Loading...
HomeMy WebLinkAbout20180049 Ver 2_Access Revision Packet20191106_20191210WETLAND "f ' EX. MAINTAINED C TEMPORARY IMPACT ___ L AREA = 843.89 SF (70 BE ABAND NEI7) OR 0.019 ACRES R� _- - � _._ .„, PROPOSED 24" DIP SS J r7p y no no no no s� wdo-01K no + WJO-3Sx • wJo�e3x � 0 MILL CREEK ("SK") TOP OF BANK (SEE SHEET S13 FOR IMPACTS) % ° _ WJR- GG - grr.. ems- _ I- Mr '�����+,,1 � J0-'29.M ••••• •gip Ox EX. MAINTAINED CORRIDOR �.'+.• - (TO BE ABANDONED) - + JR- - WJR-71Xx• W f0-10 X m m • r��Fk`gAR m m. • .F T m m y� \��. m m, T. , , WJ0�28 x WJR-12^x R-1 % wJo-7 iX m m '•,�, ��.��:WETLAND WF r m ;'` m m TEMPORARY IMPACT s m• + •'•,^, '_ '::►g•����' AREA = 7745.42 SF WJR-73x,� T •:.tiv: OR .18 ACRES 'PKx wjlr ax a4c •R�'v �� . WJOs27x WETLAND \ (SEE SHEET W7 FOR IMPACTS) 10' PERMANENT MAINTENANCE 1 CORRIDOR WETLAND IMPACT s i wJo-iJo-1s AREA = 1069.51 SF OR m m m ivio zsx, ( '+ 0.025 ACRES m� m m �•� m m m m. m m \m m m m m m WJO-16WJO-1�/M WhI0-19 mX.. , m m. m m m m m m •.. TEMPORARY CONSTRUCTION wJor2m,�. • • �:.wJa�z7,m m m ENTRANCE m WJO-18k' m i� x+ vN44T4&CREED � 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com CITY OF DURHAM. DEPARTMENT OF WATER MANAGEMENT WETLAND "WF" POINT TABLE DESCRIPTION NORTHING EASTING WJO-01 841130.02 2020843.13 WJO-02 841146.09 2020849.63 WJO-03 841142.01 2020838.43 WJO-03 841168.86 2020864.70 WJO-04 841173.39 2020856.33 WJO-05 841153.99 2020849.34 WJO-06 841149.54 2020844.23 WJO-07 841166.06 2020838.57 WJO-08 841186.18 2020850.22 WJO-09 841205.95 2020853.89 WJO-10 841234.13 2020842.86 WJO-11 841250.74 2020832.68 WJO-12 841286.01 2020809.71 WJO-13 841292.74 2020773.79 WJO-14 841309.86 2020747.42 WJO-15 841309.97 2020733.23 WJO-16 841325.47 2020723.45 WJO-17 841325.35 2020704.73 WJO-18 841344.21 2020678.57 WJO-19 841327.49 2020655.28 WJO-20 841334.66 2020618.14 WJO-21 841335.31 2020586.28 WJO-22 841349.46 2020567.53 WJO-23 841348,75 2020555.41 WJO-24 841313.24 2020565.45 WJO-25 841304.92 2020591.55 WJO-26 841292.27 2020646.36 WJO-27 841279.15 2020677.48 WJO-28 841243.23 2020675.91 WJO-29 841196.38 2020682.64 WJO-30 841183.59 2020716.11 WJO-32 841160.15 2020800.90 WJO-33 841162,92 2020829.79 WJO-35 841133.89 2020835.83 ENO RIVER OUTFALL UPGRADE PHASE II - WEST WETLAND WF IMPACTS (REVISED) WETLAND PERMANENT i MAINTENANCE IMPACT -, WETLAND TEMPORARY IMPACT LOD- LIMITS OF DISTURBANCE - - Z1 - - STREAM BUFFER ZONE 1 - - Z2 - - STREAM BUFFER ZONE 2 �1 -11 II ... I ••••• WETLAND BOUNDARY ��I �`. ��H CARg4' I`,, SEAL _ 037309 �1�1��21at� 40' 0 40' 80' 1 ■ ■ ■ ■ ■ 1 SCALE: 1"=40' (Horiz.) DATE: OCTOBER 2019 MCE PROJ. 9 3079-a012 DRAWN DWH DESIGNED AJP CHECKED AJP PROJ. MGR. BRL MAC FILE NUMBER SCALE HORIZONTAL: DRAWNG NUMBER 1.