Loading...
HomeMy WebLinkAbout20160585 Ver 2_FB_Greenway_PlanSheets_20191211. 1 0 .90Lou i si a n a Av e.HaywoodRd.Haywood Rd. EdwardsSt.ClingmanAve.S.MeadowRd .Meadow Rd. Amboy Rd. Amboy Rd. Fairfax AvenueHominy Creek Smith MillCreek Creek Railway Sout he r nRail way SouthernRailway Swannanoa River Broad French River .01 HospitalMissionMemorial Hospital Health CareAston ParkBrevardRd.A ve.McDowell St.SouthsideAve.LodgeSt. BEGIN PROJECT END PROJECT 74A 70 25 240 WVWMWSSSSWSSROAD SOIL LINE DISTRIBUTION LINE DISTRIBUTIONLINEDISTRIBUTION LINE DISTRIBUTIO N 30' SEWER EASEMENT (TYP.)30' 30' S EW ER EAS E ME NT (TYP.)30'CONC. WALKSIGNCREEKCONC. WALKISLANDCONC. ISLANDCONC. COSSSSWVCOH YD WV SCOTSS30' SEWER EASEMENT (TYP.)30'TOP OF BANK 8 " SS 8" SS 8" SS 10" SS 48" SS 8" SS 8" SS 48" SS 8" SS 48" SS 48" SS R/WR /W R/WR/WR/W R/WR/W PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEER 039201 . J A O CB M BYERSSNURB .D MAH ARG 042574 SEAL A NILO RAC HTRO NLA NOISSEFO RPREENIGNEwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051VICINITY MAP 1 NORTH CAROLINA CITY OF ASHEVILLE GRAPHIC SCALES = = = DESIGN DATA PROJECT LENGTH 25 50 10050 25 50 10050 5 1010000 PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL) 0 00 LENGTH OF PROJECT = 20 INDEX OF SHEETS FRENCH BROAD WEST GREENWAY TO NEW BELGIUM BREWERY FROM FRENCH BROAD RIVER PARK LOCATION: -L1-1.14 MILES -L1- STA. 10+00.00 BEGIN CONSTRUCTION -L1- STA. 16+48.64 END -L1- CONSTRUCTION 4 5 6 7 8 9 AMBOY ROADHAYWOOD ROADMEADOW ROAD LYMAN STREET SIGNAGE, EROSION CONTROL DRAINAGE, & LANDSCAPING, GRADING, PAVING, RETAINING WALL, TYPE OF WORK: -L2REV3- -L2REV3- STA. 63+47.37 END CONSTRUCTION -L2REV3- STA. 9+88.21 BEGIN -L2REV3- CONSTRUCTION END PROJECT BEGIN PROJECT LIMITS ESTABLISHED USING METHOD II. CLEARING ON THIS PROJECT SHALL BE TO METHOD OF GRADING: RETAINING WALL #1 RETAINING WALL #2 TIP# U-5019B CITY OF ASHEVILLE PERMIT# 17-03455PZ & 17-03811FL CONSTRUCTION PLANSFUNC. CLASSIFICATION LEAN ANGLE DESIGN SPEED GREENWAY 15 DEGRESS 20 MPH CONSTRUCTION BY THE CITY OF ASHEVILLE THESE PLANS HAVE BEEN APPROVED FOR CROSS SECTIONSX1 THRU X37 INDEX OF CROSS SECTIONSXA RETAINING WALL PLANSW1 THRU W4 SIGNAGE PLANL300 PARKING LAYOUT PLANSL200 THRU L201 PLANTING PLANL100 STORMWATER PLANSSW-1 THRU SW-5 EROSION CONTROL PLANSEC-1 THRU EC-9 PLAN & PROFILE SHEETS4 THRU 9 SUMMARY SHEETS3 THRU 3D-1 TYPICAL SECTION & DETAILS2 THRU 2D3 NOTES1B THRU 1C STANDARD SYMBOLOGY SHEET1A TITLE1 1B GENERAL NOTESGENERAL NOTESGENERAL NOTES NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. THE CITY OF ASHEVILLE STANDARDS. ALL STORM DRAIN FRAMES, GRATES, AND HOODS SHALL BE STAMPED WITH IN ACCORDANCE WITH CITY OF ASHEVILLE TYPICAL GREENWAY CONSTRUCTION NOTES THE OWNER. DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE THE ENGINEER AND OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS VEGETATION ON BANKS AND WETLANDS SHOULD BE HAND CUT WITH ROOT MATS UNDISTURBED. ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED REPRESENTATIVE PRIOR TO CONSTRUCTION. