Loading...
HomeMy WebLinkAbout20181597 Ver 2_B4438_Permit_Drawings_20191205_20191210(Version 2.07; Released October 2016)38365.1.2TIP No.:B-4438County(ies):Brunswick Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future: Year:2039Existing: Year:Aquatic T&E Species?Comments:Yes NoNoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.THE EXISTING ROADWAY IS A TWO-WAY ALIGNMENT WITH 12' TRAVEL LAVES, 1' PAVED SHOULDER, AND 3:1 SLOPES. THE EXISTING BRIDGE HAS AN OUT TO OUT OF 25'5".2948JRECK@MOFFATTNICHOL.COMProject Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyN/ABuffer Rules in Effect:None1908THE PROPOSED ROADWAY WILL BE A TWO-WAY ALIGNMENT WITH 12' TRAVEL LANES, 2' PAVED SHOULDER, 6' GRASSED SHOULDER, AND 3:1 SLOPES. THE PROPOSED BRIDGE HAS AN OUT TO OUT OF 33' AND CLEAR ROADWAY OF 30'10" THE BRIDGE WILL HAVE TWO 12' TRAVEL LANES AND 3' WIDE SHOULDER ON THE NORTH SIDE AND 3'10'' WIDE SHOULDER ON THE SOUTH SIDE.Waterbody Information2019NCDWR Stream Index No.:38365.1.2Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Project consists of the replacement of Bridge #090047 in Brunswick County. The existing bridges carries NC 211 Green Swamp Road over Bear Pen Islands Swamp between Little Loop Road and Federal Road. The proposed structure for Bridge #090047 is a 39'' Box Beam bridge. The proposed alignment is upstream of the existing alignment. There are wetlands located within the project limits. STORMWATER CONTROLS: . The proposed bridge does not utilize deck drains. Runoff from the bridge roadway and paved shoulders at the bridge approaches drains into inlets. The stormwater is then diffused at a riprap pad outlet prior to discharging into Bear Pen Islands Swamp. Shoulders will be paved and then grassed except on the proposed bridges. Bank Stabilization is planned to prevent erosion of the streambanks.MOFFATT &NICHOLNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOT CENTURY CENTERAddress:General Project InformationB-4438WBS Element:Bridge ReplacementWBS Element:JEFF RECK,P.E.NCDOT Contact:(919) 707-65744700 FALLS OF THE NEUSE RD, SUITE 300RALEIGH, NC 27609Contractor / Designer:(919) 781-4626dstutts@ncdot.govRALEIGH NC 27610Address:11/6/2018BrunswickBaileyDavid Stutts1000 BIRCH RIDGE DRRiver Basin(s): City/Town:2.1Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)YesRURAL,AGRICULTURE, WOODSBear Pen Island Swamp15-7-31.80.403 MILESProject DescriptionProposed ProjectLumberSupplemental Classification: Swamp Waters (Sw) Wetlands within Project Limits?Revised 12/5/19 Revised 12/5/19 152025-L- 10 -Y1- -L- EXISTING R/W EXISTING R/WEXISTING R/W EXISTING R/W WOODS WOODS WOODS WOODS WOODS WOODS 8' SOIL GR AVE L GATE W P POST FO WITNESS WPWPPOST FO WITNESS POST FO WITNESSPOST FO WITNESS STATE OF NORTH CAROLINASTATE OF NORTH CAROLINA RED MOUNTAIN TIMBER COMPANY LLC POST FO WITNESS WALL TYP. WOOD WING MTL MTL MTL MTL 150' PUBLIC R/W GREEN SWAMP ROAD (NC 211) 27' BST LI TTLE LOOP ROADISLANDS SWAMPBEAR PENRED MOUNTAIN TIMBER COMPANY LLC (PRI VATE) 2 2 TB 2GI 15"15'' CL III30" CL IV 15"TB 2GI d 3: 1 B D ( Not to Scale) Flatter3:1 or SPECIAL LATERAL BASE DITCH FROM STA. 11+12 -Y1- RT TO STA. 11+32 Y1 LT FROM STA. 21+74 -L- TO STA. 22+00 -L- LT Slope Fill DETAIL C B= 4.