Loading...
HomeMy WebLinkAboutNC0024406_Modification_20191212Permit NCO024406 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Duke Energy Carolinas, LLC is hereby authorized to: I . Continue to discharge: • Outfall 001: once through cooling water consisting of intake screen backwash, recirculating cooling water, station equipment cooling water and once -through cooling water. This outfall discharges to Belews Lake. • Outfall 003: Stormwater and remediated groundwater. This outfall discharges to Unnamed Tributary (UT) to Dan River. • Internal Outfall 002: FGD wastewater (discharging to line retention basin). • Outfall 003A/006. Discharge from the new Lined Retention Basin. Basin will accept wastes from holding basin, ash contact water, various sumps, coal pile runoff, stormwater runoff, cooling tower blowdown, FGD wastewater, and various low volume wastes such as boiler blowdown, oily waste treatment, wastes/backwash from the water treatment processes, coal pile collection basins (collecting contact stormwater from coal piles), plant area wash down water, cooling tower blowdown, equipment heat exchanger water, remediated groundwater, emergency overflow (rain in excess of designed storm event), toe drain (potential discharge to outfall 006 only), emergency release of anhydrous ammonia, release of ammonia during quarterly testing, and treated domestic wastewater. Outfall 003A discharges to UT to Dan River via the Outfall 003. Construction of new Outfall 006 has been completed. Outfall 006 will discharge to Dan River. This Outfall will be used for decanting and dewatering of the ash basin. • Outfall 005. This is a former stormwater outfall SW002, consisting of once through non -contact chiller water and stormwater. This outfall discharges to Belews Lake. • Internal Outfall 006A. This is a temporary internal outfall for decanting and dewatering of the ash basin, it will discharge through new Outfall 006. • Outfall 007 (lat. - 360 16'51.604"; long. 80003'52.995"). This is an emergency spillway for South Coal Basin. This outfall discharges to Belews Lake. The spillway is designed for a flood greater than 100-year event. Sampling of this spillway is waived due to unsafe conditions associated with sampling during overflow events. Page 1 of 2 Permit NCO024406 A. (4.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Internal Outfall 006A - dewatering/decanting) [15A NCAC 02B .0400 et seq., 02B .0500 et seq.] During the period beginning on the commencement of decanting and lasting until expiration of the permit, the Permittee is authorized to discharge from Outfall 006A Ash settling basin (Dewatering — removing the interstitial water. Decanting- decanting the free water above the settled ash layer). Such discharges shall be limited and monitored5 by the Permittee as specified below: PARAMETER LIMITS MONITORING REQUIREMENTS Monthly Average Daily Maximum Measurement Frequency Sample Type Sample Location Flow 2.0 MGD11 Daily Pump logs or estimate Effluent Oil and Grease' 15.0 mg/L 20.0 mg/L Weekly Grab Effluent Total Suspended Solids' 7 30.0 mg/L 50.0 mg/L Weekly Grab Effluent Total Arsenic Weekly Grab Effluent Chlorides, mg/L Weekly Grab Effluent Total Iron, mg/L10 1.0 mg/L 1.0 mg/L Weekly Grab Effluent Total Copper 211.3 Ng/L 231.4 Ng/L Weekly Grab Effluent Total Selenium 134.0 Ng/L 1,237 Ng/L Weekly Grab Effluent Total Molybdenum 4,289 Ng/L 4,289 Ng/L Weekly Grab Effluent Total Aluminum 174.2 mg/L 174.2 mg/L Weekly Grab Effluent Fluoride, mg/L Weekly Grab Effluent Chromium VI, Ng/L Weekly Grab Effluent Total Cadmium, Ng/L Weekly Grab Effluent Total Zinc, Ng/L Weekly Grab Effluent Total Nickel, Ng/L Weekly Grab Effluent Total Dissolved Solids, mg/L Weekly Grab Effluent Total Phosphorus, mg/L Monthly Grab Effluent Total Nitrogen (NO2 + NO3 + TKN), mg/L Monthly Grab Effluent Chronic Toxicity2 Monthly Grab Effluent pH3,8 Weekly Grab Effluent Bromides, mg/L Weekly Grab Effluent Total Lead 30.5 Ng/L 654.6 Ng/L Weekly Grab Effluent Total Thallium, Ng/L Weekly Grab Effluent Total Barium, mg/L Weekly Grab Effluent Sulfates, mg/L Weekly Grab Effluent Total Antimony, Ng/L Weekly Grab Effluent Total Mercury4, ng/L Weekly Grab Effluent Turbidity6, NTU Weekly Grab Effluent Total Hardness, mg/L Weekly Grab Effluent Ammonia9 1.0 mg/L 5.0 mg/L Variable Grab Effluent Notes: 1. Monitoring for TSS, oil and grease and all toxicants shall be performed concurrently with the Chronic Toxicity test. 2. Whole Effluent Toxicity shall be monitored by chronic toxicity (Ceriodaphnia) P/F at 3.7%. See Condition A. (14.) for details. 3. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units. 4. The facility shall employ method 1631E. 5. Please See Special Condition A. (23.). 6. The discharge from this facility shall not cause turbidity in the receiving stream to exceed 50 NTU. If the instream turbidity exceeds 50 NTU due to natural background conditions, the discharge cannot cause turbidity to increase in the receiving stream. Therefore, if the effluent measurement exceeds 50 NTU, the Permittee shall sample upstream and downstream turbidity in the receiving Page 2 of 2