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S ACCORDING TO DETAIL. CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF ASHEVILLE. EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO DURING CONSTRUCTION. THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER PIPING ARE IMMEDIATELY PUT INTO SERVICE. IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED TRAFFIC AWAY FROM HAZARDOUS AREAS. CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN CONSTRUCTION/SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL REPRESENTATIVE IMMEDIATELY. BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). REMOVED FROM THE SITE ON A DAILY BASIS. MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE ETC. THAT MAY BE REQUIRED. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES. TO BE REMOVED FROM REMAINING VEGETATION. INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. WHERE ASPHALT OR CONCRETE SECTIONS ARE REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. APPLICABLE REQUIREMENTS OF THE CITY OF ASHEVILLE STANDARD SPECIFICATIONS AND THE 2018 THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE WITH SIGNS THAT READ TRAIL CLOSED FOR CONSTRUCTION. THE CONTRACTOR SHALL ENSURE THAT ALL ACCESS POINTS LEADING TO THE TRAIL ARE POSTED 21. SAFETY RAILING SHALL BE LOCATED AS SHOWN ON PLANS. 20. THE EDGES OF PAVED TRAILS SHALL BE A MINIMUM OF 2' TO THE EDGE OF RAISED MANHOLES. 19. GATES OR BOLLARDS AS SHOWN ON THE PLANS. ALL TRAILS THAT INTERSECT WITH ROADS OR PARKING LOTS SHALL BE SECURED WITH STANDARD 18. TO PAVING. A MINIMUM OF 95% COMPACTION IS REQUIRED. PLACEMENT OF FABRIC AND 6’’ OF CRUSHED STONE. THE TRAIL SHALL ALSO BE PROOF ROLLED PRIOR THE ENGINEERING INSPECTOR SHALL INSPECT PROOF ROLL OF GREENWAY TRAIL PRIOR TO 17. UTILIZING THE TRAIL SHALL BE REMOVED DURING CONSTRUCTION. AS DIRECTED BY THE PARK PLANNER. DEAD TREES THAT PRESENT A DANGER TO PEDESTRIANS 5 FEET FROM THE OUTSIDE EDGE OF THE TRAIL. REMOVE DANGEROUS TREE LIMBS HANGING OVER TRAIL TREES SHALL BE LIMBED UP A VERTICAL DISTANCE OF 10 FEET FROM THE FOREST FLOOR, WITHIN 16. CLASS B RIP-RAP DISSIPATER WITH FILTER FABRIC SHALL BE INSTALLED AT THE PIPE OUT-FLOW. DRAINAGE CULVERTS SHALL BE CONCRETE AND HAVE A FLARED END SECTION ON BOTH ENDS. A 15. AND SLICK SPOTS ON GREENWAY TRAIL. ADDITIONAL CULVERTS WILL BE ADDED AS NEEDED DURING CONSTRUCTION TO PREVENT EROSION 14. CULVERTS. WATER ON EITHER SIDE OF THE TRAIL. INSTALL DIVERSION DITCH AS NEEDED TO DIRECT WATER TO GRADE SIDE SLOPES AND ADJACENT GROUND TO DRAIN. ENSURE THAT THERE IS NO STANDING 13. ALL DISTURBED AREAS SHALL BE SEEDED PER SPECIFICATION. 12. SIDE SLOPE SHALL BE 2:1 MAXIMUM AND 2% MINIMUM SLOPE EXCEPT WHERE OTHERWISE NOTED. 11. SHOWN ON THE PLANS AND CROSS-SECTIONS. TRAIL TO EXHIBIT 2% CROSS SLOPE TOWARDS CREEK OR LOW AREA, OR PER SUPER ELEVATIONS 10. PROPOSED PAVEMENT SHALL MEET EXISTING PAVEMENT FLUSH. 9. CONTRACTOR TO CALL FOR UTILITY LOCATIONS PRIOR TO CONSTRUCTION. 8. INSTALL REQUIRED EROSION CONTROL MEASURE PRIOR TO CONSTRUCTION. 7. ASHEVILLE SITE INSPECTOR. ERECT TREE PROTECTION FENCE ALONG LIMIT OF CONSTRUCTION FOR INSPECTION BY CITY OF 6. STAKED CENTERLINE OF THE TRAIL IS TO BE APPROVED BY THE CITY OF ASHEVILLE, 5. PLAN. THE TRAIL IS TO BE STAKED AT 50’ INTERVALS IN THE FIELD. CONTRACTOR SHALL RETAIN A PLS TO STAKE CENTERLINE OF THE TRAIL AS SHOWN ON THE LAYOUT 4. CONTRACTOR SHALL CONFINE CONSTRUCTION ACTIVITY WITHIN LIMITS OF CONSTRUCTION. 