Loading...
HomeMy WebLinkAboutNCC193005_ESC Approval Submitted_20191202 ROY COOPER Governor MICHAEL S.PECAN n.; n Secretary S.DANIEL SMITH NORTH CAROLINA interim Director Environmental Quality 110ctober 2019 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Oaks at Hunters Ridge,LLC ATTN: Mr. Michael Brown 5670 Anchor Dr. Granite Falls,N.C. 28630 RE: Project Name: The Oaks on fake Drive Acres Approved: 9.6 Project ID: BURKE-2020-004 County: Burke City: Morganton Address: Lake Drive&South Road River Basin: Catawba Stream Classification: Unnamed Tributary of Irish Creek, LIVS-I1I Submitted By: Mr.Ben Lail,EIT Date Received by LQS: 3 October 2019 Plan Type: Residential Dear Mr. Brown, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately,a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (N0I) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project.The NCI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NO1 form to Annette Lucas at Annette.lucas ncdenr. ov or Paul Clark at Paul.clark cdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for North Carolina Department oFEnvironmental Quality I Division oFEnergy,Mineral and Land Resources DI E L Asheville Regional Office I 2O90 U.S.Highway 70 1 Swannanoa,North Carolina 28778 Th012 HC�q !f noc,nmema menw,nuour 828.246.45O0 3 - Letter of Approval with Modifications and Performance Reservations Mr.Michael Brown 11 October 2019 Page 2 of 4 coverage under the NCGO1 permit. However,a $1.00 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B.0118(a)and the N CG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land- disturbance,as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Since 4W_J 'A Michael Smith Assistant Regional Engineer Land Quality Section Letter of Approval with Modifications and Performance Reservations Mr. Michael Brown 11 October 2019 Page 3 of 4 Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet ec: Mr. Ben Lail, EIT blail west-consultants.com cc: Regional Office file MODIFICATIONS AND PERFOP.MANCE RESERVATION Project Name: The Oaks on Lake Drive Project ID: BURKE-2020-004 County: Burke MODIFICATIONS On or before Thursday,the 24'th of October 2019 please provide to this office plan sheets and documentation in accordance with the following modifications: 1. Please add a note to the plans that if the same person conducts the land-disturbing activity and any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land-disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land-disturbing activity and any related borrow or waste activity are not conducted by the same person,they shall be considered separate land-disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one-use borrow site or through the Mining Act. (1SA NCAC 04B .0110). 2. Please add a note to the plans that graded slopes and fills shall be stabilized with a rolled erosion and sediment control product if completed outside of optimum germination seasons,when unfavorable conditions prevent the establishment of vegetative ground cover. {G.S. 113A-57 (3)1. 3. Please provide a list of the lot number and corresponding address for each of the 14 sites to be permitted. {G.S. 113A-54 (1)1. P 1 Letter of Approval with Modifications and Performance Reservations Mr. Michael Brown 11October 2014 Page 4 of 4 PERFORMANCE RESERVATION Please note that the developer is responsible for the control of sediment on-site. If the approved erosion and sediment control measures prove insufficient,the developer must take those additional steps necessary to stop sediment from leaving the site. Each sediment control device must be inspected after each storm event. Maintenance and/or cleanout is necessary anytime the device is at SO% capacity. {G_S. 113A-54 (1)1. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities CD 0 O arL CD a � 0 0 e Is GP EAI CD e+ * { o ' " � - Q U1 rr- rD ec CD ""� eD �p � CL rree