Loading...
HomeMy WebLinkAboutNCG210392_Inspection Report_20191217ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Beasley Flooring Products Inc Attention: Lynn Cody 77 Industrial Park Road Bryson City, North Carolina 28713 NORTH CAROLINA Environmental Quality December 17, 2019 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210392 Swain County, North Carolina Dear Mr. Cody: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on December 12, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Since Isaiah Reed, SWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report 0.0 D_EQ'� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 rvomH curouru. °e^o°^Ao10^'onoan°'^oe°�� 828.296.4500 Permit: NCG210392 SOC: County: Swain Region: Asheville Contact Person: Heath Talley Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 08/01/18 Expiration: 07/31/23 Owner : Beasley Flooring Products Inc Effective: Expiration: Facility: Beasley Flooring Products Inc. BC 77 Industrial Park Rd Inspection Date: 12/12/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: EntryTime: 01:OOPM Certification: Bryson City NC 28713 Phone: 828-369-1261 Phone: Exit Time: 02:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge CDC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210392 Owner -Facility: Beasley Flooring Produclslnc Inspection Date: 12/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On December 12, 2019 this facility was inspected for compliance. 1 met with Wendy Welborn, Sandra Wood, and Lynn Cody on site. During the inspection, the following items were noted: 1) The site map did not include the location of all onsite and adjacent surface waters. The permittee is directed to revise the Stormwater Pollution Prevention Plan to meet all requirements outlined in the NCG210000 General Permit. 2) An annual evaluation and certification of non-stormwater discharge evaluations has not been documented. The permittee is directed to evaluate, document, and certify that all outfalls have been evaluated for the presence of non-stormwater discharge, as outlined in the NCG210000 General Permit. 3) Analytical monitoring has not been performed in accordance with the NGG210000 General Permit. The permittee is directed to immediately begin efforts to comply with all monitoring requirements outline in the NCG210000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210392 Owner -Facility: Beasley Flooring Products Inc Inspection Date: 12/12/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ M ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3.years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment. See summary for more information Qualitative Monitoring Yes Na NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment. See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3