Loading...
HomeMy WebLinkAbout19990589 Ver 1_COMPLETE FILE_19990607State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director MEMORANDUM NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES August 6, 1999 TO: Doug Huggett, DCM FROM: John Domey, DWQ CAL, "IT, 3-1f RE: Water Quality Comments Rose Craft Marina Project Carteret County DWQ Project # 990589 DWQ has no objections to the project plans to add one dock, remove three slips and add 23 new slips. DWQ believes that the total number of slips should be limited so as not to result in closure of these shellfish waters. Also a pump out facility should be constructed with proper signage at this facility. Please call me at 733-9646 if you have any questions. Cc: WIlmington DWQ Regional Office John Dorney Central Files 990589.dcm Division of Water Quality • Environmental Sciences Branch Enviro. Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 9 50% recycled/10% post consumer paper Re: Rose Craft Marina #990589-Carteret Subject: Re: Rose Craft Marina #990589-Carteret Date: Mon, 26 Jul 1999 10:21:10 -0500 From: "JoAnne Steenhuis" <joanne_steenhuis@wiro.enr.state. nc.us> Organization: wiro.enr.state.nc.us To: "Eric Fleek" <eric fleek@h2o.enr.state.nc.us> Eric, The proj e 5c obj ectioi t4L quality around i+ availabl, Joanne RIO 11 r Aidn , r f I VA l \ 0 OJAI r --? ve??u2 ?crG/ 1 of 1 7/26/99 10:44 AM MEMORANDUM: TO: DOUG HUGGETT FROM: CHARLES PIGOTT SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT - ROSE CRAFT MARINA, CARTERET COUNTY DATE: June 3, 1999 I would recommend that the number of slips allowed by Rose Craft Marina be limited to 23 additional or 39 total slips. I also offer the following comments and recommendations: 1. Prior to occupancy of any new slips authorized under this permit, a marina pumpout sewage disposal facility will be installed and operable, and, maintained for the life of the marina. .2. The marina will display a sign showing the location of the location of the onsite pumpout facility, including other appropriate waste disposal information, at the entrance and exit from the main piers. 3. No sewage, whether treated or untreated, shall be discharged at any time from boats using the marina. Any sewage discharge at the facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4 This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this marina without permit modification. No non- water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. .5. The piers, mooring pilings and associated structures shall have a minimum setback distance of 15' between any parts of the structure and the adjacent property lines as extended perpendicular to the channel into the water at the points where they intersect the shoreline. Comments & Recommendations Rose Craft Marina/ Harkers Island, Carteret County Page # 2 6. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7. NOTE: The permittee and/or his contractor is urged to meet with DCM & COE prior to project initiation. 8. NOTE: Future development on the permittee's property may require a modification of this permit. Contact a representative of this Division at (252) 808- 2808 prior to commencement of any such activity for this determination. cc: M. Ted Tyndall, District Manager Jeff Richter, COE DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Rose Craft Marina 2. LOCATION OF PROJECT SITE: 240 Bay View Drive, adjacent to Westmouth Bay, in the community of Harkers Island, Carteret County Photo Index - 1989: 156-4 K-7 1984: 38-1213 L-12, M-13 1995: 49-586 0-13 State Plane Coordinates - X: 2731800 Y:356600 3. INVESTIGATION TYPE: CAMA only 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -6-2-99 Was Applicant Present - yes 5. PROCESSING PROCEDURE: Application Received - 6-2-99 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County Land Classification From LUP - Developed (B) AEC(s) Involved: EW, PTA (C) Water Dependent: yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - individual septic tanks Planned -none (F) Type of Structures: Existing - 19 boat slips, marine railway and gravel parking lot Planned - 23 new (G) Estimated Annual Rate of Erosion: 0' /yr Source - Personal observation 7. HABITAT DESCRIPTION: [AREA] TWPT)rrPTI rM T Vn nlpT=D (A) Vegetated Wetlands none (B) Non-Vegetated Wetlands Open water 12,500 s q. ft. (C) Other ?ij) i otal area Disturbed: 12,SUU sq. ft. (E) Primary Nursery Area: no (F) Water Classification: SA Open: no 8. PROJECT SUMMARY: The applicant is proposing to add one dock measuring 380' long x 5' wide, remove 3 side to slips and add 23 new perpendicular slips. FIELD INVESTIGATION REPORT: Rose Craft Marina/ Carteret County PAGE #2 9. NARRATIVE DESCRIPTION: Proiect Setting: The applicant's property is located at 240 Bay View Drive adjacent to Westmouth Bay in the community of Harkers Island, Carteret County. The property is approx. 7 acres in size, with approx. 80% being Coastal Wetlands, vegetated mainly with `Juncus roemerianus'. There is an existing marina basin which measures approx. 500' long x 150' wide with an entrance channel measuring approx. 800' long x 30' wide x -6'. The center line of the entrance channel splits the property between the applicant and Mrs. Lucita Mooney. The channel and basin were excavated prior CAMA regulations and has been maintained several times since it was originally dug (see Major CAMA Permit #170-73). The South side of the marina was bulkheaded several years ago. The north side is bordered by Coastal Wetlands and has never been bulkheaded. The high ground portion of the property is approx. 3-5' above Mean Sea Level. Historically the property has been used for a boat building facility and a marine railways. The boat building portion of the operation has closed but the owner still operates a marine railway where he hauls boats for repairs, sanding and painting. The applicant has 19 boat slips he rents out and Mrs. Mooney was permitted for 11 slips (see Major CAMA Permit #100-95), but only 9 slips were built. The applicant recently filled an area of Coastal Wetlands and a Notice of Violation was issued to him. The applicant restored the area to the saistifaction of this office and installed a retaining wall to prevent any material from reentering adjacent waters or wetlands. Waters at the project site have been classified as SA and are closed to the harvesting of shellfish. Water depths inside the basin average a minus 8' deep at Mean Low Water. Proiect Description: The applicant is proposing to replace the docks along the east side of the basin and add a new dock measuring approx. 380' long x 5' wide running parallel with the shore on the north side. Mr. Rose plans too remove the 3 side to docking and replace them with perpendicular slips. Approx. 27 new mooring pilings would be placed 20' beyond the new pier allowing for an additional 23 boat slips. The typical slip would measure 20' long x 20' wide. The typical boat would be 22'-40' in length. Anticipated Impacts: Approximately 12,500 sq. ft. of Estuarine Waters and Public Trust Areas would be usurped by the construction of the piers and boat slips. The piers would shade approx. 2,500 sq. ft. of Estuarine Waters and Public Trust Areas. Some increases in turbidity would be expected during the construction phase of the project, however one would expect this to be minium and very temporary in nature with no long term detrimental effects to the habitat. The shellfish sanitation office has indicated that 50 would be the total number of slips allowed in the basin without increasing the closure area. Including the 3 slips Mr. Rose plans to remove, this would limit the Rose property to 23 additional or 39 total slips. All of the proposed docks would be at least 15' from any riparian property lines. Both riparian property owners have written letters objecting to the proposed project. No further improvements including bulkheading or excavation is being proposed at the present time. Prepared by Charles O. Pigott June 3, 1999 FIELD INVESTIGATION REPORT: Rose Craft Marina/ Carteret County PAGE #2 9. NARRATIVE DESCRIPTION: Proiect Setting: The applicant's property is located at 240 Bay View Drive adjacent to Westmouth Bay in the community of Harkers Island, Carteret County. The property is approx. 