Loading...
HomeMy WebLinkAbout19990596 Ver 1_COMPLETE FILE_19990618State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director 1LF!?F'J AiK4?j 0 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES July 26, 1999 Brunswick County DWQ Project #990596 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS Mr. Daniel Cabe Division of Engineering Services NC Wildlife Resources Commission 512 N. Salisbury St. Raleigh NC 27604-1188 Dear Mr. Cabe: You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 2520 square feet of wetlands and dredge 378 square feet wetlands acres of wetlands acres of wetlands or waters for the purpose of constructing boat ramps, docks and shoreline stabilization under NC 130 bridge in Holden Beach as, described in your application dated 8 June, 1999. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Water shed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. DWQ shall be sent three copies of the wetland mitigation monitoring report. Monitoring shall be for a five (5) year period after construction. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. prrr_S'tevel'?" Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DWQ Regional Office John Domey Central Files Ron Ferrell, WRP 990596.1tr Division of Water Quality • Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: J. Steenhuis WO Supervisor: Bock Shaver Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NC WRC Project Number 99 0596 Recvd From DCM Received Date 6/8/99 Recvd By Region Project Type boat ramps County Brunswick County2 Region Wilmington Certificates Stream Stream Impacts (ft.) Class Permit Wetland Wetland Wetland Stream Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA F__O Y O N F__ 15-25 SA ?- 30,759. F-F- ?- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y O N Recommendation: 0 Issue 0 Issue/fond 0 Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: That the pro?pr't be done in such a manner so as to not cause turbidity outside the immediate onstn ction area to exceed 25 NTi 1_ This office would like to be copied on the mitigation monitoring construction- reports cc: Regional Office Page Number 1 Central Office .. cc V J y • ?y? d , N?'rNat?v 1401-J? 2 .c-0 _ (BAR 191999 o `? ,. y,?• D,IVISiuw uF _ 1 \ o O COASTAL MA14AGEMENT • ?" `3? q SO' ld ~ Z O F; - • ??. \ \ ?? ? SC?y`9 N3?'10? z \\ W ;?:' ,v?.i`•s ?t- tom/ i i : ..,;k+ ?:. ?' F . - i _,.. Y? c d r Ix ' ' r p u "v Cx.1 I - _ - 7 I Z ' W } k r ><Y = w y p- a io ( \ , ,?. of :, ??. # z • ? Y { Lail .,. } ea i•q+i' A,yr R w Lam- i• ? vk- ej 'ell Sir oo- is J Facility Name NC WRC Project Number 99 0596 Comments (continued from page 1): County Brunswick Regional Contact: J. Steenhuis Date: 6/30/99 cc: Regional Office Page Number 2 Central Office State of North Carolina Department of Environment arM Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director 1?• =Now NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES June 9, 1999 NC Wildlife Resources Commission 512 N. Salisbury Street Raleigh, NC 27604 Dear Sirs: Subject: Boat ramp DWQ # 990596 Brunswick County On June 8, 1999, your application for a 401 Water Quality Certification for replacing existing boat ramps in Brunswick County was received by the N.C. Division of Water Quality. The Division will begin to review the project for eventual decision. However, please be aware that beginning January 1, 1999 that the N.C. General Assembly passed legislation requiring payment of a fee of $200.00 for this project. The 401 Certification cannot be issued until this fee is paid. Until that time, your application will remain on hold as incomplete. Please call Cyndi Bell at 919-733-1786 if you have any questions. rnR. ly cc: Central Files Wilmington DWQ Regional Office Wilmington Field Office US Army Corps of Engineers Cyndi Bell John Dorney Wetlands/401 Unit 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT' S NAME: NC Wildlife Resource Commission 2. LOCATION OF PROJECT