3. CONSTRUCTION MEETING. CONTRACTOR SHALL SUBMIT ANY AND ALL SHOP DRAWINGS BEFORE THE TIME OF OR AT THE PRE- 2. SPECIFICATIONS. TRAIL SHALL BE CONSTRUCTED PER PLANS AND ACCORDING TO ALL OTHER PERTINENT DETAILS AND 1.ANILO RAC HTRO NLA NOISSEFO RPREENIGNE047504 SEAL LLENOMOD .M CIR EPLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 2 J1 T PAVEMENT SCHEDULE V1 GEOTEXTILE SEPERATOR FABRIC PROPOSED 6" AGGREGATE BASE COURSE. EARTH MATERIAL. DETAILED INFORMATION. SEE PROJECT GEOTECH REPORT FOR MORE PERFORMED IN EACH LIFT BY A SOILS TECHNICIAN. OBTAINED, FIELD DENSITY TESTING SHOULD BE THAT THE SPECIFIED DEGREE OF COMPACTION IS STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE TEST. THE UPPER 12 INCHES OF THE STRUCTURAL FILL PROCTOR COMPACTION OPTIMUM MOISTURE AS DEFINED BY THE STANDARD DENSITY AND WITHIN 3 PERCENT OF THE COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY OF 8 INCHES OR LESS (LOOSE MEASURE), AND STRUCTURAL FILL SHOULD BE PLACED IN UNIFORM LIFTS A1 WELDED WIRE MESH. 4.5" PORTLAND CEMENT CONCRETE PAVEMENT WITH C1 229 LBS. PER SQ. YD. COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF PROP. APPROX. 2" ASPHALT CONCRETE SURFACE 480 LBS. PER SQ. YD. COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF PROP. APPROX. 4" ASPHALT CONCRETE SURFACE D1 TYPICAL SECTION NO. 2 HD 10' ASPHALT GREENWAY SECTION TYPICAL SECTION NO. 1 C1 J1V1 T T D1 2:1 MIN 0.02 0.02 VAR SEE X-SECTI ONSX-SECTI ONSVAR SEE0.02 5'5' CL 2' SHLD. C1 J1 V1 TT GRADE TO THIS LINE 2' SHLD. GRADE POINT 0.020.02 0.02 5'5' CL 2' SHLD. GRADE TO THIS LINE 2' SHLD. GRADE POINT -L2REV3- STA. 14+68.05 TO 25+00.00 -L2REV3- -L1-, -L2REV3-, -PL2- GROUND ORIGINAL GROUND ORIGINAL X-SECTIONSVAR SEE GROUND ORIGINAL 2:1 M IN VAR SEE X-SECTIONS GROUND ORIGINAL 0.02 0.02 BY CONTSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES DISTRUBED3. SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2. DIRECTION OF SLOPE. CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS FOR1. NOTES: LD TYPICAL 10' ASPHALT GREENWAY SECTION -PL2- STA. 10+00.00 TO 10+75.78 -L2REV3- STA. 9+88.21 TO 14+68.05 -L1- STA. 10+00.00 TO 15+60.00 AND SHEET 3D-1 DETAIL 12 SEE SWALE AND SHEET 3D-1 DETAIL 12 SEE SWALE SHEET 2C SEE DETAIL 1 AND 4 SAFETY RAIL* SHEET 2C SEE DETAIL 1 AND 4 SAFETY RAIL* WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE SEE CROSS-SECTIONSVARIABLE SLOPE GROUND ORIGINAL 4.5" A1 0.020.02 T COMPACTED SUBGRADE (95% MIN.) TYPICAL SECTION NO. 3 10' CONCRETE SECTION 0.02 5'5' CL 1' SHLD. GRADE TO THIS LINE GRADE POINT SHEET 2C SEE DETAIL 4 SAFETY RAIL* GROUND ORIGINALSEE CROSS-SECTI ONSVARI ABLE SLOPEVAR SEE X-SECTIONS GROUND ORIGINAL WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE 1' SHLD. 0.02 -L1-, -L2REV3- -L2REV3- STA. 63+15.00 TO 63+47.37 -L1- STA. 15+60.00 TO 16+48.62 PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERSNURB .D MAH ARG 042574 SEAL A NILO RAC HTRO NLA NOISSEFO RPREENIGNEwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 