7 acres in size, with approx. 80% being Coastal Wetlands, vegetated mainly with `Juncus roemerianus'. There is an existing marina basin which measures approx. 500' long x 150' wide with an entrance channel measuring approx. 800' long x 30' wide x -6. The center lire of the entrance channel splits the property between the applicant and Mrs. Lucita Mooney. The charnel and basin were excavated prior CAMA regulations and has been maintained several times since it was originally dug (see Major CAMA Permit #170-73). The South side of the marina was bulkheaded several years ago. The north side is bordered by Coastal Wetlands and has never been bulkheaded. The high ground portion of the property is approx. 3-5' above Mean Sea Level. Historically the property has been used for a boat building facility and a marine railways. The boat building portion of the operation has closed but the owner still operates a marine railway where he hauls boats for repairs, sanding and painting. The applicant has 19 boat slips he rents out and Mrs. Mooney was permitted for 11 slips (see Major CAMA Permit #100-95), but only 9 slips were built. The applicant recently filled an area of Coastal Wetlands and a Notice of Violation was issued to him. The applicant restored the area to the saistifaction of this office and installed a retaining wall to prevent any material from reentering adjacent waters or wetlands. Waters at the project site have been classified as SA and are closed to the harvesting of shellfish. Water depths inside the basin average a minus 8' deep at Mean Low Water. Proiect Description: The applicant is proposing to replace the docks along the east side of the basin and add a new dock measuring approx. 380' long x 5' wide running parallel with the shore on the north side. Mr. Rose plans too remove the 3 side to docking and replace them with perpendicular slips. Approx. 27 new mooring pilings would be placed 20' beyond the new pier allowing for an additional 23 boat slips. The typical slip would measure 20' long x 20' wide. The typical boat would be 22'-40' in length. Anticipated Impacts: Approximately 12,500 sq. ft. of Estuarine Waters and Public Trust Areas would be usurped by the construction of the piers and boat slips. The piers would shade approx. 2,500 sq. ft. of Estuarine Waters and Public Trust Areas. Some increases in turbidity would be expected during the construction phase of the project, however one would expect this to be minium and very temporary in nature with no long term detrimental effects to the habitat. The shellfish sanitation office has indicated that 50 would be the total number of slips allowed in the basin without increasing the closure area. Including the 3 slips Mr. Rose plans to remove, this would limit the Rose property to 23 additional or 39 total slips. All of the proposed docks would be at least 15' from any riparian property lines. Both riparian property owners have written letters objecting to the proposed project. No further improvements including bulkheading or excavation is being proposed at the present time. Prepared by Charles O. Pigott June 3, 1999 Form DCM-MP-1 APPLICATIONNI 0 2 1999 (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT xarkers Island, N. C. a. Landowner: Name Calvin Rose Address 240 Bay View Drive City Harkers Island State N. C. Zip 28531 Day Phone (252) 728-5774 Fax None b. Authorized Agent: Name Address City State Zip