SITE: Under NC 130 High Rise Bridge on South Shore Drive in Holden beach in Brunswick County Photo Index -1Q9?: Photo 4-39 gr Q,R, 4,5 1989:Photo 184-28 gr I, 4 1984: Photo 7-47 gr 1,6 State Plane Coordinates - X: 2222200 Y: 61200 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Date of Site Visit - 4-13-99 and 5-28-99 Was Applicant Present- Yes 5. PROCESSING PROCEDURE: Application Received Complete- 5-28-99 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Holden Beach 1997 Land Use Plan Update Land Classification From LUP - Developed (B) AEC(s) Involved: PT,EW,FS CW (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - NSA Planned - N/A (F) Type of Structures: Existing - 14' X 80' boat ramp with dock and bulkhead Planned - Replace existing structures with twol4' X 100' boat launching ramps with five 8' X 16' floating dock units between the ramps and a vinyl sheet piling retaining wall (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] Tli??'iTlr_Fil M" T U" nrr+TTrr (A) Vegetated Wetlands Approx. 378 sq. ft. (B) Area Below Mean High Water Am=, 2520 (C) High Ground Area Approx. 1080 s . ft. Grading of 21,600 s .ft. W] Luau area Listurnea: L:),Luu sq. It. (Vegetated wetlands are incorporated in this figure) (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes 8. PROJECT SUND4ARY: Applicant proposes to replace existing boat ramp with two 14' X 100' boat ramps and five floating dock units at 8' X 16' each and extending perpendicularly to the shore between the proposed ramps. Also proposes vinyl sheet piling wall on each side of the ramps. Page 2 NC Wildlife Resource Commission 9. PROTECT DESCTPTT[lty The project site is located under NC Hwy 130 Holden Beach High Rise Bridge on the south side of the AIWW. The site is on South Shore Drive immediately west of Capt. Pete's Seafood on Holden Beach in Brunswick County, NC. It is an existing public boat launching facility with associated parking. The size of the entire tract is 0.55 acres and it consists mostly of a gravel parking lot with very little vegetation. Manmade features on the tract include the single concrete boat ramp with a fixed dock and a wooden bulkhead along the waterward boundary of the property. The area waterward of the bulkhead and on both sides of the existing boat ramp is sparsely inundated with Spartina altem flora. The adjacent waters of the Atlantic Intracoastal Waterway are open to the harvest of shellfish and classified as SA waters by the NC Division of Environmental Management. It is not a primary nursery area. The NC Wildlife Resource Commission proposes to replace the single boat ramp and fixed dock with two 14' X 100' concrete boat ramps. The applicant proposes an eight-foot wide area between the length of the ramps in which a concrete walkway and floating dock system are planned. The concrete walkway will extend from mean high water to 14 feet landward whereas the floating dock system will extend from mean high water to eighty feet waterward to the end of the proposed ramps. The floating dock system will consist of five units with dimensions of 16' long by 8' wide. The applicant proposes to remove the existing boat ramp before constructing the news ramps and to also subgrade'the area in preparation for the proposed new ramps. The subgrading and construction of the new ramps will involve the excavation of approximately 436 cu. yds. of material from below mean high water and approximately 118 cu. yds. from above mean high water. It will also involve the placement of approximately 200 cu. yds. of fill below mean high water. These actions will result in the loss of approximately 378 square feet of Spartina alter flora marsh area (14' X 27'). The applicant has secured a 50' X 50' site from the Town of Holden Beach for the disposal of the excavated material. The disposal site is a completely high ground site located approximately 0.5 miles from the project area. The spoil, which is expected to be clean sand, concrete