2A 0.02 T 18" 6" 12" 4.5" A1 0.020.02 T 6" COMPACTED SUBGRADE (95% MIN.) TYPICAL SECTION NO. 4 10' CONCRETE SECTION 0.02 VAR SEE X-SECTIONS2:1 MIN X-SECTI ONSVAR SEE5'5' CL 1' SHLD. GRADE TO THIS LINE 1' SHLD. GRADE POINT -L2REV3- 0.02 T 18" 6" 12" 4.5" A1 0.020.02 6" COMPACTED SUBGRADE (95% MIN.) TYPICAL SECTION NO. 6 10' CONCRETE SECTION 5'5' CL GRADE TO THIS LINE GRADE POINT -L2REV3- STA. 50+15.00 TO 53+24.00 -L2REV3- PAVE TO FACE OF WALL2:1S E E C RO S S -S E C T IO N S V A R IA B L E S LO P E 1' SHLD. VAR OR J1 T PAVEMENT SCHEDULE V1 GEOTEXTILE SEPERATOR FABRIC PROPOSED 6" AGGREGATE BASE COURSE. EARTH MATERIAL. DETAILED INFORMATION. SEE PROJECT GEOTECH REPORT FOR MORE PERFORMED IN EACH LIFT BY A SOILS TECHNICIAN. OBTAINED, FIELD DENSITY TESTING SHOULD BE THAT THE SPECIFIED DEGREE OF COMPACTION IS STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE TEST. THE UPPER 12 INCHES OF THE STRUCTURAL FILL PROCTOR COMPACTION OPTIMUM MOISTURE AS DEFINED BY THE STANDARD DENSITY AND WITHIN 3 PERCENT OF THE COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY OF 8 INCHES OR LESS (LOOSE MEASURE), AND STRUCTURAL FILL SHOULD BE PLACED IN UNIFORM LIFTS A1 WELDED WIRE MESH. 4.5" PORTLAND CEMENT CONCRETE PAVEMENT WITH C1 229 LBS. PER SQ. YD. COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF PROP. APPROX. 2" ASPHALT CONCRETE SURFACE 480 LBS. PER SQ. YD. COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF PROP. APPROX. 4" ASPHALT CONCRETE SURFACE D1 GROUND ORIGINAL GROUND ORIGINAL GROUND ORIGINAL GROUND ORIGINALVAR SEE X-SECTI ONSGROUND ORIGINAL GROUND ORIGINAL SHEETS W1 & W2) (SEE DETAILS & PROFILE HEIGHT VARIES. RETAINING WALL, #4 BARS @ 8" EW #4 BARS @ 8" EW TYPICAL SECTION NO. 5 BY CONTSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES DISTRUBED3. SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2. DIRECTION OF SLOPE. CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS FOR1. NOTES: **VARIES **VARIES -L2REV3- STA. 36+65.00 TO 38+85.00 **-L2REV3- STA. 36+55.00 TO 36+65.00 (SEE PLANS) **-L2REV3- STA. 38+85.00 TO 38+95.00 (SEE PLANS) 0.02 T 18" 6" 12" 4.5" A1 0.020.02 T 6" COMPACTED SUBGRADE (95% MIN.) 0.02 VAR SEE X-SECTIONS CL 1' SHLD. GRADE TO THIS LINE 1' SHLD. GRADE POINT -L2REV3- S E E C RO S S -S E C T IO N S VA R IA B L E S LO P E GROUND ORIGINAL GROUND ORIGINAL GROUND ORIGINALVAR SEE X-SECTI ONS#4 BARS @ 8" EW 4'4' 10' CONCRETE SECTION SEE CROSS-SECTIONSVARIABLE SLOPE GROUND ORIGINAL SEE CROSS-SECTI ONSVARI ABLE SLOPEAND SHEET 3D-1 DETAIL 12 SEE SWALE SHEET 2C SEE DETAIL 1 AND 4 SAFETY RAIL* WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE SHEET 2C SEE DETAIL 1 AND 4 SAFETY RAIL* SHEET 2C SEE DETAIL 1 AND 4 SAFETY RAIL* -L2REV3- STA. 53+24.00 TO 61+55.00 -L2REV3- STA. 38+95.00 TO 50+15.00 -L2REV3- STA. 25+00.00 TO 36+55.00 -L1- STA. 15+60.00 TO 16+48.62 PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERSNURB .D MAH ARG 042574 SEAL A NILO RAC HTRO NLA NOISSEFO RPREENIGNEwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 2B TYPICAL SECTION NO. 8 USE TYPICAL SECTION FOR THE FOLLOWING: 0.02 0.02 0.02 0.02 C1 V1 T T GRADE TO THIS LINE GRADE POINT 3:1 CL