Loading...
HomeMy WebLinkAboutNCG030246_Inspection_20170627Permit: NCG030246 SOC: County: Catawba Region: Mooresville Contact Person: Steve Street Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 11/01/12 Expiration: 10/31/17 Owner : Corning Optical Communications LLC Effective: Expiration: Facility: Hickory Manufacturing and Technology Center 1164 23rd St Se Inspection Date: 06/27/2017 Primary Inspector: James D Moore Secondary Inspector(s): Title: Certification: Hickory NC 28602 EntryTime: 10:OOAM Exit Time: 12:15PM Reason for Inspection: Routine Inspection Type Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Phone: 828-901-6695 Phone: Phone: Technical Assistance Page 1 of 3 Permit: NGG030246 Owner - Facility: Corning Optical Communications LLC Inspection Date: 06/27/2017 Inspection Type : Technical Assistance Reason for Visit: Routine Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Yes No NA NE ❑ ❑ ❑ ❑❑■❑ Comment: Monthly monitorinq has been ongoing at the site since September 2014. Corning has taken all reseaonable measures to evaluate sources of metals and TSS and has implemented several corrective actions to mitigate stormwater impacts (see Amec May 26, 2017 report). To further reduce potential TSS and metal impacts, the MRO recommends silt sack inlet protection for all yard inlets and curb inlets in the drainage area for ouffalls 2 and 3. Once implemented Corning can reduce the monthly monitoring requirements from monthly to quarterly. After 1 year we can meet again to review the data and next steps. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? Yes No NA NE ■❑❑❑ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ 1113 Comment: All outfalls were observed during the inspection. Based on a review of past monitoring data and site conditions, Corning could request representative site sampling status for ouffalls 3 and 5. In an effort to further reduce TSS discharged at outfalls 2 and 3, silt sack inlet protection is recommended for all yard inlets and curb inlets in the drainage area for outfalls 2 and 3. Page 3 of 3 Permit: NCG030246 Owner - Facility: Corning Optical Communications LLC Inspection Date: 06/27/2017 Inspection Type : Technical Assistance Reason for Visit: Routine Inspection Summary: Based on the site inspection, after silt sack inlet protection is implemented for outfalls 2 and 3, monthly monitoring can be reduced to quarterly.The MRO also recommends that representative outfall status be requested for outfalls 3 and 5. Page 2 of 3