and stone, will be contained within a silt fence enclosure. The applicant is proposing no upland development except the grading of the existing 21,600 sq. ft. parking lot. In order to lessen runoff from the parking lot, the applicant is proposing a-grassed area between the parldng lot and the bulkhead which will allow for seepage of the runoff into a sand and stone backfill area landward of the bulkhead. The runoff will then be allowed to pass through weep holes within the bulkhead. Since construction of ramps and floating docks will involve the filling of approximately 378 square feet of coastal wetlands, an act which is contrary to the rules and regulations of the Coastal Area Management Act, the applicant is proposing to mitigate the loss of wetlands by creating new vegetated wetlands at a nearby site. The site is owned by the NC Department of Transportation and is located adjacent to the AIWW in their right of way under the old drawbridge. In consultation with Kelly Williams, Wetland Restoration Specialist for the Division, a plan has been developed whereas: 1. The area in the vicinity of the boat ramp will be planted with newly purchased Spartina altem flora sprigs in an attempt to create at least a one to one ratio of wetland loss versus wetland gain. In addition, plants from the disturbed area will be transplanted to the fullest extent practicable. 2. A nearby stormwater culvert which has created a scouring effect will be lengthened and lowered so as to discharge below mean low water. The scoured area will also be repaired. 3.1he applicant will monitor the replanted area for success at least once a year for a minimum of , three years or until success occurs (whichever is longer). A coverage of at least 85 % of a reference area of the planted species would be considered successful re-vegetation. 4. Applicant will submit an annual monitoring report to DCM which will provide information on the success of the planted area and stormwater outfall culvert. Photo documentation should be included. In order to achieve: best planting results, a site visit with Tracy Skrabel with the NC Coastal Federation was conducted on May 28, 1999, whereas, she provided specific information on planting methods, plant sources and monitoring techniques. The applicant has agreed to utilize the information supplied by Ms. Skrabel. The applicant has also obtained permission from the Town of Holden Beach to rework the stormwater outfall culvert and from the NC DOT to utilize their right of way beneath the old drawbridge for mitigation. 10. AhMCIPA D MWA T The new boat ramps and floating docks will incorporate approximately 2,520 sq. ft. of estuarine and public trust waters, an increase of approximately 1400 sq. ft. of what the existing structures now incorporate. As proposed, the project will cause the excavation of approximately 436 cu. yds. of material below water level and approximately 118 cu. yds. of high ground excavation. There would be some short term turbidity associated with the removal and installation of the ramps and docks and vinyl sheet piling retaining wall, but no long term impacts are anticipated. The project will also involve the placement of approximately 200 cu. yds. of fill below mean high water and the loss of approximately 378 square feet of a Spartina alterniflora wetland. Because of the projected public benefit of the project, the applicant has been allowed to propose mffigation for the loss of wetland by presenting a plan to create vegetated wetlands at a nearby site and to correct a scouring problem created by a stormwater outfall culvert. If properly conducted and maintained, the mitigation activities should provide at least a one to one ratio of wetland loss to wetland creation. The project as proposed is consistent with the Holden Beach Land Use Plan. Since the existing site is the only public boat ramp within miles of Holden Beach, the facility should provide a much needed community