Day Phone Fax c. Project name (if any) Rose Craft Marina NOTE. Permit will be issued in name of landovmer(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Carteret c. Street address or secondary road number 240 Bavview Drive d. Is proposed work within city limits or planning jurisdiction? P" Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Westmouth Bay 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Pier extension in existing marina b. Is the proposed activity maintenance of an existing project, new work, or both? Addition to existing piers c. Will the project be for public, private or commercial use? Commercial and recreational d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Proposed pier additigns will lie within existing marina basin below the high water line with no land disturbance above the HWL. Piers will provide access to.21 additional boat slips on the east and north sides of the basin. Revised 03/95 Form DCM-MP-1 JUKE v1 2 199'9 4. LAND AND WATER CHARACTERISTICS m. Describe existing wastewater treatment facilities. Local system is septic tanks. No toilet facilities on site. Lot 9623: 2.17 ac (1008'x105') a. Size of entire tract Lot 0623: 2.11 ac (1008'x105 1)n. Lot 2615: 5.07 ac 931 x106') b. Size of individual lot(s) c. Approximate elevation of tract above MHW or NWL +3 to +5 d. Soil type(s) and texture(s) of tract Fine sand Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface run-off from parking area. o. Describe existing drinking water supply source. Town water system e. Vegetation on tract Native grass and low shrub f. Man-made features now on tract Existing marina basin with 28,boat slips and parking area (100'x300') g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: Conservation Transitional ? Developed Community Rural Other h. How is the tract zoned by local government? Community i. Is the proposed project consistent with the applicable zoning? ? Yes No (Attach zoning compliance cernficate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes ? No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes ? No 1. Are there wetlands on the site? ? Yes No Coastal (marsh) ? Other If yes, has a delineation been conducted? No; not (Anach documentation, if available) applicable because marina is existing and the proposed addition will not infringe on wetlands. • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by I V white paper. (Refer to Coastal Resources Commission Rule 7).02030 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Reviwd nl/" Form DCM-MP-1 llI\ J 4, ;___ 4. LAND AND WATER CHARACTERISTICS m. Describe existing wastewater treatment facilities. Local system is septic tanks. No toilet facilities on site. Lot 9623: 2.17 ac (1008'x105') a. Size of entire tract Lot 0623: 2.11 ac (10081x105')n. Lot 2615: 5.07 ac 931 x106') b. Size of individual lot(s) c. Approximate elevation of tract above MHW or NWL +3 to +5 d. Soil type(s) and texture(s) of tract Fine sand Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface run-off from parking area. o. Describe existing drinking water supply source. Town water system e. Vegetation on tract Native grass and low shrub f. Man-made features now on tract Existing marina basin with 28-boat slips and parking area (100'x300') g. What is the CAMA Land Use Plan land classification of the site? (Consult the toot Land use plms.) