (cfs) Hyd. No. 19 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 14 Hyd No. 15 Hyd No. 17 Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 4.074 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 10,103 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac POST TOTAL Q (cfs) Hyd. No. 20 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 12 Hyd No. 19 48 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.088 2 720 4,835 ------ ------ ------ PRE 1 2 SCS Runoff 3.751 2 720 8,588 ------ ------ ------ PRE 2 3 SCS Runoff 3.340 2 726 11,586 ------ ------ ------ POST 1 4 Reservoir 0.184 2 780 1,037 3 230.38 6,162 BIORETENTION 5 SCS Runoff 0.605 2 718 1,229 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.280 2 716 571 ------ ------ ------ PRE 4 7 SCS Runoff 0.276 2 718 552 ------ ------ ------ PRE 5 8 SCS Runoff 3.054 2 718 7,209 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.276 2 718 552 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 0.388 2 718 799 ------ ------ ------ POST 2 11 Combine 0.388 2 718 1,836 4,10 ------ ------ POST TO POND 12 Reservoir 0.052 2 874 1,806 11 220.40 1,094 DETENTION 13 SCS Runoff 0.727 2 718 1,455 ------ ------ ------ PRE 3 14 SCS Runoff 0.381 2 716 907 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 1.215 2 718 3,226 ------ ------ ------ POST OFFSITE 16 SCS Runoff 1.215 2 718 3,226 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.111 2 718 228 ------ ------ ------ POST BYPASS 5 18 Combine 8.246 2 718 19,227 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 5.624 2 718 13,351 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 5.630 2 718 15,157 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 5 Year Tuesday, 12 / 10 / 2019 Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 2.088 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 4,835 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE 1 Q (cfs) Hyd. No. 1 -- 5 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 3.751 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 8,588 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE 2 Q (cfs) Hyd. No. 2 -- 5 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 3.340 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 11,586 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 1 Q (cfs) Hyd. No. 3 -- 5 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 -- Fk ::j 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 52 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 0.184 cfs Storm frequency = 5 yrs Time to peak = 780 min Time interval = 2 min Hyd. volume = 1,037 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.38 ft Reservoir name = BIORETENTION Max. Storage = 6,162 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 4.00 3.00 r M 1.00 0.00 0 120 — Hyd No. 4 BIORETENTION Hyd. No. 4 -- 5 Year 240 360 480 600 720 840 960 — Hyd No. 3 Total storage used = 6,162 cuft Q (cfs) 4.00 3.00 2.00 1.00 '- 0.00 1080 Time (min) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 0.605 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,229 cuft Drainage area = 0.290 ac Curve number = 62 Basin Slope = 25.5 % Hydraulic length = 47 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 POST BYPASS 1 Hyd. No. 5 -- 5 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.060 ac Curve number Basin Slope = 1.8 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 4.68 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.280 cfs = 716 min = 571 cuft = 82 = 112 ft = 3.80 min = Type II = 484 Q (cfs) 0.50 PRE 4 Hyd. No. 6 -- 5 Year Q (cfs) 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0 120 Hyd No. 240 360 480 600 720 840 960 1080 6 0.00 1200 1320 1440 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge = 0.276 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 552 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 4.0 % Hydraulic length = 82 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 5 Hyd. No. 7 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 56 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge = 3.054 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 7,209 cuft Drainage area = 0.590 ac Curve number = 88 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = LAG Time of conc. (Tc) = 7.10 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST BYPASS 2 Q (cfs) Hyd. No. 8 -- 5 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 8 Time (min) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge = 0.276 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 552 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 3 Hyd. No. 9 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge = 0.388 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 799 cuft Drainage area = 0.210 ac Curve number = 60 Basin Slope = 10.0 % Hydraulic length = 131 ft Tc method = LAG Time of conc. (Tc) = 3.40 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST 2 Hyd. No. 10 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 59 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 0.388 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,836 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST TO POND Hyd. No. 11 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 — Hyd No. 4 Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.052 cfs Storm frequency = 5 yrs Time to peak = 874 min Time interval = 2 min Hyd. volume = 1,806 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 220.40 ft Reservoir name = DETENTION Max. Storage = 1,094 cuft Storage Indication method used. Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 DETENTION Hyd. No. 12 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 12 Hyd No. 11 Total storage used = 1,094 cult 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge = 0.727 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,455 cuft Drainage area = 0.270 ac Curve number = 67 Basin Slope = 3.9 % Hydraulic length = 159 ft Tc method = LAG Time of conc. (Tc) = 5.30 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PRE 3 Hyd. No. 13 -- 5 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.381 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 907 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 Hyd No. 14 POST BYPASS 4 Hyd. No. 14 -- 5 Year Q (cfs) Hydrograph Report 63 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 4.68 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST OFFSITE Hyd. No. 15 -- 5 Year Tuesday, 12 / 10 / 2019 = 1.215 cfs = 718 min = 3,226 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 15 Q (cfs) 2.00 1.00 0.00 1320 Time (min) Hydrograph Report 64 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 4.68 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE OFFSITE Hyd. No. 16 -- 5 Year Tuesday, 12 / 10 / 2019 = 1.215 cfs = 718 min = 3,226 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 16 Q (cfs) 2.00 1.00 0.00 1320 Time (min) 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.111 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 228 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 4.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 5 Hyd. No. 17 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 66 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 8.246 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 19,227 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac Q (cfs) 10.00 UR . 0M 4.00 r M M 120 240 360 Hyd No. 18 PRE TOTAL Hyd. No. 18 -- 5 Year 480 600 Hyd No. 1 Hyd No. 7 720 Q (cfs) 10.00 H. We 4.00 r M 1 1 It 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 13 Hyd No. 16 Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 5.624 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 13,351 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac POST SUBTOTAL Q (cfs) Hyd. No. 19 -- 5 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 19 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) — Hyd No. 14 Hyd No. 15 Hyd No. 17 Hydrograph Report 68 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 5.630 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 15,157 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 POST TOTAL Hyd. No. 20 -- 5 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 12 Hyd No. 19 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.832 2 720 6,497 ------ ------ ------ PRE 1 2 SCS Runoff 4.902 2 720 11,227 ------ ------ ------ PRE 2 3 SCS Runoff 4.260 2 726 14,718 ------ ------ ------ POST 1 4 Reservoir 0.977 2 748 3,466 3 230.51 7,035 BIORETENTION 5 SCS Runoff 0.844 2 718 1,695 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.345 2 716 710 ------ ------ ------ PRE 4 7 SCS Runoff 0.361 2 718 725 ------ ------ ------ PRE 5 8 SCS Runoff 3.672 2 718 8,756 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.361 2 718 725 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 0.554 2 718 1,119 ------ ------ ------ POST 2 11 Combine 1.034 2 748 4,585 4,10 ------ ------ POST TO POND 12 Reservoir 0.100 2 878 4,554 11 221.12 3,178 DETENTION 13 SCS Runoff 0.972 2 718 1,944 ------ ------ ------ PRE 3 14 SCS Runoff 0.444 2 716 1,062 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 1.414 2 718 3,777 ------ ------ ------ POST OFFSITE 16 SCS Runoff 1.414 2 718 3,777 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.158 2 718 320 ------ ------ ------ POST BYPASS 5 18 Combine 10.77 2 718 24,879 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 6.874 2 718 16,335 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 6.883 2 718 20,889 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 10 Year Tuesday, 12 / 10 / 2019 Hydrograph Report 70 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 2.832 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 6,497 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE 1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 4.902 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 11,227 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 PRE 2 Hyd. No. 2 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 4.260 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 14,718 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 POST 1 Hyd. No. 3 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 0.977 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 3,466 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.51 ft Reservoir name = BIORETENTION Max. Storage = 7,035 cuft Storage Indication method used. Exfiltration extracted from Outflow. BIORETENTION Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) — Hyd No. 4 Hyd No. 3 Total storage used = 7,035 cult 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge = 0.844 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,695 cuft Drainage area = 0.290 ac Curve number = 62 Basin Slope = 25.5 % Hydraulic length = 47 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 POST BYPASS 1 Hyd. No. 5 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge = 0.345 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 710 cuft Drainage area = 0.060 ac Curve number = 82 Basin Slope = 1.8 % Hydraulic length = 112 ft Tc method = LAG Time of conc. (Tc) = 3.