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. Type of Liner= CL A Rip-Rap Ground Natural Geotextile Geotextile SURFACE WATERS & IMPACTS IN BANK STABILIZATION SITE 4 WETLANDS & IMPACTS IN FILL SLOPE SITE 2 WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED* ** * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SURFACE WATERS & IMPACTS IN BANK STABILIZATION SITE 4 E F WETLANDS & IMPACTS IN DRAINAGE OUTLET SITE 5 WETLANDS & IMPACTS IN DRAINAGE OUTLET SITE 6 WETLANDS & IMPACTS IN FILL SLOPE SITE 7 WETLANDS & IMPACTS IN BRIDGE REMOVAL SITE 3 WETLANDS & IMPACTS IN BRIDGE FILL SLOPE SITE 3 IMPACTS & NONMITIGABLE CUT DITCH SITE 2 F SURFACE WATERS & IMPACTS IN FILL SLOPE & CUT DITCH SITE 1 S S SURFACE WATER DENOTES IMPACTS IN TS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PE F-0105 (919) 781-4626 VOICE (919) 781-4869 FAX RALEIGH, NORTH CAROLINA 27609 4700 FALLS OF NEUSE ROAD, SUITE 300 N AD 83 / N A 2011NC GRIDHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4438 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_04_no_contours.dgnjdavenport8/17/99MATCH LINE -L- STA. 26+00.00 SEE SHEET 5GRAPHIC SCALE 0'50'50' SHEET 2 OF 18 PERMIT DRAWING V10= 1.2 FT/S Q10=14 CFS PRM-02 PSH-04 C F F F F F F F F F F F F F F F F F C C C C C C C C C C F F F F F C C C F F CC C C C C C C C C F Revised 12/5/19 3035-L- 8 :1 8:1 -L- EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS SAG=79.54' OVERHEAD POWER N 44°03'37" W 100.00'N 70°35'43" E149.14'EXISTING R/WTTT TT DIRPOST FO WITNESS INV=57.16'INV=56.20' 30" CMP EIP EIP 7' CHL S WP WP POST FO WITNESS POST FO WITNESSWP WP S STATE OF NORTH CAROLINA MEMBERSHIP CORP. ATLANTIC TELEPHONE RED MOUNTAIN TIMBER COMPANY LLC POST FO WITNESS MTL MTL 150' PUBLIC R/W GREEN SWAMP ROAD (NC 211) 27' BST ROAD NW (SOIL)FEDERAL 2 WETLANDS & IMPACTS IN FILL SLOPE SITE 7 IMPACTS & NONMITIGABLE FILL SLOPE SITE 7 WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED* ** * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PE F-0105 (919) 781-4626 VOICE (919) 781-4869 FAX RALEIGH, NORTH CAROLINA 27609 4700 FALLS OF NEUSE ROAD, SUITE 300 N AD 83 / N A 2011NC GRID HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4438 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_05_no_contours.dgnjdavenport8/17/99MATCH LINE -L- STA. 26+00.00 SEE SHEET 4GRAPHIC SCALE 0'50'50' SHEET 3 OF 18 PERMIT DRAWING V10= 1.4 FT/S Q10=11 CFS PRM-03 PSH-05 F F F F F F F F F F F F F F F F F F F F F F C F C F C F C F C F C F F F F F F F F Revised 12/5/19 Revised 12/5/19 Revised 12/5/19 5252525353545454 5555555 55555 5556 5656565656 5657 57 5757 5757 575757 57 575757 5757 57 5758 58 58 5858 58 5858 58585858585858585858585858 58585 8 58 585959 595959 59 59 59 595959595959 59595959 59 595960 606060606060 606060606060 606060606060 606 0 60 6060 6 0 6060 60 606060 60 60 6060606061 616161 6161 61 61616161 61 616161 6161 61 61616161 626262 62 62 6262626262 626262 62 62 6262626262626262 63 63 63636363 63 64 5252525353545454 5555555 55555 5556 5656565656 5657 57 5757 5757 575757 57 575757 5757 57 5758 58 58 5858 58 5858 58585858585858585858585858 58585 8 58 585959 595959 59 59 59 595959595959 59595959 59 595960 606060606060 606060606060 606060606060 606 0 60 6060 6 0 6060 60 606060 60 60 6060606061 616161 6161 61 61616161 61 616161 6161 61 61616161 626262 62 62 6262626262 626262 62 62 6262626262626262 63 63 63636363 