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: Conservation Transitional • Developed Community A copy of the deed (with state application only) or Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then community forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? ? Yes No (Attach zoning compliance certificate, if applicable) • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1/2" by 11" white paper. (Refer to done for the tract? Yes ? No Coastal Resources Commission Rule 7].0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes ? No Are there wetlands on the site? ? Yes No Coastal (marsh) >/ Other If yes, has a delineation been conducted? No; not (Attach documentation, if available) applicable because marina is existing and the proposed addition will not infringe on wetlands. Please note that original drawings are preferred and only high quality copies will be accepted. Blue-Iine prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the V^v;-d mroc Form DCM-MP-1 JUNI C 2 1999 site. Include highway or secondary road (SR) numbers, landmarks, and the like. N/A • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Address Phone N/A Owen and Lucita Mooney 256 Lake Shore Drive Pascoag, RI 02859 Name Charles C. Guthrie c/o Family Address P-O. Box 609 Phone Harkers Island, NC 28531 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None known • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained ;•i the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the _6 day of C\14,.?e, 19... Print Name Calvin Rose Signature 4?L" 2 ,, cvl"44 Z,ndo- r Authorized Agmlg Please indicate attachments pertaining to your proposed project. N/A DCM MP-2 Excavation and Fill Information N/A DCM MP-3 Upland Development N/A DCM MP-4 Structures Information N/A DCM MP-5 Bridges and Culverts t/ DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-INIP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) ? Commercial ,-Community Private (2) _ Number 014E-Proposed (3) Length 380 if (4) Width - -V . (5) Finger Piers Yes >/ No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes v,? No (i) Number (ii) Length (iii) Width (7) Number of slips proposed :3?RGS` (8) Proximity of structure to adjacent riparian property lines -See site plan (9) Width of water body (10) Water depth at waterward end of pier at Iv1LW or NWL 6' mLw b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length (3) Width Groin (e.g. wood, sheetpile, etc.) N/A (1) Number (2) Length(s) Breakwater (e.g. (1) Length wood, shwtpile, etc.) N/A (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands JJN ( z 199 : e. Mooring buoys N/A (1) Commercial -Community Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Moorina structure (boatlift, mooring pilings, etc.) N/A (1) _ Commercial -Community _ Private (2) Number (3) Length (4) Width g. Other (Give eorrDlele c!-s..:pdonJ Existing basin is 150' x 500' and has 28 existing slips and an existing marine railway L4urJe-H Ramp I) Le- App cant or Project frame ?P SignAturjr/ v t Date Form DChi-NIP-4 STRUCTU.]R'U.#S (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _? Commercial -Community Private (2) Number owE'Proposed (3) Length 980 if ' (4) . Width -9 (5) Finger Piers Yes >/ No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes 1/ No (i) Number (ii) Length (iii) Width (7) Number of slips proposed :Z3/RGS,F (8) Proximity of structure to adjacent riparian property lines See site plan (9) Width of water body (10) Water depth at waterw•ard end of pier at hfLW or NWL 6' MLW b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length (3) Width r c. Groin (e.g. wood, sheetpile, etc.) N/A (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL or wetlands (3) 1`•faximurn distance beyond MHW, NVWL or wetlands e. Mooring buoys N/A (1) Commercial -Community __ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Mooring structure (boatlift, mooring pilings, etc.) N/A (1) Commercial _Community _ Private (2) Number (3) Length (4) Width g. Other (Give com.plue d ..; :prior) Existing basin is 150' x 500' and has 28 existing slips and an existing marine railway L4uacH RAMP. App 'cant or Project Name -P Signaturl/ Z?x Date . Form DChi-MP-6 MARINA DEVELOPMENT (Required for the mooring of more than 10 vessels) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. MARINA CHARACTERISTICS a. Check below the type of marina proposed. ? Commercial ? Public Residential b. Will the marina be open to the general public? Yes No c. If there is residential development associated with the marina, how many units or lots are planned and how many are currently developed? N/A Check all of the types of services to be provided. ? Full service, including travel lift and/or rail Dockage, fuel, and marine supplies Dockage ("wet slips") only. _ Number of slips?'