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) PRE 4 Hyd. No. 6 -- 10 Year Q (cfs) 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 76 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge = 0.361 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 725 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 4.0 % Hydraulic length = 82 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 5 Hyd. No. 7 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 77 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.590 ac Curve number Basin Slope = 2.4 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 5.44 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 4.00 3.00 rM 1.00 0.00 1 ---J— 0 120 240 — Hyd No. 8 POST BYPASS 2 Hyd. No. 8 -- 10 Year 360 480 600 720 840 960 Tuesday, 12 / 10 / 2019 = 3.672 cfs = 718 min = 8,756 cuft = 88 = 375 ft = 7.10 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 Time (min) 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge = 0.361 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 725 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 3 Hyd. No. 9 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge = 0.554 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,119 cuft Drainage area = 0.210 ac Curve number = 60 Basin Slope = 10.0 % Hydraulic length = 131 ft Tc method = LAG Time of conc. (Tc) = 3.40 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 POST 2 Hyd. No. 10 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 80 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 1.034 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 4,585 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 2.00 1.00 M POST TO POND Hyd. No. 11 -- 10 Year 120 240 360 480 600 720 840 960 1080 Hyd No. 11 — Hyd No. 4 Hyd No. 10 Q (cfs) 2.00 1.00 0.00 1200 Time (min) Hydrograph Report 81 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.100 cfs Storm frequency = 10 yrs Time to peak = 878 min Time interval = 2 min Hyd. volume = 4,554 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 221.12 ft Reservoir name = DETENTION Max. Storage = 3,178 cuft Storage Indication method used Q (cfs) 2.00 1.00 DETENTION Hyd. No. 12 -- 10 Year 360 720 1080 1440 1800 2160 2520 2880 Hyd No. 12 Hyd No. 11 Total storage used = 3,178 cuft Q (cfs) 2.00 1.00 0.00 3240 Time (min) 82 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge = 0.972 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,944 cuft Drainage area = 0.270 ac Curve number = 67 Basin Slope = 3.9 % Hydraulic length = 159 ft Tc method = LAG Time of conc. (Tc) = 5.30 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 PRE 3 Hyd. No. 13 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.444 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,062 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST BYPASS 4 Hyd. No. 14 -- 10 Year Q (cfs) ■1 ■I 0 120 240 Hyd No. 14 360 480 600 720 840 960 1080 1200 Time (min) Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 5.44 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST OFFSITE Hyd. No. 15 -- 10 Year Tuesday, 12 / 10 / 2019 = 1.414 cfs = 718 min = 3,777 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 15 Q (cfs) 2.00 1.00 0.00 1320 Time (min) Hydrograph Report 85 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 5.44 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE OFFSITE Hyd. No. 16 -- 10 Year Tuesday, 12 / 10 / 2019 = 1.414 cfs = 718 min = 3,777 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 16 Q (cfs) 2.00 1.00 0.00 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.158 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 320 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 5 Hyd. No. 17 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 87 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 10.77 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 24,879 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac Q (cfs) 12.00 10.00 M M 4.00 r M� M PRE TOTAL Hyd. No. 18 -- 10 Year Q (cfs) 12.00 10.00 M . �� 4.00 r M� 1 1 It 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 88 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 6.874 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 16,335 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac POST SUBTOTAL .1 MIS 1 1 •.1 1M 11 1 1 Hydrograph Report 89 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 6.883 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 20,889 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac Q (cfs) 7.00 . Me 5.00 3.00 1.00 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 20 — Hyd No. 12 Hyd No. 19 .o Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.931 2 720 8,998 ------ ------ ------ PRE 1 2 SCS Runoff 6.611 2 718 15,124 ------ ------ ------ PRE 2 3 SCS Runoff 5.577 2 726 19,260 ------ ------ ------ POST 1 4 Reservoir 2.415 2 742 7,168 3 230.65 8,164 BIORETENTION 5 SCS Runoff 1.204 2 718 2,407 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.437 2 716 909 ------ ------ ------ PRE 4 7 SCS Runoff 0.486 2 716 982 ------ ------ ------ PRE 5 8 SCS Runoff 4.530 2 718 10,941 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.486 2 716 982 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 0.806 2 718 1,612 ------ ------ ------ POST 2 11 Combine 2.509 2 742 8,780 4, 10 ------ ------ POST TO POND 12 Reservoir 0.140 2 894 8,749 11 222.08 6,523 DETENTION 13 SCS Runoff 1.331 2 718 2,677 ------ ------ ------ PRE 3 14 SCS Runoff 0.531 2 716 1,278 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 1.692 2 718 4,546 ------ ------ ------ POST OFFSITE 16 SCS Runoff 1.692 2 718 4,546 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.230 2 718 461 ------ ------ ------ POST BYPASS 5 18 Combine 14.46 2 718 33,235 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 8.648 2 718 20,616 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 