Loading...
HomeMy WebLinkAbout20071869 Ver 1_Compliance Inspection Comments_20091028LT-XXA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 28, 2009 Mr. Ron Willing McCar Homes 10150 Mallard Lake Rd., Ste. 106 Charlotte, NC 28262 Subject: 401 Certification Compliance DWQ #07-1869 Mirabella Project Mecklenburg County, NC Dear Mr. Willing: On October 23, 2009, I conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once construction at the site begins DWQ must be notified. If ownership of the property changes, the certification will remain with the property. If you have any questions, please do not hesitate to me at (704) 663-1699. Sincerely, Michael W. Burkhard Surface Water Protection Environmental Specialist cc: John Hennessy - Compliance/Enforcement Ian McMillan - Wetlands Group Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterauality.oro North Carolina Natimallry An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper