Loading...
HomeMy WebLinkAboutNCG140009_Inspection Report_20191217ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Southern Concrete Materials Attention: Jeff Lamm Post Office Box 5395 Asheville, North Carolina 28813 NORTH CAROLINA Environmental Quality December 17, 2019 Subject: Compliance Evaluation Inspection Permit: NCG140000 Certificate of Coverage: NCG140009 Macon County, North Carolina Dear Mr. Lamm: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on December 12, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer ,lam Isaiah Reed, C EPSCI, S4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report re D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 nnmNcaaa�Nn 828.296A500 Compliance Inspection Report Permit: NCG140009 Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Concrete Materials SOC: Effective: Expiration: Facility: Southern Concrete Mat -Macon County: Macon 49 Wells Grove Rd Region: Asheville Franklin NC 28734 Contact Person: Jason Greene Title: Phone: 828-707-8502 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/12/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: EntryTime: 10:15AM Exit Time: 11:00AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge CDC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NGG140009 Owner -Facility: Southern Concrete Materials Inspection Date: 12/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 12, 2019 this facility was inspected for compliance. I met with Bill Price on site. During the inspection, the following was noted: Secondary containment has not yet been provided for the bulk storage of liquid materials on site. The permittee is directed to immediately begin efforts to provide secondary containment for all bulk storage as outlined in the NCG140000 General Permit. This facility will be re -inspected on or after January 23, 2020. If the above item has not been addressed, further action will be taken. If you have any questions, please contact this regional office at (828) 296-4614 Page 2 of 3 Permit: NCG140009 Owner -Facility: Southern Concrete Materials Inspection Date: IM2/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Secondary containment not vet provided for bulk storage on site. Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ❑■❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ❑ E ❑ ❑ Page 3 of 3