-40, VERTICAL: W6 NA Q�yiccn STATl15: RFNS« ISSUED FOR PERMIT City of Durham Eno River Outfall Upgrade Phase I II - East West November 2019 Sheet No. Site No.Structure Size / Type Permanent Fill in Wetlands (ac) 2016 Permanent Fill in Wetlands (ac) DIFFERENCE Excavation in Weltands (ac) 2016 Excavation in Weltands (ac) DIFFERENCE Permanent SW impacts (ac) 2016 Permanent SW impacts (ac)DIFFERENCE Temporary SW impacts (ac) 2016 Temporary SW impacts (ac)DIFFERENCE Existing Channel Impacts Permanent (ft) 2016 Existing Channel Impacts Permanent (ft) DIFFERENCE Existing Channel Impacts Temp. (ft) 2016 Existing Channel Impacts Temp. (ft) DIFFERENCE S5 5 Rip Rap - - - - - - - 0.050 (0.050) 0.030 - 0.030 - 50.0 (50.0) 30.0 - 30.0 S8 8 Open Cut Trenching for 48" Gravity Sewer Main - - - - - - 0.040 - 0.040 - 0.040 (0.040) 60.0 - 60.0 - 60.0 (60.0) S9 9 Open Cut Trenching for 48" Gravity Sewer Main - - - - - - 0.040 - 0.040 - 0.040 (0.040) 62.0 - 62.0 - 62.0 (62.0) W3, W4, S11 11 Open Cut Trenching for 48" Gravity Sewer Main - - - - 0.011 (0.011) 0.040 - 0.040 - 0.040 (0.040) 44.0 - 44.0 - 42.0 (42.0) W5, S12 12 Open Cut Trenching for 48" Gravity Sewer Main - 0.001 (0.001) 0.020 0.022 (0.002) 0.020 - 0.020 0.010 0.060 (0.050) 44.0 - 44.0 50.0 94.0 (44.0) W6, W7, S13 13 0.025 0.028 (0.003) 0.199 0.110 0.089 - - - - - - - - - - - - W8 16 Clearing - - - 0.004 0.004 - - - - - - - - Total 0.025 0.029 (0.004) 0.223 0.143 0.080 0.140 0.050 0.090 0.040 0.180 (0.140) 210.0 50.0 160.0 80.0 258.0 (178.0) WETLAND AND SURFACE WATER IMPACTS COMPARISON (positive number = increase) WETLAND IMPACTS SURFACE WATER IMPACTS Eno River Outfall Upgrade, Durham NC SAW-2017-00096 , DWR #18-0049 Impact Change Summary Table* Sheet No. Site No. Zone 1 and Zone 2 Allowable Impacts (ft2) Zone 1 Mitigable Temporary Impacts (ft2) Zone 1 Mitigable Permanent Impacts (ft2) Permanent Fill in Wetlands (ac) Excavation in Wetlands (ac) Permanent SW Impact (ac) Temporary SW Impact (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temporary (ft) S5 5 (2,647.24) 1,106.29 (629.86) - - (0.050) 0.030 (50.0) 30.0 S8 8 (559.58) (1,162.11) (26.25) - - 0.040 (0.040) 60.0 (60.0) S9 9 335.92 978.50 - - - 0.040 (0.040) 62.0 (62.0) S11, W5 11 (113.97) - - - (0.011) 0.040 (0.040) 44.0 (42.0) S12 12 115.93 871.52 - (0.001) (0.002) 0.020 (0.050) 44.0 (44.0) S13, W6, W7 13 (2,379.30) (997.82) - (0.003) 0.089 - - - - S16, W8 16 4,811.49 4,084.28 - - 0.004 - - - - Total (436.75) 4,880.66 (656.11) (0.004) 0.080 0.090 (0.140) 160.0 (178.0) * positive number = increase 11/18/2019