? ;-T'R .?.p _ Dry storage, - ` Number of boats-=-?9--=.3 .---F-:Z3- PROPOs_0__- V Boat ramp(s) s/ Other (describe) Exist. marine railway e. Check below the proposed type of siting. Exist. Land cut and access channel Open water with dredging for basin and/or channel Open water, no dredging required Other (describe) f. Describe the typical boats to be served (for example, open runabout, charter boats, sail boats, mixed types). Mixed types, mostly open commercial and recreational g. Typical boat length 1.999 22' h. Maximum boat length 40 1 i. Are any floating structures planned? No If so, describe -"f ?TF rC L T P_-Size 2. MARINA OPERATIONS Check each of the following sanitary facilities that will be included in the proposed project.. N/A Office toilets Toilets for patrons Number Location Showers Boat holding tank pumpout Type and location b. Describe treatment type and disposal location for all sanitary wastewater. No sanitary waste is presently accommodated and none is intended for immediate future. c. Describe the disposal of solid waste, fish offal. and trash disposal. All waste to be hauled away by owner. d. How will overboard discharge of sewage from boats be controlled? None allowed. owner continually monitors and reminds boaters. e. Give the location and number Discharge" signs proposed. At of marina. of "No Sewage each corner Revised 03/95 Form DCM-MP-6 Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. No industrial type operation is planned. Sanding waste is collected, packaged, and disposed. g. Where will residue from vessel maintenance be disposed of? Solid waste disposal b boat owner and by marina owner. 11 h. Give the number of channel markers and "No Wake" signs proposed. None proposed i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. None on-site j. Describe design measures that promote boat basin flushing or circulation and that reduce water quality impacts. Basin is existing and no change is proposed with this addition. k. What will be the marina policy on overnight and live-board dockage? None allowed. Is the proposed marina located near any shellfish leases? ? Yes No If yes, give the name and address of the leaseholder. Westmouth Bay Guyon Willis Carolina-Atlantic Seafood M. If this project is an expansion of an existing marina, what types of services are currently provided? None, except electrical and water. n. How many slips are now available? 19 FRose JUN 0 2 jq.y o. Is the marina proposed within a primary or secondary nursery area? Yes A` No p. Is the marina proposed within an area open to shellfish harvesting? Yes No On edge q. Give the location and number of "Pumpout Available" signs proposed. N/A Calvin Rose Ap 'cmt or Project Name knature/ Date Revised 03/95 Form DCM-NIP-6 f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. No industrial type operation is planned. Sanding waste is collected, packaged, and disposed. g. Where will residue from vessel maintenance be disposed of ? Solid waste disposal by boat owner and by marina owner. h. Give the number of channel markers and "No Wake" signs proposed. None proposed i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. None on-site j. Describe design measures that promote boat basin flushing or circulation and that reduce water quality impacts. Basin is existing and no change is proposed with this addition. k. What will be the marina policy on overnight and live-board dockage? None allowed. 