Loading...
HomeMy WebLinkAboutNCC193083_ESC Approval Submitted_20191213ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality October 18, 2019 LETTER OF APPROVAL WITH MODIFICATIONS The Charlotte Mecklenburg Hospital Authority Attention: Mr. Tom Washington, Director of Planning, Design & Construction . P O Box 32861 Charlotte, North Carolina 28232 The Charlotte Mecklenburg Hospital Authority Attention: Mr. Keith A. Smith, Registered Agent 1111 Metropolitan Avenue Suite 600 Charlotte, North Carolina 28204 RE: Project Name: Atrium Union West (Express Review) Acres Approved: 45.0 Project ID: UNION-2020-030 County: Union City: Stallings Address: Stallings Road River Basin: Yadkin -Pee Dee Stream Classification: Others Submitted By: Kimley-Horn Date Received by LQS: October 16, 2019 Plan Type: New Dear Mr. Washington and Smith: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdcnr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete 0\ North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources MQ•/ Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 ueperu�.Mm�naromm.nte 4w"' \ 704.663.1699 Letter of Approval with Modifications The Charlotte Mecklenburg Hospital Authority October 18, 2019 Page 2 of 4 and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC'4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 1I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Letter of Approval with Modifications The Charlotte Mecklenburg Hospital Authority October 18, 2019 Page 3 of 4 Your cooperation is appreciated. Sincerely, J Zahid S. Khan, CPM, Assistant Regional Engineer Land Quality ,Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet C: Kimley-Horn, Attention: Mr. Nathan Tidd, PLA, Suite 200, 200 South Tryon Street, Charlotte, North Carolina, 28202 Inspection Department Letter of Approval with Modifications The Charlotte Mecklenburg Hospital Authority October 18, 2019 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Atrium Union West Project ID: UNION-2020-030 County: Union Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: Provide copies of any wetland determinations or Water Quality Certifications (401/404) for this project from the Army Corps and/or Water Quality Regional Operations Section, as well as any local approvals for activity within the buffers. All requested information must be received and approved prior to Phase H construction. Please submit all requested information at one time. [15A NCAC 4B .0106(1), Clean Water Act, Sections 401 and 404]. 2. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]. 3. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]