December 12, 2019
Duke Energy Progress, LLC.
Attn: Gary Whisnant, Plant Manager
200 CPL Drive
Arden, NC 28704
Subject: Permit Modification
Application No. NC0000396
Asheville Steam Electric Power Plant
Buncombe County
Dear Applicant:
The Water Quality Permitting Section acknowledges the December 11, 2019 receipt of your permit modification
application and supporting documentation. Your application will be assigned to a permit writer within the Section's NPDES
WW permitting branch. Per G.S. 150E-3 your current permit does not expire until permit decision on the application is
made. Continuation of the current permit is contingent on timely and sufficient application for renewal of the current
permit. The permit writer will contact you if additional information is required to complete your permit renewal. Please
respond in a timely manner to requests for additional information necessary to allow a complete review of the application
and renewal of the permit.
Information regarding the status of your renewal application can be found online using the Department of Environmental
Quality's Environmental Application Tracker at:
https://deq.nc.gov/permits-regulations/permit-guidance/environmental-application-tracker
If you have any additional questions about the permit, please contact the primary reviewer of the application using the
links available within the Application Tracker.
Sincerely,
.....%9j4j
Wren Thedford
Administrative Assistant
Water Quality Permitting Section
ec: WQPS Laserfiche File w/application
E Q North Caro rsDepartrrertofEnvronn eats!gut,ty I Dvsonof Water Reso.roes
Ashev a Regona Office 12090 U.S.70 Hghway I Swannanoe,North Csro ra 25778
°�r'•��"'�� 828,28E-4530
DUKE
�' ENERGY Garry A.Whisnant
Plant General Manager
PROGRESS Asheville Steam Electric Plant
Certified Mail: 7014 1820 0001 7891 3459 Duke Energy Progress
ASVL PLT 200 CP&L Dr
Arden,NC 28704
File: 12520B
o: 828-687-5211
f 828-687-5204
garry.whisnant@ duke-energy.com
December 4, 2019
Julie Grzyb
Department of Environmental Quality
NPDES Complex Permitting Unit RECEIVED
1617 Mail Service Center
Raleigh, NC 27699-1617 DEC 11 2019
Subject: Asheville Steam Electric Generating Plant NCDEQIDWRINPDES
NPDES Permit NC0000396
Outfall 002 NPDES Permit Modification Request
Dear Ms. Grzyb:
Asheville Steam Electric Generating Plant coal units are retiring soon. These coal units
will then proceed with decommissioning activities. The shutting down of operational
systems and decommissioning activities will warrant the need to modify the NPDES
permit. It is requested that the NPDES permit be modified to reflect the NPDES related
changes. The following and attachments provide the details associated with this permit
modification request.
The Condenser Cooling Water (CCW) system currently discharges through NPDES
Outfall 002 into Lake Julian. When the coal units are retired this system will no longer
discharge into Lake Julian. The current average flow from the CCW system is
approximately 255 mgd.
The cooling water from the evaporator system for the Combustion Turbines currently
discharges into the 64-ash basin, which discharges through NPDES Outfall 001 . One
of the initial decommissioning activities is to modify the evaporator system's cooling
water flow path to discharge into the treatment pond that the CCW system currently
discharges into and then exit Outfall 002 into Lake Julian. This treatment pond also
receives storm water.
The evaporator system is used to cool air at ambient temperatures by the water flowing
across filter media into the Combustion Turbine Air Inlet. The cooling of the air
increases the combustion efficiency and maintains megawatt production level in the
warmer months. There are no chemicals added to the evaporator system. The source
of water is service water (raw lake water) from Lake Julian.
Julie Grzyb
Department of Environmental Quality
NPDES Complex Permitting Unit
December 4, 2019
The evaporator system is operated typically from May through October. The average
flowrate from this system is estimated to be 56 gpm (0.08 mgd). The temperature of this
discharge is close to ambient. The evaporator discharge will not begin to discharge to
Outfall 002 until after the CCW flow has stopped. The future flow and heat load from
the evaporator at Outfall 002 will be significantly less in comparison to the current CCW
discharge.
Therefore, it is requested that Outfall 002 be modified to include the discharge from the
evaporator system and to reflect shutting down of the coal station's CCW. Continuous
thermal, flow and chlorine sampling associated with the CCW flows are requested to be
removed with this modification as the addition of chlorine at the intake structure has
ceased.
Attached are sample results from the evaporator cooling water, a process flow diagram
that shows the evaporator, an aerial photo identifying the flow paths for the changes
described in this submittal and a check for $1 ,030 to process this permit modification
request.
Should you have questions or need additional information please contact Robert Wylie
at 704 382-4669.
Sincerely,
Garry Whisnant, Plant Manager
GM II - Regulated Stations
Attachments:
A. Evaporator Analytical Data
B. Process Flow Diagram
C. Aerial Photos Illustrating Current and Future Flow Paths
D. Check for Modification Fee
cc: Landon Davidson, DEQ, Asheville Regional Office
Teresa Williams, Duke Energy
Robert Wylie, Duke Energy
Attachment A
Evaporator Analytical Data
Asheville Electric Power Plant
NPDES Permit # NC0000396
Evaporator Cooling Water Analytical Results
Item Parameter Concentration
1 Chloride 17.2 mg/L
2 Chromium 0.80 ug/L
3 Copper 2.4 ug/L
4 Hardness 26 mg/L
5 Iron 61.9 ug/L
6 Magnesium 3.1 mg/L
7 Manganese 12.8 ug/L
8 Nickel ND
9 Oil and Grease ND
10 Sulfate 6.2 mg/L
11 TDS 99.0 mg/L
12 TSS ND
13 Zinc ND
ND = Not Detected
Note the temperature should be approximately the same as the ambient
temperature.
