Loading...
HomeMy WebLinkAboutNCG070193_Inspection Report_20191217ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Appalachian Stone Company, Inc Attention: Daniel Ray Post Office Box 1598 Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality December 17, 2019 Subject: Compliance Evaluation Inspection Permit: NCG070000 Certificate of Coverage: NCG070193 McDowell County, North Carolina Dear Mr. Ray: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on December 11, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere r Isaiah Reed, C WQ, C PSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQZ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 w ems'\ /_ 828.296.4500 Permit: NCG070193 SOC: County: McDowell Region: Asheville Contact Person: Daniel Ray Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 06/01/18 Expiration: 05/31/23 Owner: Appalachian Stone Company Inc Effective: Expiration: Facility: Appalachian Stone Company -Marion Mine 4582 Huy 221 N Inspection Date: 12/1112019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Entry Time: 10:45AM Certification: Marion NC 28752 Phone: 828-286-2541 Phone: Exit Time: 11:30AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070193 Owner -Facility: Appalachian Stone Company Inc Inspection Date: 12/11/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 11, 2019 this facility was inspected for compliance. I met with Daniel Ray on site. The deficiencies listed in the previously issued Notice of Deficiency have been addressed and the Notice of Deficiency is resolved. Between now and the next inspection, documentation and monitoring shall be essential. Please contact me if you have any questions. The permittee is directed to follow all documentation and reporting requirements of the NCG070000 General Permit. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG070193 Owner - Facility: Appalachian Slone Company Inc Inspection Date: 12/11/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ 0 i • IKi M=i Page 3 of 3