1. Is the proposed marina located near any shellfish leases? k-1 Yes No If yes, give the name and address of the leaseholder. Westmouth Bay Guyon Willis Carolina-Atlantic Seafood m. If this project is an expansion of an existing marina, what types of services are currently provided? None, except electrical and water. M' n. How many slips are now available? 19? o. Is the marina popo ed within a primary or secondary nursery area? Yes k' No p. Is the marina proposed within an area open to shellfish harvesting? Yes No On edge q. Give the location and number of "Pumpout Available" signs proposed. N/A Calvin Rose ApBlic?at or Project Name - l/ signatum/ 9 Date Revised 03/95 !C (9,) s 7?- 4 y W z d? t i N t d.- i? w V\ m a a Le Y Lu (Ii q o ?- JOB NAME: G I i 4t, 1 ac '? Q ?n 0 u LL--L t J (?- p N 00 N M t. r D` sn G? o a ?S, -`t ??o I LU Id U t8 0 Vn V\ N 2 w?! 0 c ?I o . m -? DE?1 D _ ..__ROS.E?CRaFT:=.I?RIN4_?_-.- - _J DRAWN:J JOB N0, DESCRIPTION: SNEET 3A V APMP- 1-99 u vi Y to a? v vc ? 1>1 z w ?o d : a V o? 8? J W a v LLB ?t`? ? x C? Ul•- >> LLI 41- ,oQ? M Q > C'Hw ? ,?,Si? a T. ? osi t + s: Al P T JOB NAME: DESIGN: DATE: DESCRIPTION: -- - - - SHEET: _ MARINA LAYOL17 3 ???- -99 + ,GJ I Q 30 LLI N : koZ4 n C w _o Q ; off W• • b N z N = - ? ?? tea ?? ?t ?. N ?a +a . ?? Z t?•._- ? mot-- _ z t? fi? X ? ? L ' cr V w x ? Y• ;f Z ?.< _? Q , `!? L1 LLI x LX V\ y W Q ?: W ? _lu z a T ' x + 05 5?.4l.? it ^ ?o JOB NAME: p??????5 DESIGN: DATE: ' __ROSE-CR4?T =:1?1AR?N4------ --- - :: ---=??-1?ARi5EF,S-1?1:AND, Na.C..?._?_ DRAWN: JOB NO: DESCRIPTION: L POUT SHEET: O? __..- - MARI??tA- RAP-? _ 99 0 c 1999 doe-NAME , DDI?C?OFCQ -F A/ST--..LIP .? DESIGN: DATE: :.: ROSE.. CRAPT...... ? O.e JUN' ' 6, A?MDK M ;?W 57 c7R.?vr-- A' ?w nni?t: A V. V rT- l ON A L DA i- SZ __ DESIGN: DATc: - LY P t [Ql. _BDLTT?? t P - SNEE r _._ i) < < (t AMOK M4-\,V 45'r 4;ZF?4pr-- 4.=ki r ? ` ?` Po All Smyrna . ? :; . • ' Sft 33 jUN 0 21 1999 3 ' pb$m$ 4 _?, t, 2 f• 2 2} % Goon s!k ., r2q a' • 1?. i i Oi. ?. Z i a •- r 00 ? w.% •2 ^C ' i 3 = ±• a` ` 3 Gloucester sn I Mars all er ° 3 S `6Q $tralts • v. Crab Pt ••'>. °.?+ •tir- ':°4's d' Cable 6 ; ., 3• : Area $ e R P 3 I 2 I 4 .^ 2 2.Ss 1 ' I • ...... Grs All ti rSubm? 4n?y .,qq.. 2 ?? •SN.e ??M sn ?. 1 rs Vile / 1 1 2 2 i4 4 c:s PA IB 22 24 y ?•,. 9 ??? 1"48" 1/ yt• i } e IC 8 112 11 3 2 I 16 6 2 Submple PA Id PA 8 3 2 S Q p 2 .may\y'g? 8 19 II S 8 .......... I 1 2 4s'? 16 2 sn 4 ........•,?o' 4 9 14/ 2 s 3 PA/ ACS PA -6? c 3 .. 3 ....•• 13 9. 1 V? it 3....,, i 1 T `••ZT......? 19 10 Hankers Pc 4 lZ ?5 2S T i A= ?'1 S 2,F` - R2 ??Gesl 2 a bsms reo Cad 2 3 2 u 3 22 y° 6 S s 3 ue.n hrd -(??????? he Area' 3 j r 1 ry'?Y.•+•.3?`• =PilmgPA P 1 VPA _ 1 } -.J PA 4 PA / f 2 S PA Grs 2 3 NI ?f SNn .'M an d "WStmouth W? BRIDGE i 4 4 ?? HOR 0.36 Fr f 3 - Marth 4 VERT 0. 14 FT - z OWOPWRCAB 2 sn Bay 3 'BROWNS I ?` 4 Q% F2 4 1, ` Marsh 2 /I Pies Sl! 4 % 2 % Shl rep 19901 S `i H S R K J fr 2 4 R ?. ~ get 1 R E 1 r 2 SPIRE / / . r'•. 3 ?'t .:.. 2 4 3 1 2 t A'// 2 2 SPIRE T ;'.• , Al Z..sn I5 2 3 4 2 O aREerS s •s Lt3t411.1` ~>.,.?y 4 3 3 S14 `??(1 R 156: S 3 2 2 I 4 // 6 13 4 9 14 2 2 1 2 rs 2 ?r ` r T 52 4 9 Sh II 2 3 2 h LJ ??`• 4 ???%R 6 6 10 2 S 1 ?r S 8 4 y ?' •4• PA 4 l1 a S s_wosy3re8 1013 2 3 sn 4 4' 4 4 6 4 14 6 3 2 ?F/G I It s 4 2 I h'd S? 2 SU&M 1 nrd S 15 4 1 I 2SS /S aM.. 4 4 12 16 2 1 I PU? '° PA ?i 4 3 4 FI 4s 156 3M "2- 1 S 5 4 1 I 3 19 b 4 S 16 4 3 N o? 2 4 1 S 4 3 1 3 4 8 ?• rne IP 1 l 4 3 hrd 4p3 8 16 3 Oy -" 2 3 3 3 \5 AM',? 13D Pie 3 PA Run Flt 27 a c\Gp5 e -? I\?? ?dP 3 3 little nF JOB NAIdE ,&171- JTT D?'I,? _ _T DESIGN: DATE: -l0 99 ROSE :.CMFT.._.MAR-?-???. HANKS; S--AS:L"L?Np?_.1?1.-C_s_ DRAwN: JOB NO DESCRIPTION: SHEET. OF .S y ` - ?u M4'-y 20099 Atlas 06 Harkers Island School s? -Bayvie`v Dr I----?--*- 0 Feet 7 D1ST4wCE To NE1:P, S? SAND , R (\,?ZTEP, TA?l cC" 1996-1998 TravRouteg Sofhvare 511' ?Jil:' .. G i? Atlas U Tan V,6:- rank, NC ../\ f Harkers Island School ppp- R tot ?.. t?c5 S??