Loading...
HomeMy WebLinkAboutNCC193188_NOI Application_20191216Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/12/2019 5:03:48 PM (NCG01 NOI Submission) Approve by Clark, Paul 12/13/2019 8:25:20 AM (Review- Construction NOI 19515) • The task was assigned to Clark, Paul by round robin distribution 12/12/2019 5:04 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 16, 2019 5:00 PM 12/12/2019 5:04 PM Submit by McCoy, Suzanne 12/16/2019 7:39:02 AM (Payment Verification for NCC193188) * Mary -Beth Sewell • McCoy, Suzanne assigned the task to McCoy, Suzanne 12/16/2019 7:38 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 24, 2020 5:00 PM 12/13/2019 8:25 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Durham Technical Community College - New Applied Technology Building 2. County* Durham 3. Highway or Street 1604 East Lawson Street Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Durham 5. State * NC 6. Zip Code* 27703 7. Latitude* Enter the latitude in decimal degrees 35.9727 8. Longitude * Enter the longitude in decimal degrees (MJST be negative) -78.8821 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/02/2019 Estimated Construction Project Start Date 10. Date to End* 01/15/2021 Estimated Construction Project End Date 11. SIC (Primary) * Other (0000) Standard Industrial cassification for Development 12. Acres to be 3.15 disturbed* (including off -site borrow and waste areas) 13. Total site area 3.15 (acres) * 14. Post- 1.34 construction (Estirated) impervious area (acres) * NCC Project NCC-DURHA-2019-Durham Technical Community College - New Tracking ID Applied Technology Building Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Third Fork Creek Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b. Waterbody 16-41-1-12-(1) Index No. * NCWaterbody Index Number Stormwater r- No discharges will flow 17 Yes to additional wate rs * 15c. Additional Cape Fear River Basin Receiving Waterbody narre Waterbody 15d. Waterbody NCWaterbody Index Number Index No. 15e. Additional Waterbody name Receiving Waterbody 15f. Waterbody NCWaterbody Index Number Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Bordeaux Construction Name * 2. First Name* Matthew If Corporation, enter Pegistered Agent First Barre 3. Last Name* Woodlief If Corporation, enter Faegistered Agent Last %rre 3b. Title Project Manager 4. Permitee E-mail matt.w@bordeauxconstruction.com Address * 5. Permittee 919-220-1141 Telephone No.* 6. Permittee Mailing Street Address Address* 135 E. Martin Street Address Line 2 #101 city Raleigh Fostal / Zip Code 27601 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 135 E. Martin Street Address Line 2 #101 City Raleigh Fbstal / Zip Code 27601 State / Ftovince / Region North Carolina Country United States State / Frovince / Fbgion North Carolina Country United States C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Government - County Ownership * 2. Primary Site Roy Contact - First Name * 3. Primary Site Weaver Contact - Last Name * 4. Title Project Superintendent 5. Site Contact E- roy@bordeauxconstruction.com mail Address* 6. Site Contact 919-201-7513 Telephone No.* 7. Organization Bordeaux Construction Name 8. Site Contact Street Address Mailing Address* 135 E. Martin Street Address Line 2 #101 Cty Raleigh Fbstal / Zip Code 27601 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion North Carolina Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/30/2019 Approved * 2. E&SC Plan Project DURHA-2020-001 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan DURHA-2020-001 LOA 20190730.pdf 60.14KB Approval Wst be RDFfornat letter/documentation 6. NOI Certification DTCC - eNO1 Certificate Form.pdf 924.06KB Form Mist be RDFfon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Matthew C Woodlief Title Project Manager Organization Bordeaux Construction Company Date * 12/12/2019 F. Tracking and COC Info NOI Tracking No. 19515 NC Reference No. NCG01-2019-3188 Uses 'count number' variable (incremrented by SP) Certificate of NCC193188 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 3188 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)