Loading...
HomeMy WebLinkAboutNCG140395_NOV_20191217ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality December 17, 2019 CERTIFIED MAIL: 7019 0700 0000 8867 4339 RETURN RECEIPT REQUESTED Southern Concrete Materials Attn: Jeff Lamm Post Office Box 5395 Asheville, North Carolina Subject: NOTICE OF VIOLATION (NOV-2019-PC-0771) NPDES Stormwater General Permit NCG140000 Southern Concrete Materials Certificate of Coverage NCG140395 Swain County Dear Mr. Lamm: On December 12, 2019, Isaiah Reed from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Southern Concrete facility located at 450 Industrial Park Road, Swain County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG140000 under Certificate of Coverage NCG140395. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Cochran Branch, a Class C waterbody in the Little Tennessee River Basin. As a result of the site inspection, the following permit conditions violations are noted: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has not been properly Maintained. 2) Secondary Containment Requirements The proposed secondary containment for Bulk storage of liquid materials on site was observed overtopping due to regular washout processes, demonstrating that the process area's applicability as secondary containment is not valid. WE on Q:> North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 ���� 828.296.4500 Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296- 4500. Sincerely, :f �'_4�� Stanley E. Aike�EGA Regional Engineer Land Quality Section Enclosure: Inspection Report ec: Alaina Morman, Environmental Specialist Alaina.morman(2ncdenr.gov Stanley E. Aiken- Regional Engineer stan.aikenna ncdenr.gov Permit: NCG140395 SOC: County: Swain Region: Asheville Contact Person: Jeff Lamm Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 owner: Southern Concrete Materials Effective: Expiration: Facility: Southern Concrete Materials -Bryson City Plant 450 Industrial Park Rd Bryson City NC 28713 Title: Phone: 828-277-7030 Inspection Date: 12/12/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 03:OOPM Exit Time: 04:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant E Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NGG140395 Owner -Facility: Southern Concrete Materials Inspection Date: 12/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 12, 2019 this facility was inspected for compliance. I met with Gabe Kirkpatrick on site. During the inspection, the following items were noted. 1) Documentation of SWPPP maintenance through 2018 and 2019 was largely unavailable during the inspection. The permittee is directed to locate all records of compliance efforts from 2017 to current and make them available to the department as outlined in the NCG140000 General Permit. 2) The process water holding area that was previously described as the secondary containment for bulk liquid materials on site was observed to be overtopping during the inspection. Overtopping demonstrates that the process area is not functioning as adequate secondary containment, and that untreated process water was being discharged from the facility. The permittee is directed to immediately begin efforts to provide secondary containment for all bulk storage tanks on site as outlined in the NCG140000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NGG140395 Owner - Facility: Southern Concrete Materials Inspection Date: 12/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ M ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: Documentation of non-Stormwater discharge certifictaion. Annual review, updated spills record not available for 2018. Secondary containement not provided. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ M ❑ ❑ Comment: None found during documentation review for 2018 or 2019. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: None found during documentation review for 2018 or 2019. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3