- P419 mm- -?j L?ay ?,le`V 0 Feet it MMMML?? C 1996-1995 TravRoutet Software 511S VIC1f`1I Y _...-- _. ?15TA?iCF. To t?1ELP,=,? ,r?p1?I,?F \?l g iA?l? 42 425 c^-i 6 l?n U? C r? 199 %i (379A) 6675 ? 196, 11001 / / / 2718 / / (VIA) 3696 * IA) (2.11A) 1633 % 615 (226A) 9623 8621 / / / f / /iBOAT BASIN// , ...MooU ? n /2,0 - BAY VIEW DRIVE 5073 -aA43?w Q-- -- 5R 1419 Q-"A) 4686 / - I 1936 - I a 4946 s 2435 :3435 CARTERET I I COUNTY BOARD I I CF EDUCATION S 330 dOg NA?aE,?p ncl?7?T-l ESIGN: DATE: p5E- .6,;-T- ??fdF T1`l?- DR?wN: ,)oe No: DESCRIPTION p Vo SHEET ? ?. L`""-?-?-1 -???+ _ EV-MAY 20 -ie- PROHIBITED TERRITORY NORTH RIVER AREA CARTERET COUNTY Area E-6 (Map 28) (Prohibited areas are shaded) Revisions: 11/16/81,12/10/84, `t? ;.; 5/21/86, 7/3/89, 4/23/90, 3/16/94, 6/18/98, 6/29/98 E x ? 3 _ e , .'?,.. a ~•?-+q , . x ? • z , C z ? Q. ^ ' 00 . 12 z s _ , ,' 7. o J`` x ! c ?? R ` s 11mW?t6w i6irzo SZEA PRO"; G"ED AREA S (fz w ?•t. .: '.emu. - clrV 767 aY .....-•B80WN6 I. .. / Hq _ ";;-'-- ' •. :;.c• -: ? ? ay^i,,s-+?? _` •'•.r[: C?,?? AkLaRS ..«. LLD r w... , L-- ?`d4 /0 <. pTw NO PERSON SHALL TAKE OR ATTEMPT TO TAKE ANY OYSTERS, CLAMS OR MUSSELS OR POSSESS, SELL, OR OFFER FOR SALE ANY OYSTERS, CLAMS OR MUSSELS TAKEN FROM THE FOLLOWING AREAS, AT ANY TIME: (Description on back of sheet) PROHIBITED TERRITORY NORTH RIVER AREA CARTERET COUNTY Area E-6 (Map 28) (Prohibited areas are shaded) Revisions: 11/16/81,12/10/84, 5/21/86, 7/3/89, 4/23/90, 3/16/94, 6/18/98, 6/29/98 ?A D , pRo?jRg ?-' _ - C e AAA ? '.? . o 4- i AzeA ih TED AREA M _ U Yw .\ ="'i „_ •___ f^ n•u. ???' B•1 7 .....••SEOWN6 I. ac- 4p?;?FO O t?; NO PERSON SHALL TAKE OR ATTEMPT TO TAKE ANY OYSTERS, CLAMS OR MUSSELS OR POSSESS, SELL, OR OFFER FOR SALE ANY OYSTERS, CLAMS OR MUSSELS TAKEN FROM THE FOLLOWING AREAS, AT ANY TIME: (Description on back of sheet) (Map 28) (28) NORTH RIVER AREA (a) All those waters upstream of a line beginning on the east shore at 34° 48' 05" N - 76° 36' 26" W; thence across the River to a point on the west shore at 340 4749" N - 76° 37' 14" W. (b) Marshallberg Boat. Harbor - All those waters within the harbor at Marshallberg and extending beyond the dockage facilities 275 feet. (c) N.C. Shellfish Enterprises - All those waters within the docking facilities at N.C. Shellfish Enterprises and extending beyond the dockage facilities 275 feet. (d) Taylor's Boat Docks and Railway - All those waters within the canal at Taylor's Boat Docks and Railway and extending beyond the docking facilities 200 feet. (e) Ervins Marina - All those waters within Ervins Marina and extending beyond all docking facilities 275 feet. (fl L.R. Rose BoatWorks- All those waters within L.R. Rose Boatworks and extending beyond all docking facilities 200 feet. (g) Calvin Rose Boat Dockage - All those waters within the docking facilities at Calvin Rose Boat Dockage and extending beyond the docking facilities 275 feet. (h) Fulchers Bay - All those waters in Fulchers Bay west of a straight line beginning at a point on the southwest shore at 340 45'47" N - 76° 37'2011 W; thence to a point on the northeast shore at 340 45' 56" N - 76° 37' 11" W. (1) Cow Pen Creek - All those waters in Cow Pen (Newby) Creek upstream of a straight line beginning at a point on the north shore at 340 44'52" N - 76° 37' 18" W; thence to the south shore at 34° 44'27" N - 76° 37'23" W. Lennoxville Point Area - All those waters enclosed by a line beginning at a point 34° 43' 40" N - 76° 37' 04" W; thence in a straight line to Channel Marker #56A; thence in a straight line to Flashing Beacon #58; thence in a straight line back to the point of beginning. (k) Gaskill Creek - All those waters in Gaskill Creek upstream of a straight line beginning at a point on the west shore at 34° 43' 20" N - 76° 34' 10" W; thence to a point on the east shore at 34° 43' 20" N - 76° 34' 05" W. os Toe,, - - ------ tell 5Y, 'Y?'? { 1-7 61