63 64 5252525353545454 5555555 55555 5556 5656565656 5657 57 5757 5757 575757 57 575757 5757 57 5758 58 58 5858 58 5858 58585858585858585858585858 58585 8 58 585959 595959 59 59 59 595959595959 59595959 59 595960 606060606060 606060606060 606060606060 606 0 60 6060 6 0 6060 60 606060 60 60 6060606061 616161 6161 61 61616161 61 616161 6161 61 61616161 626262 62 62 6262626262 626262 62 62 6262626262626262 63 63 63636363 63 6420 2510 EXISTING R/W EXISTING R/W WOODS WOODS WOODS WOODS 8' SOIL GRAVE L GATE WP POST FO WITNESS WPWPPOST FO WITNESS STATE OF NORTH CAROLINA POST FO WITNESS WALL TYP. WOOD WING MTL MTL MTL MTLLITTLE LOOP ROADISLANDS SWAMPBEAR PENRED MOUNTAIN TIMBER COMPANY LLC (PRI VATE) 2 TB 2GI 15"15'' CL III30" CL IV 15"TB 2GI FROM STA. 11+12 -Y1- RT TO STA. 11+32 Y1 LTFROM STA. 21+74 -L- TO STA. 22+00 -L- LTType of Liner= CL A Rip-Rap SURFACE WATERS & IMPACTS IN BANK STABILIZATION SITE 4 WETLANDS & IMPACTS IN FILL SLOPE SITE 2 WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED* * * * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SURFACE WATERS & IMPACTS IN BANK STABILIZATION SITE 4 E F WETLANDS & IMPACTS IN DRAINAGE OUTLET SITE 5 WETLANDS & IMPACTS IN DRAINAGE OUTLET SITE 6 WETLANDS & IMPACTS IN FILL SLOPE SITE 7 WETLANDS & IMPACTS IN BRIDGE REMOVAL SITE 3 WETLANDS & IMPACTS IN BRIDGE FILL SLOPE SITE 3 IMPACTS & NONMITIGABLE CUT DITCH SITE 2 F SURFACE WATERS & IMPACTS IN FILL SLOPE & CUT DITCH SITE 1 S S SURFACE WATER DENOTES IMPACTS IN TS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PE F-0105 (919) 781-4626 VOICE (919) 781-4869 FAX RALEIGH, NORTH CAROLINA 27609 4700 FALLS OF NEUSE ROAD, SUITE 300 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4438 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_06_enlarged.dgnjdavenport8/17/99V10= 1.2 FT/S Q10=14 CFS N A D 83 / N A 20 1 1NC GRID MATCH LINE -L- STA. 26+00.00 SEE SHEET 5GRAPHIC SCALE 0'50'50' SHEET 6 OF 18 PERMIT DRAWING PRM-06 PSH-04 F F F C C C C C C C C C C F F F F F C C C F F CC C C C C C C C C F Revised 12/5/19 -L- 8 :1 8:1 EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS SAG=79.54' OVERHEAD POWER TT POST FO WITNESSWP WP STATE OF NORTH CAROLINA RED MOUNTAIN TIMBER COMPANY LLC POST FO WITNESS MTL MTL 2 WETLANDS & IMPACTS IN FILL SLOPE SITE 7 IMPACTS & NONMITIGABLE FILL SLOPE SITE 7 WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED* * * * ** * ** * * TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN55 55555556 56 5656565656 56 5656 5657 57575757 57 57575757 575757 57 57 5757575 7 5757 57575758585858 5858 5858585858 58585 8 5858 5858585959595959 5959 595959595959 59 59 59 5959 595 9606060606060606060 60606060606060606060 60 60 60 60 60 60 60 6060 6060606161616161 61 61 61 61616161616161 61 61626262626262 62 62 62 6262626363635555555556 56 5656565656 56 5656 5657 57575757 57 57575757 575757 57 57 5757575 7 5757 57575758585858 5858 5858585858 58585 8 5858 5858585959595959 5959 595959595959 59 59 59 5959 595 9606060606060606060 60606060606060606060 60 60 60 60 60 60 60 6060 6060606161616161 61 61 61 61616161616161 61 61626262626262 62 62 62 6262626363635555555556 56 5656565656 56 5656 5657 57575757 57 57575757 575757 57 57 5757575 7 5757 57575758585858 5858 5858585858 58585 8 5858 5858585959595959 5959 595959595959 59 59 59 5959 595 