Loading...
HomeMy WebLinkAboutNCG110097_Inspection Report_20191217ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Town of Spruce Pine Attention: Darrel Graham Post Office Box 189 Spruce Pine, North Carolina 28777 NORTH CAROLINA Environmental Quality December 17, 2019 Subject: Compliance Evaluation Inspection Permit: NCG110000 Certificate of Coverage: NCG110097 Mitchell County, North Carolina Dear Mr. Graham: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on December 10, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Since Oe'Isaiah Reed, CP Q, CEPSCI, M 4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 ORfHCPHIXINP °Aei°^°^' �'•'°m^^"'a'"v 828.296.4500 Compliance Inspection Report Permit: NCG110097 Effective: 06/01/18 Expiration: 05/31/23 Owner: Town of Spruce Pine SOC: Effective: Expiration: Facility: Spruce Pine WWfP County: Mitchell 909 Creed Pitman Rd Region: Asheville Spruce Pine NC 28777 Contact Person: Richard Canipe Title: Phone: 828-766-6915 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/10/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 02:OOPM Exit Time: 03:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal VNIVfP > 1MGD, Stormwater Discharge, COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG110097 Owner- Facility: Town of Spruce Pine Inspection Date: 12/10/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 10, 2019 this facility was inspected for compliance. No major issues were noted during the inspection, and the issues noted in the previous report have been addressed. While not complete, the SWPPP has been created, and needs to be maintained and improved. The next inspection will be mainly to confirm that the SWPPP is being implemented and reviewed. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG110097 Owner- Facility: Town of Spruce Pine Inspection Date: 12/10/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Cutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment Page 3 of 3