HomeMy WebLinkAbout20191377 Ver 1_Impact Table 10.4.19_20191213Wetlands Impacts Table
Wetland Impact
Number
Impact Area (from
Impact Map)
Type of Impact
Type of Wetland
Forested?
Type of
Jurisdiction
Area of Impact
(Acres)
W1
B
Fill
Bottomland
Hardwood Forest
Yes
Corps
0.0049
W2
C
Permanent - No
Permanent Loss
Combined Wetland
and Stream
Yes
Corps
0.0969
W3
C
Permanent - No
Permanent Loss
Bottomland
Hardwood Forest
Yes
Corps
0.0055
W4
K
Fill
Bottomland
Hardwood Forest
Yes
Corps
0.0295
Total Impacts
0.1368
Total Permanent Impacts (w/
0.0344
Stream Impacts Table
Stream Impact
Number
Impact Area
(from Impact
Map)
Permanent (P) or
Temporary (T)
Type of Impact
Stream Name
Pernennial (PER) or
Intermittent (INT)
Type of
Jurisdiction
Average Stream
Width (ft)
Impact length
(LF)
51
C
P - No Permanent
Loss
Combined wetland
and stream
ST-TD
PER
Corps
79
S2
C
P
Stream Crossing
ST-TD
PER
Corps
22.6
50
S3
C
T
Stream Crossing
ST-TD
PER
Corps
8.7
31
S4
C
P - No Permanent
Loss
Dissipator Pad
ST-TD
PER
Corps
18.1
50
S5
H
T
Stream Crossing
ST-TA
INT
Corps
2
38
S6
H
P
Stream Crossing
ST-TA
INT
Corps
2
88
S7
H
P - No Permanent
Loss
Dissipator Pad
ST-TA
INT
Corps
2
19
58
K
P - No Permanent
Loss
Dissipator Pad
ST-TB (Unimportant)
INT
Corps
2
15
S9
K
P
Stream Crossing
ST-TB (Unimportant)
INT
Corps
2
96
510
K
T
Stream Crossing
ST-TB (Unimportant)
INT
Corps
2
39
Total Impacts
505
Total Temporary Impacts
108
Total Permanent Impacts
(Excluding No -Loss Impacts)
234
Total Permanent Impacts
(Excluding No -Loss Impacts and
Unimportant Streams)
138
Buffer Impacts Table
Buffer Impact
Number
Impact Area
(from Impact
Map)
Permanent (P) or
Temporary (T)
Reason for Impact
Stream Name
Buffer Mitigation
Required?
Zone 1 impact
(SF)
Zone 2 impact
(SF)
131
A
P
Greenway
ST-TH
No
0
1536
B2
C
P
Stream Crossing
ST-TD
Yes
10,827
6,254
B3
D
P
Greenway
ST-TD
No
678
939
B4
E
P
Greenway
ST-TD
No
0
57
B5
F
P
Greenway
ST-TA
No
0
1,029
B6
G
P
Greenway
ST-TC
No
0
641
B7
H
P
Stream Crossing
ST-TA
No
8,570
5,276
B8
I
P
Stormwater
ST-TA
No
0
4,303
B9
J
P
Stormwater
ST-TC
No
0
5,020
B10
K
P
Stream Crossing
ST-TB (Unimportant)l
No
8,368
5,555
Total Per Zone:
28,443
31,610
Total Per Zone (excluding unimportant
streams):
20,075
26,055
Total:
60,053
Total (excluding unimportant streams):
46,130