9606060606060606060 60606060606060606060 60 60 60 60 60 60 60 6060 6060606161616161 61 61 61 61616161616161 61 61626262626262 62 62 62 626262636363DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PE F-0105 (919) 781-4626 VOICE (919) 781-4869 FAX RALEIGH, NORTH CAROLINA 27609 4700 FALLS OF NEUSE ROAD, SUITE 300 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4438 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_07_enlarged.dgnjdavenport8/17/99V10= 1.4 FT/S Q10=11 CFS N AD 83 / NA 2011NC GRID MATCH LINE -L- STA. 26+00.00 SEE SHEET 4GRAPHIC SCALE 0'50'50' SHEET 7 OF 18 PERMIT DRAWING PRM-07 PSH-05 F F F F F F F F F F F F F F F F F F F F F F C F C F C F C F F F F F F Revised 12/5/19 20 30 40 50 60 70 15 16 17 18 19 20 21 22 23 24 2625 80 90 100 110 20 30 40 50 60 70 80 26 27 28 29 30 31 32 33 34 35 36 20 30 40 50 60 70 80 90 100 110 110 100 90 80 70 60 50 40 30 20 SHEET 8 OF 18 PERMIT DRAWING5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER PRM-08B-4438 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_08_profile.dgnjdavenportHORIZONTAL VERTICAL 50 1002550 10 20105 -L- FOR PLAN VIEW SEE SHEET 4 -L- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ELEV = 63.56' -L- STA 36+00.00 END GRADE PI = 26+80.00 EL = 66.20' (+)0.5690%(-)1.0612% VC = 250' K = 153 PI = 30+15.00 EL = 62.65' (-)1.0612%(+)0.3000% VC = 190' K = 140 PI = 34+60.00 EL = 63.98' (+)0.3000%(-)0.3000% VC = 100' K = 167 EL = 57.0032+25.00 -L- (LT)EL = 57.4135+90.00 -L- (LT)LEFT DITCH DITCH LEGEND (+) 0.1123% PI = 17+10.00 EL = 64.08' VC = 100' K = 166 ELEV = 63.36' -L- STA 14+70.000 BEGIN GRADE EL = 63.12' -L- STA 25+70.89, 74.82' RT BM #1 - R/R SPIKE SET IN 10" OAK -Y1- STA 11+63.47 -L- STA 21+50.80 (+)0.3000%(-)0.3026% PI = 21+00.00 EL = 62.90' (-)0.3026%(+)0.5690% VC = 130' K = 149 WSEL = 61.0' 50-YR WSEL = 61.6' 100-YR (-) 0.0614%EL = 57.63LEFT DITCH DITCH LEGEND EL = 57.3223+60.00 -L- (LT)18+55.00 -L- (LT)DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1400 = 50 = 1720 = 100 = 61.6 = 500+ = 62.5 = 57.7 -L- STA 24+73.88 BEGIN BRIDGE -L- STA 25+81.13 END BRIDGE NORMAL WSEL = 57.7' = 61.0 = 3400 = 04-26-2018 ELEV.=59.0 ELEV.=59.0 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1660 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 B-4438 -L- 2.5 5 19+00.00 18+50.00 18+00.00 17+50.00 17+00.00 16+50.00 PRM-09 SHEET 9 OF 18 PERMIT DRAWING 63.37 3:13:1 0.0200.020 63.36 3:13:1 0.0200.020 63.35 3:13:1 0.0200.020 63.34 3:13:1 0.0200.020 63.32WETLANDWETLAND 3:13:1 0.0200.020 63.23WETLAND 0.0200.020 3:157.60 6 .7 :1 3:1 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1660 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 B-4438 -L- 2.5 5 21+00.00 20+50.00 20+00.00 19+50.00 PRM-10 SHEET 10 OF 18 PERMIT DRAWING 63.15WETLANDWETLAND 0.0200.020 8:1 3:1 57.573:162.88 WETLANDWETLAND3:1 0.0200.020 3:157.54 12:1 62.34WETLANDWETLAND3:1 0.0200.020 57.513:112:1 62.17 WETLANDWETLAND0.0200.020 EL=62.66Y112:1 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1660 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 55 55 60 60 65 65 70 70 50 50 B-4438 -L- 2.5 5 21+50.00 23+50.00 23+00.00 22+50.00 22+00.00 PRM-11 SHEET 11 OF 18 PERMIT DRAWING 62.41 0.0170.017 EL=62.55Y112:1 59.17 3:1 0.0010.001 57.423:112:1 57.98 WETLAND3:1 0.0200.020 63.3257.393:114:1 57.31 