8.667 2 718 29,365 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 25 Year Tuesday, 12 / 10 / 2019 Hydrograph Report 91 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 3.931 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 8,998 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE 1 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 92 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 6.611 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 15,124 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 PRE 2 Hyd. No. 2 -- 25 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' .1 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 93 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 5.577 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 19,260 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 POST 1 Hyd. No. 3 -- 25 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 94 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 2.415 cfs Storm frequency = 25 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 7,168 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.65 ft Reservoir name = BIORETENTION Max. Storage = 8,164 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 0.00 0 120 — Hyd No. 4 BIORETENTION Hyd. No. 4 -- 25 Year 240 360 480 600 720 840 960 Hyd No. 3 Total storage used = 8,164 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 --"- 0.00 1080 Time (min) Hydrograph Report 95 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.290 ac Curve number Basin Slope = 25.5 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.50 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST BYPASS 1 Hyd. No. 5 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 5 Tuesday, 12 / 10 / 2019 = 1.204 cfs = 718 min = 2,407 cuft = 62 = 47 ft = 3.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 96 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge = 0.437 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 909 cuft Drainage area = 0.060 ac Curve number = 82 Basin Slope = 1.8 % Hydraulic length = 112 ft Tc method = LAG Time of conc. (Tc) = 3.80 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) PRE 4 Hyd. No. 6 -- 25 Year Q (cfs) Ell 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 97 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge = 0.486 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 982 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 4.0 % Hydraulic length = 82 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE 5 Hyd. No. 7 -- 25 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge = 4.530 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 10,941 cuft Drainage area = 0.590 ac Curve number = 88 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = LAG Time of conc. (Tc) = 7.10 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 0.00 ' 0 120 240 — Hyd No. 8 POST BYPASS 2 Hyd. No. 8 -- 25 Year 360 480 600 720 840 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge = 0.486 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 982 cuft Drainage area = 0.090 ac Curve number = 70 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 3 Hyd. No. 9 -- 25 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 100 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge = 0.806 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,612 cuft Drainage area = 0.210 ac Curve number = 60 Basin Slope = 10.0 % Hydraulic length = 131 ft Tc method = LAG Time of conc. (Tc) = 3.40 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 POST 2 Hyd. No. 10 -- 25 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 101 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 2.509 cfs Storm frequency = 25 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 8,780 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 3.00 r M 1.00 e 120 Hyd No. 11 240 POST TO POND Hyd. No. 11 -- 25 Year 360 480 — Hyd No. 4 600 720 Hyd No. 10 840 960 1080 Q (cfs) 3.00 2.00 1.00 -Mmi- 0.00 1200 Time (min) Hydrograph Report 102 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.140 cfs Storm frequency = 25 yrs Time to peak = 894 min Time interval = 2 min Hyd. volume = 8,749 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 222.08 ft Reservoir name = DETENTION Max. Storage = 6,523 cuft Storage Indication method used Q (cfs) 3.00 r M 1.00 e DETENTION Hyd. No. 12 -- 25 Year 360 720 1080 1440 1800 2160 2520 2880 3240 Hyd No. 12 Hyd No. 11 Total storage used = 6,523 cuft Q (cfs) 3.00 2.00 1.00 1 0.00 3600 Time (min) Hydrograph Report 103 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.270 ac Curve number Basin Slope = 3.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 6.50 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE 3 Hyd. No. 13 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 13 Tuesday, 12 / 10 / 2019 = 1.331 cfs = 718 min = 2,677 cuft = 67 = 159 ft = 5.30 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 104 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.531 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,278 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST BYPASS 4 Hyd. No. 14 -- 25 Year Q (cfs) . MI ■I 0 120 240 Hyd No. 14 360 480 600 720 840 960 1080 1200 Time (min) Hydrograph Report 105 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 6.50 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e POST OFFSITE Hyd. No. 15 -- 25 Year Tuesday, 12 / 10 / 2019 = 1.692 cfs = 718 min = 4,546 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 15 Q (cfs) 2.00 1.00 --" 0.00 1320 Time (min) Hydrograph Report 106 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 6.50 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e PRE OFFSITE Hyd. No. 16 -- 25 Year Tuesday, 12 / 10 / 2019 = 1.692 cfs = 718 min = 4,546 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 16 Q (cfs) 2.00 1.00 --" 0.00 1320 Time (min) 107 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.230 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 461 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 5 Hyd. No. 17 -- 25 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 108 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 14.46 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 33,235 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac PRE TOTAL Q (cfs) Hyd. No. 18 -- 25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 6.00 9.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 109 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 8.648 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 20,616 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac Q (cfs) 10.00 UR . 0M 4.00 r M M 120 240 Hyd No. 19 POST SUBTOTAL Hyd. No. 19 -- 25 Year 360 480 600 Hyd No. 5 — Hyd No. 14 720 840 960 Hyd No. 8 Hyd No. 15 Q (cfs) 10.00 H. We 4.00 r M 1 1 It 1080 1200 1320 1440 Hyd No. 9 Time (min) Hyd No. 17 Hydrograph Report 110 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 8.667 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 29,365 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac POST TOTAL Q (cfs) Hyd. No. 20 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 20 Hyd No. 12 Hyd No. 19 111 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 4.846 2 718 11,096 ------ ------ ------ PRE 1 2 SCS Runoff 8.011 2 718 18,347 ------ ------ ------ PRE 2 3 SCS Runoff 6.636 2 726 22,962 ------ ------ ------ POST 1 4 Reservoir 3.614 2 740 10,291 3 230.75 8,931 BIORETENTION 5 SCS Runoff 1.504 2 718 3,013 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.510 2 716 1,069 ------ ------ ------ PRE 4 7 SCS Runoff 0.591 2 716 1,195 ------ ------ ------ PRE 5 8 SCS Runoff 5.207 2 718 12,688 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.591 2 716 1,195 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 1.017 2 718 2,035 ------ ------ ------ POST 2 11 Combine 3.735 2 740 12,326 4,10 ------ ------ POST TO POND 12 Reservoir 0.163 2 912 12,295 11 222.77 9,401 DETENTION 13 SCS Runoff 1.629 2 716 3,290 ------ ------ ------ PRE 3 14 SCS Runoff 0.600 2 716 1,450 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 1.912 2 718 5,155 ------ ------ ------ POST OFFSITE 16 SCS Runoff 1.912 2 718 5,155 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.291 2 718 581 ------ ------ ------ POST BYPASS 5 18 Combine 17.47 2 718 40,152 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 10.07 2 718 24,083 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 10.10 2 718 36,378 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 50 Year Tuesday, 12 / 10 / 2019 112 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 4.846 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 11,096 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 PRE 1 Hyd. No. 1 -- 50 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 113 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 8.011 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 18,347 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 N. We . UM 4.00 r w M PRE 2 Hyd. No. 2 -- 50 Year Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 114 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 6.636 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 22,962 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 . Me 5.00 3.00 1.00 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 115 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 3.614 cfs Storm frequency = 50 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 10,291 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.75 ft Reservoir name = BIORETENTION Max. Storage = 8,931 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 7.00 . Me 5.00 3.00 1.00 Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) — Hyd No. 4 Hyd No. 3 Total storage used = 8,931 cult Hydrograph Report 116 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.290 ac Curve number Basin Slope = 25.5 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST BYPASS 1 Hyd. No. 5 -- 50 Year 120 240 360 480 600 720 840 960 Hyd No. 5 Tuesday, 12 / 10 / 2019 = 1.504 cfs = 718 min = 3,013 cuft = 62 = 47 ft = 3.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 117 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge = 0.510 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,069 cuft Drainage area = 0.060 ac Curve number = 82 Basin Slope = 1.8 % Hydraulic length = 112 ft Tc method = LAG Time of conc. (Tc) = 3.80 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) PRE 4 Hyd. No. 6 -- 50 Year Q (cfs) a as 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) Hydrograph Report 118 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.090 ac Curve number Basin Slope = 4.