Loading...
HomeMy WebLinkAbout20191432 Ver 1_USACE Email_20191106Moore, Andrew W From: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil> Sent: Wednesday, November 6, 2019 10:58 AM To: Anna Priest Cc: Moore, Andrew W Subject: [External] Request for Additional Information - Rivercane, SAW-2019-02073 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> ClearWater Environmental Consultants, Inc. Asheville, NC 28801 Anna Priest, The Corps has received (October 17) and reviewed the submitted Pre -Construction Notification (PCN) application and supporting documents for the Rivercane industrial development project at 101 Mills Gap Road (PIN 9663-11-7979) in Fletcher, Henderson County, NC. Coordinates are 35.43591 N, 82.48674 W. The PCN request utilization of Nationwide Permits (NWP) 12 and 18 for authorization of 190 linear feet of proposed stream impacts and 0.09 acres of proposed wetland impacts. After review of the submitted PCN and supporting documents the Corps has the following comments and request for additional information. 1) After review the submitted documents and project plans, the Corps can authorize proposed stream impact S4 under NWP 12. All other proposed impacts may be authorized under NWP 18. The proposed volume of fill in waters of U.S. (WoUS) for stream impact S2 is 14.3 cubic yards. Please provide the proposed volume of fill in WoUS for impacts S1 and S3. 2) As proposed, the total permanent impacts to WoUS resulting in a loss of WoUS is 0.104 acres (0.09 acres of wetlands + 0.014 acres of stream). Under NWP 18 the discharge will not cause the loss of more than 1/10 an acre of WoUS. The proposed impacts to be authorized under NWP 18 do not meet the terms of this NWP. You should redesign the project to meet the terms NWP 18 or withdraw this request and resubmit the project under another NWP or resubmit the project under an Individual Permit. Please copy Andrew Moore with NC Department of Environment Quality, Division of Water Resources on your response to this request. At this time, the request to utilize NWP 18 for authorization of impacts to WoUS for this project is on hold until the above noted information is submitted. Once the Corps receives the information listed above we will be able to continue to process your application. If you have any questions please contact me. Sincerely, David Brown, PG Regulatory Specialist/Geologist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 david.w.brown@usace.army.mil