HomeMy WebLinkAbout20090842 Ver 1_More Info Letter_20091105 ';A
A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H.Sullins Dee Freeman
Governor Director Secretary
November 5, 2009
DWQ Project#2009-0842
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
First Assembly of God of Raleigh
Attn: Mr. David Allsbrook
3249 Blue Ridge Road
Raleigh,NC 27612
Subject Property: First Assembly of God,Raleigh
UT to Crabtree Creek [030402,27-33-(10), C,NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Allsbrook:
On August 4, 2009,the Division of Water Quality(DWQ)received your application dated August 3,
2009,with additional information received by DWQ on October 8,2009,to impact 674 square feet(ft)of
Zone 1 protected riparian buffers and 616 square feet(ft)of Zone 2 protected riparian buffers to
construct the proposed stormwater discharge through the protected buffer. The DWQ has determined that
your application was incomplete and/or provided inaccurate information as discussed below. The DWQ
will require additional information in order to process your application to impact protected wetlands
and/or streams on the subject property. Therefore, unless we receive five copies of the additional
information requested below,we will place this project on hold as incomplete until we receive this
additional information. If we do not receive the requested information,your project will be formally
returned as incomplete. Please provide the following information so that we may continue to review your
project.
Additional Information Requested:
l. Please provide full-sized plan sheets of the entire site at a scale of 1"= 50' or larger.
2. Per the requirements of the Neuse Riparian Buffer Rule,the stormwater that is discharged from
the dry detention basin during the design storm must be discharged through a correctly designed
level spreader. Level spreader design requirements are set forth in Chapter 8 of the North
Carolina Stormwater BMP Manual, available at: http://h2o.enr.state.nc.us/su/bmp forms.htm.
Please provide a Level Spreader Supplement Form for each proposed level spreader, available at
the same web site. Please include the Required Items checklist and all items listed therein.
3. Please provide plan details and drawdown calculations for the proposed dry detention basin so the
DWQ can verify the flow rate that will be directed to the level spreader.
4. Please provide a detail of the location where the high flow bypass system will discharge to the
receiving stream. Please also provide a calculation of the outlet velocity during the ten-year
401 Oversight/Express Review Permitting Unit One
1650 Mail Service Center,Raleigh,North Carolina 27699-1650 NorthCarolina
Location:2321 Crabtree Blvd.,Raleigh,North Carolina 27604
6
Internet:hftp://h2o.enr.state.nc.us/ncwetiands/
An Equal Opportunity 1 Affirmative Action Employer
First Assembly of God of Raleigh
Page 2 of 2
November 5,2009
storm. If the outlet velocity will be erosive,then you must provide an appropriately sized
dissipation device.
5. One(1)data CD of full size plans in TIFF Group 4 format(black and white, not grayscale or
color). If the plans are too large to store in TIFF format,they can be stored in PDF format.
Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this
information to me. If you will not be able to provide the requested information within that timeframe,
please provide written confirmation that you intend to provide the requested information,and include a
specific timetable delineating when the requested materials will be provided. If we do not hear from you
in 30 calendar days,we will assume that you no longer want to pursue this project and we will consider
the project as returned.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized(at
this time)by the DWQ. Please call Ms. Amy Chapman or Ms. Cyndi Karoly at 919-733-1786 if you have
any questions regarding or would like to set up a meeting to discuss this matter.
Since ,
Cyndi Karoly, Supervisor
401 Oversight/Express Review Permitting Unit
CBK/asc
cc: Lauren Witherspoon,DWQ Raleigh Regional Office
DLR Raleigh Regional Office
Alpha&Omega Group,Attn: Mr. Glenn Zeblo,4911 Green Road, Suite 107, Raleigh,NC 27616
File Copy
Filename: 090842FirstAssemblyofGod(W ake)NBR_On_Hold
COMPLETE■ Complete items 1,2,and 3.Also complete A. Signature
item 4 if Restricted Delivery is desired. X' , 'L ❑Agent
■ Print your name and address on the reverse - - l ll k i ❑Addressee
so that we can return the card to you. B. Re ived by(Pripted Name) C. Date of Delivery
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
Is delivery addre�y m 1? ❑Yes
1. Article Addressed to:
If YES,enter delivis ,a res w: ❑ No
First Assembly of God.Raleigh 200,
Mr David Allsbrook 11/6/09
3249 Blue Ridge Rd
Raleigh NC 27612 1-1
Certrfied Mail ,❑,t Express Mail
DWQ 09-0942 Wake County Q Registered g Return Receipt for Merchandise
❑Insured Mail ❑C.O.D.
4. Restricted Delivery?(Extra Fee) ❑Yes
2. Article Number
alansfer from service 7008 3230 0003 1103 4177
PS Form 3811,February 2004 Domestic Return Receipt 102595-02•M-1540
UNITED STAT P.0 8,,VA ,Z1=R Fw^St~
r Perm"No9Q�w,
• Sender: Please print your name, address, and ZIP+4 in this box •
NC DENR DIVISION OF WATER QUALITY
401 OVERSIGHT/EXPRESS UNIT
2321 CRABTREE BOULEVARD, SUITE 250
RALEIGH,NC 27604
1111111111 I111lllli11/H oil 111111111111111 Ifliffilifli 1111 Of I