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.591 cfs = 716 min = 1,195 cuft = 70 = 82 ft = 3.10 min = Type II = 484 Q (cfs) PRE 5 Hyd. No. 7 -- 50 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0 120 Hyd No. 11 OIE 240 360 480 600 720 840 960 1080 7 0.00 1200 1320 1440 Time (min) 119 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge = 5.207 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 12,688 cuft Drainage area = 0.590 ac Curve number = 88 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = LAG Time of conc. (Tc) = 7.10 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 POST BYPASS 2 Hyd. No. 8 -- 50 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1-""'-- ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) Hydrograph Report 120 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.090 ac Curve number Basin Slope = 2.4 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.591 cfs = 716 min = 1,195 cuft = 70 = 375 ft = 3.10 min = Type II = 484 Q (cfs) 1.00 POST BYPASS 3 Hyd. No. 9 -- 50 Year Q (cfs) 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 K 0.10 0.10 0.00 0 120 Hyd No. 240 360 480 600 720 840 960 1080 9 0.00 1200 1320 1440 Time (min) Hydrograph Report 121 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.210 ac Curve number Basin Slope = 10.0 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST 2 Hyd. No. 10 -- 50 Year 120 240 360 480 600 720 840 960 Hyd No. 10 Tuesday, 12 / 10 / 2019 = 1.017 cfs = 718 min = 2,035 cuft = 60 = 131 ft = 3.40 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 122 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 3.735 cfs Storm frequency = 50 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 12,326 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac POST TO POND Q (cfs) Hyd. No. 11 -- 50 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) — Hyd No. 11 Hyd No. 4 Hyd No. 10 Hydrograph Report 123 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.163 cfs Storm frequency = 50 yrs Time to peak = 912 min Time interval = 2 min Hyd. volume = 12,295 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 222.77 ft Reservoir name = DETENTION Max. Storage = 9,401 cuft Storage Indication method used Q (cfs) 4.00 3.00 r M 1.00 e DETENTION Hyd. No. 12 -- 50 Year 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Hyd No. 12 Hyd No. 11 Total storage used = 9,401 cuft Q (cfs) 4.00 3.00 2.00 1.00 '- 0.00 3960 Time (min) Hydrograph Report 124 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.270 ac Curve number Basin Slope = 3.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE 3 Hyd. No. 13 -- 50 Year 120 240 360 480 600 720 840 960 Hyd No. 13 Tuesday, 12 / 10 / 2019 = 1.629 cfs = 716 min = 3,290 cuft = 67 = 159 ft = 5.30 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 125 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.600 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,450 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST BYPASS 4 Hyd. No. 14 -- 50 Year Q (cfs) MI -��-� ■I MI 0 120 240 Hyd No. 14 360 480 600 720 840 960 1080 1200 Time (min) Hydrograph Report 126 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e POST OFFSITE Hyd. No. 15 -- 50 Year Tuesday, 12 / 10 / 2019 = 1.912 cfs = 718 min = 5,155 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 15 Q (cfs) 2.00 1.00 — 0.00 1320 Time (min) Hydrograph Report 127 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 7.34 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e PRE OFFSITE Hyd. No. 16 -- 50 Year Tuesday, 12 / 10 / 2019 = 1.912 cfs = 718 min = 5,155 cuft = 98 = 345 ft = 6.90 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 16 Q (cfs) 2.00 1.00 — 0.00 1320 Time (min) 128 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.291 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 581 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 7.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 5 Hyd. No. 17 -- 50 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 129 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 17.47 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 40,152 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac Q (cfs) 18.00 15.00 12.00 M M 3.00 M PRE TOTAL Hyd. No. 18 -- 50 Year Q (cfs) 18.00 15.00 12.00 M . �� 3.00 1 1 It 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 130 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 10.07 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 24,083 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac Q (cfs) 12.00 10.00 M M 4.00 r M� M 120 240 Hyd No. 19 POST SUBTOTAL Hyd. No. 19 -- 50 Year 360 480 600 Hyd No. 5 — Hyd No. 14 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 1 1 It 720 840 960 1080 1200 1320 1440 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 15 Hyd No. 17 Hydrograph Report 131 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 10.10 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 36,378 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 240 480 720 Hyd No. 20 Hyd No. 12 POST TOTAL Hyd. No. 20 -- 50 Year Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 960 1200 1440 1680 1920 Time (min) Hyd No. 19 132 Hydrograph Summary Repo rtHydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.838 2 718 13,354 ------ ------ ------ PRE 1 2 SCS Runoff 9.485 2 718 21,781 ------ ------ ------ PRE 2 3 SCS Runoff 7.742 2 726 26,867 ------ ------ ------ POST 1 4 Reservoir 4.266 2 732 13,662 3 230.88 9,931 BIORETENTION 5 SCS Runoff 1.824 2 718 3,671 ------ ------ ------ POST BYPASS 1 6 SCS Runoff 0.585 2 716 1,237 ------ ------ ------ PRE 4 7 SCS Runoff 0.701 2 716 1,423 ------ ------ ------ PRE 5 8 SCS Runoff 5.905 2 718 14,507 ------ ------ ------ POST BYPASS 2 9 SCS Runoff 0.701 2 716 1,423 ------ ------ ------ POST BYPASS 3 10 SCS Runoff 1.244 2 718 2,495 ------ ------ ------ POST 2 11 Combine 4.440 2 732 16,157 4,10 ------ ------ POST TO POND 12 Reservoir 0.884 2 788 16,126 11 223.01 10,417 DETENTION 13 SCS Runoff 1.952 2 716 3,947 ------ ------ ------ PRE 3 14 SCS Runoff 0.672 2 716 1,627 ------ ------ ------ POST BYPASS 4 15 SCS Runoff 2.140 2 718 5,786 ------ ------ ------ POST OFFSITE 16 SCS Runoff 2.140 2 718 5,786 ------ ------ ------ PRE OFFSITE 17 SCS Runoff 0.355 2 718 713 ------ ------ ------ POST BYPASS 5 18 Combine 20.66 2 718 