Loading...
HomeMy WebLinkAboutNCC192992_NOI Application_20191213Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/2/2019 12:38:03 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 12/2/2019 3:36:40 PM (Review- Construction NOI 19001) • The task was assigned to Garcia, Lauren V by round robin distribution 12/2/2019 12:38 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 4, 2019 5:00 PM 12/2/2019 12:38 PM Submit by McCoy, Suzanne 12/13/2019 2:11:57 PM (Payment Verification for NCC192992) * Carolina Raptor Center • McCoy, Suzanne assigned the task to McCoy, Suzanne 12/13/2019 2:11 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 13, 2020 5:00 PM 12/2/2019 3:36 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Carolina Raptor Center 2. County* Mecklenburg 3. Highway or Street Sample Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Huntersville 5. State * NC 6. Zip Code * 28078 7. Latitude * Enter the latitude in decimal degrees 35.3588 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.9082 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/25/2019 Estimated Construction Project Start Date 10. Date to End* 09/30/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Other (0000) Standard Industrial Classification for Ceveloprrent 12. Acres to be 10.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 114.99 (acres) * 14. Post- 2.25 construction (Estimated) impervious area (acres) * NCC Project NCC-MECKL-2019-Carolina Raptor Center Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Catawba River Wate rbody* Barre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-(114) Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Carolina Raptor Center Name * 2. First Name* Jim IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Warren If Corporation, enter F3egistered Agent Last %rre 3b. Title Executive Director 4. Permitee E-mail jwarren@carolinaraptorcenter.org Address * 5. Permittee 704-875-6521 Telephone No.* 6. Permittee Mailing Street Address Address* 6000 Sample Road Address Line 2 city Huntersville Fbstal / Zip Code 28078 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 6000 Sample Road Address Line 2 Cty Huntersville F bstal / Zip Code 28078 State / Frovince / Faegion NC Country us State / Frovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration ........................................................................................................................................................................................................... 1. Type of Government - County Ownership * 2. Primary Site Steve Contact - First Name * 3. Primary Site Sweat Contact - Last Name * 4. Title Senior Project Manager 5. Site Contact E- steven.sweat@mecklenburgcountync.gov mail Address* 6. Site Contact 980-314-2521 Telephone No.* 7. Organization Mecklenburg County Name 8. Site Contact Street Address Mailing Address* 3205 Freedom Drive Address Line 2 Suite 6000 Cty Charlotte Fbstal / Zip Code 28208 9. Consultant Name (Optional) Jason Dolan First and Last narre 10. Consultant E- jason.dolan@timmons.com mail This person will be copied on all correspondence. 11.Consultant 704-900-4945 Telephone No. State / Rovince / Fbgion NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/26/2019 Approved * 2. E&SC Plan Project MECKL-2020-013 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Carolina Raptor Center NCDEQ Erosion approval 9- Approval 19.pdf 128.54KB letter/documentation Mist be R7Ffon-rat 6. NOI Certification CRC NCGO1 NOI form-Signed.pdf 39.02KB Form Mist be R7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature p, wa" Type Name * Jim Warren Title Executive Director Organization Carolina Raptor Center Date * 12/02/2019 F. Tracking and COC Info NOI Tracking No. 19001 NC Reference No. NCG01-2019-2992 Uses 'count number' variable (incremrented by SP) Certificate of NCC192992 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2992 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)