Loading...
HomeMy WebLinkAboutNC0004952_Compliance Evaluation Inspection_20191213ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA £rtkbro,` Wenrcr grsoltty December 13, 2019 Ms. Renee Culler, Sr. Environmental Engineer CNA Holding, LLC 2525 Blacksburg Road Grover, NC 28073 Subject: Compliance Bioassay Inspection Celanese — Shelby Plant NPDES Permit No. NC0004952 Cleveland County Dear Ms. Culler: Enclosed is a copy of the Compliance Sampling Inspection for the inspection conducted at the subject facility on December 10, 2019, by Ori Tuvia and Maria Schutte. Michael Sparks', Randy Turner's and your cooperation during the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. At the time of the inspection split samples for toxicity were taken. The results will be sent at a later date when they have been returned from the lab. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia(abncdenngov. Sincerely, DocuSigned by: f�y.el ii Nuft for F161 FB69A2D84A3... W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources Cc: NPDES, MRO Files (Laserfiche) State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 IF I 3 I NC0004952 111 12 I 19/12/10 I17 18 i Q i 19 i G i 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 2.0 70 Id I 71 I— „ I 72 I �, I 73 �74 751 I I I I I I I80 I —I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:30AM 19/12/10 13/11/01 Ticaona Facility NC Hwy 198 Exit Time/Date Permit Expiration Date Shelby NC 28150 11:45AM 19/12/10 18/08/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Michael D. Sparks/ORC/704-480-5793/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Nicole Coffee,2525 Blacksburg Rd Grover NC 28073//704-480-5728/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Maria Schutte _ DWR/Division of Water Quality/704-663-1699/ 12/13/2019 Ori A Tuviar DWR/MRO WQ/704-663-1699/ _jt— rl I- -7_A_'l D F .4Qa Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers DocuSigned by: Date *-. uo H p's"f' EF1611`1369AMUAI.. Andrew Pitner DWR/MRO WQ/704-663-1699 Ext.2180/ 12 .13.19 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NC0004952 I11 121 19/12/10 117 18 JBI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NC0004952 Owner - Facility: Ticaona Facility Inspection Date: 12/10/2019 Inspection Type: Bioassay Compliance Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The subject permit expired on 8/31/2018. The facilty permit limits are in pounds/day rather then mg/L Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ Comment: The records reviewed during the inspection were organized and well maintained. DMRs, COCs, Bench sheets, Calibration logs and ORC visitation logs, were reviewed for the period February 2019 through June 2019. Laboratory Yes No NA NE Page# 3 Permit: NC0004952 Owner - Facility: Ticaona Facility Inspection Date: 12/10/2019 Inspection Type: Bioassay Compliance Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: On -site effluent analvses (DH. temDerature. TSS) are Derformed under the ComDanv's laboratory certification #221. Prism Laboratories, Inc. (BOD, oil & grease, total nitrogen, total phosphorus, pollutant scan, fecal coliform) and ETT, Inc. (toxicity) have also been contracted to provide analytical support. The laboratory instrumentation used for field analyses appeared to be properly calibrated/verified and documented. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: The subiect Dermit reauires both comDosite and arab effluent samDles. At the time of the inspection the effluent sampler pulled 172 ml aliquot. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The wastewater facility appeared to be properly operated and well maintained. The facility staff incorporate a comprehensive process control program with all measurements being Properly documented and maintained on -site. Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? ❑ ❑ ❑ Page# 4 Permit: NC0004952 Owner - Facility: Ticaona Facility Inspection Date: 12/10/2019 Inspection Type: Bioassay Compliance Bar Screens Yes No NA NE Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual b.Mechanical ❑ Is the grit free of excessive organic matter? 0 ❑ ❑ ❑ Is the grit free of excessive odor? 0 ❑ ❑ ❑ # Is disposal of grit in compliance? 0 ❑ ❑ ❑ Comment: Equalization Basins Yes No NA NE Is the basin aerated? 0 ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? ❑ ❑ 0 ❑ Are all pumps operable? ❑ ❑ 0 ❑ Are float controls operable? ❑ ❑ 0 ❑ Are audible and visual alarms operable? ❑ ❑ 0 ❑ # Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: The Drocess wastewater flows throuah three eaualization basins (in series) Drior to combining with the domestic wastewater. Sodium hydroxide (pH adjustment) is added to the first EQ Basin and phosphoric acid (nutrient supplement) is added on an as -needed basis at the third EQ Basin. A fourth equalization tank is also available for emergency situations. Chemical Feed Is containment adequate? Is storage adequate? Are backup pumps available? Is the site free of excessive leaking? Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 5 Permit: NC0004952 Owner - Facility: Ticaona Facility Inspection Date: 12/10/2019 Inspection Type: Bioassay Compliance Chemical Feed Yes No NA NE Comment: Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Surface Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? E ❑ ❑ ❑ Are the diffusers operational? ❑ ❑ 0 ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? E ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ ❑ 0 ❑ Comment: Both aeration basin trains were operational and in service at the time of the inspection. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Both secondary clarifiers were operational and in service. Pumps-RAS-WAS Yes No NA NE Are pumps in place? 0 ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ❑ ❑ ❑ Comment: Page# 6 Permit: NC0004952 Inspection Date: 12/10/2019 Owner - Facility: Ticaona Facility Inspection Type: Bioassay Compliance Lagoons Type of lagoons? # Number of lagoons in operation at time of visit? Are lagoons operated in? # Is a re -circulation line present? Is lagoon free of excessive floating materials? # Are baffles between ponds or effluent baffles adjustable? Are dike slopes clear of woody vegetation? Are weeds controlled around the edge of the lagoon? Are dikes free of seepage? Are dikes free of erosion? Are dikes free of burrowing animals? # Has the sludge blanket in the lagoon (s) been measured periodically in multiple locations? # If excessive algae is present, has barley straw been used to help control the growth? Is the lagoon surface free of weeds? Is the lagoon free of short circuiting? Yes No NA NE Aerated 3 Series ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The facility is equipped with three polishing ponds (operated in series) and two sludge holding ponds Filtration (High Rate Tertiary) Yes No NA NE Type of operation: Down flow Is the filter media present? 0 ❑ ❑ ❑ Is the filter surface free of clogging? 0 ❑ ❑ ❑ Is the filter free of growth? ❑ ❑ ❑ Is the air scour operational? ❑ ❑ ❑ Is the scouring acceptable? ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? ❑ ❑ ❑ Comment: All six tertiary filters were operational and in-service. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑ Page# 7 Permit: NC0004952 Inspection Date: 12/10/2019 Flow Measurement - Effluent Owner - Facility: Ticaona Facility Inspection Type: Bioassay Compliance Yes No NA NE Comment: The flow meter is calibrated/verified on a quarterly basis by the Company's I & E personnel. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Effluent appeared clear with no floatable solids or foam. Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: The facility is authorized to land apply digested sludge under the authority of Permit WQ0011038 ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ Page# 8