and public boating access to estuarine waters and should decrease the need for private boat ramps. Submitted by: Jerry A. Parker Date: 6-3-99 Office: Wilmington Form DCM-MP-1 APPLICATIONvuLm-'4anky'm (To be completed by all applicants) 6 MAR 191999 1. APPLICANT a. Landowner: Name NC Wildlife Resources Commission Address 512 N Salisbury Street City Raleigh State zip 27604 Day Phone 919 715-3155 Fax 919 715-2380 b. Authorized Agent: Name Address City. Zip Fax Day Phone D!V1 Si.,-- o F ' OASTAL MANAGEMENT c. - Street address or secondary road number South Shore Drive d. Is the proposed work within the city limits or planning jurisdiction? X Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Atlantic Intracoastal Waterway 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Construction of a boat launching facility. Consisting of removing the existing bulkhead, ramp, and dock Proposed construction will consist of excavation for and construction of two ramps, State a bulkhead, one floating dock, and regradmg the parking area b. Is the proposed activity maintenance of an existing project, new work, or both? Both C. Project name (if any) Holden Beach Boating Access Area NOTE. Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Brunswick b. City, town, community, or landmark Holden Beach, Under NC 130 High rise Bridge C. Will the project be public, private or commercial use? Public a. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. The purpose of tbis project is to replace an intracoastal waterway access area that has deteriorated beyond repair. Operations will include removing old stn ctire, washing in sheet piling, concrete fomvng, and dock installation. Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 0.55 acres Size 'of individual lot(s) N/A C. Approximate elevation of tract above MHW or NWL 3'+/- d. Soil type(s) and texture(s) on tract Compacted stone (parking area) Sand e. Vegetation on tract Grass between post and cable and existing bulkhead, strip of marsh grass waterward of bulkhead £ Man-made features now on tract launch ramp, wooden fixed dock, bulkhead, stone parking area, and bridge g. What is the CAMA Land Use Plan land classification of the site? (Consult the local use plan) X Conservation Transitional X Developed Community Rural Other h. How is the tract zoned by local government? Commercial i. Is the proposed project consistent with applicable zoning? X Yes No (attach zoning compliance certificate, if applicable) - Has a professional archaeological assessment been done for the tract? Yes X No if yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on site? X Yes No Coastal (marsh) X Yes No if yes, has a delineation been conducted? No (attach documentation, if available) m. Describe existing wastewater treatment facilities. N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) surface runoff is directed to grassed area behind bulkhead o. Describe existing drinking water supply source. N/A 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acrgeptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) numbers, Ian 11rA >F orm DCM-MP-R R 191999 DIVI&----, -r' COASTAL MANAGEMENT • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Captain Petes Seafood Inc. . Address 101 South Shore Drive Holden Beach, NC 28462 Phone Name Holden Beach Enterprises Inc. Address 109 South Shore Drive Holden Beach, NC 28462 Phone Name Town of Holden Beach Address Rothschild Street Holden Beach, NC 28462 Phone A list of previous state or federal permits issued for work on this project tract. Include permit numbers, permittee, and issuing dates. NC Coastal Resources Commission # 238-88, NC Wildlife Resource Conm+tecion 12-6-88 • A check for $250.00 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environment Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 12 day of i March , 19 99 Print Name Daniel E Cabe Signature Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information X DCM MP-3 Upland Development X DCM MP-4 Structures DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. V ???E ?? MAR 19 7999 DlVISiu jF COASTAL MANAGEMENT Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities All values to be given in feet. MAR 191999 DIVISi",- or COASTAL MA14AGEMENT 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards 436 cu yds b. Type of material to be excavated sand Average Final Existing Project Access channel (MHW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (excluding shoreline stabilization) Length Width Depth Depth 97.5 46.0 1.0 4.0 fi 4 S C. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAV's) or other wetlands. X Yes No d. Highground excavation in cubic yards 118 cu yds 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area Town ofHolden Beach lot at the end of Rothschild Street b. Dimensions of disposal area 50'x50' C. Do you claim title to the disposal area? Yes X No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? Yes X No If yes, where? Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAV's, or other wetlands? Yes X No f. Does the disposal area include any area in the water? Yes X No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization X Bulkhead Riprap b. Length 100' C. Average distance waterward of MHW or NWL 0.0' d. Maximum distance waterward of MHW or NWL . 0.0' e. Shoreline erosion during preceding 12 months None. (source of information): observation of existing bulkhead f. Type of bulkhead or riprap material Vinyl Sheet Piling g. Amount of fill in cubic yards to be placed below water level (1) Riprap N/A (2) Bulkhead backfill 0.0 cu yds h. Type of fill material #57 Stone, Graded sand i. Source of fill material Aggregate producers 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) (1) Amount of fill to be placed in the water 200 cu yds (2) Dimensions of fill area 2'x36'x100' (3) Purpose of fill subgrade preparation and launch ramps b. Will the fill material be placed in coastal wetlands (marsh), SAV's, or other wetlands? X Yes No If yes, (1) Dimensions of fill area 14'x27' (2) Purpose of fill subgrade preparation and launch ramps 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled Excavated material will be transported .5 mile to the disposal site and contained, until dry, in a silt fence enclosure. Fill will be clean stone, sand, and concrete b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Bulldozer, backhoe, excavator b. Will wetlands be crossed in transporting equipment to project site? Yes X No if yes, explain steps that will be taken to lessen environmental impacts. NC Wildlife Resources Commission a. Will fill material be brought to site? X Yes No ?try _ 1 1999 If yes, COASTr,?i ?v. ,,.^aEMENT Applicant or Project Name Signature L/ 7,17 Date ' Form DCM-MP-3 UPLAND DEVELOPMENT F 'D MAR 191999 DIVISluiv OF COASTAL MA14AGEMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted a. Type and number of buildings, facilities, units, or i. Describe proposed method of sewage disposal. structures proposed N/A N/A b. Number of lots or parcels j. Have the facilities described in item i. above received state or local approval (attach appropriate documentation) C. Density (give the number of residential and the units per acre) k. Describe location and type of proposed discharges to waters of the state (or example, surface runoff, sanitary wastewater, industrial/commercial effluent, d. Size of area to be graded, filled, or disturbed including "wash down" and residential discharges). roads, ditches, etc. 21,600 sq. ft Surface mnoff from parking area is passed through grassed area behind bulkhead Tke surface run off will then pass through sand and stone backfill then out weep holes e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must 1. Describe proposed drinking water supply source (e.g. receive an erosion and sedimentation 4ontrol plan at well, community, public system, etc.) least 30 days before land disturbing activity