D1 11'11'18'18' -PL1- STALLS PARKING STALLS PARKING LANE DRIVING LANE DRIVING -PL1- STA. 10+35.80 TO 13+51.39 58' ASPHALT PARKING SECTION3:14.5" A1 0.020.02 T COMPACTED SUBGRADE (95% MIN.) TYPICAL SECTION NO. 7 10' CONCRETE SECTION 0.02 5'5' CL 1' SHLD. GRADE TO THIS LINE GRADE POINT -L2REV3- S E E C RO S S -S EC T IO N S VA R IA B L E S LO P E J1 T PAVEMENT SCHEDULE V1 GEOTEXTILE SEPERATOR FABRIC PROPOSED 6" AGGREGATE BASE COURSE. EARTH MATERIAL. DETAILED INFORMATION. SEE PROJECT GEOTECH REPORT FOR MORE PERFORMED IN EACH LIFT BY A SOILS TECHNICIAN. OBTAINED, FIELD DENSITY TESTING SHOULD BE THAT THE SPECIFIED DEGREE OF COMPACTION IS STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE TEST. THE UPPER 12 INCHES OF THE STRUCTURAL FILL PROCTOR COMPACTION OPTIMUM MOISTURE AS DEFINED BY THE STANDARD DENSITY AND WITHIN 3 PERCENT OF THE COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY OF 8 INCHES OR LESS (LOOSE MEASURE), AND STRUCTURAL FILL SHOULD BE PLACED IN UNIFORM LIFTS A1 WELDED WIRE MESH. 4.5" PORTLAND CEMENT CONCRETE PAVEMENT WITH C1 229 LBS. PER SQ. YD. COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF PROP. APPROX. 2" ASPHALT CONCRETE SURFACE 480 LBS. PER SQ. YD. COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF PROP. APPROX. 4" ASPHALT CONCRETE SURFACE D1 GROUND ORIGINAL GROUND ORIGINAL GROUND ORIGINAL SHEETS W1 & W2) (SEE DETAILS & PROFILE HEIGHT VARIES. RETAINING WALL, J1 BY CONTSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES DISTRUBED3. SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2. DIRECTION OF SLOPE. CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS FOR1. NOTES: WHERE INDICATED ON PLAN SHEETS USE STANDARD SPLIT-RAIL FENCE SLOPE ≥ 1:1 AND DROP OF 1' SLOPE ≥ 2:1 AND DROP OF 4' SLOPE ≥ 3:1 AND DROP OF 6' FOLLOWING CIRCUMSTANCES: *PROVIDE A SAFETY RAIL FOR THE SHEET 2C SEE DETAIL 4 SAFETY RAIL* -L2REV3- STA. 61+55.00 TO 62+00.00 PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERSNURB .D MAH ARG 042574 SEAL A NILO RAC HTRO NLA NOISSEFO RPREENIGNEwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 2C 5 STANDARD SAFETY RAIL4 DOUBLE GATE NTS ASPHALT TRAIL/ GREENWAY GREENWAY TYPICAL SIGN INSTALLATION U-CHANNEL POST 3' 2" 4"x4" POST 1'-0" #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE 2'-0"5'-0"2"1'-6"4" PREVENT THEFT/REMOVAL HARDWARE TO BE GALVANIZED AND FILED TO MOUNT SIGN TO POST TO NCDOT SPECS. ALL FOOTING, (TYP.) CLASS B CONC. DRAWING 904.50 AND BE INSTALLED PER NCDOT STANDARD MEET NCDOT AND MUTCD SIGN REQUIREMENTS, TRAFFIC AND SIGNS ALONG ROADWAYS SHALL 2.SIGNS ASSOCIATED WITH VEHICULAR 1. SEE PLANS FOR SIGN TYPE AND SIZE. NOTES: U-CHANNEL POST 3' 2" 4"x4" POST 1'-0" #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE 2'-0"5'-0"2"1'-6"4" PREVENT THEFT/REMOVAL HARDWARE TO BE GALVANIZED AND FILED TO MOUNT SIGN TO POST TO NCDOT SPECS. ALL FOOTING, (TYP.) CLASS B CONC. DRAWING 904.50 AND BE INSTALLED PER NCDOT STANDARD MEET NCDOT AND MUTCD SIGN REQUIREMENTS, TRAFFIC AND SIGNS ALONG ROADWAYS SHALL 2.SIGNS ASSOCIATED WITH VEHICULAR 1. SEE PLANS FOR SIGN TYPE AND SIZE. NOTES: TRANSVERSE EXPANSION JOINT JOINT FILLER 5" 1/2" : 1. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 40 FEET. NOTE GROOVE JOINT 5" 1/8" : NOTE GROOVE JOINT CONCRETE GREENWAY JOINTS GREENWAY TYPICAL SIGN INSTALLATION 1. PLACE GROOVE JOINTS EVERY 10'. 3 CONCRETE/ASPHALT TRAIL/ GREENWAY ANILO RAC HTRO NLA NOISSEFO RPREENIGNE047504 SEAL LLENOMOD .M CIR E 2) END POST SHALL BE TERMINAL POST. 1) ALL WOOD FOR SPLIT RAIL FENCE TO BE PRESSURE TREATED. :NOTES TAPERED TIPS TO MEET SLOTS 10' x 3.5" x 1.5" RAILS WITH 4.5" 6" 10" FRONT VIEW PERSPECTIVE VIEW 4.5" SLOTS 6" 10" 3'-10" 1'-6" 3.5" 10'-0" EXISTING SOIL CONCRETE FOOTING EXISTING GRADE POST RAIL RAI LSLOT 1'-3" POST (TYPICAL) POST END 1 STANDARD SPLIT-RAIL FENCE 2 SURFACE CONCRETE SURFACE CONCRETE SLEEVE POST PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 10 FT.1'SOLID YELLOW LINE 4" PAINT STRIPE -6'6'10'EDGE OF PAVEMENT TYPICAL BOLLARD PLACEMENT & PAVEMENT MARKING COLLAPSIBLE BOLLARD PERMANENT BOLLARD PERMANENT BOLLARD 2C-1 6 7 BOLLARDS ANILO RAC HTRO NLA NOISSEFO RPREENIGNE047504 SEAL LLENOMOD .M CIR E ACCESSIBLE PARKING SIGNAGE 8 NTS PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051 1975 197519 8 0 1980 19801980 198019801980 1980 1980198019801980 1 9 8 0 1980 1980 19801980198019801980198019801980198019 8 5 1985 1985 1985 1985 1985 1 9 8 5 1985 19851985199019901990 1990 1 9 9 0 19901995 1995 1995 2000 2000 2005 20052010 2015 PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051WVWMWSSW1 8 " RCP WOODEN FENCE GATE GATE CONC. PAD ANTENNA GATERIVERVIEW DR. (ASPHALT - R/W VARIES) AREA PARKING GRAVEL COLUMNS CONC. DRIVE ASPH. DRIVE ASPH. DRIVEGRAVEL INV.=1988.19'INV.=1990.30'TANKGATE GATE GATE8" SS 10" SS 48" SS 8" SS 48" SS 30' SEWER EASEMENT (TYP.)30'-PL1--PL2- PAVEMENT REMOVAL LD ASPHALT PAVEMENT CONCRETE PAVEMENT HD ASPHALT PAVEMENT 10 11 12 13 14 15 1,960 1,970 1,980 1,990 2,000 2,010 2,010 2,000 1,990 1,980 1,970 1,960 2,010 2,000 1,990 1,980 1,970 1,960 10 11 12 13 14 15 2,010 2,000 1,990 1,980 1,970 1,960 4A SCALE = 30' SEE SHEET 4FOR REFERENCE ONLY SEE SHEET 4FOR REFERENCE ONLY 15" EL. = 1979.47 -PL1- STA. 10+35.80 BEGIN GRADE EL. = 1985.56 -PL1- STA. 13+51.39 END GRADE (+)3.6556% (+)7.0000%(+)4.0000%(+)0.0000% PI = 10+51.00 EL = 1,980.02' VC = 30' PI = 10+89.00 EL = 1,982.68' VC = 46' PI = 11+60.89 EL = 1,985.56' VC = 50'(-)6.381% (-)2.00% (-)2.00% EL. = 1980.19 -PL2- STA. 10+75.78 TIE TO EXISTING GREENWAY END GRADE EL. = 1984.66 -PL2- STA. 10+00 TIE TO PROPOSED PARKING LOT BEGIN GRADE PI = 10+02.50 EL = 1,984.61' VC = 4' PI = 10+70.00 EL = 1,980.30' VC = 4' -PL2- -PL1-1111 TYPTYPTYP1118TYP18R=15R=40-PL2- PC Sta. 10+43.37 -PL2- PT Sta. 10+70.91 -PL2- POT Sta. 10+85.05 -PL1- POT Sta. 13+82.66 -PL1- PT Sta. 12+69.41 -PL1- PC Sta. 12+53.61 -PL1- PT Sta. 12+35.29 -PL1- PC Sta. 11+68.16 -PL1- PT Sta. 11+45.25 -PL1- PC Sta. 10+00.00 CONSTRUCTION ACCESS #1 -PL2- POT Sta. 10+00.00 -PL2- PC Sta. 10+05.00 -PL2- PT Sta. 10+18.12 R=10 R=10 TIE TO EXISTING -PL2- 10+75.78 EXIST GATE REMOVE CONSTRUCTION ACCESS #2 3 BOLLARDS INSTALL SET OF BMP #311 TIE TO EXISTING -PL1- 10+35.80 R=10 TO NEW SHOULDER RELOCATE SIGN R=6 RELOCATE SIGN ADJUST WATER VALVE EXIST GATE REMOVE EXISTING PAVEMENT SAWCUT