WETLAND3:1 0.0380.038 63.3157.363:114:1 56.86 WETLAND3:1 0.0400.040 63.6157.333:115:1 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1655 55 60 60 65 65 70 70 75 75 50 50 55 55 60 60 65 65 70 70 50 50 55 55 60 60 65 65 70 70 50 50 B-4438 -L- 2.5 5 25+00.00 24+50.00 24+00.00 BEGIN BRIDGE PRM-12 SHEET 12 OF 18 PERMIT DRAWING 56.32 WETLANDWETLAND3:1 0.0400.040 63.9315:1 55.67 WETLANDWETLAND3:1 0.0400.040 64.2515:1 56.35 0.0400.040 WETLANDRevised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1655 55 60 60 65 65 70 70 75 75 50 50 55 55 60 60 65 65 70 70 75 75 50 50 55 55 60 60 65 65 70 70 75 75 50 50 B-4438 -L- 2.5 5 26+50.00 25+50.00 26+00.00 END BRIDGE PRM-13 SHEET 13 OF 18 PERMIT DRAWING 53.92 0.0400.040 WETLAND55.30WETLAND3:1 0.0400.040 11.5:1 55.43WETLAND3:1 0.0400.040 11:1 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1655 55 60 60 65 65 70 70 75 75 50 50 55 55 60 60 65 65 70 70 75 75 50 50 55 55 60 60 65 65 70 70 75 75 50 50 B-4438 -L- 2.5 5 28+00.00 27+50.00 27+00.00 PRM-14 SHEET 14 OF 18 PERMIT DRAWING 55.70WETLAND55.70 3:1 0.0400.040 11.4:1 56.23WETLAND3:1 0.040 12:1 0.040 56.73WETLAND3:1 0.022 12:1 0.022 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1650 50 55 55 60 60 65 65 70 70 75 75 45 45 50 50 55 55 60 60 65 65 70 70 75 75 45 45 50 50 55 55 60 60 65 65 70 70 45 45 B-4438 -L- 2.5 5 29+50.00 29+00.00 28+50.00 PRM-15 SHEET 15 OF 18 PERMIT DRAWING 57.85WETLAND3:1 0.0040.004 12:1 59.27WETLAND3:1 0.0150.015 12:1 60.40WETLAND3:1 0.0200.020 12:1 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1655 55 60 60 65 65 70 70 50 50 50 50 55 55 60 60 65 65 70 70 45 45 55 55 60 60 65 65 70 70 50 50 B-4438 -L- 2.5 5 31+00.00 30+50.00 30+00.00 PRM-16 SHEET 16 OF 18 PERMIT DRAWING 61.03WETLAND3:1 0.0200.020 12:1 61.95WETLAND3:1 0.0200.020 12:1 62.60WETLAND 12:1 3:1 0.0200.020 Revised 12/5/19 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 12/5/2019Q:\RA\9729-01\CADD\B4438\Hydraulics\PERMITS_Environmental\Drawings\B4438_hyd_prm_wet_09-17_xpl.dgnjdavenportPROJ. REFERENCE NO.SHEET NO.0 6/23/1650 50 55 55 60 60 65 65 70 70 45 45 60 60 65 65 70 70 55 55 60 60 65 65 70 70 55 55 55 55 60 60 65 65 70 70 50 50 B-4438 -L- 2.5 5 33+00.00 32+50.00 31+50.00 32+00.00 PRM-17 SHEET 17 OF 18 PERMIT DRAWING 62.82WETLAND 0.0200.020 3:1 8:1 62.96 WETLAND3:13:1 0.0200.020 62.99 3:10.0200.020 3.2:1 62.99 3:10.0200.020 3:157.06 3.2:1 Revised 12/5/19 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 18+30 LT TO 21+24 LT ROADWAY FILL & CUT DITCH 0.05 < 0.01 2 -L- 21+30 LT TO 24+65 LT ROADWAY FILL & CUT DITCH 0.13 0.01 0.05 < 0.01 3 -L- 24+65 LT TO 25+95 LT BRIDGE 0.04 < 0.01 0.03 0.05 4 -L- 24+98 TO 25+71 BANK STABILIZATION 0.10 129 5 -L- 22+32 RT TO 24+39 RT DRAINAGE OUTLET < 0.01 0.01 < 0.01 6 -L- 24+32 RT TO 24+72 RT DRAINAGE OUTLET < 0.01 < 0.01 7 -L- 25+90 LT TO 32+24 LT ROADWAY FILL 0.36 0.01 0.08 0.16 TOTALS*:0.53 0.03 0.12 0.05 0.27 0.10 129 *Rounded totals are sum of actual impacts NOTES: Revised 11/26/2019 SHEET 18 OF 18 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS BRUNSWICK COUNTY B-4438 38365.1.2 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 11/26/2019 0.03 acres of Temp Fill in Wetlands in the Hand Clearing areas for erosion control measures -L- 25+53LT TO 32+22 LT, Open Water Impacts (OWA) 0.17 ac Revised 12/5/19