begins. N/A If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land in. Will water be impounded? Yes X No Resources? Yes X No If yes, how many acres? If yes, date submitted n. If the project was an oceanfront development, when f. List the materials (such as marl, paver stone, asphalt, was the lot(s) platted and recorded? or concrete) to be used for paved surfaces. NC Wildlife Resource Commission Applicant or Project Name g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an signature Outstanding Resource Water, to be covered by ,3 impervious and/or built upon surfaces, such as Date / pavement, buildings, rooftops, or to be used for vehicular driveways or parking 64% Form DCM-MP-4 STRUCTURES (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major e Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Dock(s) and/pier(s) (1) Commercial X Community _ Private (2) Number 1 floating dock (3) Length 80' (4) Width 8' (5) Finger Piers Yes X No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes X No (i) Number (ii) Length (iii) Width (7) Number of slips proposed N/A (8) Proximity of structure to adjacent riparian property lines 105' (9) Width of water body 330' (10 Water depth at waterward end of piex at MHW or NWL 9.3' BelowNMW b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) N/A (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL, or wetlands D ZOMIIV)-R? MAR 191999 DIVISI,.,IV OF COASTAL MANAGEMENT Mooring Buoys N/A (1) _ Commercial _ Community (2) Number (3) Description of Buoy (Color, inscription, size, anchor, etc.; (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Mooring structure (boatlift, mooring pilings, etc.) N/A (1) Commercial Community Private (2) Number (3) Length (4) Width g Other (Give complete Description) NC Wildlife Resource Commission Applicant or Project Name Signature Date ' Private (3) Maximum distance beyond MHW, NWL, or wetlands z Z LLI w Q • r?? V.1 O c n U cn ? - V, CY) O nW W T Lij J •? 0 ¦Ocn .? O ? rn Q) N cD d ?° x N / O o x o ? v N (a Q) O ? x . o U Q Q to o Q a s U , + N a o c Q E N II o s U o E o j w 3 Q c L Q Q c cr O c Q) - o , L E ii U '3 0 C) t? - c o m c O p ` 0 w w E w m +? o E ° a- U "- o c o_ ( a o U O +J N C C N° N C: U n Q) Q) (D C E N p o N O m ?/ 4 W > ? c W L o ` >1 ? o a N E n c +? -- N x E W ? U 5 a o O u N N v U U LL Vj Q. C Q T C: 0 o n (n V) 0 -? ?-; Q o + N -+ - U) U) ?ooa- C >? aa? 04- o o o w a c)- X lij n .1 .4-j 4-j N N N 4-j -1-j N N N N Q) N N Cn (n (n • (n (n f' { K R N o ?QulmToN r H ? 4 x P, ?? ? O ? ? 26 . So 2 U C y ind.O- r.-I > p " a 'a31143srMa i t wA r' a v r rn • H 0 0 0 0 0 io O U 0 -0 C v 0 •-F_-_ C c c 0 0 Q U U a) M C a) L 0 r 0 C 0 I- w C!y ? ? p ?Q -4 0 0 1.7 miles L' Atlontic Ocean . rl- a) LO x I 4x o Lo I I O ui x ?x i O rj x L I O O I co ?x I .-x ci x `n x I CP X L• uj 0 I +M x4 I -4 -x m ?- Ln a O N S cA O a) d U 0 o m C O (3) 0.1 _ _o 00 CY) N R? c o ?a a II ? c rn 0 O b w O o C 0 U > V) Cc$ .° p O a) p m N ? W o U i aT 0 W 01 0 ? 0 z O •U = 0 N m L "" N N J In do 4 ri ? ? 4iv tL +? y? x x- x- :+ 1x x! C 00 WU cu ?x v° ^ _0 _ c 0 L Q) m x I in Tc ? O J Q Ud : ? T ? . t a) 1 O1 x ° ,09 o- ? v c aul-I ?C?aadoad Ox CL Q / a O 00 Q) U C 0 L 0 CD U 0 / U L a) n? A ? U) a. aa) O 0 V O a. Q cy i O 0 C ? W O i0 'o w o Sri 3.- `,00c?oy O 7 .. O O O U 0 r Ly x . W Z0 a wa,-°a V) N M i CZ L Q _ a) Q? U) U L C U- 0N UU m cn ca (U L OC =W ?J 2 3 r ? c ? O c ? 3 y D c m O U :n x tn - s rn c o v J 2 O O « m ` n. °_ =O Y _ _ N 0 N O W 7 ? +' O O x x I ? I M x '? I ? O ? Q O ' i x x LLJ '1- LLJ U O 0 Q V) 1.7 m$es 0 ocean O o Atlantic u 3 +-? a• - C ? 3 U Q) C C x a 0 LO ++ C o x I 4x Q U ao L I I o Ln X LO ?x I to .fx d x 1 I O` U o rn ' c 0 N m Q) J m CL - D o %.- 0 0- 0 3 o aul? Avadoad tc) I- d x Q / OL O :Q?? O ? C O I ff7 Q m O c ? O 00- (1) _C a. 0 a I -ice L (n a) M -0 a a) O 0 U O a. Q cy- v N C O v o ?O .. - v II O 0,6 m C tfj U 3 a U) :.2 T D o m y c :% - O 0 0 0 E V C N > > 7 C Ln j W 0 to 00 0 0w 0 0- v 0. X< 0 ?