47,528 1, 2, 6, ------ ------ PRE TOTAL 7, 13, 16, 19 Combine 11.56 2 718 27,727 5, 8, 9, ------ ------ POST SUBTOTAL 14, 15, 17, 20 Combine 11.60 2 718 43,854 12,19 ------ ------ POST TOTAL BIORET & DET POND - TYPE Il.gpw Return Period: 100 Year Tuesday, 12 / 10 / 2019 133 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 1 PRE 1 Hydrograph type = SCS Runoff Peak discharge = 5.838 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 13,354 cuft Drainage area = 0.880 ac Curve number = 66 Basin Slope = 5.8 % Hydraulic length = 294 ft Tc method = LAG Time of conc. (Tc) = 7.30 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 PRE 1 Hyd. No. 1 -- 100 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' .I ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 134 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 2 PRE 2 Hydrograph type = SCS Runoff Peak discharge = 9.485 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 21,781 cuft Drainage area = 1.260 ac Curve number = 71 Basin Slope = 3.3 % Hydraulic length = 305 ft Tc method = LAG Time of conc. (Tc) = 8.80 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 N. We . UM 4.00 r w M PRE 2 Hyd. No. 2 -- 100 Year Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 135 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 3 POST 1 Hydrograph type = SCS Runoff Peak discharge = 7.742 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 26,867 cuft Drainage area = 1.330 ac Curve number = 77 Basin Slope = 1.0 % Hydraulic length = 544 ft Tc method = LAG Time of conc. (Tc) = 21.30 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 1 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report 136 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 4 BIORETENTION Hydrograph type = Reservoir Peak discharge = 4.266 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 13,662 cuft Inflow hyd. No. = 3 - POST 1 Max. Elevation = 230.88 ft Reservoir name = BIORETENTION Max. Storage = 9,931 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 8.00 am 4.00 r M 0.00 0 120 — Hyd No. 4 BIORETENTION Hyd. No. 4 -- 100 Year 240 360 480 600 720 840 960 Hyd No. 3 Total storage used = 9,931 cuft Q (cfs) 8.00 4.00 2.00 0.00 1080 Time (min) Hydrograph Report 137 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 POST BYPASS 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.290 ac Curve number Basin Slope = 25.5 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST BYPASS 1 Hyd. No. 5 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 5 Tuesday, 12 / 10 / 2019 = 1.824 cfs = 718 min = 3,671 cuft = 62 = 47 ft = 3.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 138 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 6 PRE 4 Hydrograph type = SCS Runoff Peak discharge = 0.585 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,237 cuft Drainage area = 0.060 ac Curve number = 82 Basin Slope = 1.8 % Hydraulic length = 112 ft Tc method = LAG Time of conc. (Tc) = 3.80 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 PRE 4 Hyd. No. 6 -- 100 Year 0 120 240 360 480 600 720 840 960 Hyd No. 6 Q (cfs) Hydrograph Report 139 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 PRE 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.090 ac Curve number Basin Slope = 4.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.701 cfs = 716 min = 1,423 cuft = 70 = 82 ft = 3.10 min = Type II = 484 Q (cfs) PRE 5 Hyd. No. 7 -- 100 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0 120 Hyd No. 240 360 480 7 600 720 840 960 1080 0.00 1200 1320 1440 Time (min) 140 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 8 POST BYPASS 2 Hydrograph type = SCS Runoff Peak discharge = 5.905 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 14,507 cuft Drainage area = 0.590 ac Curve number = 88 Basin Slope = 2.4 % Hydraulic length = 375 ft Tc method = LAG Time of conc. (Tc) = 7.10 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 POST BYPASS 2 Hyd. No. 8 -- 100 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) Hydrograph Report 141 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 9 POST BYPASS 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.090 ac Curve number Basin Slope = 2.4 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 12 / 10 / 2019 = 0.701 cfs = 716 min = 1,423 cuft = 70 = 375 ft = 3.10 min = Type II = 484 Q (cfs) 1.00 POST BYPASS 3 Hyd. No. 9 -- 100 Year Q (cfs) 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0 120 Hyd No. 240 360 480 9 600 720 840 960 1080 0.00 1200 1320 1440 Time (min) Hydrograph Report 142 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 10 POST 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.210 ac Curve number Basin Slope = 10.0 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M POST 2 Hyd. No. 10 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 10 Tuesday, 12 / 10 / 2019 = 1.244 cfs = 718 min = 2,495 cuft = 60 = 131 ft = 3.40 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 143 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 11 POST TO POND Hydrograph type = Combine Peak discharge = 4.440 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 16,157 cuft Inflow hyds. = 4, 10 Contrib. drain. area = 0.210 ac Q (cfs) 5.00 4.00 3.00 R 11 1.00 0.00 0 120 — Hyd No. 11 POST TO POND Hyd. No. 11 -- 100 Year 240 360 480 Hyd No. 4 600 720 Hyd No. 10 840 960 1080 Q (cfs) 5.00 4.00 3.00 2.00 1.00 W—� 0.00 1200 Time (min) Hydrograph Report 144 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 12 DETENTION Hydrograph type = Reservoir Peak discharge = 0.884 cfs Storm frequency = 100 yrs Time to peak = 788 min Time interval = 2 min Hyd. volume = 16,126 cuft Inflow hyd. No. = 11 - POST TO POND Max. Elevation = 223.01 ft Reservoir name = DETENTION Max. Storage = 10,417 cuft Storage Indication method used DETENTION Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) — Hyd No. 12 Hyd No. 11 Total storage used = 10,417 cult Hydrograph Report 145 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 13 PRE 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.270 ac Curve number Basin Slope = 3.