Attachment B
Process Flow Diagram
Combined and Simple Cycle Combustion Turbine Plant
•
Ultrafiltrat;on Service Water/Fire Water Service Water Equipment Drains
Ejuia)
NI >111 ) �� Tank ----> Users ----> Sump
Simple Cycle Existing
Evaporator Cooling and 7 Outfall 002 Lake Julian
Stormwater Drains
Unit 07/OS Raw Standby RO/Dem;n
-� Water7upply > Trailers
Existing Unit 3 and 4-->
Simple Cycle
Simple Cycle CTG Water Two-Pass Reverse Osmosis
D Mixed-Bed Demineralized `
Demineralized Water Injection -----> Demineralizer ,-----> Water Tanks ,_.> CTG NOx Injection /\
Storage Tanks
Simple Cycle CTG ® Atmosphere I( D
Water Wash I I
Atmosphere
V
)
® HRSG Blowdown HRSG
Cooling Tower&Basin
) Tank/Sump
V A V
Water Treatment ) 1( CTG Wash
Building Sump V Water > Transfer Truck )
A
Sample Panel /
n
Unit 07/08
Cooling Tower Unit 07/08
V Blowdown Oil-Water Separator
Unit 07/08 Sludge Side-Stream
001C 001B
Sludge Thickener I Thickener < Filters
Unit 05/06 Oil-Water
A Separator
O01D
V V V VV
<UudgeThkener
Filter Press Unit OS/06 Secondary
�� (Shared) CoolingTowerWasteWaterSump Sli Blowdown 001A ) (Shared) ) easing ____> French Broad River
Outfa11001
> Transfer Truck / Existing Ash pond /Exsting Fuel Oil Footing Fuel Oil
LRB/WTS C oB-water t { Area
Separator ` Stormwater
-- -- Process Flow Diagram
Duke Energy Progress,LLC
Asheville Steam Electric Plant
Buncombe County, November 2019
Attachment C
Aerial Photos Illustrating Current and Future Flow Paths
Asheville plant current NPDES flows
KEY
<--- Ash Treatment—Sluice lines to Rim Ditch,
+, 9 Center Pond,Filter Skid,pH building,outfall 001
�+al ', Plant Drains, Coal Pile Run off RO,
*t =4.1
OWS(LVSW)
' W WT—FGD Slowdown(currently to POTW)
It' 1., rtt_ ,i 1964 Basin Dewatering(Duck Pond)-
9 ' AIL
LVSW,Ash removal decant,Industrial SW,
4
tila
~` ' r " ' Once through Cooling�, g g—outfall 002
,- - j )
ru Industrial SW Permit area(SW1,3
.it 'r." -, •i;,,�;A;K * l' Duke En . '�� River Pump make up to Lake Julian
.• 41�P Asheville
n t Ka_
' an ',4
'tP- 002
4 v
•
'NSitts,
..:-'-'A-': '-'. ,?. - . N'LL.'-'"4".,' -'
_,• - itR. • S ♦� Mlf n Dam is removed- �' .+ A '
'W. - ,� ,. ys -- �4 s - future industrial r `ti �
s��,�y- r; 'R ` " . Stormwater flows A " :*•; ��
�I y
yT a�
�kl�ram_ * 'n */_r f :
_ �t �
4�.._s as ,,, '_�i:fit '_'�.y+ „ .r. J.4 '�l" a
Asheville plant current NPDES flows at Coal Plant Shut down/CC start
KEY
( Waste water line to outfall 001
-, �_ Demo- Plant Drains,Coal Pile Run
.
off, LVSW, Existing OWS
iy,W —
i F—W WT FGD Slowdown(currently to MSD)
P+ `• 1964 Basin Dewatering
‘k ,
{. l.
• . LVSW,Ash removal decant,Industrial SW,
`. ,,Convert Once through Cooling—outfall
'' ; 002 to CT EVAP Cooler/stormwater
1.
4--Industrial SW area—adding upper back
... 001 �,* road, Fuel oil,CC
,, 713• • • River Pump make up to Lake Julian
.., - Duke F.teryy�
4raevillc Platt 002\`r- Extraction r. �k
Well ` I Future NPDES
yy y 2i, f' • Modification
�dM► t
!;:^i Y� LQt + tW
`V4
• , •te` 001B 101D ,
, :4 k-
., - C Plan 001C f k(1.' .
,/ r, f
, • ',,,'Alk,1*. IL,iti, ot., t. 411 i- ''
4.
t •^t'+I. _ �' .r.4. -S.M ;ram , + 6F1
- i
Cr
\ r
',sp a + e v v�� air T �► ' 4 � �'Aa ,,,
"441 �
�r v.l' .M.. ♦ to •
Attachment D
Check for Modification Fee