- CL N M 1 i c 0 C: .0 N Ln a Q) j $ • u O to ? L p v U Q co U V N Q rn cn c 4 ? -0 'D O C) Ql CV C o$ N 4- U 2 r? II O C U u O C M cn C U Cd, y_ O O (3) C M N O D cd o U N A LLI S2 wo W O O U z = o L.L vN N m N L 0 Q a) U) -a--? O O O U n U- O U) Q) a) m cn C a) L a) 0c = LLJ 0 3 c 0 c y m O N, O O O G7 0 3 3 _ o N O U x c 0 -0 o IV 'a >1 c 0 a 03 0- c c r_ M 0) >. 0 U) CL 4) 0 o w :3 ° o ? O n l a m a_ cn m 0 m a_ W I I I x n l 1 1 x W I x I I 1 ? I I D O ? Q O x I I ? 1 x -o 74 LL; (? C- LLI IL c.?„ ? rrt O 1 y i. a, c ? ? a E t c a (n c L s a?i a cr 5, c 41 c ? >ry N r N u o ? o ° w N-) Ln a Q E v > o r3 U) U U Q u E CD N - C CA C C: -51 U 0 (n 1 W -C -d W m o O (D c? O L p D x J c O cd • u 0 > O C), 03 C O N ? •> m ? N p 0 ? ? ? ,n [- ? U U o o c o o , Ln ao o O p z = U ° O I r U U LO v d o o o o`. 1+•3 O. 71.5 0 N O N ?, O O O Y T D 0 C: 1 j aJ Y o C N U) •=L O r U -r I D %.- cu m u ` LO U a- U C \ '36A ' I O I x _ x f -00 1 J I N -' p?L au!? I Q ? 0 °' ° 4.1 N ? 3r o Qi pi 7 'O O J = m N N _0 C C: U) -o o U ? O O Q m ?o n1 ? `1J . a Ii O I 0 o Lri 0 cy- LL. ° Q) cn T ? o 0 0 0 0 2 E I - LL- x o a O za)a?`'°v a (nlJa F°-?" Q I r N I O cfl O I'7 II O r a? 0 U (n 0. C O N J ? a >, N a O +, L CL ° CO u 4 Cr) L ?`_ q7 .9 Q 3 N ? r ?d U N 3 Cl- U 4 >+ - - rg un II ao rU N IC"?_1 W O i II O O .fa C7 II U -) ON 7 C D ?. s a U Ui C :p U 3 II U p II 02 O. dd xU1.0d 3 II c: i L 0 O c d x n d 0'd d (U O Ul ¢ N - L UW a a NU > U xt O O W 4_ O L Q d u W d 0 d d U 6A {+¢ O 4- 0 C CU W 4- c d ~ L, O£ 0 . 0 i X ¢? UW > d d 0 d 3 }+ Y4- d. 3 0 Iv W 4- S- X Si N d s- 0 <Ww > d d 3 O O Lj U i N O d 3 0 N t,XJI0Q> cs d 3 U L N W La- Q > O O 4 -4 -A .-4 4 VI LC) a M in > 0 (Q l V v o) d cn u C 01 s-4 cn Ql O c Nk < C: 0 ol , c 0 N N CM 0 C: n 'Cy LL Co Q C -C U Q > O N ? Q) CD N ? / L1- U z Li 71.5 I N I O O A ?16x'ti N LJ? '0 U0 0 a. v¢ O 1 0 Lp m W I O Q ? I _ ? M V ??? I II I 1 ' / O 1 V) a ? C ?C aad°?d ?` ? C 1 0 ? a ? cr- ) o cu 3: o ?, o Q1 J J = j 0 -0 >N CL CO N =? pi -C CL 0 c N U Y 0 L .• a? g Q Lij :3 cc ? ? m d. n l ? 1 I ? I W I I I ? ? I I Q ? I I N I- S U d O C ,a -F+ ?O ~ d x m 4f Ln i W J L W A o ??? t77 o P d 01) LL //i?j W O ?, 'V1 V O O O iL,Ji T -,/ In o a d ; 3 D ?2?i ? ? M W W d C /? `? '2 3 O O 0 d?f O U y .T_? I a N O.__j I ( M L O wajr/ N N 4A G C , L?.J I O bOW U Y Y 1 U` H 6 b N 6 y V T C in >. CIl1 N d O d 0 a J(, s?jd I JUaV Fu zo N:-. I N?o .O. 1 I N y D p, a 7 V U N Imo' Y 11 11 ? C 0 n u d o duo b a D N > C N d ? O % W O U Y b C p - L c Ub x D a>7 m C0 d O cc a 66 oL L 7 CL W O O O N a 0 r? N .d+ Ny c Oyr u `N .cln Jus to :3 0 0 a? 4- 0 n c c c NY 7 O' U N ^ Y m N M'r EOW o[uo Lm, b d D N > C N d O CiJW Y b o >dm s G - x > ? r d O °L a N u ai j c7 a n I C) r 0 m v 5 ?o ` 9L (L YID a r OI r d ce N .?W r _ ?Y O I ?OL?6 8 m' O? n f W 0 !. O O a 4 P O.W O L. [ C3 as O aoe N 0 Q 0 0 w 0 Nh ? Y 0 U `N C - J U ? J N Ln () 4- 0 n O N c n O II •- o L? 0 0 U n O b b Y N a N O ObC C = D O C 7 y I- N Y 6 t m ?'o a c6 L . y U N O D d s O.u .o .o cur r a d ;S C- i do Up N f ANN ?a, x H11 I J t7 4, C O t >. 0 d y y yl J H Y U d c da d J H d y N N 1r O U D N m D r .. ON u du Y O La7 d CL bL ?k m $ 7 In u N l u + Ln 0 0 Y y ?y ® North Carolina Wildlife Resources Commissc 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director June 17, 1999 John Dorney NC DENR Division of Water Quality Wetlands/401 Unit , PAYMENT 4401 Reedy Creek Road Raleigh, NC 27607 RECEIVED Re: 401 Certification Project No. DWQ# 990596 Dear Mr. Dorney: i On June 15, 1999 I received your letter concerning our proposed renovations to the Holden Beach Boating Access Area. Your letter stated that our application for a 401 Water Quality Certification was incomplete. Please find enclosed a check for $200.00 to complete our application. If you have any questions or concerns please contact me at (919) 715-3155 x282. Sincerely, Daniel E. Cabe, PE Facility Engineer Division of Engineering Services Enclosures DEC/dec