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M PRE 3 Hyd. No. 13 -- 100 Year Tuesday, 12 / 10 / 2019 = 1.952 cfs = 716 min = 3,947 cuft = 67 = 159 ft = 5.30 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 13 Q (cfs) 2.00 1.00 0.00 1440 Time (min) 146 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 14 POST BYPASS 4 Hydrograph type = SCS Runoff Peak discharge = 0.672 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,627 cuft Drainage area = 0.060 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 3.10 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST BYPASS 4 Hyd. No. 14 -- 100 Year Q (cfs) 0 120 240 Hyd No. 14 360 480 600 720 840 960 1080 1200 Time (min) Hydrograph Report 147 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 POST OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 r M 1.00 e 120 240 Hyd No. 15 POST OFFSITE Hyd. No. 15 -- 100 Year Tuesday, 12 / 10 / 2019 = 2.140 cfs = 718 min = 5,786 cuft = 98 = 345 ft = 6.90 min = Type II = 484 360 480 600 720 840 960 1080 1200 Q (cfs) 3.00 2.00 1.00 -110 0.00 1320 Time (min) Hydrograph Report 148 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 16 PRE OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.200 ac Curve number Basin Slope = 0.9 % Hydraulic length Tc method = LAG Time of conc. (Tc) Total precip. = 8.21 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 r M 1.00 e 120 240 Hyd No. 16 PRE OFFSITE Hyd. No. 16 -- 100 Year Tuesday, 12 / 10 / 2019 = 2.140 cfs = 718 min = 5,786 cuft = 98 = 345 ft = 6.90 min = Type II = 484 360 480 600 720 840 960 1080 1200 Q (cfs) 3.00 2.00 1.00 -110 0.00 1320 Time (min) 149 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 17 POST BYPASS 5 Hydrograph type = SCS Runoff Peak discharge = 0.355 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 713 cuft Drainage area = 0.060 ac Curve number = 60 Basin Slope = 4.2 % Hydraulic length = 143 ft Tc method = LAG Time of conc. (Tc) = 5.60 min Total precip. = 8.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 POST BYPASS 5 Hyd. No. 17 -- 100 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 150 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 18 PRE TOTAL Hydrograph type = Combine Peak discharge = 20.66 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 47,528 cuft Inflow hyds. = 1, 2, 6, 7, 13, 16 Contrib. drain. area = 2.760 ac Q (cfs) 21.00 18.00 15.00 12.00 3.00 PRE TOTAL Hyd. No. 18 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 18 Hyd No. 1 Hyd No. 2 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 13 Hyd No. 16 Hydrograph Report 151 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 19 POST SUBTOTAL Hydrograph type = Combine Peak discharge = 11.56 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 27,727 cuft Inflow hyds. = 5, 8, 9, 14, 15, 17 Contrib. drain. area = 1.290 ac Q (cfs) 12.00 10.00 M M 4.00 r M� M POST SUBTOTAL Hyd. No. 19 -- 100 Year Q (cfs) 12.00 10.00 M . �� 4.00 r M� 1 1 It 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 19 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 14 Hyd No. 15 Hyd No. 17 Hydrograph Report 152 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Hyd. No. 20 POST TOTAL Hydrograph type = Combine Peak discharge = 11.60 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 43,854 cuft Inflow hyds. = 12, 19 Contrib. drain. area = 0.000 ac Q (cfs) 12.00 10.00 91011111 .M 4.00 rM e POST TOTAL Hyd. No. 20 -- 100 Year 240 480 720 Hyd No. 20 Hyd No. 12 Q (cfs) 12.00 10.00 M M 4.00 2.00 0.00 960 1200 1440 1680 1920 Time (min) Hyd No. 19 153 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 12 / 10 / 2019 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 69.0574 12.9000 0.8960 -------- 2 77.0598 12.9000 0.8772 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.3048 12.8000 0.8361 -------- 10 78.6305 12.4000 0.8044 -------- 25 67.9775 11.0000 0.7384 -------- 50 63.8674 10.3000 0.7025 -------- 100 56.1060 9.1000 0.6530 -------- File name: Ft. Bragg, NC.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 5.21 4.18 3.50 3.02 2.66 2.38 2.16 1.97 1.82 1.69 1.58 1.48 2 6.14 4.94 4.16 3.60 3.18 2.85 2.59 2.37 2.19 2.04 1.91 1.79 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.14 5.81 4.92 4.28 3.81 3.43 3.13 2.88 2.67 2.49 2.33 2.20 10 7.90 6.45 5.48 4.79 4.27 3.86 3.53 3.26 3.03 2.83 2.66 2.51 25 8.77 7.18 6.13 5.38 4.82 4.38 4.02 3.73 3.48 3.27 3.08 2.92 50 9.40 7.71 6.60 5.82 5.22 4.76 4.38 4.07 3.81 3.59 3.39 3.22 100 9.97 8.17 7.02 6.21 5.60 5.12 4.73 4.41 4.14 3.91 3.71 3.53 Tc = time in minutes. Values may exceed 60. Precip. file name: Z:\_stan&det\IDF Curves\Hydraflow Hydrographs\Ft. Bragg, NC.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 3.07 3.71 0.00 4.68 5.44 6.50 7.34 8.21 SCS 6-Hr 2.20 2.66 0.00 3.35 3.90 4.65 5.26 5.91 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. <Name> Circular Diameter (ft) = 1.50 Invert Elev (ft) = 219.50 Slope (%) = 7.77 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 0.08 Elev (ft) Thursday, Sep 19 2019 Highlighted Depth (ft) = 0.06 Q (cfs) = 0.080 Area (sqft) = 0.02 Velocity (ft/s) = 3.32 Wetted Perim (ft) = 0.61 Crit Depth, Yc (ft) = 0.11 Top Width (ft) = 0.59 EGL (ft) = 0.23 Section 222.00 221.50 2.1 221.00 1.! 220.50 1.1 220.00 0.! 219.50 0.1 01 a M) _n 0 2 Reach (ft) 3 4