November 21, 2019
LETTER OF APPROVAL
Engie Solar
ATTN: Marc -Alain Behar, Managing Director
7000 North Mopac Expressway, Suite 200
Austin, TX 78731
RE: Project Name: Hawtree Creek Substation
Project ID: WARRE-2020-001
Acres Approved: 7.0
County: Warren, City: Warrenton, Address: Peete 1=ann Road (SR 1307)
River Basin: Roanoke, Stream Classification: Other
Submitted By: Ballentine Associates, PA
Date Received by LQS: October, 29, 2019
Plan Type: New
Dear Madam or Sir:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3) years following the date of approval,
if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the N01 form to Annette Lucas at
Annette.Iticas-(@—ncdenr.gov or Paul Clark at Paul.clark2ncidenr.gov. Afteryou submit a complete and
correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
D_EC��
.,E i . cnnca.w
&-"
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Raleigh Regional Office 11628 Mall Service Center 3800 Barrett Drive I Raleigh. North Carolina 27609
919 791.4200
Letter of Approval
Engie Solar
November 21, 2019
Page 2of2
Title 15A NCAC 4B A118(a) and the NCG01 permit require that the following documentation be kept
on Fie at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspection made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Cast 6EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
cc: Ashton R. Smith, PE ( a5htons0bapi.eng.pro - Electronic Copy
DEMLR - Raleigh Regional Office File