HomeMy WebLinkAboutNC0055255_authorization to construct_20150120 Parkins, LLC RECEIVED DEWWWR
Crown Mobile Home Park WWTP JAN 2 0 2015
Authorization to Construct No. 055255A03
Issued November 17,2014 Water Quality
Permitting Section'
Engineer's Certification
6;;v' �- (ai , as a duly registered Professional Engineer in
the State of North Carolina,having,been authorized to observe(periodically/weekly/full time)
the construction of the modifications and improvements to the Crown Mobile Horne Park
Wastewater Treatment Plant,located in Guilford County,hereby state that,to the best of my
abilities, due care and diligence was used in the observation of the following construction:
Installation of one (I) new W disinfection unit capable of treating 70 GPM
tertiary filter effluent and meeting at a minimum 30,000 µWseckm2 after 10,000
hours of operation,manufacturer recommended spare parts, piping, and controls;
installation of an autodialer alarm system to alert operator/owner of imminent W
failures so the necessary actions are conducted to place the backup tablet
chlorination/dechlorination systems in service; in conformity with the project
plans, specifications, and other supporting data subsequently filed and approved
by the Department of Environment and Natural Resources
I certify that the construction of the above referenced project was observed to be built within
substantial compliance,intent and in conformity with all applicable regulations and statutes and
the project plans,specifications,and other supporting documentation comprising the
Authorization to Construct Permit plic 'on package.
Signatur Registration No.
Date
Mail this Certification to: Attn: Ron Berry
Complex Permitting Unit
DENR/DWR/Water Quality Programs J J iQ
1617 Mail Service CenterMJ1CC,.:
Raleigh,NC 27699-1617
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
November 17, 2014
Robert P. Hahn
Owner Parkins, LLC
P. O. Box 1000
Pittsboro,North Carolina 27312
SUBJECT: Authorization to Construct
A to C No. 055255A03
Parkins, LLC
Crown Mobile Home Park WWTP
Dear Mr. Hahn:
A letter of request for an Authorization to Construct was received October 10, 2014, by the
Division of Water Resources (Division), and final plans and specifications for the subject project have
been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of
modifications to the existing 0.042 MGD Crown Mobile Home Park WWTP , with discharge of treated
wastewater into the unnamed tributary to Hickory Creek in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for the
construction of the following specific modifications:
Installation of one (1) new UV disinfection unit capable, of treating 70 GPM tertiary
filter effluent and meeting at a minimum 30,000 µWsec/cm? after 10,000 hours of
operation, manufacturer recommended spare parts, piping, and controls; installation of an
autodialer alarm system to alert operator/owner of imminent UV failures so the necessary
actions are conducted to place the backup tablet chlorination/dechlorination systems in
service; in conformity with the project plans, specifications, and other supporting data
subsequently filed and approved by the Department of Environment and Natural
Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES
Permit No. NCO055255 issued effective October 1, 2011, and shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with the conditions and limitations
specified in Permit No.NC0055255.
1617 Mail Service Center,Raleigh,North Carolina 27699-1617
Phone:919-807-63001 Internet:www.ncwaterquality.org
An Equal OpportunitMi'firmalive Action Employer
Robert P.Hahn, Owner Parkins,LLC
November 17,2014
Page 2 of 3
The sludge generated from these treatment facilities must be disposed of in accordance with
G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by
the Division, such as the construction of additional or replacement wastewater treatment or disposal
facilities.
The Winston-Salem Regional Office, telephone number (336) 775 - 9800, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the normal
office hours from 8.00 a.m. until 5:00 p.m. on.Monday through Friday, excluding State Holidays.
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been installed
in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to: NPDES Unit, DWRJDENR, 1617 Mail Service Center,
Raleigh,NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall employ
a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater
treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or
greater than the classification assigned to the wastewater treatment facilities by the Certification
Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and grade
to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I
facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and
holidays, must properly manage the facility, must document daily operation and maintenance of the
facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for
the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall continue to
properly maintain and operate the existing wastewater treatment facilities at all times, and in such a
manner, as necessary to comply with the effluent limits specified in the NPDES Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with the
North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam
Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall
be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Robert P.Hahn, Owner Parkins,LLC
November 17,2014
Page 3 of 3
Failure to abide by the requirements contained in this Authorization to Construct may subject
the Permittee to an enforcement action by the Division in accordance with North Carolina General
Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other
government agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Ron Berry at
telephone number(919) 807-6396.
Sincerely,
Thom . eeder, Director
Division of Water Resources/NCDENR
cc: Gary S. MacConnell, P.E.
MacConnell &Associates, P.C.
P. O. Box 129
Morrisville,NC 27560
DWR/Winston-Salem Regional Office, Water Quality Programs
Central Files
NPDES File
Without Engineer's Certificate attached:
Guilford County Health Department