AND PATCH PI Sta 10+77.71 D L = 145.25' T = 77.71' R = 165.00' PI Sta 12+02.30 D L = 67.12' T = 34.13' R = 150.00' PI Sta 12+66.83 D L = 14.73' T = 7.37' R = 602.09' PI Sta 10+11.81 D L = 13.12' T = 6.81' R = 19.73' PI Sta 10+57.71 D L = 27.54' T = 14.34' R = 40.00' -PL1- -PL2- 197019701970 19701970 197019701970 1970 1970 1970 19701975197519751975 19751975 1975197519751975197519751975197 51975 19751975 1975 1975 1980 1980 19801980 198019801 9 8 0 1980 1980 19801980 1980 19801980 198019851985 1 9 8 5 1985 1985 1985 1985 1985 198519851990 199019901990 1 9 9 0 199019901990 1990 1 99 0 1990199519951995 1995 1995 19951995 1 9 9 5 19951 99519952000200020002000 20002 0 0 020002000 2000 20002000200020002005200520052005 2005 20052005 2 0 1 0 20102 0 1 0 2010 2010201020102 0 1 0 201020102010201020102010 2015 2015201520152015 201520152015 2015202020202020 2020 20202020 2020 2 0 2 02020 20202025202520302035204020402045 PLANS PREPARED BY:PROJECT NO.: A15002.00GREENWAYFRENCH BROAD RIVERTRAIL ENGINEER HYDRAULIC ENGINEERwww.stewartinc.comT 919.380.8750Raleigh, NC 27603Suite 1100223 S. West Street,Firm License No. C-1051SCOSSSCOT6015' LT OFFSET EXISTING 15" SS LINE PRC Sta.58+40.15 PT Sta.58+93.57 PC Sta.59+10.51 PT Sta.59+40.82 PC Sta.60+17.63 PT Sta.60+34.13 PC Sta.60+78.11 PT Sta.61+03.40 PT Sta.62+09.81 5' RT OFFSET -L2REV3- 63+15.00 RETAINING WALL 2 END 5' RT OFFSET -L2REV3- 61+55.00 BEGIN STANDARD SAFTEY RAIL BEGIN RETAINING WALL 2 R/W NCDOT UNDER BRIDGE APPROX. 200' LONG NCDOT ENCROACHMENT CONCRETE BARRIER PROPOSED TEMPORARY CULVERT C5 PT Sta.61+59.99 PT Sta.63+33.39 POT Sta.63+44.62 PC Sta.62+84.10 ELEVATION ADJUST MANHOLE TRANSITION IN ALL DIRECTIONS. INTERSECTION TO PROVIDE SMOOTH GRADE TIE TO EXISTING GREENWAY AND RECONSTRUCT -L2REV3- 63+40 TO 63+48 21SY, SEE DETAIL 16 SHEET 2D STANDARD ROCK PLATING CL I RIP RAP -L2REV3- 61+75 TO 63+00 137SY, SEE DETAIL 16 SHEET 2D STANDARD ROCK PLATING CL I RIP RAP -L2REV3- 58+50 TO 60+00 129SY, SEE DETAIL 16 SHEET 2D STANDARD ROCK PLATING CL I RIP RAP HW BMP #7 ROAD SOIL GATE3 0' S EWER EAS EMENT (TYP.)30'DR13DIST. POLE DR14DIST. POLE 8' CHAIN-LINK W/BARBED WIRE FENCEGUY POLE SIGNCREEKDR17PDIST. POLE DWELLING1 STORY FRAME DR18PDIST. POLE BU ILD ING FRAME 1 STORY GUY POLE DR19PDIST. POLE 197119721971 19971969199819911 9 6 9 197419731971-L2REV3- PI STA. 58+00.84 D D L = 79.77' T = 40.46' R = 194.00' PI STA. 58+68.05 D D L = 53.42' T = 27.90' R = 75.00' PI STA. 59+25.87 D D L = 30.31' T = 15.36' R = 75.00' PI STA. 60+25.91 D D L = 16.50' T = 8.28' R = 75.00' PI STA. 60+90.79 D D L = 25.28' T = 12.68' R = 135.00' PI STA. 63+10.96 D D L = 49.29' T = 26.86' R = 50.00' PI STA. 61+85.19 D D L = 49.82' T = 25.20' R = 135.00' 9 1,960 1,970 1,980 1,990 2,000 58 59 60 61 62 63 64 1,950 1,950 1,960 1,970 1,980 1,990 2,000 65MATCHLINE -L2REV3- STA. 58+00.00 SEE SHEET 8-L2REV3- SCALE = 50' PAVEMENT REMOVAL LD ASPHALT PAVEMENT CONCRETE PAVEMENT HD ASPHALT PAVEMENTHAYWOOD RDC R A V E N S T FRENCH BROAD RIVER ANILO RAC HTRO NLA NOISSEFO RPREENIGNE LLENOMOD .M CIRE047504 SEALCCCCC C C C CCCCCCC C CCCCF F FF CCCF F F F FFFF CLEARANCE 32.2'+ VERT. 15" (+)0.4000%(+)0.4000% PI = 58+76.00 EL = 1,971.71' (+)0.4000%(-)0.6000% VC = 7' (-)0.6000% (+)8.0000%(+)2.0000%(+)5.0000%(-)6.0000% PI = 61+43.84 EL = 1,970.10' VC = 40' PI = 62+25.00 EL = 1,976.59' VC = 20' PI = 62+50.00 EL = 1,977.09' VC = 20' PI = 63+18.72 EL = 1,980.53' VC = 20' EL. = 1979.00 -L2REV3- STA. 63+44.21 TIE TO EXISTING GREENWAY END GRADE HAYWOOD RD. 00 1010 2020 3030 4040 5050 6060 707080 0 4/12/2019M:\Projects\2015\A15002.00_French_Broad_River_Greenway\Roadway\CorridorModeling\A15002.00_CMD_L2REV3_XPL_withL2REV4.dgnedomonell8/23/99PROJ. REFERENCE NO.SHEET NO. 1970 1970 1975 1975 1980 1980 1965 1965 59+00.00 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1965 1965 59+25.00 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 1965 1965 59+50.00 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1965 1965 59+75.00 1965 1965 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1960 1960 60+00.00 00 1010 2020 3030 4040 5050 6060 707080 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1965 196560+25.00 X-31A15002.000 -L2REV3- 5 10 1970.93 2.00% 1971.56 2:12:1 2:12:1 S.S.1971.28 S.S.1970.54 1970.94 2.00% 1971.41 2:12:1 3:1S.S.1972.31 3:1 1968.50 S.S.1971.16 1971.11 2.00% 1971.26 2:12:1 3:1S.S.1972.78 3:11968.50 S.S.1971.27 1970.76 2.00% 1971.11 2:12:1 3:1S.S.1973.17 3:11968.50 S.S.1970.91 1970.60 2.00% 1970.96 2:12:1 3:1S.S.1973.06 3:11968.50 S.S.1970.75 1971.21 2.00% 1970.81 2:12:1S.S.1970.94 S.S.1971.69 00 1010 2020 3030 4040 5050 606070 0 4/12/2019M:\Projects\2015\A15002.00_French_Broad_River_Greenway\Roadway\CorridorModeling\A15002.00_CMD_L2REV3_XPL_withL2REV4.dgnedomonell8/23/99PROJ. REFERENCE NO.SHEET NO. 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1970 1970 60+50.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1970 1970 60+75.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1970 1970 61+00.00 00 1010 2020 3030 4040 50506070 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1965 196561+25.00 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1965 196561+50.00 1970 1970 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1965 1965 61+75.00 X-32A15002.00 -L2REV3- 5 101:12.00% S.S.1972.93 S.S.1970.29 2.00% S.S.1970.70 S.S.1970.191:14 :1 2.00% S.S.1972.98 S.S.1970.06 1:12.00% S.S.1972.59 S.S.1970.08 4 :12.00% S.S.1971.00 S.S.1970.031:12.00% S.S.1975.26 00 1010 2020 3030 4040 5050 606070 0 4/12/2019M:\Projects\2015\A15002.00_French_Broad_River_Greenway\Roadway\CorridorModeling\A15002.00_CMD_L2REV3_XPL_withL2REV4.dgnedomonell8/23/99PROJ. REFERENCE NO.SHEET NO. 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1970 1970 62+00.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1970 1970 62+25.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1970 1970 62+50.00 00 1010 2020 3030 4040 50506070 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1970 1970 62+75.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 2005 2005 1970 1970 63+00.00 1975 1975 1980 1980 1985 1985 1990 1990 1995 1995 2000 2000 1970 1970 63+25.00 X-33A15002.00 -L2REV3- 5 10 4:1 2.00% S.S.1974.48 4:1 2.00% S.S.1975.55 4:1 2.00% S.S.1976.70 4:1 2.00% S.S.1978.10 4:1 2.00% S.S.1979.13 2:12.00% S.S.1974.10 S.S.1980.00