From: Brian Breissinger <Brian.Breissinger@timmons.com>
Sent: Friday, December 13, 2019 8:59 AM
To: David.E.Bailey2@usace.army.mil; Homewood, Sue
Subject: RE: [External] RE: Draft Hydrology Monitoring Plan
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
No concerns on our side.
Thanks!
Brian Breissinger
Environmental Services Manager
TIMMONS GROUP I www.timmons.com
1001 Boulders Parkway, Suite 300 1 Richmond, VA 23225
Office:804.200.6439 1 Fax:804.560.1648
Mobile: 804.839.2645 1 brian.breissinger@timmons.com Your Vision Achieved Through Ours
-----Original Message -----
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Friday, December 13, 2019 8:58 AM
To: Homewood, Sue <sue.homewood@ncdenr.gov>; Brian Breissinger <Brian.Breissinger@timmons.com>
Subject: RE: [External] RE: Draft Hydrology Monitoring Plan
Brian,
The Corps echoes NCDWRs comments, and would include the same start time for the 3 years of monitoring as
mentioned in Sue's email below. Please let me know if there are any concerns about this from the applicant side.
Thanks.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
-----Original Message -----
From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov]
Sent: Thursday, December 12, 2019 2:56 PM
To: Brian Breissinger <Brian.Breissinger@timmons.com>
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Subject: [Non-DoD Source] RE: [External] RE: Draft Hydrology Monitoring Plan
Hi Brian,
As I started drafting the Individual Certification for this project I realized that I missed catching something in the
Hydrology Monitoring Plan during my review of the draft. I apologize for that. DWR's concerns which prompted the
request for the monitoring stems from the "post construction" conditions on site. The Hydrology Plan proposes to start
monitoring the streams in December 2019 and concluding 3 years later, December 2022. Depending on how long
construction and final stabilization takes, the monitoring will not provide us with 3 full years of post -construction
sampling.
I propose that this can be handled easily. I will draft a condition that accepts the Hydrology Monitoring Plan with a
modification that monitoring will occur for at least 3 years from the time that the project is released from DEMLR/local
government erosion control as a stable site.
Thanks
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
-----Original Message -----
From: Brian Breissinger <Brian.Breissinger@timmons.com>
Sent: Wednesday, November 27, 2019 10:34 AM
To: David. E.Bailey2@usace.army.miI
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>; Ben Sagara <Ben.Sagara@timmons.com>
Subject: [External] RE: Draft Hydrology Monitoring Plan
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Thanks Dave! I appreciate your input. All great things to think about on the setup side. Looking forward to our
discussion this afternoon.
Brian Breissinger
Environmental Services Manager
TIMMONS GROUP I Blockedwww.timmons.com
1001 Boulders Parkway, Suite 300 1 Richmond, VA 23225
Office: 804.200.6439 Fax: 804.560.1648
Mobile: 804.839.2645 brian.breissinger@timmons.com Your Vision Achieved Through Ours
-----Original Message -----
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Wednesday, November 27, 2019 10:09 AM
To: Brian Breissinger <Brian.Breissinger@timmons.com>
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: RE: Draft Hydrology Monitoring Plan
Thanks Brian. I reviewed the proposal and am in favor in principle of the plan, pending Sue's comments and our
discussion today. I'm glad that you included photo documentation, as our mitigation group has found this information to
be quite helpful in their monitoring report evaluation. Camera placement will be very important, and things to consider
when choosing locations include: consistent view frame of the thalweg of each channel, visibility to outside parties (i.e.
vandalism prevention), and growth of spring/summer vegetation, as leaf -out and herbaceous vegetation growth can
obscure the vantage point as we transition through the growing season.
Having an upstream and downstream view of each channel could prove useful, given that any water in the channel at
the toe of the fill slope may be relatively stagnant.
Also, our mitigation group showed me a file sent in by another consultant using video cameras rather than single shot
cameras. The result was a montage of once -daily video snippets (1 or 2 second videos) that the consultant had stitched
together for the monitoring period and placed on YouTube. It was able to clearly show not just water in the channel, but
actual flow (that is, until the new vegetation growth obscured the view). If you're interested, contact Kevin O'Briant with
KCI (Kevin.OBriant@kci.com).
Thanks again, and I look forward to our discussion at noon today.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David. E.Bailey2@usace.army.miI
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
-----Original Message -----
From: Brian Breissinger [mailto:Brian.Breissinger@timmons.com]
Sent: Wednesday, November 27, 2019 6:02 AM
To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue
<sue.homewood@ncdenr.gov>
Cc: John Fisher <John.Fisher@publix.com>; Jay Matey <Jay.Matey@timmons.com>
Subject: [Non-DoD Source] Draft Hydrology Monitoring Plan
Dave and Sue,
Please find attached draft monitoring plan for discussion this afternoon.
Thanks!
Brian Breissinger
Environmental Services Manager
TIMMONS GROUP I Blocked Blockedwww.timmons.com <BlockedBlockedhttp://intranet.timmons.com/marketing-
services/documents/www.timmons.com>
1001 Boulders Parkway, Suite 300 1 Richmond, VA 23225
Office: 804.200.6439 Fax: 804.560.1648
Mobile: 804.839.2645 brian.breissinger@timmons.com<maiIto: brian.breissinger@timmons.com>
Your Vision Achieved Through Ours